EXHIBIT C - Calculation of Self-Performed Work.docx

DOCX document 39 KB Posted

Attached to
Y1DA--Renovate Building 22 Construction | Project #595-15-201
Solicitation number
36C24421R0001
Issued by

About this file

This document provides details for a federal construction contract opportunity with the Department of Veterans Affairs. The solicitation will be for renovations to Building 22 at the Lebanon VA Medical Center in Pennsylvania, including demolition, construction, floors, ceilings, mechanical and electrical systems, with a period of performance not to exceed 545 calendar days from receipt of the notice to proceed. The total estimated value of the contract is between $2 million and $5 million. The solicitation will be set aside 100% for Service-Disabled Veteran-Owned Small Businesses. The NAICS code is 236220 and businesses must have average annual receipts of $39.5 million or less for the past three years to qualify as small. Questions regarding the solicitation are due by July 6, 2020 and the pre-bid conference will be held approximately one week after posting to the System for Award Management website. Offerors must be registered in SAM and verified by the Department of Veterans Affairs Center for Veterans Enterprise at the time of proposal submission to be eligible for award.

View the file

Other files

File Type Posted
AE-105 NEW SECOND FLOOR REFLECTED CEILING PLAN.pdf PDF
102123.pdf PDF
VA LEBANON RENOVATE BUILDING 22 - AE601 DOOR SCHEDULE - FRAME_ DOOR TYPES.pdf PDF
36C24421R0001 0001.pdf PDF
Geotech Memo Report (JULY 2019).pdf PDF
VA LEBANON RENOVATE BUILDING 22 - AE301 BUILDING SECTIONS.pdf PDF
VA LEBANON RENOVATE BUILDING 22 - I102 FINISH SCHEDULES.pdf PDF
317400 Micropiles.pdf PDF
AB-SDS-Wink-2019-GLOSS.pdf PDF
122492.pdf PDF
Wink-ProductSpecs-2019.pdf PDF
VA LEBANON RENOVATE BUILDING 22 - AE402 ENLARGED RESTROOM PLANS AND ELEVATIONS.pdf PDF
117300 REV.pdf PDF
VA LEBANON RENOVATE BUILDING 22 - AE401 ENLARGED RESTROOM PLANS AND ELEVATIONS.pdf PDF
J and A (Ceiling Lifts).pdf PDF
EXHIBIT E - Past Performance Questionnaire.docx DOCX document
WD PA20200093.pdf PDF
Bid Dwgs Part 1 - Building 22.pdf PDF
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
J and A (Secuirty System).pdf PDF
S02 Apendix C to 6500.6.pdf PDF
Bid Dwgs Part 2 - Building 22.pdf PDF
J and A (Fire Alarms).pdf PDF
EXHIBIT B - Subcontractor Information and Consent Form.docx DOCX document
J and A (HVAC Controls).pdf PDF
36C24421R0001.docx DOCX document
EXHIBIT A - Past Performance Relevancy Questionnaire.docx DOCX document
Combined Bid Specs Building 22.pdf PDF
J and A (Locksets).pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EXHIBIT C - CALCULATION OF SELF-PERFORMED WORK

EXHIBIT C - CALCULATION OF SELF-PERFORMED WORK

SUBMITTED in RESPONSE To: Request For Proposal 36C24421R0001

Use a format similar to the following to identify and calculate cost of the work to be self-performed. Refer to the definitions pertaining to “Self-performance of work”, “On the Site” and “Total amount of work to be performed under the contract”.

Explain in detail how you will perform the minimum percentage required (15% GC) with your own resources. Note: An offeror who has the capability to perform both as a General contractor and self-perform a major element of construction, for example, pre-fabricated concrete, may be afforded additional consideration in the evaluation. You should address your general self-performance capability.

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

Clearly describe the work to be self-performed:

Show Calculation of Self-Performed work:

B.1 Total Offer Price: $

B.2 If applying for consideration as a General Contractor subtract Specialty Trades (Unless being self performed)

B.3 Subtract G&A, home office overhead, prime contractor’s markups for profit, bond, state use tax, etc. ($)

B.4 Remainder is “Total amount of work to be performed under the Contract” = $

B.5 “Work to be self-performed”: = $ Amount shown on this line should match the amount shown for “Show Calculation of Self-Performed work”?

(Includes mobilization and utilization of owned or rented plant and equipment to be operated by the prime contractor’s own employees; only those materials which will be both purchased and installed by the prime’s own forces; labor associated with those aforementioned materials or equipment; only those supplies to directly support work performed by the contractor’s own employees; and the contractor’s own job overhead costs.)

B.6 15 % Self-performed Work = Line B.5 / B.4 X 100% = %

File details come from the government source that posted it. Updated .