Exhibit C. 2026 Work Order Bid Sheet.xlsx

XLSX spreadsheet 120 KB Posted

Attached to
RFP No 2026004 Fiber to the Premises (FTTP) Fiber Optic Construction Services
Solicitation number
S-R33123-00018104
Issued by
Wasco County, Oregon

About this file

This is a Work Order Bid Sheet for RFP No. 2026004 issued by the Northern Wasco County People's Utility District in Oregon for Fiber to the Premises (FTTP) fiber optic construction services. The project encompasses aerial and underground fiber network construction, including service drops and network equipment installation at customer premises. The bid sheet details comprehensive cost line items across four primary construction categories: aerial work (92,000 linear feet of strand installation, 106,000 linear feet of fiber optic cable placement, and 435 aerial storage loops); underground work (1,000 linear feet of trenched conduit, various boring and directional drill operations); splicing operations (3 large and 430 small fiber optic closures, with 2,400 individual fiber splices); and drop labor units (1,192 aerial drops, 1,000 buried drops via multiple installation methods, and 1,192 new service installations). Owner-furnished materials include splice cases, splitters, terminals, conduit, handholes, and customer premises equipment, while contractor-furnished materials encompass fiber optic cable in multiple configurations totaling approximately 348,400 linear feet, customer access points, and associated hardware.

Pricing for the project is structured on a unit cost basis with contractors required to complete each bid tab and submit responses in PDF format. All units include labor, equipment, and standard materials, with contractor reimbursement available at cost plus 15% for non-standard materials when written approval is obtained and supporting invoices provided. The bid sheet specifies that contractors may request compensation for standby or wait time only when authorized by the District representative prior to billing, with compensation explicitly excluding delays attributable to contractor deficiencies such as inadequate planning, material shortages, or equipment failures. No incumbent information, set-asides, funding sources, or contract term details are specified in this work order bid sheet document.

View the file

Other files

Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Network Build EXHIBIT C (Proposer to complete each tab, print and submitin PDF format) Work Order Bid Sheet RFP No: 2026004 Fiber to the Premises (FTTP) - Fiber Optic Construction Services

Work Order - Network Build: Job Name / Purchase Order Number
Site NameSite Address
Site POCContractor Total$ - 0Project Total$ - 0
Build Overview
Aerial
Cost ItemCodeUnitEstimated QtyUnit CostTotal CostDefinitionsAll units include labor, equipment, and materials not provided by owner. Contractor may seek reimbursement for materials not commonly associated with units, with written approval, which will be paid at cost plus 15%. This includes conditions when suitable soil or native soil is not allowed or readily available. Contractor must supply a copy of invoice.
Installation of Aerial Strand, including grounding bondsAPSFT92000$ 1.00$ 92,000.00APS-Placement of messenger wire to the required tension. All pole attachments, bonding and dead end framing is included. Strain Insulators are required in overhead guys and down guys pending on location. Documentation of new attachment height from ground and neutral is required
Place and Lash Fiber Optic Cable, including fiber tagsALSFT106000$ 1.00$ 106,000.00ALS-Any work required to secure fiber optic cable to a messenger wire, including overlashing of fiber cable, placement of storages (snow-shoes), placement of wind dampeners and coiling of fiber for splicing. LASHER is to ALWAYS have down pressure to prevent slipping and/or skipping. Unit includes bonding, strapping and cable management on the face of the pole. Straps and spacers will be uniform and placed per standards. No Tape is to be left on the fiber optic cable after lashing has been completed.
Place and Lash additional cable, including fiber tagsALS1FT1$ 1.00$ 1.00ALS1-Any work required to secure an additional fiber optic cable to a messenger wire, including overlashing of fiber cable, placement of storages (snow-shoes), placement of wind dampeners and coiling of fiber for splicing.
Delash & Relash Fiber CableALDFT1$ 1.00$ 1.00ALD-Complete the operation of delashing, retrieving slack, and relashing of the fiber optic cable. The removal, relocation, and completion of fiber storage assemblies and wind dampeners are required. The fiber may be relocated up to 60 feet in road widening situations. LASHER is to ALWAYS have down pressure to prevent slipping and or skipping. Unit includes bonding, strapping and cable management on the face of the pole. Straps and spacers will be uniform and placed per standards. No Tape is to be left on the fiber optic cable after lashing has been completed.
Fiber Placement, self supporting, ADSSCFOFT1$ 1.00$ 1.00CFO-Placement of ADSS fiber to required tension. The placement of required ADSS hardware, including dead ends, vibration dampeners, and storage assemblies are included. Refer to material specifications sheet for specific hardware and placing requirements.
Place New or Transfer crossarms wood or compositeARMEA5$ 1.00$ 5.00ARM-The placement and/or transfer of a cable arm. Wood arms will be 4’ arms, placement of braces included. Fiberglass arms up to 24” in length. Included in these units is the transfer or move of the existing or new attachment. Both ADSS and or Strand and lash attachment types are included
Place New Riser up to 2", with stand off bracketsARR2EA1$ 1.00$ 1.00ARR2-The placement, removal, and/or transfer of a new or existing conduit riser, transition from underground to aerial. Riser will be placed on standoff brackets, never mounted to the face of the pole. Conduits shall be capped at all times.
Place New Riser up to 4", with stand off bracketsARR4EA1$ 1.00$ 1.00ARR4-This unit include the placement, removal, and/or transfer of a new or existing conduit riser, transition from underground to aerial. Riser will be placed on standoff brackets, never mounted to the face of the pole. Conduits shall be capped at all times.
Anchor Placement NewPFEA140$ 1.00$ 140.00PF-Transfer, remove or placement of a new anchor to required depth. This scope of work includes all types of anchors including, plates, screw and or rock. Unit also includes transferring or replacement of down guy and bonding if required.
Anchor Placement New, Rock, SidewalkPFSEA1$ 1.00$ 1.00PFS-Transfer, remove or placement of a new anchor to required depth. This scope of work includes all types of anchors including, plates, screw and or rock. Unit also includes transferring or replacement of down guy and bonding if required.
Anchor Transfer and or RemovalPF1EA10$ 1.00$ 10.00PF1-Transfer, remove or placement of a new anchor to required depth. This scope of work includes all types of anchors including, plates, screw and or rock. Unit also includes transferring or replacement of down guy and bonding if required.
Place New 30' Class 4 PoleP30-4EA1$ 1.00$ 1.00P30-4, Place new 30' class 4 pole, unit includes providing the new pole, involves auguring a hole that is 5 feet deep (10% of the pole's height + 2 feet), backfilling with crushed rock or compacted native soil. Ensure the pole is perfectly vertical before and during the backfill process.
Place New 35' Class 5 PoleP35-5EA1$ 1.00$ 1.00P35-5, Place new 35' class 5 pole, unit includeds providing the new pole, involves auguring a hole that is 5.5 feet deep (10% of the pole's height + 2 feet), backfilling with crushed rock or compacted native soil. Ensure the pole is perfectly verticall before and during the backfill process.
Aerial Storage LoopPM69EA435$ 1.00$ 435.00PM69, An aerial fiber optic storage loop safely coils and stores excess cable on utility poles or messenger stands. It maintains the cable's minimum bend radius and provides slack for future repairs or maintenance splices.
Underground
Cost ItemCodeUnitEstimated QtyUnit CostTotal CostDefinitionsAll units include labor, equipment, and materials not provided by owner. Contractor may seek reimbursement for materials not commonly associated with units, with written approval, which will be paid at cost plus 15%. This includes conditions when suitable soil or native soil is not allowed or readily available. Contractor must supply a copy of invoice.
Trench 1 - 2" ConduitBTPFT1000$ 1.00$ 1,000.00BTP-Trenching and placement of conduit, warning signs, marker tape, suitable backfill material, soil compaction, and restoration as specified on the construction drawings and municipality permit up to 36" depth. This unit includes all fencing work, including temporary removal, restoration, and any surface restoration of gravel or sod. Unit includes proofing and roping of newly installed conduit when fiber isn’t to be pulled through conduit.
Trench 2 - 2" ConduitBTP1FT1$ 1.00$ 1.00BTP2-Placement of a 2nd conduit in the BTP trench. Unit includes proofing and roping of newly installed conduit when fiber isn’t to be pulled through conduit.
Rock Breaking or SawingBRPFT1$ 1.00$ 1.00BRP-Rock Trench and placement of conduit when rock conditions exist and approved by owner. Minimum 6” wide and up to 36” depth. The placement of buried cable warning marker tape, backfill, compaction tamping, and restoration as specified on the construction drawings. These units include all fence work, including temporary removal, restoration and replacement. Unit includes proofing and roping of newly installed conduit when fiber isn’t to be pulled through conduit.
Plow 1 - 2" ConduitBPPFT1$ 1.00$ 1.00BPP-Plow and placement of conduit, warning signs, market tape, suitable backfill material, soil compaction, and restoration as outlined on construction prints and municipal permitting up to 36" depth. Pre-ripping shall precede all plowing and be made in the same direction as the plow route at a minimum depth of 4 inches below the depth of HDPE/inner duct placement as noted in the Specifications and Construction Drawings. Minimum depth of 36” is required. All restoration is included to pre-existing conditions. Unit includes proofing and roping of newly installed conduit when fiber isn’t to be pulled through conduit.
Bore 1 - 2" ConduitBDBFT1$ 1.00$ 1.00BDB-Directional Drill, these units includes all work and access to bore site (including entry, exit and intermediate bore pits), Bore Profiles and material handling to directional bore the specified size up to 2” HDPE and or (2) 1 ¼”HDPE, to the depth and distance specified on the construction drawings. These units include the removal and proper disposal of any drilling fluids in accordance with the requirements of governmental authority.
Bore 1 - 4" ConduitBDB1FT1$ 1.00$ 1.00BDB1-This unit is to supply the terms of the BDB unit for up to 4" size hole
Bore Rock up to a 2" size holeBDRFT1$ 1.00$ 1.00BDR-Rock Directional Drill, these units shall apply only when the Contractor encounters rock that will not allow the bore to continue with a conventional boring head, and a rock directional boring machine is required. Owner approval is required prior to commencing work.
BDC Credit, 251 feet or aboveBDCFT1$ (1.00)$ (1.00)BDC-This is a per foot credit for work orders constructing beyond 251 feet for directional rock activities, any size. Applies to BDB, BDB1, and BDR units.
Rod and Rope pre-existing conduitBRRFT1$ 1.00$ 1.00BRR-This unit includes “rodding and roping” of any existing conduits or inner ducts. An appropriately sized mandrel shall be passed through each conduit/inner duct and a pull tape, pull rope, or detectable locatable mule tape shall be left in each vacant conduit and or inner duct. Pre-approval is required by owner for any conduit repairs. Unit is paid from wall to wall measurements and will require slack / storage in the vault or hand hole. This unit is only used on Pre-Existing Conduit, not installed under the trenching or boring units. All conduit shall include a locate wire if conduit doesn’t come with a pre-installed locate wire.
Pull or Blow Fiber Cable thru conduitBCDFT1000$ 1.00$ 1,000.00BCD-Pull or blow fiber optic cable through any size duct, and to seal and or plug all conduit(s) and inner duct(s). All opening and closing of vaults / hand holes and restoration is part of this scope. At no time will the cable be compressed over 200 pounds by blowing machine. If a blowing and capstan method of operations is used, the capstan shall not at any time pull over 600 pounds of tension to cable. Burden of proving equipment calibration is the Contractor’s responsibility. Fiber optic cable shall be coiled, racked and stored on cable shoes inside the vault. Unit is paid from wall to wall measurements, and will require slack / storage in the vault or hand hole. All conduit shall include a locate wire if conduit doesn’t come with a pre-installed locate wire.
Install Locate Wire, 500 feet or aboveUGLWFT1$ 1.00$ 1.00UGLW-Underground Locate Wire, this unit only applies on sections over 500 feet in length. Unit is to be paid by footage of conduit from wall to wall, vault to vault, or vault to building. Unit included using detectable mule tape or coated copper wire, pending on the engineering requirements. Slack is to be left in vault and building for easy access connections for locating equipment, and at times, attached to fiber marker per standards. All Unit is paid per conduit foot. Sections under 500' in length, pulling locate wire or detectable mule tape is included in the fiber pulling unit.
Handhole Placement, LargeBVMFT5$ 1.00$ 5.00BVM-Remove and/or install a pre-cast vault or hand hole per specified drawings. These units include excavation, placing the specified granular footing for the vault, placing the grounding system, ground rod, backfilling per specifications, setting new frames, racks and covers, running conduit into the hand hole and sealing the entrances with an industry accepted sealant or grout. Composite type bottomless vaults require 8” of base pea gravel and a rodent screen. Typical composite hand hole size is 30x48x48 (Large). See Material requirement attachment for specific details on materials included within the handhole. All cables and splice cases will be racked on cable shoes. Grounding is required in all vaults, see specifications for more details.
Handhole Placement, SmallBVMSFT1$ 1.00$ 1.00BVMS-Remove and/or install a pre-cast vault or hand hole per specified drawings. These units include excavation, placing the specified granular footing for the vault, placing the grounding system, ground rod, backfilling per specifications, setting new frames, racks and covers, running conduit into the hand hole and sealing the entrances with an industry accepted sealant or grout. Composite type bottomless vaults require 8” of base pea gravel and a rodent screen. Typical composite hand hole size is 17x30x30 (Small) and 30x48x48. See Material requirement attachment for specific details on materials included within the handhole. All cables and splice cases will be racked on cable shoes. Grounding is required in all vaults, see specifications for more details.
Handhole Placement, Flower PotBVMFFT20$ 1.00$ 20.00BVMF-Work necessary to install or remove at ground level one flower pot handhole per construction standards.
Install Fiber Marker PostFMPEA5$ 1.00$ 5.00FMP-Install Fiber Marker Post, and include locate wire and grounding to cable or handhole per specifications.
Asphalt RestorationBRASq. Foot1$ 1.00$ 1.00BRA-Saw cut, remove, and restore asphalt up to 6” depth, surface mix, sub‑base, gravel base, striping paint, and speed bumps, as detailed on construction drawings or as required on permits. The Unit includes labor for stone or gravel needed and compaction All pavement will be line cut or otherwise cut with an approved method to ensure only a minimum amount has to be replaced. When required by Federal, State, or Local regulations, the contractor will be allowed a cutback or “T-Cut” of paving at the unit prices for the applicable work. A “cutback" shall be defined as the cutting and removal of additional paved surface outside that which was cut and removed for the actual trench width requirement. After backfilling the Contractor shall keep all trenches and excavations in safe condition for vehicular and pedestrian traffic, until permanent paving has been completed. All materials to be removed shall be disposed of by the Contractor at a “recognized dump facility” in the area as designated by the local governing authority. Contractor shall invoice for gravel at a cost plus 15% and shall provide a copy of the invoice.
Concrete Remove & RestoreBRCSq. Foot1$ 1.00$ 1.00BRC-Saw cut, remove, and restore concrete up to 6” depth, including sub‑base, sidewalks, curbs, gutters, gravel base, reinforcement steel, striping paint, and speed bumps, as detailed on the construction drawings or as required on permits. The Contractor's price includes labor for stone or gravel needed and compaction. After backfilling the Contractor shall keep all trenches and excavations in safe condition for vehicular pedestrian traffic, until permanent paving has been completed. All materials to be removed shall be disposed of by the Contractor at a “recognized dump facility” in the area as designated by the local governing authority. This unit includes contractors cost for concrete.
Splicing
Cost ItemCodeUnitEstimated QtyUnit CostTotal CostDefinitionsAll units include labor, equipment, and materials not provided by owner. Contractor may seek reimbursement for materials not commonly associated with units, with written approval, which will be paid at cost plus 15%. This includes conditions when suitable soil or native soil is not allowed or readily available. Contractor must supply a copy of invoice.
New Fiber Optic Closure placement, largeSCCEA3$ 1.00$ 3.00SCC-Placement of a new fiber optic splice case enclosure, large. Also included are all tasks necessary to make the final placement/securing of cables and closures in manholes, hand holes or other structures, pumping the vault, testing for hazardous situations (i.e. – gas), ventilating the hole. Organizer tray assembly and all other tasks necessary to prepare Fiber Optic cables (OSP & ISP), securing the closure in the vault, grounding and cleanup of the work area. See Fiber Splicing Spec’s for further details.
New Fiber Optic Closure placement, small, including Green Hornet/Yellow Jacket terminalSCCSEA430$ 1.00$ 430.00SCCS-Placement of a new fiber optic splice case enclosure, small. Also included are all tasks necessary to make the final placement/securing of cables and closures in manholes, hand holes or other structures, pumping the vault, testing for hazardous situations (i.e. – gas), ventilating the hole. Organizer tray assembly and all other tasks necessary to prepare Fiber Optic cables (OSP & ISP), securing the closure in the vault, grounding and cleanup of the work area. See Fiber Splicing Spec’s for further details.
New Fiber Optic Closure placement, Cable Cut Mid-Entry Prep, including Green Hornet/Yellow jacket terminalSPREA350$ 1.00$ 350.00SPR-Cable Cut or Mid-entry Prep by removing the sheath at two ends, pulling back the sheath, cleaning the fibers, managing the lateral cable of the specified size, tray and cleaning fibers, and placing a new splice case. This unit is an adder to the SCC or SCCS unit. These units also include complete troubleshooting and repair (i.e. Clean-up & Re-splicing Attempts) that may arise during Acceptance Testing, i.e. Bi-directional OTDR and Power (Insertion Loss) testing as specified owner construction standards. See Fiber Splicing Spec’s for further details.
Splice and Test FiberHOEA2400$ 1.00$ 2,400.00HO-splices, complete one (1) single fusion splice of (2) fiber optic strands. These units also include fusion splicing/terminating of affiber cable to pigtail(s) in any case, panel, etc. These units also include complete troubleshooting and repair (i.e. Clean-up & Re-splicing Attempts) that may arise during Acceptance Testing, i.e. Bi-directional OTDR and Power (Insertion Loss) testing as specified in owner specifications. All Testing requirements are included in this unit. See Fiber Splicing Spec’s for further details. Splicing of fiber will be paid by the total quantity of fibers spliced per project Work Order.
Drop Labor Units
Cost ItemCodeUnitEstimated QtyUnit CostTotal CostDefinitions
Aerial Drop PlacementPLAFEA1192$ 1.00$ 1,192.00PLAF-This unit encompasses the labor, equipment, and materials required for the installation of an aerial flat fiber service drop, from the terminal to the home up to 250 linear feet. It encompasses the labor and materials essential for mounting a flat single fiber aerial service drop securely end to end using the manufacturer-recommended material and specifications, including slack loop placement and storage. This unit encompasses the labor, equipment, and materials required for the mounting of a single NID, and the termination of the fiber drop to include a fusion or mechanical splice.
Buried Drop Placement-Plow - Drop Duct 18/14MMBPP- sFT1000$ 1.00$ 1,000.00BPP-s- This unit covers the labor, equipment, and materials for installing an underground flat fiber service drop using a vibratory plow method. Unit includes all applicable restoration to return disturbed ground to original form prior to construction. This unit encompasses the labor, equipment, and materials required for the mounting of a single NID, and the termination of the fiber drop to include a fusion or mechanical splice. Includes installing grey smoke tube from the bottom of NID to conduit stub from ground level and applicable sealing/routing. The 18/14 innerduct will be supplied to the contractor for this work.
Buried Drop Placement -Trench - Drop Duct 18/14MMBTP- sFT1000$ 1.00$ 1,000.00BTP-s- This unit covers the labor, equipment, and materials for installing an underground flat fiber service drop using an open trenching method. Unit includes all applicable restoration to return disturbed ground to original form prior to construction. This unit encompasses the labor, equipment, and materials required for the mounting of a single NID, and the termination of the fiber drop to include a fusion or mechanical splice. Includes installing grey smoke tube from the bottom of NID to conduit stub from ground level and applicable sealing/routing. The 18/14 innerduct will be supplied to the contractor for this work.
Buried Drop Placement -Missile on private property - Drop Duct 18/14MMBDB - sFT1000$ 1.00$ 1,000.00BDB-s - This unit covers the labor, equipment, and materials for installing an underground flat fiber service drop using a missile bore. Unit includes all applicable restoration to return disturbed ground to the original form prior to construction. This unit encompasses the labor, equipment, and materials required for the mounting of a single NID, and the termination of the fiber drop to include a fusion or mechanical splice. Includes installing grey smoke tube from the bottom of NID to conduit stub from ground level and applicable sealing/routing. The 18/14 innerduct will be supplied to the contractor for this work.
Installation Of New ServiceINSTALLEA1192$ 1.00$ 1,192.00INSTALL - Furnish and install an exterior fiber pathway from the NID to the designated interior wall penetration point, including all required surface-mounting conduit, raceway, fittings, fasteners, transitions, penetrations, weatherproofing, fiber termination jack, and installation necessary to provide a continuous protected pathway around the exterior of the structure. Unit includes up to 50 linear feet of exterior pathway. This unit consists of all labor, equipment, and material needed for mounting the designated ONT. This unit includes connecting the ONT 12v power adaptor to an adjacent customer provided receptacle. Applicable troubleshooting and acceptance testing including documented power level reading is required. This unit includes connecting the WiFi router 12v power adaptor to an adjacent customer provided receptacle. This unit also includes the first 15 minutes of wait time coordinating with the District to turn up the customer ONT and WiFi router connections and verify connectivity. ONT and WiFi router will be supplied to the contractor for this install.
Additional Exterior Fiber Pathway Beyond The Included FootageHWRAPEA1$ 1.00$ 1.00HWRAP - Exterior Fiber Pathway (House Wrap) - Additional pathway beyond the included footage shall be paid per 50 linear foot increments.
Additional Aerial Drop Footage Beyond The Included FootagePLAF-AEA1$ 1.00$ 1.00PLAF-A – Additional aerial drop footage beyond the included footage shall be paid per 100 linear foot increments
Miscellaneous
Cost ItemCodeUnitEstimated QtyUnit CostTotal CostDefinitionsAll units include labor, equipment, and materials not provided by owner. Contractor may seek reimbursement for materials not commonly associated with units, with written approval, which will be paid at cost plus 15%. This includes conditions when suitable soil or native soil is not allowed or readily available. Contractor must supply a copy of invoice.
Outdoor Communications CabinetCABCLEA1$ 1.00$ 1.00CABLC-Installation of a universal broadband enclosure, generally 26x24x24 on a concrete pad or H frame. Cabinet shall be installed according to manufacturers specifications, and shall include grounding, pouring of the pad, and installation of the H frame if applicable. Electrical services are not included in this unit.
Traffic Control CrewTRALump Sum1$ 1.00$ 1.00TRA-Two person certified traffic control licensed individuals with required safety and traffic protection items. Unit is paid by the crew hour. Must be approved by owner prior to commencing work
Tree TrimmingTTSq. Foot1$ 1.00$ 1.00TT-Trimming of trees and branches to maintain a safe clearance between communications and utility lines, shall be paid by square foot
Standby / Wait TimeSTANDBYHR1$ 1.00$ 1.00STANDBY - Contractor Standby/Waiting Time - Compensation for contractor personnel and equipment required to remain on-site to perform authorized work when work cannot proceed due to circumstances beyond contractor's control, including customer access delays, utility coordination, inspection requirements, or other District-directed delays. Standby time must be authorized by the District representative prior to billing. Contractor shall not be compensated for delays resulting from inadequate planning, lack of materials, equipment failure, crew availability, or other conditions within the contractor's control. Unit does not include the first 15 minutes of wait time coordinating with the District to turn up customer ONT and WiFi router connections and verity connectivity.
Work Order Total
Total CostDefinitions
Construction Sub-Total
Owner Furnished Materials
Contractor Furnished Materials
Grand Total

Contractor Name:_______________________________Title:____________________________Signature:_________________________Date:__________________

&28DRAFT

Materials Work Order - Materials - RFP No.: 2026004 Fiber to the Premises (FTTP) - Fiber Optic Construction Services

Site NameSite Address
Site POC
Build Overview
Owner Supplied Materials
Cost ItemManufactorPart NumberQtyDefinitions
Splice Case, 432 Splices, LargeAFLAX-2-B-L-1-2-0-XApex Fiber Optic Closure, X-2 Size, With Basket, With Loaded Trays, 1 Trays, 2 Cable Entry Kits, O Grounds, No Inner Basket
Splice Case, 144 Splices, SmallAFLAX-1-B-L-1-1-0-XApex X-1 Splice Closure, X-1 Size, Tray Loaded with Splice Module, Cable Strain Relief, Zero Ground Lugs, No Basket
Small Tray, Small Splice ClosureAFLAX-TRAY-2S-2Apex X-2S Splice Tray, Fully Loaded with Splice Modules
Splice Tray, Large Splice ClosureAFLAX-TRAY-2-4Apex X-2 Splice Tray, Fully Loaded with Splice Modules
Splitters, Field PLC (1x8) (12 Pack)ChannellSPL1X08DNDNNPPKSplitter, 1x8 PLC 60X7X4 2M Ribbon Output 250 um (No Conn) (12 Pack)
Yellow Jacket Terminal, 1x8 SplitterChannellYJK016DA0NN0NNANYellow Jacket Terminal, 16 Drop Ports, (ONE) 1x8 Primary Splitter SC/APC, STD Seal, No Bond/Ground
Green Hornet Terminal, G5N, 1x8 SplitterChannellG5NSTA1DAONNONNNG5 Next Gen Splitter Terminal, No Grommet, (1) 1x8 Splitter SC/APC, (2) Splice Tray
Grommet Kit (12 Pack)ChannellGR06106407-49Grommet Kit, 1-1/2" (12-Pack) Figure-8 Slit Serrated (.4mm to .9mm) Cable OD
Single Flat Drop Grommet Kit 3/4"ChannellGR06116101-34Single Flat Drop Grommet Kit 3/4" (Pack of 72 Grommets) .188-.250" w/Lube
Aerial Bracket Hanger KitChannellAX-KIT-AERIAL-1Apex Closure Aerial Hanger Bracket Kit
Aerial Fiber markerTridentSA3SnapAround Cable Markers Aerial Fiber Tag 4"x7", Orange w/Black, Generic Label
PUPI ArmPUPITB2000060SPX2PUPI Tangent Crossarm Assembly, Series 2000, 60 in, Gray
Fiber Optic Storage System - Sno-Shoe 21"Multilink71221K21" Sno-Shoe w / Standard Tap Brackets 25.3"W x 33.0"L x 2.0"D, 11.5"
Conduit, 2 Inch HDPE, SDR9, Smooth out, Ribbed in20518508102" / SDR-9 / Regular / Straight Ribs / Orange / Orange / No Lube / Empty /Ink jet / Standar Print / Steel / SR 83x42 Wide / 2,000'
18/14mm Locatable DuctDuralinePOL HDPE18/14MMORG,SIL- TONABLE4,000 foot reels
End Caps for Innerduct, 18mm End CapDuralineDUR 20001485End Caps for Innerduct, 18mm End Cap
Handhole, Medium, 17x30, Tier 22ChannellBULKU1730240066818Bulk Utilities GLB, 1730,24 "D, QLife Logo, Shield Lid, Self-Lock
Handhole, Flower Pot, 12x12x12ChannellCHA SGL B01211001Handhole, Flower Pot
ONT, Residential, XGS PON ONTTBDTBD
WiFi RouterTBDTBD
Owner Approved Materials - To be supplied by contractor
Cost ItemManufactorPart NumberQtyDefinitions
1/4" EHS 6.6M Galvanized Strand (Guy or Messenger Wire) and associated attachment hardware92,000
ADSS, 48 CountAFL, Corning, Lightera, or Prysmian90,000ADSS, 12F, ITU G.652.D Bend Insensitive
ADSS, 96 CountAFL, Corning, Lightera, or Prysmian70,000ADSS, 12F, ITU G.652.D Bend Insensitive
1 Fiber Flat DropAFL, Corning, Lightera, or Prysmian298000
Customer Premises Fiber - 1 Fiber Ruggedized Cable89400
Field Splice On Connector/Pigtail - SC/APC4768This is the total required Field Splice On Connectors/Pigtails if both the 1 Fiber Flat Drop and the 1 Fiber Ruggedized cable are not pre-connectorized on either end
NID, 6" round, no splitterChannellHRN06P1S0NNC5B00001192HARTLAND ROUND TURTLE NID, 6", NO SPLITTER, (1) SC-APC, GREY, WALL MOUNT
Fiber Termination Jack1192

Contractor Name:_______________________________Title:____________________________Signature:_________________________Date:__________________ image1.png image2.svg