Combined Bid Specs Building 22.pdf

PDF 11 MB Posted

Attached to
Y1DA--Renovate Building 22 Construction | Project #595-15-201
Solicitation number
36C24421R0001
Issued by

About this file

This is a solicitation for construction services to renovate Building 22 at the Lebanon VA Medical Center in Lebanon, Pennsylvania. The scope of work includes demolition, construction of floors, lighting, ceilings, alarm systems, fire suppression, plumbing, HVAC, an elevator, and associated structural components. The period of performance is 545 calendar days from notice to proceed. The estimated cost is between $2-5 million. The solicitation will be issued as an RFP and set aside 100% for SDVOSBs. The NAICS code is 236220 with a $39.5 million size standard. Questions are due by email by a specified date. A pre-bid site visit will be held. Proposals are due on or around July 06, 2020. Offerors must be registered in SAM and CVE at time of proposal submission to be eligible for award.

View the file

Other files

File Type Posted
AE-105 NEW SECOND FLOOR REFLECTED CEILING PLAN.pdf PDF
102123.pdf PDF
VA LEBANON RENOVATE BUILDING 22 - AE601 DOOR SCHEDULE - FRAME_ DOOR TYPES.pdf PDF
36C24421R0001 0001.pdf PDF
Geotech Memo Report (JULY 2019).pdf PDF
VA LEBANON RENOVATE BUILDING 22 - AE301 BUILDING SECTIONS.pdf PDF
VA LEBANON RENOVATE BUILDING 22 - I102 FINISH SCHEDULES.pdf PDF
317400 Micropiles.pdf PDF
AB-SDS-Wink-2019-GLOSS.pdf PDF
122492.pdf PDF
Wink-ProductSpecs-2019.pdf PDF
VA LEBANON RENOVATE BUILDING 22 - AE402 ENLARGED RESTROOM PLANS AND ELEVATIONS.pdf PDF
117300 REV.pdf PDF
VA LEBANON RENOVATE BUILDING 22 - AE401 ENLARGED RESTROOM PLANS AND ELEVATIONS.pdf PDF
EXHIBIT C - Calculation of Self-Performed Work.docx DOCX document
J and A (Ceiling Lifts).pdf PDF
EXHIBIT E - Past Performance Questionnaire.docx DOCX document
WD PA20200093.pdf PDF
Bid Dwgs Part 1 - Building 22.pdf PDF
EXHIBIT D - Sample Transmittal Letter for Past Performance Evaluation Questionnaire.docx DOCX document
J and A (Secuirty System).pdf PDF
S02 Apendix C to 6500.6.pdf PDF
Bid Dwgs Part 2 - Building 22.pdf PDF
J and A (Fire Alarms).pdf PDF
EXHIBIT B - Subcontractor Information and Consent Form.docx DOCX document
J and A (HVAC Controls).pdf PDF
36C24421R0001.docx DOCX document
EXHIBIT A - Past Performance Relevancy Questionnaire.docx DOCX document
J and A (Locksets).pdf PDF
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Renovate Building 22

Bid Submission Specifications

PROJECT 595-15-201

January 24, 2020

PRESENTED TO:

VA MEDICAL CENTER

DEPARTMENT OF VETERANS AFFAIRS

LEBANON, PA

DERBY ENTERPRISES, LLC.

BEL AIR, MARYLAND

-BURDETTE KOEHLER MURPHY ASSOCIATES, INC.

-BUILDING COST CONSULTANTS

RICKERT ENGINEERING, INC.

KOFFEL ASSOCIATES, INC.

WHITMAN, REQUART & ASSOCIATES

ROBERT L. SEYMOUR ASSOCIATES

Veterans Administration Medical Center 01-20

Lebanon, Pennsylvania

595-15-201

00 01 10-1

DEPARTMENT OF VETERANS AFFAIRS

SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

DIVISION 00 - SPECIAL SECTIONS DATE

00 01 15 List of Drawing Sheets 07-15

DIVISION 01 - GENERAL REQUIREMENTS

01 00 00 General Requirements 10-17

01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build 04-13

01 33 23 Shop Drawings, Product Data, and Samples 05-17

01 35 26 Safety Requirements 02-17

01 42 19 Reference Standards 05-16

01 45 29 Testing Laboratory Services 08-17

01 57 19 Temporary Environmental Controls 01-11

01 58 16 Temporary Interior Signage 07-15

01 74 19 Construction Waste Management 09-13

01 81 13 Sustainable Construction Requirements 10-17

01 91 00 General Commissioning Requirements 10-15

DIVISION 02 – EXISTING CONDITIONS

02 21 13 Site Surveys 08-16

02 41 00 Demolition 08-17

02 82 11 Traditional Asbestos Abatement 09-15

DIVISION 03 – CONCRETE

03 30 00 Cast-in-Place Concrete 12-15

DIVISION 04 – MASONRY

04 05 13 Masonry Mortaring 10-17

04 05 16 Masonry Grouting 02-16

04 20 00 Unit Masonry 08-17

DIVISION 05 – METALS

05 12 00 Structural Steel Framing 02-16

05 21 00 Steel Joist Framing 03-10

05 31 00 Steel Decking 02-16

05 40 00 Cold-Formed Metal Framing 05-16

05 50 00 Metal Fabrications 08-18

DIVISION 06 – WOOD,PLASTICS AND COMPOSITES

00 01 10-2

06 10 00 Rough Carpentry 10-17

06 20 00 Finish Carpentry 08-16

DIVISION 07 - THERMAL AND MOISTURE PROTECTION

07 13 52 Modified Bituminous Sheet Waterproofing 08-16

07 21 13 Thermal Insulation 10-17

07 21 19 Formed In Place Closed Cell Polyurethane Building

Insulation

01-20

07 21 23 Loose-Fill Insulation 02-16

07 22 00 Roof and Deck Insulation 02-16

07 27 27 Fluid-Applied Membrane Air Barrier, Vapor Retarding 02-16

07 31 13 Asphalt Shingles 02-16

07 60 00 Flashing and Sheet Metal 07-14

07 72 00 Roof Accessories 10-15

07 81 00 Applied Fireproofing 10-17

07 84 00 Firestopping 02-16

07 92 00 Joint Sealants 10-17

07 95 13 Expansion Joint Cover Assemblies 02-16

DIVISION 08 - OPENINGS

08 11 13 Hollow Metal Doors and Frames 08-16

08 14 00 Interior Wood Doors 02-16

08 31 13 Access Doors and Frames 02-16

08 41 13 Aluminum-Framed Entrances and Storefronts 08-16

08 51 13 Aluminum Windows 02-16

08 71 00 Door Hardware 01-16

08 71 13 Automatic Door Operators 02-16

08 80 00 Glazing 10-15

08 90 00 Louvers and Vents 05-15

DIVISION 09 – FINISHES

09 05 16 Subsurface Preparation for Floor Finishes 02-15

09 06 00 Schedule for Finishes 04-15

09 22 16 Non-Structural Metal Framing 06-18

09 29 00 Gypsum Board 06-18

09 30 13 Ceramic/Porcelain Tiling 09-15

09 51 00 Acoustical Ceilings 12-16

09 65 13 Resilient Base and Accessories 02-16

09 65 19 Resilient Tile Flooring 05-18

09 68 00 Carpeting 10-15

09 91 00 Painting 01-16

DIVISION 10 – SPECIALTIES

10 11 13 Chalkboards and Markerboards 10-15

10 11 23 Tackboards 10-15

10 14 00 Signage 10-15

00 01 10-3

10 21 13 Toilet Compartments 12-15

10 22 26 Operable Partitions 05-15

10 26 00 Wall and Door Protection 10-15

10 28 00 Toilet, Bath, and Laundry Accessories 02-16

10 44 13 Fire Extinguisher Cabinets 08-18

10 22 26 Operable Partitions 01-20

DIVISION 11 – EQUIPMENT NOT USED

DIVISION 12 – FURNISHINGS

12 32 00 Manufactured Wood Casework 01-20

12 36 00 Countertops 01-20

DIVISION 13 - SPECIAL CONSTRUCTION NOT USED

DIVISION 14– CONVEYING EQUIPEMENT

14 24 00 Hydraulic Elevators 04-18

DIVISION 21- FIRE SUPPRESSION

21 08 00 Commissioning of Fire Suppression System 11-16

21 13 13 Wet-Pipe Sprinkler Systems 06-15

DIVISION 22 – PLUMBING

22 05 11 Common Work Results for Plumbing 07-16

22 05 12 General Motor Requirements for Plumbing Equipment 09-15

22 05 19 Meters and Gages for Plumbing Piping 09-15

22 05 23 General-Duty Valves for Plumbing Piping 09-15

22 07 11 Plumbing Insulation 09-15

22 08 00 Commissioning of Plumbing Systems 11-16

22 11 00 Facility Water Distribution 09-15

22 11 23 Domestic Water Pumps 09-15

22 13 00 Facility Sanitary and Vent Piping 09-15

22 14 29 Sump Pumps 09-15

22 35 00 Domestic Water Heat Exchangers 09-15

22 40 00 Plumbing Fixtures 09-15

DIVISION 23 – HEATING, VENTILATING, AND AIR

CONDITIONING (HVAC)

23 05 11 Common Work Results for HVAC 08-17

23 05 12 General Motor Requirements for HVAC and Steam

Generation Equipment

08-17

23 05 41 Noise and Vibration Control for HVAC Piping and

Equipment

02-15

23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15

00 01 10-4

23 07 11 HVAC and Boiler Plant Insulation 02-15

23 08 00 Commissioning of HVAC Systems 11-16

23 09 23 Direct-Digital Control System for HVAC 09-11

23 21 13 Hydronic Piping 08-17

23 21 23 Hydronic Pumps 08-17

23 22 13 Steam and Condensate Heating Piping 08-17

23 23 00 Refrigerant Piping 02-15

23 25 00 HVAC Water Treatment 02-15

23 31 00 HVAC Ducts and Casings 03-13

23 36 00 Air Terminal Units 02-15

23 37 00 Air Outlets and Inlets 02-15

23 40 00 HVAC Air Cleaning Devices 02-12 23 73 00 Indoor Central-Station Air-Handling Units 04-11 23 81 00 Decentralized Unitary HVAC Equipment 02-11 23 82 00 Convection Heating and Cooling Units 04-11

23 82 16 Air Coils 04-11

DIVISION 25 – INTEGRATED AUTOMATION NOT USED

DIVISION 26 – ELECTRICAL

26 05 11 Requirements for Electrical Installations 01-16

26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17

26 05 26 Grounding and Bonding for Electrical Systems 01-17

26 05 33 Raceway and Boxes for Electrical Systems 01-18

26 08 00 Commissioning of Electrical Systems 11-16

26 09 23 Lighting Controls 01-18

26 24 16 Panelboards 01-18

26 27 26 Wiring Devices 01-18

26 29 11 Motor Controllers 01-18

26 29 21 Enclosed Switches and Circuit Breakers 01-17

26 51 00 Interior Lighting 01-18

DIVISION 27 – COMMUNICATIONS

27 05 11 Requirements for Communications Installations 06-15

27 05 26 Grounding and Bonding for Communications Systems 06-15

27 05 33 Raceways and Boxes for Communications Systems 06-15

27 08 00 Commissioning of Communications Systems 11-16

27 10 00 Control, Communication and Signal Wiring 06-15

27 11 00 Communications Equipment Room Fittings 06-15

27 15 00 Communications Structured Cabling 01-16

27 31 31 Voice Communications Switching and Routing Equipment -

Extension

06-15

27 51 16 Public Address and Mass Notification Systems 10-15

27 52 23 Nurse Call and Code Blue Systems 01-18

DIVISION 28 – ELECTRONIC SAFETY AND SECURITY

28 05 00 Common Work Results for Electronic Safety and Security 04-18

00 01 10-5

28 05 13 Conductors and Cables for Electronic Safety and

Security

09-11

28 05 26 Grounding and Bonding for Electronic Safety and

Security

09-11

28 05 28.33 Conduits and Backboxes for Electronic Safety and

Security

09-11

28 08 00 Commissioning of Electronic Safety and Security Systems 11-16

28 13 00 Physical Access Control System 10-11

28 23 00 Video Surveillance 09-11

28 31 00 Fire Detection and Alarm 10-11

DIVISION 31 – EARTHWORK

31 20 00 Earthwork 07-16

31 23 19 Dewatering 10-12

DIVISION 32 – EXTERIOR IMPROVEMENTS

32 05 23 Cement and Concrete for Exterior Improvements 08-16

DIVISION 33 – UTILITIES NOT USED

DIVISION 34 – TRANSPORTATION NOT USED

DIVISION 48 – Electrical Power Generation NOT USED

01-20 Veterans Administration Medical Center

Lebanon, Pennsylvania Renovate Building 22

595-15-201 00 01 15 - 1

SECTION 00 01 15

LIST OF DRAWING SHEETS

The drawings listed below accompanying this specification form a part of the contract.

Drawing No. Title

00 GENERAL INFORMATION

GI101 COVER SHEET

GI102 TANDARD ACCESSIBILITY GUIDELINES

GI103 FIRST & THIRD FLOOR LIFE SAFETY PLANS AND PARTITION TYPES

GI104 SECOND FLOOR LIFE SAFETY PLAN

GI105 PHASING PLAN

GI106 INFECTION CONTROL AND RISK ASSESSMENT (ICRA) PLANS & DETAILS

GI107 INFECTION CONTROL AND RISK ASSESSMENT (ICRA) PLANS

01 CIVIL

L-1 EXISTING CONDITIONS AND DEMOLITION PLAN

L-2 SITE UTILITY AND GRADING PLAN

L-3 EROSION AND SEDIMENT CONTROL NOTES & DETAILS

L-4 EROSION AND SEDIMENT CONTROL PLAN & DETAILS

02 ARCHITECTURE

ASB-1 ASBESTOS ABATEMENT - PARTIAL FIRST AND THIRD FLOORS

ASB-2 ASBESTOS ABATEMENT SECOND FLOOR

AD101 PARTIAL EXISTING/ DEMO FIRST AND THIRD FLOOR PLANS

AD102 EXISTING/ DEMO - SECOND FLOOR

AE101 NEW PARTIAL FIRST AND THIRD FLOOR PLANS

AE102 NEW SECOND FLOOR PLAN

AE103 NEW SECOND FLOOR DIMENSION PLAN

AE104 PARTIAL FIRST AND THIRD FLOOR REFLECTED CEILING PLANS & DETAILS

AE105 NEW SECOND FLOOR REFLECTED CEILING PLAN

AE106 NEW ROOF PLAN

AE201 NEW WORK ELEVATIONS

AE202 NEW WORK ELEVATIONS

AE301 BUILDING SECTIONS

AE401 ENLARGED RESTROOM PLANS AND ELEVATIONS

Lebanon, Pennsylvania Renovate Building 22

595-15-201 00 01 15 - 2

AE402 ENLARGED RESTROOM PLANS ANS ELEVATIONS

AE403 ENLARGED PLANS AND ELEVATIONS

AE404 INTERIOR ELEVATIONS

AE501 INTERIOR DETAILS

AE601 DOOR SCHEDULE - FRAME & DOOR TYPES

AE602 INTERIOR STOREFRONT & EXTERIOR CURTAINWALL ELEVATIONS

03 ARCHITECTURE F & E

AQ101 SECOND FLOOR FURNITURE & EQUIPMENT PLAN

04 INTERIORS

I101 2ND FLOOR - FLOOR FINISH PLAN AND DETAILS

I102 FINISH SCHEDULES

06 STRUCTURAL

S101 FOUNDATION AND FIRST FLOOR FRAMING PLAN

S102 SECOND FLOOR FRAMING PLAN

S103 THIRD FLOOR FRAMING PLAN

S104 PENTHOUSE FLOOR AND LOW ROOF FRAING PLAN

S201 STRUCTURAL SECTIONS AND DETAILS

S202 STRUCTURAL SECTIONS AND DETAILS

S203 STRUCTURAL SECTIONS AND DETAILS

S204 STRUCTURAL SECTIONS AND DETAILS

S301 STRUCTURAL SCHEDULES

S401 GENERAL NOTES

07 VERTICAL TRANSPORTATION

VT101 NEW ELEVATOR HOISTWAY AND MACHINE ROOM PLANS

VT102 NEW ELEVATOR HOISTWAY SECTION

09 MECHANICAL

M001 MECHANICAL LEGEND, ABBREVIATIONS AND GENERAL NOTES

MD101 SECOND FLOOR PLAN - MECHANICAL - DEMOLITION

MD102 ROOF PLAN - MECHANICAL - DEMOLITION

M101 SECOND FLOOR PLAN - HVAC DUCTWORK - NEW WORK

M102 ROOF PLAN - MECHANICAL - NEW WORK

M201 SECOND FLOOR PLAN - HVAC PIPING - NEW WORK

Lebanon, Pennsylvania Renovate Building 22

595-15-201 00 01 15 - 3

M301 PART BASEMENT PLAN - MECHANICAL - NEW WORK

M401 MECHANICAL DETAILS

M402 MECHANICAL DETAILS

M403 MECHANICAL DETAILS

M501 MECHANICAL CONTROLS

M502 MECHANICAL CONTROLS

M601 MECHANICAL SCHEDULES

10 PLUMBING

P001 PLUMBING LEGEND, ABBREVIATIONS, SCHEDULES, AND GENERAL NOTES

PD101 SECOND FLOOR PLAN - PLUMBING - DEMOLITION

P101 SECOND FLOOR PLAN - PLUMBING - NEW WORK

P201 PLUMBING DETAILS

11 ELECTRICAL

E001 ELECTRICAL LEGEND, ABBREVIATIONS & SCHEDULES

ED101 SECOND FLOOR PLAN - ELECTRICAL - DEMOLITION

ED102 FLOOR PLANS - ELECTRICAL - DEMOLITION

ED103 ROOF PLAN - ELECTRICAL - DEMOLITION

ED104 POWER RISER DIAGRAM - DEMOLITION

E201 SECOND FLOOR PLAN - LIGHTING - NEW WORK

E202 FLOOR PLANS - LIGHTING & SPECIAL SYSTEMS - NEW WORK

E301 SECOND FLOOR PLAN - POWER - NEW WORK

E302 FLOOR PLANS - POWER - NEW WORK

E303 ROOF PLAN - ELECTRICAL - NEW WORK

E401 POWER RISER DIAGRAM - NEW WORK

E501 LIGHTING CONTROL WIRING DIAGRAMS

E601 PANEL SCHEDULES

EY101 SECOND FLOOR PLAN - SPECIAL SYSTEMS - NEW WORK

12 FIRE PROTECTION

FA-1 FIRE ALARM NOTES, SYMBOLS, ABBREVIATIONS AND MATRIX

FA-2 FIRST AND THIRD FLOOR PLAN - FIRE ALARM - EXISTING/ DEMO

FA-3 SECOND FLOOR PLAN - FIRE ALARM - EXISTING/ DEMO

FA-4 FIRST AND THIRD FLOOR PLAN - FIRE ALARM - NEW WORK

FA-5 SECOND FLOOR PLAN - FIRE ALARM - NEW WORK

FA-6 FIRE ALARM RISER

Lebanon, Pennsylvania Renovate Building 22

595-15-201 00 01 15 - 4

FS-1 FIRE SUPPRESSION NOTES, SYMBOLS, AND ABBREVIATIONS

FS-2 FIRST AND THIRD FLOOR PLAN - FIRE SUPPRESSION - EXISTING/ DEMO

FS-3 SECOND FLOOR PLAN - FIRE SUPPRESSION - EXISTING/ DEMO

FS-4 FIRST AND THIRD FLOOR PLAN - FIRE SUPPRESSION - NEW WORK

FS-5 SECOND FLOOR PLAN - FIRE SUPPRESSION - NEW WORK

FS-6 FIRE SUPPRESSION DETAILS

15 TECHNOLOGY

T-001 LEGEND AND ABBREVIATIONS

TD-101 TELECOM DEMOLITION PLAN - SECOND FLOOR

TD-102 SECURITY DEMOLITION PLAN - SECOND FLOOR

T-101 TELECOM NEW WORK PLAN - SECOND FLOOR

T-102 SECURITY NEW WORK PLAN - SECOND FLOOR

T-103 TELECOM NEW WORK PART PLANS

T-301 TELECOM DETAILS

T-302 TELECOM DETAILS

T-303 TELECOM DETAILS

T-304 SECURITY DETAILS

T-305 TELECOM GENERAL NOTES

- - - END - - -

Renovate Building 22

595-15-201 i

SECTION 01 00 00

GENERAL REQUIREMENTS

TABLE OF CONTENTS

1.1 SAFETY REQUIREMENTS

1.2 GENERAL INTENTION

1.3 STATEMENT OF BID ITEM(S)

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

1.5 CONSTRUCTION SECURITY REQUIREMENTS

1.6 OPERATIONS AND STORAGE AREAS

1.7 ALTERATIONS

1.8 DISPOSAL AND RETENTION

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT,

UTILITIES, AND IMPROVEMENTS

1.10 RESTORATION

1.11 PHYSICAL DATA

1.12 PROFESSIONAL SURVEYING SERVICES

1.13 LAYOUT OF WORK

1.14 AS-BUILT DRAWINGS

1.15 USE OF ROADWAYS

1.16 RESIDENT ENGINEER'S FIELD OFFICE

1.17 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

1.18 TEMPORARY USE OF EXISTING ELEVATORS

1.19 TEMPORARY USE OF NEW ELEVATORS

1.20 TEMPORARY TOILETS

1.21 AVAILABILITY AND USE OF UTILITY SERVICES

1.22 NEW TELEPHONE EQUIPMENT

1.23 TESTS

1.24 INSTRUCTIONS

Renovate Building 22

595-15-201 ii

1.25 GOVERNMENT-FURNISHED PROPERTY

1.26 EQUIPMENT

1.27 STORAGE SPACE FOR DEPARTMENT OF VETERANS AFFAIRS EQUIPMENT

1.28 CONSTRUCTION SIGN

1.29 SAFETY SIGN

1.30 PHOTOGRAPHIC DOCUMENTATION

1.31 FINAL ELEVATION Digital Images

1.32 HISTORIC PRESERVATION

1.33 VA TRIRIGA CPMS

05-19

Lebanon, Pennsylvania Renovate Building 22

595-15-201

01 00 00 -1

SECTION 01 00 00

GENERAL REQUIREMENTS

1.1 SAFETY REQUIREMENTS

Refer to section 01 35 26, SAFETY REQUIREMENTS for safety and infection control requirements.

1.2 GENERAL INTENTION

A. Contractor shall completely prepare site for building operations, including demolition and removal of existing structures, and furnish labor and materials and perform work for VAMC Lebanon Renovate Building

22 as required by drawings and specifications.

B. Visits to the site by Bidders may be made only by appointment with the

Contracting Officer’s Representative (COR).

C. Offices of Derby Enterprises, LLC, as Architect-Engineers, will render certain technical services during construction. Such services shall be considered as advisory to the Government and shall not be construed as expressing or implying a contractual act of the Government without affirmations by Contracting Officer or his duly authorized representative.

D. All employees of general contractor and subcontractors shall comply with VA security management program and obtain permission of the VA police, be identified by project and employer, and restricted from unauthorized access.

1.3 STATEMENT OF BID ITEM(S)

A. ITEM I, GENERAL CONSTRUCTION: Renovate Building 22:Work includes general construction, alterations, walks, grading, drainage, building additions, interior and exterior demolition, necessary removal of existing structures and construction and certain other items.

Lebanon, Pennsylvania Renovate Building 22

595-15-201

01 00 00 -2

1.4 SPECIFICATIONS AND DRAWINGS FOR CONTRACTOR

A. Drawings and contract documents may be obtained from the website where the solicitation is posted. Additional copies will be at Contractor's expense.

1.5 CONSTRUCTION SECURITY REQUIREMENTS

A. Security Plan:

1. The security plan defines both physical and administrative security procedures that will remain effective for the entire duration of the project.

2. The General Contractor is responsible for assuring that all sub-contractors working on the project and their employees also comply with these regulations.

B. Security Procedures:

1. General Contractor’s employees shall not enter the project site without appropriate badge. They may also be subject to inspection of their personal effects when entering or leaving the project site.

2. Before starting work the General Contractor shall give one week’s notice to the Contracting Officer’s Representative so that security arrangements can be provided for the employees. This notice is separate from any notices required for utility shutdown described later in this section.

3. No photography of VA premises is allowed without written permission of the Contracting Officer.

4. VA reserves the right to close down or shut down the project site and order General Contractor’s employees off the premises in the event of a national emergency. The General Contractor may return to the site only with the written approval of the Contracting Officer.

C. Guards:

1. The General Contractor shall provide unarmed guards at the project site after construction hours.

Lebanon, Pennsylvania Renovate Building 22

595-15-201

01 00 00 -3

2. The Contractor shall provide the guards and VA police with communication devices as directed.

3. The general Contractor shall install equipment for recording guard rounds to ensure systematic checking of the premises.

D. Key Control:

1. The General Contractor shall provide duplicate keys and lock combinations to the Contracting officers representative (COR) for the purpose of security inspections of every area of project including tool boxes and parked machines and take any emergency action.

2. The General Contractor shall turn over all permanent lock cylinders to the VA locksmith for permanent installation. See Section 08 71

00, DOOR HARDWARE and coordinate.

E. Document Control:

1. Before starting any work, the General Contractor/Sub Contractors shall submit an electronic security memorandum describing the approach to following goals and maintaining confidentiality of

“sensitive information”.

2. The General Contractor is responsible for safekeeping of all drawings, project manual and other project information. This information shall be shared only with those with a specific need to accomplish the project.

3. Certain documents, sketches, videos or photographs and drawings may be marked “Law Enforcement Sensitive” or “Sensitive Unclassified”.

Secure such information in separate containers and limit the access to only those who will need it for the project. Return the information to the Contracting Officer upon request.

4. These security documents shall not be removed or transmitted from the project site without the written approval of Contracting

Officer.

Lebanon, Pennsylvania Renovate Building 22

595-15-201

01 00 00 -4

5. All paper waste or electronic media such as CD’s and diskettes shall be shredded and destroyed in a manner acceptable to the VA.

6. Notify Contracting Officer and Site Security Officer immediately when there is a loss or compromise of “sensitive information”.

7. All electronic information shall be stored in specified location following VA standards and procedures using an Engineering Document

Management Software (EDMS).

a. Security, access and maintenance of all project drawings, both scanned and electronic shall be performed and tracked through the

EDMS system.

b. “Sensitive information” including drawings and other documents may be attached to e-mail provided all VA encryption procedures are followed.

F. Motor Vehicle Restrictions

1. Vehicle authorization request shall be required for any vehicle entering the site and such request shall be submitted 24 hours before the date and time of access. Access shall be restricted to picking up and dropping off materials and supplies.

2. A limited number of (2 to 5) permits shall be issued for General

Contractor and its employees for parking in designated areas only.

1.6 OPERATIONS AND STORAGE AREAS

A. The Contractor shall confine all operations (including storage of materials) on Government premises to areas authorized or approved by the Contracting Officer. The Contractor shall hold and save the

Government, its officers and agents, free and harmless from liability of any nature occasioned by the Contractor's performance.

B. Temporary buildings (e.g., storage sheds, shops, offices) and utilities may be erected by the Contractor only with the approval of the

Contracting Officer and shall be built with labor and materials furnished by the Contractor without expense to the Government. The

Lebanon, Pennsylvania Renovate Building 22

595-15-201

01 00 00 -5 temporary buildings and utilities shall remain the property of the

Contractor and shall be removed by the Contractor at its expense upon completion of the work. With the written consent of the Contracting

Officer, the buildings and utilities may be abandoned and need not be removed.

C. The Contractor shall, under regulations prescribed by the Contracting

Officer, use only established roadways, or use temporary roadways constructed by the Contractor when and as authorized by the Contracting

Officer. When materials are transported in prosecuting the work, vehicles shall not be loaded beyond the loading capacity recommended by the manufacturer of the vehicle or prescribed by any Federal, State, or local law or regulation. When it is necessary to cross curbs or sidewalks, the Contractor shall protect them from damage. The

Contractor shall repair or pay for the repair of any damaged curbs, sidewalks, or roads.

(FAR 52.236-10)

D. Working space and space available for storing materials shall be coordinated and approved by the COR.

E. Workmen are subject to rules of Medical Center applicable to their conduct.

F. Phasing:

The Medical Center must maintain its operation 24 hours a day 7 days a week. Therefore, any interruption in service must be scheduled and coordinated with the COR to ensure that no lapses in operation occur.

It is the CONTRACTOR'S responsibility to develop a work plan and schedule detailing, at a minimum, the procedures to be employed, the equipment and materials to be used, the interim life safety measure to be used during the work, and a schedule defining the duration of the work with milestone subtasks. The work to be outlined shall include, but not be limited to:

Lebanon, Pennsylvania Renovate Building 22

595-15-201

01 00 00 -6

To insure such executions, Contractor shall furnish the COR with a schedule of approximate phasing dates on which the Contractor intends to accomplish work in each specific area of site, building or portion thereof. In addition, Contractor shall notify the COR two weeks in advance of the proposed date of starting work in each specific area of site, building or portion thereof. Arrange such phasing dates to insure accomplishment of this work in successive phases mutually agreeable to

COR and Contractor, as follows:

Phase 1:

Item 1 – Set up ICRA and Asbetos Abatement Barriers.

Item 2 – Perform Asbestos Abatement on off hours to minimize disruption to building operations. Coordinate with the COR and VA staff.

Item 3 – Demolish as instructed on sheets AD101 to prepare for addition.

Construct new elevator shaft, machine room and lobbies. Complete new addition and interior finishes in the addition. The contractor is to make sure that the existing elevator remains in operation and is accessible at the first, 2nd and third floors during this phase. The rest of the building is to be kept operational during this phase.

Phase 2:

Item 1 – Remove all personnel, furniture and equipment from the area indicated on the second floor. Demolish as shown on AD102. Construct all new work. Two means of egress are to remain open at all times. The new elevator, constructed in phase 1 shall be operable at all times. The 2nd floor shall be locked out during construction.

G. Part of Bldg. 22 will be vacated by Government in accordance with above phasing beginning immediately after date of receipt of Notice to

Proceed and turned over to Contractor.

Contractor shall take all measures and provide all material necessary for protecting existing equipment and property in affected areas of construction against dust and debris, so that equipment and affected areas to be used in the Medical Centers operations will not be hindered. Contractor shall permit access to Department of

Veterans Affairs personnel and patients through other construction

Lebanon, Pennsylvania Renovate Building 22

595-15-201

01 00 00 -7 areas which serve as routes of access to such affected areas and equipment. These routes whether access or egress shall be isolated from the construction area by temporary partitions and have walking surfaces, lighting, etc. to facilitate patient and staff access.

Coordinate alteration work in areas occupied by Department of

Veterans Affairs so that Medical Center operations will continue during the construction period.

2. Immediate areas of alterations not mentioned in preceding

Subparagraph 1 will be temporarily vacated while alterations are performed.

H. Construction Fence: Before construction operations begin, Contractor shall provide a chain link construction fence, 2.1m (seven feet) minimum height, around the construction area indicated on the drawings.

Provide gates as required for access with necessary hardware, including hasps and padlocks. Fasten fence fabric to terminal posts with tension bands and to line posts and top and bottom rails with tie wires spaced at maximum 375mm (15 inches). Bottom of fences shall extend to 25mm

(one inch) above grade. Remove the fence when directed by COR.

I. When a building and/or construction site is turned over to Contractor, Contractor shall accept entire responsibility including upkeep and maintenance therefore:

1. Contractor shall maintain a minimum temperature of 4 degrees C (40 degrees F) at all times, except as otherwise specified.

2. Contractor shall maintain in operating condition existing fire protection and alarm equipment. In connection with fire alarm equipment, Contractor shall make arrangements for pre-inspection of site with Fire Department or Company (Department of Veterans Affairs or municipal) whichever will be required to respond to an alarm from

Contractor's employee or watchman.

J. Utilities Services: Maintain existing utility services for Medical

Center at all times. Provide temporary facilities, labor, materials, equipment, connections, and utilities to assure uninterrupted services.

Lebanon, Pennsylvania Renovate Building 22

595-15-201

01 00 00 -8

Where necessary to cut existing water, steam, gases, sewer or air pipes, or conduits, wires, cables, etc. of utility services or of fire protection systems and communications systems (including telephone), they shall be cut and capped at suitable places where shown; or, in absence of such indication, where directed by COR.

1. No utility service such as water, gas, steam, sewers or electricity, or fire protection systems and communications systems may be interrupted without prior approval of COR. Electrical work shall be accomplished with all affected circuits or equipment de-energized.

When an electrical outage cannot be accomplished, work on any energized circuits or equipment shall not commence without a detailed work plan, the Medical Center Director’s prior knowledge and written approval. Refer to specification Sections 26 05 11, REQUIREMENTS FOR ELECTRICAL INSTALLATIONS, 27 05 11 REQUIREMENTS FOR

COMMUNICATIONS INSTALLATIONS and 28 05 00, COMMON WORK RESULTS FOR

ELECTRONIC SAFETY AND SECURITY for additional requirements.

2. Contractor shall submit a request to interrupt any such services to

COR, in writing, 7 days in advance of proposed interruption. Request shall state reason, date, exact time of, and approximate duration of such interruption.

3. Contractor will be advised (in writing) of approval of request, or of which other date and/or time such interruption will cause least inconvenience to operations of Medical Center. Interruption time approved by Medical Center may occur at other than Contractor's normal working hours.

4. Major interruptions of any system must be requested, in writing, at least 15 calendar days prior to the desired time and shall be performed as directed by the COR.

5. In case of a contract construction emergency, service will be interrupted on approval of COR. Such approval will be confirmed in writing as soon as practical.

Lebanon, Pennsylvania Renovate Building 22

595-15-201

01 00 00 -9

6. Whenever it is required that a connection fee be paid to a public utility provider for new permanent service to the construction project, for such items as water, sewer, electricity, gas or steam, payment of such fee shall be the responsibility of the Government and not the Contractor.

K. Abandoned Lines: All service lines such as wires, cables, conduits, ducts, pipes and the like, and their hangers or supports, which are to be abandoned but are not required to be entirely removed, shall be sealed, capped or plugged at the main, branch or panel they originate from. The lines shall not be capped in finished areas, but shall be removed and sealed, capped or plugged in ceilings, within furred spaces, in unfinished areas, or within walls or partitions; so that they are completely behind the finished surfaces.

L. To minimize interference of construction activities with flow of

Medical Center traffic, comply with the following:

1. Keep roads, walks and entrances to grounds, to parking and to occupied areas of buildings clear of construction materials, debris and standing construction equipment and vehicles.

2. Method and scheduling of required cutting, altering and removal of existing roads, walks and entrances must be approved by the COR.

M. Coordinate the work for this contract with other construction operations as directed by COR. This includes the scheduling of traffic and the use of roadways, as specified in Article, USE OF ROADWAYS.

1.7 ALTERATIONS

A. Survey: Before any work is started, the Contractor shall make a thorough survey with the COR of buildings in which alterations occur and areas which are anticipated routes of access, and furnish a report, signed by both, to the Contracting Officer. This report shall list by rooms and spaces:

Lebanon, Pennsylvania Renovate Building 22

595-15-201

01 00 00 -10

1. Existing condition and types of resilient flooring, doors, windows, walls and other surfaces not required to be altered throughout affected areas of building.

2. Existence and conditions of items such as plumbing fixtures and accessories, electrical fixtures, equipment, venetian blinds, shades, etc., required by drawings to be either reused or relocated, or both.

3. Shall note any discrepancies between drawings and existing conditions at site.

4. Shall designate areas for working space, materials storage and routes of access to areas within buildings where alterations occur and which have been agreed upon by Contractor and COR.

B. Any items required by drawings to be either reused or relocated or both, found during this survey to be nonexistent, or in opinion of COR, to be in such condition that their use is impossible or impractical, shall be furnished and/or replaced by Contractor with new items in accordance with specifications which will be furnished by Government.

Provided the contract work is changed by reason of this subparagraph B, the contract will be modified accordingly, under provisions of clause entitled "DIFFERING SITE CONDITIONS" (FAR 52.236-2) and "CHANGES" (FAR

52.243-4 and VAAR 852.236-88).

C. Re-Survey: Thirty days before expected partial or final inspection date, the Contractor and COR together shall make a thorough re-survey of the areas of buildings involved. They shall furnish a report on conditions then existing, of resilient flooring, doors, windows, walls and other surfaces as compared with conditions of same as noted in first condition survey report:

1. Re-survey report shall also list any damage caused by Contractor to such flooring and other surfaces, despite protection measures; and, will form basis for determining extent of repair work required of

Contractor to restore damage caused by Contractor's workmen in executing work of this contract.

Lebanon, Pennsylvania Renovate Building 22

595-15-201

01 00 00 -11

D. Protection: Provide the following protective measures:

1. Wherever existing roof surfaces are disturbed they shall be protected against water infiltration. In case of leaks, they shall be repaired immediately upon discovery.

2. Temporary protection against damage for portions of existing structures and grounds where work is to be done, materials handled and equipment moved and/or relocated.

3. Protection of interior of existing structures at all times, from damage, dust and weather inclemency. Wherever work is performed, floor surfaces that are to remain in place shall be adequately protected prior to starting work, and this protection shall be maintained intact until all work in the area is completed.

1.8 DISPOSAL AND RETENTION

A. Materials and equipment accruing from work removed and from demolition of buildings or structures, or parts thereof, shall be disposed of as follows:

1. Reserved items which are to remain property of the Government are identified by attached tags as items to be stored. Items that remain property of the Government shall be removed or dislodged from present locations in such a manner as to prevent damage which would be detrimental to re-installation and reuse. Store such items where directed by COR.

2. Items not reserved shall become property of the Contractor and be removed by Contractor from Medical Center.

3. Items of portable equipment and furnishings located in rooms and spaces in which work is to be done under this contract shall remain the property of the Government. When rooms and spaces are vacated by the Department of Veterans Affairs during the alteration period, such items which are NOT required by drawings and specifications to

Lebanon, Pennsylvania Renovate Building 22

595-15-201

01 00 00 -12 be either relocated or reused will be removed by the Government in advance of work to avoid interfering with Contractor's operation.

1.9 PROTECTION OF EXISTING VEGETATION, STRUCTURES, EQUIPMENT, UTILITIES, AND

IMPROVEMENTS

A. The Contractor shall preserve and protect all structures, equipment, and vegetation (such as trees, shrubs, and grass) on or adjacent to the work site, which are not to be removed and which do not unreasonably interfere with the work required under this contract. The Contractor shall only remove trees when specifically authorized to do so, and shall avoid damaging vegetation that will remain in place. If any limbs or branches of trees are broken during contract performance, or by the careless operation of equipment, or by workmen, the Contractor shall trim those limbs or branches with a clean cut and paint the cut with a tree-pruning compound as directed by the Contracting Officer.

B. The Contractor shall protect from damage all existing improvements and utilities at or near the work site and on adjacent property of a third party, the locations of which are made known to or should be known by the Contractor. The Contractor shall repair any damage to those facilities, including those that are the property of a third party, resulting from failure to comply with the requirements of this contract or failure to exercise reasonable care in performing the work. If the

Contractor fails or refuses to repair the damage promptly, the

Contracting Officer may have the necessary work performed and charge the cost to the Contractor.

(FAR 52.236-9)

C. Refer to Section 01 57 19, TEMPORARY ENVIRONMENTAL CONTROLS, for additional requirements on protecting vegetation, soils and the environment. Refer to Articles, "Alterations", "Restoration", and

"Operations and Storage Areas" for additional instructions concerning repair of damage to structures and site improvements.

Lebanon, Pennsylvania Renovate Building 22

595-15-201

01 00 00 -13

1.10 RESTORATION

A. Remove, cut, alter, replace, patch and repair existing work as necessary to install new work. Except as otherwise shown or specified, do not cut, alter or remove any structural work, and do not disturb any ducts, plumbing, steam, gas, or electric work without approval of the

COR. Existing work to be altered or extended and that is found to be defective in any way, shall be reported to the COR before it is disturbed. Materials and workmanship used in restoring work, shall conform in type and quality to that of original existing construction, except as otherwise shown or specified.

B. Upon completion of contract, deliver work complete and undamaged.

Existing work (walls, ceilings, partitions, floors, mechanical and electrical work, lawns, paving, roads, walks, etc.) disturbed or removed as a result of performing required new work, shall be patched, repaired, reinstalled, or replaced with new work, and refinished and left in as good condition as existed before commencing work.

C. At Contractor's own expense, Contractor shall immediately restore to service and repair any damage caused by Contractor's workmen to existing piping and conduits, wires, cables, etc., of utility services or of fire protection systems and communications systems (including telephone) which are not scheduled for discontinuance or abandonment.

D. Expense of repairs to such utilities and systems not shown on drawings or locations of which are unknown will be covered by adjustment to contract time and price in accordance with clause entitled "CHANGES"

(FAR 52.243-4 and VAAR 852.236-88) and "DIFFERING SITE CONDITIONS" (FAR

52.236-2).

1.11 PHYSICAL DATA

A. Data and information furnished or referred to below is for the

Contractor's information. The Government shall not be responsible for any interpretation of or conclusion drawn from the data or information by the Contractor.

Lebanon, Pennsylvania Renovate Building 22

595-15-201

01 00 00 -14

(FAR 52.236-4)

B. Subsurface conditions have been developed by core borings and test pits. Logs of subsurface exploration are shown diagrammatically on drawings.

C. A copy of the soil report will be made available for inspection by bidders upon request to the Engineering Officer at the VA Medical

Center, Lebanon, Pennsylvania and shall be considered part of the contract documents.

D. Government does not guarantee that other materials will not be encountered nor that proportions, conditions or character of several materials will not vary from those indicated by explorations. Bidders are expected to examine site of work and logs of borings; and, after investigation, decide for themselves character of materials and make their bids accordingly. Upon proper application to Department of

Veterans Affairs, bidders will be permitted to make subsurface explorations of their own at site.

1.12 PROFESSIONAL SURVEYING SERVICES

A registered professional land surveyor or registered civil engineer whose services are retained and paid for by the Contractor shall perform services specified herein and in other specification sections.

The Contractor shall certify that the land surveyor or civil engineer is not one who is a regular employee of the Contractor, and that the land surveyor or civil engineer has no financial interest in this contract.

1.13 LAYOUT OF WORK

A. The Contractor shall lay out the work from Government established base lines and bench marks, indicated on the drawings, and shall be responsible for all measurements in connection with the layout. The

Contractor shall furnish, at Contractor's own expense, all stakes, templates, platforms, equipment, tools, materials, and labor required to lay out any part of the work. The Contractor shall be responsible for executing the work to the lines and grades that may be established

Lebanon, Pennsylvania Renovate Building 22

595-15-201

01 00 00 -15 or indicated by the Contracting Officer. The Contractor shall also be responsible for maintaining and preserving all stakes and other marks established by the Contracting Officer until authorized to remove them.

If such marks are destroyed by the Contractor or through Contractor's negligence before their removal is authorized, the Contracting Officer may replace them and deduct the expense of the replacement from any amounts due or to become due to the Contractor.

(FAR 52.236-17)

B. Establish and plainly mark center lines for each building and corner of column lines and/or addition to each existing building, and such other lines and grades that are reasonably necessary to properly assure that location, orientation, and elevations established for each such structure and/or addition, are in accordance with lines and elevations shown on contract drawings.

C. Following completion of general mass excavation and before any other permanent work is performed, establish and plainly mark (through use of appropriate batter boards or other means) sufficient additional survey control points or system of points as may be necessary to assure proper alignment, orientation, and grade of all major features of work. Survey shall include, but not be limited to, location of lines and grades of footings, exterior walls, center lines of columns in both directions, major utilities and elevations of floor slabs:

1. Such additional survey control points or system of points thus established shall be checked and certified by a registered land surveyor or registered civil engineer. Furnish such certification to the COR before any work (such as footings, floor slabs, columns, walls, utilities and other major controlling features) is placed.

D. During progress of work, and particularly as work progresses from floor to floor, Contractor shall have line grades and plumbness of all major form work checked and certified by a registered land surveyor or registered civil engineer as meeting requirements of contract drawings.

Furnish such certification to the COR before any major items of

Lebanon, Pennsylvania Renovate Building 22

595-15-201

01 00 00 -16 concrete work are placed. In addition, Contractor shall also furnish to the COR certificates from a registered land surveyor or registered civil engineer that the following work is complete in every respect as required by contract drawings.

1. Lines of each building and/or addition.

2. Elevations of bottoms of footings and tops of floors of each building and/or addition.

3. Lines and elevations of sewers and of all outside distribution systems.

E. Whenever changes from contract drawings are made in line or grading requiring certificates, record such changes on a reproducible drawing bearing the registered land surveyor or registered civil engineer seal, and forward these drawings upon completion of work to COR.

F. The Contractor shall perform the surveying and layout work of this and other articles and specifications in accordance with the provisions of

Article "Professional Surveying Services".

1.14 AS-BUILT DRAWINGS

A. The contractor shall maintain two full size sets of as-built drawings which will be kept current during construction of the project, to include all contract changes, modifications and clarifications.

B. All variations shall be shown in the same general detail as used in the contract drawings. To insure compliance, as-built drawings shall be made available for the COR review, as often as requested.

C. Contractor shall deliver two approved completed sets of as-built drawings in the electronic version (scanned PDF) to the COR within 15 calendar days after each completed phase and after the acceptance of the project by the COR.

D. Paragraphs A, B, & C shall also apply to all shop drawings.

Lebanon, Pennsylvania Renovate Building 22

595-15-201

01 00 00 -17

1.15 USE OF ROADWAYS

A. For hauling, use only established public roads and roads on Medical

Center property and, when authorized by the COR, such temporary roads which are necessary in the performance of contract work. Temporary roads shall be constructed and restoration performed by the Contractor at Contractor's expense. When necessary to cross curbing, sidewalks, or similar construction, they must be protected by well-constructed bridges.

B. When new permanent roads are to be a part of this contract, Contractor may construct them immediately for use to facilitate building operations. These roads may be used by all who have business thereon within zone of building operations.

C. When certain buildings (or parts of certain buildings) are required to be completed in advance of general date of completion, all roads leading thereto must be completed and available for use at time set for completion of such buildings or parts thereof.

1.16 TEMPORARY USE OF MECHANICAL AND ELECTRICAL EQUIPMENT

A. Use of new installed mechanical and electrical equipment to provide heat, ventilation, plumbing, light and power will be permitted subject to written approval and compliance with the following provisions:

1. Permission to use each unit or system must be given by COR in writing. If the equipment is not installed and maintained in accordance with the written agreement and following provisions, the

COR will withdraw permission for use of the equipment.

2. Electrical installations used by the equipment shall be completed in accordance with the drawings and specifications to prevent damage to the equipment and the electrical systems, i.e. transformers, relays, circuit breakers, fuses, conductors, motor controllers and their overload elements shall be properly sized, coordinated and adjusted.

Installation of temporary electrical equipment or devices shall be in accordance with NFPA 70, National Electrical Code, (2014

Lebanon, Pennsylvania Renovate Building 22

595-15-201

01 00 00 -18

Edition), Article 590, Temporary Installations. Voltage supplied to each item of equipment shall be verified to be correct and it shall be determined that motors are not overloaded. The electrical equipment shall be thoroughly cleaned before using it and again immediately before final inspection including vacuum cleaning and wiping clean interior and exterior surfaces.

3. Units shall be properly lubricated, balanced, and aligned.

Vibrations must be eliminated.

4. Automatic temperature control systems for preheat coils shall function properly and all safety controls shall function to prevent coil freeze-up damage.

5. The air filtering system utilized shall be that which is designed for the system when complete, and all filter elements shall be replaced at completion of construction and prior to testing and balancing of system.

6. All components of heat production and distribution system, metering equipment, condensate returns, and other auxiliary facilities used in temporary service shall be cleaned prior to use; maintained to prevent corrosion internally and externally during use; and cleaned, maintained and inspected prior to acceptance by the Government.

B. Prior to final inspection, the equipment or parts used which show wear and tear beyond normal, shall be replaced with identical replacements, at no additional cost to the Government.

C. This paragraph shall not reduce the requirements of the mechanical and electrical specifications sections.

D. Any damage to the equipment or excessive wear due to prolonged use will be repaired replaced by the contractor at the contractor’s expense.

1.17 TEMPORARY USE OF EXISTING ELEVATORS

A. Contractor will not be allowed the use of existing elevators. Outside type hoist shall be used by Contractor for transporting materials and equipment.

Lebanon, Pennsylvania Renovate Building 22

595-15-201

01 00 00 -19

1.18 TEMPORARY TOILETS

A. Provide where directed, (for use of all Contractor's workmen) ample temporary sanitary toilet accommodations with suitable sewer and water connections; or, when approved by COR, provide suitable dry closets where directed. Keep such places clean and free from flies, and all connections and appliances connected therewith are to be removed prior to completion of contract, and premises left perfectly clean.

1.19 AVAILABILITY AND USE OF UTILITY SERVICES

A. The Government shall make all reasonably required amounts of utilities available to the Contractor from existing outlets and supplies, as specified in the contract. The amount to be paid by the Contractor for chargeable electrical services shall be the prevailing rates charged to the Government. The Contractor shall carefully conserve any utilities furnished without charge.

B. The Contractor, at Contractor's expense and in a workmanlike manner, in compliance with code and as satisfactory to the Contracting Officer, shall install and maintain all necessary temporary connections and distribution lines, and all meters required to measure the amount of electricity used for the purpose of determining charges. Before final acceptance of the work by the Government, the Contractor shall remove all the temporary connections, distribution lines, meters, and associated paraphernalia and repair restore the infrastructure as required.

C. Contractor shall install meters at Contractor's expense and furnish the

Medical Center a monthly record of the Contractor's usage of electricity as hereinafter specified.

D. Heat: Furnish temporary heat necessary to prevent injury to work and materials through dampness and cold. Use of open salamanders or any temporary heating devices which may be fire hazards or may smoke and damage finished work, will not be permitted. Maintain minimum temperatures as specified for various materials:

Lebanon, Pennsylvania Renovate Building 22

595-15-201

01 00 00 -20

1. Obtain heat by connecting to Medical Center heating distribution system.

E. Electricity (for Construction and Testing): Furnish all temporary electric services.

1. Obtain electricity by connecting to the Medical Center electrical distribution system. The Contractor shall meter and pay for electricity required for electric cranes and hoisting devices, electrical welding devices and any electrical heating devices providing temporary heat. Electricity for all other uses is available at no cost to the Contractor.

F. Water (for Construction and Testing): Furnish temporary water service.

1. Obtain water by connecting to the Medical Center water distribution system. Provide reduced pressure backflow preventer at each connection as per code. Water is available at no cost to the

Contractor.

2. Maintain connections, pipe, fittings and fixtures and conserve water-use so none is wasted. Failure to stop leakage or other wastes will be cause for revocation (COR discretion) of use of water from

Medical Center's system.

G. Fuel: Natural and LP gas and burner fuel oil required for boiler cleaning, normal initial boiler-burner setup and adjusting, and for performing the specified boiler tests will be furnished by the

Government. Fuel required for prolonged boiler-burner setup, adjustments, or modifications due to improper design or operation of boiler, burner, or control devices shall be furnished and paid by the

Contractor at Contractor's expense.

1.20 NEW TELEPHONE EQUIPMENT

The contractor shall coordinate with the work of installation of telephone equipment by others.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .