This federal contract opportunity notice solicits proposals for construction services related to renovating Building 22 at the Lebanon VA Medical Center in Lebanon, Pennsylvania. The scope of work includes demolishing and constructing floors, ceilings, lighting, alarm systems, fire suppression, plumbing, HVAC, an elevator, electrical and IT cabling, doors, signage and other structural components. The period of performance is 545 calendar days from notice to proceed. The estimated value is between $2-5 million. This is a 100% service-disabled veteran-owned small business set-aside with a NAICS code of 236220 and size standard of $39.5 million. Proposals are due in response to solicitation number 36C24421R0001 issued by the Department of Veterans Affairs Veterans Health Administration VISN 4. The solicitation and amendments will be posted to SAM.gov and questions must be submitted in writing by the specified date. A pre-bid conference will be held after solicitation posting. Offerors must be registered in SAM and CVE at time of proposal submission to be eligible for award.

View the file

Other files

File Type Posted
AE-105 NEW SECOND FLOOR REFLECTED CEILING PLAN.pdf PDF
VA LEBANON RENOVATE BUILDING 22 - AE601 DOOR SCHEDULE - FRAME_ DOOR TYPES.pdf PDF
36C24421R0001 0001.pdf PDF
Geotech Memo Report (JULY 2019).pdf PDF
VA LEBANON RENOVATE BUILDING 22 - AE301 BUILDING SECTIONS.pdf PDF
VA LEBANON RENOVATE BUILDING 22 - I102 FINISH SCHEDULES.pdf PDF
317400 Micropiles.pdf PDF
AB-SDS-Wink-2019-GLOSS.pdf PDF
122492.pdf PDF
Wink-ProductSpecs-2019.pdf PDF
VA LEBANON RENOVATE BUILDING 22 - AE402 ENLARGED RESTROOM PLANS AND ELEVATIONS.pdf PDF
117300 REV.pdf PDF
VA LEBANON RENOVATE BUILDING 22 - AE401 ENLARGED RESTROOM PLANS AND ELEVATIONS.pdf PDF
EXHIBIT C - Calculation of Self-Performed Work.docx DOCX document
J and A (Ceiling Lifts).pdf PDF
EXHIBIT E - Past Performance Questionnaire.docx DOCX document
WD PA20200093.pdf PDF
Bid Dwgs Part 1 - Building 22.pdf PDF
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
J and A (Secuirty System).pdf PDF
S02 Apendix C to 6500.6.pdf PDF
Bid Dwgs Part 2 - Building 22.pdf PDF
J and A (Fire Alarms).pdf PDF
EXHIBIT B - Subcontractor Information and Consent Form.docx DOCX document
J and A (HVAC Controls).pdf PDF
36C24421R0001.docx DOCX document
EXHIBIT A - Past Performance Relevancy Questionnaire.docx DOCX document
Combined Bid Specs Building 22.pdf PDF
J and A (Locksets).pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Veterans Administration Medical Center 01-20

Lebanon, Pennsylvania

Renovate Building 22

503-314

CUBICLE CURTAIN TRACKS

10 21 23 - 1

SECTION 10 21 23

PART 1 - GENERAL

1.1 DESCRIPTION:

A. This section specifies cubicle curtain track (C.C.T.).

1.2 RELATED WORK:

A. Steel shapes for suspending track assembly: Section 05 50 00, METAL

FABRICATIONS.

B. Acoustical ceiling tile and suspension systems Section 09 51 00, ACOUSTICAL CEILINGS.

1.3 SUBMITTALS:

A. Submit in accordance with Section 01 33 23, SHOP DRAWINGS, PRODUCT

DATA, AND SAMPLES.

B. Samples:

1. 305 mm (12 inch) long piece of cubicle curtain track with carrier access and end stop.

2. Clip anchor for fastening track to grid system of acoustical ceilings.

3. Curtain carrier for attaching curtain to track.

C. Shop Drawings: Showing layout of tracks and method of anchorage.

D. Manufacturer's Literature and Data:

1. Cubicle curtain track.

1.4 DELIVERY, STORAGE AND HANDLING:

A. Deliver material in original package marked to identify the contents, brand name, and the name of the manufacturer or supplier.

B. Store in dry and protected location. Store so as to not bend or warp the tracks.

C. Do not open packages until contents are needed for installation, unless verification inspection is required.

1.5 WARRANTY:

A. Construction Warranty: Cubicle curtain tracks are subject to the terms of the Article “Warranty of Construction,” FAR clause 52.246-21.

1.6 APPLICABLE PUBLICATIONS:

A. The publications listed below form a part of this specification to the extent referenced. The publications are referenced in the text by the basic designation only.

10 21 23 - 2

B. ASTM International (ASTM):

B221-14.................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Shapes, and Tubes

B221M-13................Aluminum and Aluminum-Alloy Extruded Bars, Rods, Wire, Shapes, and Tubes (Metric)

B456-11.................Electrodeposited Coatings for Copper Plus

Nickel Plus Chromium and Nickel Plus Chromium

C. Aluminum Association (AA):

DAF 45-09...............Designation System for Aluminum Finishes

D. American Architectural Manufacturers Association (AAMA):

2603-13.................Voluntary Specification, Performance

Requirements and Test Procedures for Pigmented

Organic Coatings on Aluminum Extrusions and

Panels

E. The National Association of Architectural Metal Manufacturers (NAAMM):

AMP 500 Series..........Metal Finishes Manual

PART 2 - PRODUCTS

2.1 CUBICLE CURTAIN TRACKS:

A. Channel Tracks (Surface Mounted Type): Extruded aluminum, ASTM B221M (B221), alloy 6063, temper T5 or T6, channel shaped, with smooth inside raceway for curtain carriers.

C. Curtain Carriers: Nylon carriers, with nylon wheels on metal or nylon axles.

1. Equip each carrier with either stainless steel, chromium plated brass or steel hooks with swivel, or nickel chromium plated brass or stainless steel bead chain

2. Hook for bead chain may be the same material and finish as the bead chain or may be chromium plated steel.

3. Provide 2.2 carriers for every 305 mm (1 foot) of each section of each track length, plus one (1) additional carrier.

D. End Stop Connectors, Ceiling Flanges and Other Accessories: Fabricate from the same material with the same finish as the tracks or from nylon.

E. Hangers and Fittings: Fabricate from the same material with the same finish as the tracks. Hangers may be round or square for channel tracks and round for tubular tracks. Design fittings to be compatible with design of tracks and to safely transmit the track load to the hangers.

10 21 23 - 3

F. At end of each section of track, make provision for insertion and removal of carriers. Design to prevent accidental removal of carrier.

Provide operating mechanism shall be removable with common tools.

2.2 FASTENERS:

A. Exposed Fasteners, Screws and Bolts: Stainless steel or chromium/nickel plated brass.

B. Concealed Fasteners, Screws and Bolts: Stainless steel.

C. Metal Clips: Anchor curtain tracks to exposed grid of lay-in acoustical tile ceilings, with concealed metal (butterfly) type or two piece snap locking type ceiling clip of high strength spring steel.

1. When it is not possible to install the metal ceiling clip, the cubicle curtain track may be screwed to the ceiling grid.

2.3 FINISHES:

A. Aluminum: Finish numbers for aluminum specified are in accordance with

AA DAF 45. AA-C22A31 finish, chemically etched medium matte with clear anodic coating, Class II Architectural, .01 mm (0.4 mils) thick.

B. Chrome/Nickel Plating: Satin or polished finish, ASTM B546, minimum thickness of chromium plate as follows:

1. 0.005 mm (0.2 mil) on copper alloys.

2. 0.01 mm (0.4 mil) on steel.

C. Stainless Steel: No. 4 in accordance with NAAMM AMP 500.

D. Baked Enamel or Powder Coat Finish: AAMA 2603.

2.4 FABRICATION:

A. Weld and grind smooth joints of fabricated components.

B. Form tracks and bends of lengths that will produce the minimum number of joints. Make track sections up to 4877 mm (16 feet) without joints.

Form corner bend on a 305 mm (12 inch) radius.

C. Provide steel anchor plates, supports, and anchors for securing components to building construction.

D. Form flat surface without distortion.

E. Shop assemble components and package complete with anchors and fittings.

PART 3 - EXECUTION

3.1 INSTALLATION:

A. Install tracks after finish painting and ceiling finishing operations are complete.

10 21 23 - 4

B. Install track level and hangers plumb and securely anchor to the ceiling to form a rigid installation.

C. Anchor surface mounted curtain tracks directly to exposed grid of lay-in acoustical tile ceilings with suitable fasteners, spaced approximately 610 mm (24 inches) on center.

D. Anchor surface mounted curtain tracks to concrete, plaster and gypsum board ceilings with a minimum of 3 mm (1/8-inch) diameter fastenings or concealed clips spaced not more than 914 mm (3 feet) on center.

E. Install suspended track 2210 mm (87 inches) above the finished floor, with hangers spaced no more than 1219 mm (4 feet) on center. At ceiling line, provide flange fittings secured to hangers with set screws.

Secure track to walls with flanged fittings and to hangers with special fittings.

F. Fasten end stop caps to prevent them from being forced out by the striking weight of carriers.

G. Remove damaged or defective components and replace with new components or repair to the original condition.

H. Install track rigid, plumb, level and true, and securely anchored to the overhead construction.

I. Verify that carrier units operate smoothly and easily over the full range of travel.

- - - E N D - - -