This document includes a reflected ceiling plan drawing and related federal contract opportunity notice. The reflected ceiling plan drawing depicts the proposed second floor layout and ceiling design for the renovation of Building 22 at the Lebanon VA Medical Center in Lebanon, Pennsylvania. Key elements in the ceiling plan include various lighting fixtures, ceiling tiles, speakers, cameras, exhaust vents, and other mechanical features.

The related federal contract opportunity is a solicitation notice for construction services for Project 595-15-201 to renovate Building 22 at the Lebanon VA Medical Center. The construction scope of work involves demolition, construction, and installation of floors, lighting, ceilings, alarm systems, fire suppression, vertical transportation, plumbing, cabling, HVAC, and other structural components as defined in the drawings and specifications. The contract type is firm-fixed price with a period of performance not to exceed 545 calendar days. The solicitation will be set aside and awarded to a verified Service-Disabled Veteran-Owned Small Business. The estimated construction cost is between $2-5 million. The solicitation is expected to issue on July 6, 2020.

View the file

Other files

File Type Posted
102123.pdf PDF
VA LEBANON RENOVATE BUILDING 22 - AE601 DOOR SCHEDULE - FRAME_ DOOR TYPES.pdf PDF
36C24421R0001 0001.pdf PDF
Geotech Memo Report (JULY 2019).pdf PDF
VA LEBANON RENOVATE BUILDING 22 - AE301 BUILDING SECTIONS.pdf PDF
VA LEBANON RENOVATE BUILDING 22 - I102 FINISH SCHEDULES.pdf PDF
317400 Micropiles.pdf PDF
AB-SDS-Wink-2019-GLOSS.pdf PDF
122492.pdf PDF
Wink-ProductSpecs-2019.pdf PDF
VA LEBANON RENOVATE BUILDING 22 - AE402 ENLARGED RESTROOM PLANS AND ELEVATIONS.pdf PDF
117300 REV.pdf PDF
VA LEBANON RENOVATE BUILDING 22 - AE401 ENLARGED RESTROOM PLANS AND ELEVATIONS.pdf PDF
EXHIBIT C - Calculation of Self-Performed Work.docx DOCX document
J and A (Ceiling Lifts).pdf PDF
EXHIBIT E - Past Performance Questionnaire.docx DOCX document
WD PA20200093.pdf PDF
Bid Dwgs Part 1 - Building 22.pdf PDF
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
J and A (Secuirty System).pdf PDF
S02 Apendix C to 6500.6.pdf PDF
Bid Dwgs Part 2 - Building 22.pdf PDF
J and A (Fire Alarms).pdf PDF
EXHIBIT B - Subcontractor Information and Consent Form.docx DOCX document
J and A (HVAC Controls).pdf PDF
36C24421R0001.docx DOCX document
EXHIBIT A - Past Performance Relevancy Questionnaire.docx DOCX document
Combined Bid Specs Building 22.pdf PDF
J and A (Locksets).pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

2 X 4 VOLUMETRIC LED LIGHT FIXTURE

EMERGENCY LIGHTING

2 X 2 VOLUMETRIC LED LIGHT FIXTURE

EMERGENCY LIGHTING

SUPPLY AIR DIFFUSERS

RETURN AIR DIFFUSER

4" LED DOWN LIGHTLIGHT FIXTURE

EXIT LIGHT

2 X 4 VOLUMETRIC LED LIGHT

FIXTURE

2 X 2 VOLUMETRIC LED LIGHT

FIXTURE

DRYWALL

CEILING

2 x 2 ACOUSTIC

CEILING TILE

REFLECTED

CEILING LEGEND

S

M

C

SPEAKER - CEILING MOUNTED

CAMERA - CEILING MOUNTED

MICROPHONE - CEILING MOUNTED

PROJECTOR - CEILING MOUNTED

EXHAUST AIR DIFFUSER

4' LONG LENSED LED STRIP LIGHT

WITH DIFFUSE LENS

MULTI-FUNCTION LED BED LIGHTING

FIXTURE

4' LED PENDANT LIGHT FIXTURE

SECOND FLOOR RCP NOTES:

1. ALL CEILINGS TO BE 8'-0" AFF UNLESS OTHERWISE NOTED.

2. ALL BULKHEADS AT EXTERIOR WALLS TO BE 7'-10" AFF

3. ALL CEILINGS AT EXISTING STAIRS TO REMAIN

4. SEE FINISH SCHEDULE FOR FINISH AND PAINT COLORS.

5. SEE ELECTRICAL DRAWINGS FOR LIGHT LOCATIONS AND

DETAILS.

6. SEE MECHANICAL DRAWINGS FOR LOCATIONS AND DETAILS.

1 2 3 4

7 8

11 12 13 14

A

B

C

D

E

F

G

H

OFFICE

OFFICE

OFFICE

IT

OFFICE

EQUIPMENT

MULTI-PURPOSE

CONTROL B

MULTI-PURPOSE

SIM LAB - BSIM. LAB - A TRAINING ROOM - A TRAINING ROOM - B

COMPUTER ROOM

EQUIPMENT

HAC

STORAGE/

EQUIPMENT

TRAINING ROOM - C

STORAGE

WOMENS TOILET

MENS TOILET

CHANGING ROOM CHANGING ROOM

LOBBY

WAITING / LOUNGE

UTILITIES

STORAGEBREAK ROOM

WORK AREA

UP DN

UPDN

UP

DN

EXIST

IT

EXIST

ELEV

NEW

ELEV

EXIST

H.A.C.

BULKHEAD

@ 7'-10"

BULKHEAD

@ 7'-10"

BULKHEAD

@ 7'-10"

BULKHEAD

@ 7'-10"

SIM LAB - A & SIM LAB - B

1. UNISTRUT OR EQUAL GRID ONLY, NO

TILE. OPEN TO ABOVE

2. NEW WALLS ENCLOSING THESE ROOMS

ARE TO RUN UP TO DECK AND SEAL

A.F.F.

9'-0"

A.F.F.

9'-0"

A.F.F.

9'-0"

A.F.F.

9'-0"

A.F.F.

9'-0"

A.F.F.

9'-0"

A.F.F.

9'-0"

A.F.F.

9'-0"

A.F.F.

9'-0"

A.F.F.

9'-0"

A.F.F.

9'-0"

A.F.F.

9'-0"

AE104

TYPICAL

AE105

BULKHEAD

7'-10" A.F.F., TYP.

CHASE

AE501

A.F.F.

9'-0"

PRIVACY CURTAIN TRACK HUNG FROM ALL-THREAD

ATTACHED TO STRUCTURE ABOVE.11 73 00.A1

PRIVACY CURTAIN

TRACK HUNG FROM

ALL-THREAD ATTACHED

TO STRUCTURE ABOVE.

AE501

140 SF

CONTROL A

A.F.F.

8'-0"

A.F.F.

8'-0"

S M CC M

SMC CM

SMC CM

S M CC M

SMC CM

SMC CM

S

M

C

MC

MS S

M S S

M S S

MS S

M S S

M S S

M S

M S

M S

S

M

S

S

M

S

S

M

S

S

M

S

S

S

S

M

S

S

S

M

S

S

S

M

S

S

M

S

S

M

S

S

M

S

M

TOILET PARTITION

CEILING MOUNTED

TOILET PARTITION

CEILING MOUNTED

THIRD FLOOR

568'-0"

09 22 16.B3

ATTACH TO

STRUCTURE

ABOVE

1' -0

09 29 00.B1

A.F.F.

8'-0"

7'-10" A.F.F.

09 51 00.A1

Project Title

DE

PA

RT

M

EN

T

OF

VE

TE

RA

NS

A

FF

AI

RS

Drawing Title Date

Project No.

Drawing No.

Dwg. Of

Approved: Associate Director for Operations:

Approved: Director, Medical Center:

Drawn:Building No: Checked:

Location:

Additions:

Revisions:

1 5 6 7 8

21 3 4 5 6 7 8

A B

C D

E on e-qu ar te r i nc h on e fo ot on e-ei gh th in ch o ne fo ot th re e-ei gh th s in ch o ne fo ot on e-ha lf in ch o ne fo ot on e an d on e ha lf in ch o ne fo ot on e in ch o ne fo ot th re e-qu ar te rs in ch o ne fo ot th re e in ch es o ne fo ot

DELLC

JOB No.

LEBANON VA

MEDICAL CENTER

LEBANON, PA

2 3 4

Consultants:Date

Bel Air, Maryland 21015-1457 2215 Conowingo Rd, Suite 100 fax 410.836.6611 410.803.0009

ARCHITECTURE

PLANNING

ENGINEERING

BID DOCUMENTS

FULLY SPRINKLERED

& ASSOCIATES, INC.

BURDETTE KOEHLER MURPHY

RICKERT ENGINEERING, INC.

BUILDING COST CONSULTANTS

COST ESTIMATING

12917 - 30TH AVENUE

PLATTSMOUTH, NEBRASKA 68048

402.298.8260 - FAX 402.298.8290

MECHANICAL / ELECTRICAL

CONSULTING ENGINEERING

1416 CLARKVIEW ROAD

BALTIMORE, MARYLAND 21209

410.323.0600 - FAX 410.377.2543

STRUCTURAL ENGINEERING

8813 WALTHAM WOODS ROAD, SUITE 301

BALTIMORE, MARYLAND 21234

410.663.5110 - FAX 410.663.5114

FIRE PROTECTION ENGINEERING

8815 CENTRE PARK DR., SUITE 200

COLUMBIA, MARYLAND 21045

410.750.2246 - FAX 410.750.2588

KOFFEL ASSOCIATES, INC.

WHITMAN, REQUARDT &

ASSOCIATES, LLP

CIVIL ENGINEERING

801 SOUTH CAROLINE STREET

BALTIMORE, MD 21231

410.235.3450 - FAX: 410.243.5716

ROBERT L. SEYMOUR & ASSOCIATES, INC.

VERTICAL TRANSPORTATION CONSULTANTS

182 THOMAS JOHNSON DR. SUITE 200

FREDERICK, MARYLAND 21702

301.662.8112 - FAX 301.662.8117

1SOURCE SAFETY AND HEALTH

ASBESTOS CONSULTANT

140 SOUTH VILLAGE AVENUE, SUITE

EXTON, PA 19341

610.524.5525 - FAX: 610.524.0565

I CERTIFY THAT THESE DOCUMENT WERE

PREPARED OR APPROVED BY ME, AND THAT I

AM A DULY LICENSED ARCHITECT UNDER THE

LAWS OF THE STATE OF PENNSYLVANIA,

LICENSE NUMBER 407296, EXPIRATION DATE

06/30/21

NEW SECOND FLOOR

REFLECTED CEILING PLAN

LEBANON RENOVATE

BUILDING 22

CDP/ CAJ JSK/ DGW

1700 S. LINCOLN AVE, LEBANON, PA 17042

01/24/2020

AE105

595-15-201

170801D

SCALE: 1/8" = 1'-0"

4'-0" 8'-0"0 16'-0"

PLAN NORTH

TRUE NORTH

SCALE: 1/8" = 1'-0"AE105

1 SECOND FLOOR REFLECTED CEILING PLAN

SCALE: 1 1/2" = 1'-0"AE105

2 TYPICAL BULKHEAD AT CORRIDORS

KEYNOTE LEGEND

DIVISION DESCRIPTION

09 22 16.B3 3 5/8" METAL STUD @ 16" OC

09 29 00.B1 5/8" GYPSUM WALLBOARD - 1 LAYER

09 51 00.A1 ACT 2'-0" X 2'-0"

11 73 00.A1 625 LB CAPACITY PATIENT LIFT SYSTEM FROM BED TO TRAINING BATHROOM - CEILING MOUNTED

SCALE:1 1/2"=1'-0"

4" 8"0 16"

Sheets
AE105 - NEW SECOND FLOOR REFLECTED CEILING PLAN

File details come from the government source that posted it. Updated .