Exhibit B - Drawings.pdf

PDF 2 MB Posted

Attached to
Lab A Electric Heat Install
Solicitation number
ISD-378581-RO
Issued by

About this file

These are final design drawings for Project 8-2-242, the Lab A Electric Heat project at Fermilab's Infrastructure Services Division. The drawing set includes general cover sheets, mechanical plans for three laboratory areas (Lab A, Lab AB Connector, and Lab C), and electrical plans with panel schedules and specifications, all marked "NOT FOR CONSTRUCTION" and issued for comment and compliance review on December 22, 2025.

The mechanical work involves replacing existing hydronic baseboard heating systems with electric heating infrastructure across multiple laboratory spaces. Lab A requires demolition of existing hydronic equipment and installation of electric baseboard heaters (EBB-4, EBB-6, EBB-10 models), electric unit heaters (EUH-1, EUH-2), electric wall heaters (EWH-1), and destratification fans (DSF-1). The project includes provision of a JCI Model TEC3000 BACnet MSTP thermostat with integration into Fermilab's Niagara N4 building automation system, daisy-chained BACnet MSTP trunk wiring to existing JACE equipment, and development of soft and hard alarm lists for owner approval. The electrical infrastructure consists of a new 45 kVA transformer (TR-PP-NL-5) stepping down from 480V to 120/208V, feeding a new 54-space panel board (PP-NL-5A) with 225A bus rating and 125A main breaker, and a new 30-space panel board (PP-AB-2B) with 100A rating in the Lab A-B connector area. All electrical work requires copper wiring (THHN/THWN, minimum 12 AWG for power), 3/4-inch minimum metallic conduit, equipment grounding conductors, and compliance with NEC standards and Fermilab's ES&H safety protocols.

View the file

Other files

File Type Posted
Amendment 02 RFP ISD-378581-RO.pdf PDF
Exhibit B Rev 1 - SOW updated 3-31-26 -Lab C.docx DOCX document
Exhibit A Rev 1 - Drawings Lab C redacted JP 3-31-26.pdf PDF
Exhibit C Rev 1 - 010010 3-31-26 Updated JP.pdf PDF
Amendment 01 RFP ISD-378581-RO.pdf PDF
Exhibit T - Proposal Form ISD-371462-RO Cross Gallery Southwest Annex Refresh Project.pdf PDF
Exhibit F - 013300_Submittals_FermiForward.pdf PDF
Exhibit M - SF1413.pdf PDF
Exhibit O - Construction Environmental Safety Health Certification.pdf PDF
Exhibit A - SOW.pdf PDF
Exhibit C - SECTION_230529_-_HANGERS_AND_SUPPORTS_FOR_HVAC_PIPING_AND_EQUIPMENT.pdf PDF
Exhibit E - 013100_ESH_Requirements.pdf PDF
Exhibit I - 2025 Construction Insurance Requirements.pdf PDF
Exhibit L - Bond Performance FL-40.pdf PDF
Exhibit N - Fermilab Subcontractor Safety Information Questionnaire.pdf PDF
Exhibit P - SARC_Subcontractor Annual RepsCerts.pdf PDF
Exhibit D - 010010 - General Requirements.pdf PDF
Exhibit J - Bond Bid FL-41.pdf PDF
Exhibit K - Bond Payment FL-42.pdf PDF
Exhibit R - Davis Bacon Wage Rates General Decision IL20260008 Mod 1.txt TXT text file
1.0 RFP ISD-378581-RO.pdf PDF
Exhibit G - 014100_Quality_Requirements.pdf PDF
Exhibit H - FFDG General Terms and Conditions for Construction (08.2025).pdf PDF
Exhibit Q - PUR-466_Proposal Certifications.pdf PDF
Exhibit S - Sample Subcontract.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P-112

WILSON ST.

RING RD.

HWY. 56 BUTTERFIELD RD.

TO

IN

TE

RS

TA

TE

I-

FA

RN

SW

O

RT

H

CONSTRUCTION

KAUTZ RD.

ENTRANCE

ROAD B

KI

RK

R D.

(NO TRUCKS)

PINE ST.

ENTRANCE

AREA

MAIN

INJECTOR

MAIN

KA

UT

Z

RD

PINE ST. (OUT)

PINE ST. (IN) LABORATORY

AREA

HOLTER RD

CENTRAL

WILSON ST.

ENTRANCE

BURLINGTON NORTHERN R.R.

BATAVIA RD.

RECEIVING

ENTRANCE

BATAVIA RD.

(LOAD LIMIT-6 TONS)

EL

G

IN

J

O

LI

ET

E

AS

TE

RN

R .R

CO

M

M O

NW

EA

LT

H

ED

IS

O N

PO

W

ER

L

IN

ES

ROAD

C

BATAVIA RD.

SWENSON

D-0 FA

RM

R D

FE

LD

O

TT

R D

CDF

ROAD D

EO

LA

R D.

TO RT. 59

FERMILAB

VILLAGE

TO HWY 59

T

LOCKED

GATE

RAILYARD

STORAGE

WILSON ST.

HWY 38 ROOSEVELT RD.

TRAFFIC

CONSTRUCTION

MUON

CAMPUS

DISC

OVE

RY R

D.

PI

P

II

FE

YN

MAN

C.C

FIXED TARGET AREA

NEUTRINO AREA

PROTON AREA

INDUSTRIAL

AREA

SITE BOUNDARY LINES

ON SITE CONST. ROUTES

HOURS

LEGEND

EOLA RD. ENTRANCE

(NO ACCESS)

WILSON ST………….6 AM- 4:30 PM M-F / ALL DELIVERIES

PINE ST………………..24HR/7 DAYS A WEEK /NO TRUCKS ALLOWED

BATAVIA RD………...6 AM to 10 PM / 7 DAYS A WEEK/ NO TRUCKS ALLOWED

VICINITY PLAN

NTS

LAB A ELECTRIC HEAT

Project No. 8-2-242

DRAWING LIST

Sheet Number Sheet Title

GENERAL

G-01 COVER SHEET

MECHANICAL

M-01 LAB A MECHANICAL PLAN

M-02 LAB AB MECHANICAL PLAN

M-03 LAB C MECHANICAL PLAN

ELECTRICAL

E-01 ELECTRICAL PLAN

E-02 ELECTRICAL PANEL SCHEDULES AND

SPECIFICATIONS

NOT FOR

CONSTRUCTIO

N

PROJECT

NORTH

E S

W

SCALE:

PROJECT NO.

SHEET NO.

DESIGNED

DRAWN

CHECKED

APPROVED

ISD ENGINEERING DATE

PROJECT NAME.

SHEET NAME:

REVISIONS

REV. DESCRIPTION DATE

REVISION NO.FIMS. NO.

ISD

INFRASTRUCTURE

SERVICES DIVISION

12/22/2025A TAYLOR

A HEIDER

A BIELSKUS

J WILLS

12/22/2025

12/22/2025

12/22/2025

8-2-242

LAB A ELECTRIC HEAT

G-01

D

EC

. 2 2, IS

SU

ED

F O

R C

O M

M

EN

T

AN

D C

O M

PL

IA

N C

E R

EV

IE

W

COVER SHEET

600, 601, 0-00-0000

Ja n.

0,

- 1

0:

A M

Z :\F

ES

S_

EN

G

\A ct iv e

Pr oj ec ts

\8 \2

N

EU

TR

IN

O L

AB

O

R

AT

O R

Y (N

M L)

\2

L ab

A E le ct ric H ea t\3

Fi na l D es ig n\

D ra w in gs

\8 -2

-2

G en er al

.d w g

AutoCAD SHX Text

INDIAN CREEK ROAD

MECHANICAL

ROOM

MEN'S

RESTROOM

UNISEX

RESTROOM

UNISEX

RESTROOM

WATER

SOFTENER

WOMEN'S

RESTROOM

WATER

HEATER

WATER

METER

LAB

SPACE

LAB

SPACE

LAB

SPACE

LAB

SPACE

PRIVATE

OFFICE

MECHANICAL

ROOM

MEN'S

RESTROOM

UNISEX

RESTROOM

UNISEX

RESTROOM

WATER

SOFTENER

WOMEN'S

RESTROOM

WATER

HEATER

WATER

METER

LAB

SPACE

LAB

SPACE

LAB

SPACE

LAB

SPACE

PRIVATE

OFFICE

- EBB-6

EBB-6EBB-6

EBB-6

EBB-6

EUH-1

EWH-1

EWH-1

EWH-1

EBB-4

EBB-4

EBB-6

EBB-4

DEMOLISH EXISTING HYDRONIC

BASEBOARD AND ASSOCIATED

HYDRONIC PIPING

DEMOLISH EXISTING HYDRONIC

BASEBOARD AND ASSOCIATED

HYDRONIC PIPING

LAB A FIRST FLOOR - DEMO

1/8" = 1'-0"

LAB A FIRST FLOOR - NEW WORK

1/8" = 1'-0"

T

T

T

T

T

T

T

EBB-6

DSF-1

EBB-10

EBB-10

EBB-10

DEMOLISH EXISTING HYDRONIC

UNIT VENTILATOR

CUH-1

T

EUH-2 EUH-2

EUH-2

DSF-1

DSF-1

1 SUPPORT NEW DESTRATIFICATION FAN

FROM EXISTING COLUMN ANGLE BRACE.

REFER TO DETAIL 1 ON SHEET M-04 FOR

MORE INFORMATION.

2 SUPPORT NEW UNIT HEATER FROM

EXISTING STRUCTURAL BEAM. REFER TO

DETAIL 2 ON SHEET M-03 FOR MORE

INFORMATION.

3 SUPPORT NEW UNIT HEATER FROM

EXISTING COLUMN. REFER TO DETAIL 2

ON SHEET M-04 FOR MORE

INFORMATION.

5 DO NOT DISTURB BUILDING INSULATION

IN MECHANICAL SPACE.

4 DEMOLISH PIPING ON FIRST FLOOR. CAP

AT CEILING. MEZZANINE PIPING TO

REMAIN.

X KEY NOTES

DEMOLISH ALL REMAINING

ABANDONED HYDRONIC PIPING AND

EQUIPMENT IN MECHANICAL ROOM

DEMO EXISTING

SUSPENDED

EXPANSION TANK

EXISTING WALL HEATER

TO REMIAIN

4 5

EBB-4

MOUNT

THERMOSTAT

TO EXISTING

COLUMN

EXISTING WALL HEATER

TO REMIAIN

CUT AND CAP

ONICON FLOW

METER TO REMAIN

EXISTING

TO REMAIN

REMOVE SIDE STREAM FILTER

AND RETURN TO FERMILAB

REPRESENTATIVE

CAP AT

WALL

T

DEMO EXISTING

TSTAT

CUT AND CAP AT FLOOR OF

MEZZANINE LEVEL

SSS

T

T

1. PROVIDE JCI MODEL TEC3000 BACNET MSTP

COMPATIBLE THERMOSTAT.

2. PROVIDE NIAGARA BAS INTEGRATION,

INCLUDING POINTS, ALARMS, TRENDS, AND

REFLOW GRAPHICS WITH FLOOR PLANS ON

EXISTING NIAGARA N4 SERVER. (CONTACT DAN

FRANZO AT INTELLI-BUILDING).

3. PROVIDE DAISY CHAINED BACNET MSTP TRUNK

WIRING TO EXISTING JACE. LOCATION NOTED

ON PLANS.

4. VALIDATE THAT CONTROLS ARE COMPATIBLE

WITH THE OWNER SITE BUILDING AUTOMATION

SYSTEM AND BACNET.

5. SUBCONTRACTOR TO DEVELOP BOTH SOFT

AND HARD ALARMS LIST AND SUBMIT FOR

APPROVAL

CONTROLS NOTES

EXISTING JACE EXISTING JACE

SCALE:

PROJECT NO.

SHEET NO.

DESIGNED

DRAWN

CHECKED

APPROVED

ISD ENGINEERING DATE

PROJECT NAME.

SHEET NAME:

REVISIONS

REV. DESCRIPTION DATE

REVISION NO.FIMS. NO.

ISD

INFRASTRUCTURE

SERVICES DIVISION

NOT FOR

CONSTRUCTIO

N

1/8"=1'-0" 8 0 8 16

SCALE FEET

W

S

E

PN

TN

12/22/2025A TAYLOR

A HEIDER

A BIELSKUS

J WILLS

12/22/2025

12/22/2025

12/22/2025

8-2-242

LAB A ELECTRIC HEAT

M-01

D

EC

. 2 2, IS

SU

ED

F O

R C

O M

M

EN

T

AN

D C

O M

PL

IA

N C

E R

EV

IE

W

LAB A MECHANICAL PLAN

600, 601, 0-00-0000

Ja n.

0,

- 9

:2

AM

Z

:\F

ES

S_

EN

G \A ct iv e Pr oj ec ts \8

\2 N

EU

TR

IN

O

L

AB

O R

AT

O

R Y

(N M

L) \2

L ab A

E le ct ric

H ea t\3

Fi na l D es ig n\

D ra w in gs \8

-2 -2

M ec ha ni ca l.d w g

13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4"±7"

151'-7"

A B C D E F G H J K L M

N

7' -0

'-0

3'-9" ±7"

LAB A-B CONNECTOR FIRST FLOOR

1/8" = 1'-0"

EBB-10 EBB-10 EBB-10 EBB-10 EBB-10 EBB-10 EBB-10 EBB-10 EBB-10 EBB-10

DEMOLISH EXISTING HOT

WATER BASEBOARD HEATER

AND INSTALL NEW ELECTRIC

BASEBOARD HEATER (TYP.)

T T T

T

DEMOLISH EXISTING HOT

WATER BASEBOARD HEATER

CUT AND

CAP

EXISTING HEATER

TO REMAIN

SCALE:

PROJECT NO.

SHEET NO.

DESIGNED

DRAWN

CHECKED

APPROVED

ISD ENGINEERING DATE

PROJECT NAME.

SHEET NAME:

REVISIONS

REV. DESCRIPTION DATE

REVISION NO.FIMS. NO.

ISD

INFRASTRUCTURE

SERVICES DIVISION

NOT FOR

CONSTRUCTIO

N

1/8"=1'-0" 8 0 8 16

SCALE FEET

W

S

E

PN

TN

12/22/2025A TAYLOR

A HEIDER

A BIELSKUS

J WILLS

12/22/2025

12/22/2025

12/22/2025

8-2-242

LAB A ELECTRIC HEAT

M-02

D

EC

. 2 2, IS

SU

ED

F O

R C

O M

M

EN

T

AN

D C

O M

PL

IA

N C

E R

EV

IE

W

LAB AB MECHANICAL PLAN

600, 601, 0-00-0000

Ja n.

0,

- 9

:2

AM

Z

:\F

ES

S_

EN

G \A ct iv e Pr oj ec ts \8

\2 N

EU

TR

IN

O

L

AB

O R

AT

O

R Y

(N M

L) \2

L ab A

E le ct ric

H ea t\3

Fi na l D es ig n\

D ra w in gs \8

-2 -2

M ec ha ni ca l.d

LAB C CONNECTOR FIRST FLOOR

1/8" = 1'-0"

DSF-1

CLAMP UNISTRUT

TO BEAM

THREADED

ROD

ANGLE DOWN TOWARD

CENTER OF HIGH BAY

THREADED

ROD

DOUBLE UNISTRUT

BRACKET

UNIT HEATER

EXISTING BEAM

BOLT NEW BRACKET TO

BEAM

DOUBLE UNISTRUT

BRACKET

DETAIL 1

NO SCALE

DETAIL 2

NO SCALE

DETAIL 3

NO SCALE

BACK-TO-BACK

UNISTRUT CHANNEL

ANGLED THREADED

ROD HANGER

ANGLED BEAM

BEAM

COLUMN

MOUNT DESTRATIFICATION FAN TO

EXISTING STRUCTURE ABOVES

SCALE:

PROJECT NO.

SHEET NO.

DESIGNED

DRAWN

CHECKED

APPROVED

ISD ENGINEERING DATE

PROJECT NAME.

SHEET NAME:

REVISIONS

REV. DESCRIPTION DATE

REVISION NO.FIMS. NO.

ISD

INFRASTRUCTURE

SERVICES DIVISION

NOT FOR

CONSTRUCTIO

N

1/8"=1'-0" 8 0 8 16

SCALE FEET

W

S

E

PN

TN

12/22/2025A TAYLOR

A HEIDER

A BIELSKUS

J WILLS

12/22/2025

12/22/2025

12/22/2025

8-2-242

LAB A ELECTRIC HEAT

M-03

D

EC

. 2 2, IS

SU

ED

F O

R C

O M

M

EN

T

AN

D C

O M

PL

IA

N C

E R

EV

IE

W

LAB C MECHANICAL PLAN

600, 601, 0-00-0000

Ja n.

0,

- 9

:2

AM

Z

:\F

ES

S_

EN

G \A ct iv e Pr oj ec ts \8

\2 N

EU

TR

IN

O

L

AB

O R

AT

O

R Y

(N M

L) \2

L ab A

E le ct ric

H ea t\3

Fi na l D es ig n\

D ra w in gs \8

-2 -2

M ec ha ni ca l.d

NEW 45 kVA

TR-NL-5

PP-NL-5A

EX. PP-NL-23D

13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4"±7"

151'-7"

3'-9" ±7"

NEW PANEL

PP-AB-2B

75kVA

TR-PP-AB-2

TO

PP-NL-5A

NEW 125A BREAKER

FOR SWITCHBOARD

SWBBNL-4

TO

TR-PP-AB-2

LAB A FIRST FLOOR - NEW WORK

1/8" = 1'-0"

LAB A-B CONNECTOR FIRST FLOOR

1/8" = 1'-0"

LAB C CONNECTOR FIRST FLOOR

1/8" = 1'-0"

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-NL-5A

TO

PP-AB-2B

TO

PP-AB-2B

TO

PP-AB-2B

TO

PP-AB-2B

TO

PP-AB-2B

TO

PP-AB-2B

TO

PP-AB-2B

TO

PP-AB-2B

TO

PP-AB-2B

TO

PP-AB-2B

TO

PP-NL-23D

SCALE:

PROJECT NO.

SHEET NO.

DESIGNED

DRAWN

CHECKED

APPROVED

ISD ENGINEERING DATE

PROJECT NAME.

SHEET NAME:

REVISIONS

REV. DESCRIPTION DATE

REVISION NO.FIMS. NO.

ISD

INFRASTRUCTURE

SERVICES DIVISION

NOT FOR

CONSTRUCTIO

N

241684

FEETSCALE

12 282004 3/32"=1'-0"

W

S

E

PN

TN

12/22/2025A BECKER

A HEIDER

R WIELGOS

J WILLS

12/22/2025

12/22/2025

12/22/2025

8-2-242

LAB A ELECTRIC HEAT

E-01

D

EC

. 2 2, IS

SU

ED

F O

R C

O M

M

EN

T

AN

D C

O M

PL

IA

N C

E R

EV

IE

W

ELECTRICAL PLAN

600, 601, 0-00-0000

Ja n.

0,

- 9

:2

AM

Z

:\F

ES

S_

EN

G \A ct iv e Pr oj ec ts \8

\2 N

EU

TR

IN

O

L

AB

O R

AT

O

R Y

(N M

L) \2

L ab A

E le ct ric

H ea t\3

Fi na l D es ig n\

D ra w in gs \8

-2 -2

E le ct ric al

.d

1. LOCATION OF FIXTURES AND OTHER PIECES OF ELECTRICAL

EQUIPMENT AS SHOWN ON THE DRAWINGS ARE

APPROXIMATE AND SHALL BE COORDINATED IN THE FIELD

WITH THE LOCATION OF PIPES, VENTILATION DUCTS AND

MECHANICAL EQUIPMENT TO AVOID INTERFERENCES. ANY

CONFLICTS DERIVING FROM EQUIPMENT INSTALLATION SHALL

BE BROUGHT IMMEDIATELY TO THE ATTENTION OF THE

FERMILAB CONSTRUCTION COORDINATOR.

2. ALL CONDUITS SHALL CONTAIN AN INSULATED, GREEN

COLORED EQUIPMENT GROUNDING CONDUCTOR.

3. ALL WIRING SHALL BE COPPER, 600 VOLTS, TYPE THHN/THWN

INSULATION. MINIMUM SIZE SHALL BE NO. 12 AWG. FOR

POWER AND NO. 14 FOR CONTROL, UNLESS NOTED

OTHERWISE.

4. FINAL CONNECTION TO TRANSFORMERS, MOTORS OR OTHER

VIBRATION GENERATING DEVICES SHALL BE MADE WITH USE

OF STRANDED CONDUCTORS IN LIQUID TIGHT FLEXIBLE

CONDUIT.

5. ALL EQUIPMENT SHALL BE CONNECTED TO AN EQUIPMENT

GROUNDING CONDUCTOR AT THE EQUIPMENT'S GROUNDING

LUG OR BY SPLICE TO THE EQUIPMENT'S GREEN COLORED

OR BARE COPPER FIXTURE GROUNDING WIRE.

6. ALL CONDUCTORS TO BE RUN IN 3/4" MINIMUM METALLIC

CONDUIT.

6.1. EMT INDOOR, DRY, LOCATIONS NOT SUBJECT TO DAMAGE

6.2. RGS OUTDOOR, WET, LOCATIONS SUBJECT TO DAMAGE

7. ALL PULL BOXES AND JUNCTION BOXES SHALL BE SIZED PER

THE LATEST EDITION OF THE NEC. SUBCONTRACTOR SHALL

SIZE, FURNISH AND INSTALL ALL PULL BOXES OR JUNCTION

BOXES AS REQUIRED BY Y THE NEC.

8. ALL MATERIAL AND ELECTRICAL EQUIPMENT SHALL BE LISTED

BY UNDERWRITERS LABORATORIES, INC. OR CERTIFIED BY A

NATIONALLY RECOGNIZED TESTING LABORATORY. ALL

INSTALLATIONS SHALL COMPLY WITH THE RULES AND

REGULATIONS OF THE LATEST EDITION OF THE NEC AND

OSHA.

9. ALL ELECTRICAL INSTALLATIONS SHALL BE SUBJECT TO THE

REVIEW AND APPROVAL OF THE FERMILAB CONSTRUCTION

COORDINATOR. ANY ELECTRICAL INSTALLATION NOT MEETING

THE APPROVAL OF THE FERMILAB CONSTRUCTION

COORDINATOR SHALL BE REMOVED AND REINSTALLED TO

THE SATISFACTION OF FERMILAB BY THE SUBCONTRACTOR,

AT NO COST TO FERMILAB.

10. SUBCONTRACTOR TO SEAL AROUND CONDUIT PENETRATION

THROUGH FIREWALL WITH UL APPROVED FIRE BARRIER

CAULKING.

11. COORDINATE ALL CIRCUIT NUMBERS FOR NEW RECEPTACLES

WITH CONSTRUCTION COORDINATOR.

12. PANELS, RECEPTACLES, LIGHT SWITCHES, EQUIPMENT, ETC.

TO BE LABELED WITH POWER SOURCE. LABELING TAPE SHALL

BE USED FOR DEVICE LABELING AND LAMACOID SHALL BE

USED FOR EQUIPMENT LABELING. TAPES SHALL INDICATE THE

FULL PANEL DESIGNATION AND INDICATED ON THE DRAWINGS

AS WELL AS THE CIRCUIT BREAKER NUMBER AND VOLTAGE.

13. NO ELECTRICAL WORK SHALL BE PERFORMED ON ENERGIZED

CIRCUITS. ALL CIRCUITS MUST BE LOCKED OUT AND TAGGED

OUT BEFORE WORK CAN BEGIN. AFTER CIRCUITS ARE

LOCKED OUT, VERIFY WITH A TEST INSTRUMENT THAT ALL

CONDUCTORS ARE ACTUALLY DE-ENERGIZED. ALL WORK

SHALL BE PERFORMED IN ACCORDANCE WITH FERMILAB'S (ES

& H) SAFETY PROGRAM.

14. RECEPTACLES SHALL HAVE THE FOLLOWING

CHARACTERISTICS:

14.1. ALL RECEPTACLES SHALL BE FROM THE SAME

MANUFACTURER AND HAVE IDENTICAL PHYSICAL

APPEARANCE AND CHARACTERISTIC.

14.2. CONVENIENCE RECEPTACLES FOR BUILDING SERVICES

SHALL BE GROUNDING TYPE, RATED AS SPECIFIED AND

NEMA PERFORMANCE SPECIFICATION GRADE.

14.3. CONVENIENCE RECEPTACLES HOUSINGS SHALL BE

HEAVY GRADE UREA OR CERAMIC, IVORY COLOR.

14.4. THE FOLLOWING STANDARD RECEPTACLES OR THEIR

EQUIVALENT SHALL BE USED AS INDICATED ON THE

DRAWINGS, COMPLETE WITH BOXES, ANGLE ADAPTERS

AND ASSOCIATED HARDWARE:

14.4.1. CONVENIENCE (DUPLEX): 120V, 20A, 1Ø, 2-WIRE WITH

GROUND, HUBBELL HBL5362W.

14.5. ALL COVERS FOR WIRING DEVICES HOUSING

RECEPTACLES SHALL BE OF THE METALLIC TYPE.

PLASTIC COVERS ARE UNACCEPTABLE.

15. PROVIDE NEW CIRCUIT DIRECTORIES IN ACCORDANCE WITH

NEC.

15.1. EVERY CIRCUIT AND CIRCUIT MODIFICATION SHALL BE

LEGIBLY IDENTIFIED AS TO ITS CLEAR, EVIDENT, AND

SPECIFIC PURPOSE OR USE.

15.2. THE IDENTIFICATION SHALL INCLUDE SUFFICIENT DETAIL

TO ALLOW EACH CIRCUIT TO BE DISTINGUISHED FROM

ALL OTHERS.

15.3. SPARE POSITIONS THAT CONTAIN UNUSED

OVERCURRENT DEVICES OR SWITCHES BE DESCRIBED

ACCORDINGLY.

15.4. THE IDENTIFICATION SHALL BE INCLUDED IN A CIRCUIT

DIRECTORY THAT IS LOCATED ON THE FACE OR INSIDE

OF THE PANEL DOOR AND LOCATED AT EACH SWITCH ON

A SWITCH BOARD.

15.5. NO CIRCUIT SHALL BE DESCRIBED IN A MANNER THAT

DEPENDS ON TRANSIENT CONDITIONS OF OCCUPANCY

(I.E OCCUPANT OR OFFICE NAME OR NUMBER).

15.6. SUBMIT DIRECTORY FOR REVIEW AND APPROVAL PRIOR

TO INSTALLATION.

16. TRANSFORMER “TR-PP-NL-5” TO HAVE THE FOLLOWING

CHARACTERISTICS

16.1. COPPER WINDINGS

16.2. 45KVA, 3PH

16.3. 480-120/208V

16.4. 115° RISE

16.5. BOD: SQUARE D EXN45T3HFCU

17. PANEL BOARD “PP-NL-5A” TO HAVE THE FOLLOWING

CHARACTERISTICS

17.1. COPPER BUS WITH 225A BUS RATING

17.2. MAIN BREAKER CONFIGURATION WITH 125A BREAKER

17.3. BOD:BREAKER SQUARE D QDL22125

17.4. NUMBER OF SPACES: 54

17.5. NEMA 1 RATED

17.6. 208Y/120 3PH 4W

17.7. 22KA

17.8. BOD: SQUARE D NQ454L2C

18. PANEL BOARD “PP-AB-2B” TO HAVE THE FOLLOWING

CHARACTERISTICS

18.1. COPPER BUS WITH 100A BUS RATING

18.2. MAIN BREAKER CONFIGURATION WITH 100A BREAKER

18.3. BOD: BREAKER SQUARE D HDL36100U31X

18.4. NUMBER OF SPACES: 30

18.5. NEMA 1 RATED

18.6. 208Y/120 3PH 4W

18.7. 22KA

18.8. BOD: SQUARE D NQ430L1C

ELECTRICAL SPECIFICATIONS

SCALE:

PROJECT NO.

SHEET NO.

DESIGNED

DRAWN

CHECKED

APPROVED

ISD ENGINEERING DATE

PROJECT NAME.

SHEET NAME:

REVISIONS

REV. DESCRIPTION DATE

REVISION NO.FIMS. NO.

ISD

INFRASTRUCTURE

SERVICES DIVISION

NOT FOR

CONSTRUCTIO

N

1/8"=1'-0" 8 0 8 16

SCALE FEET

W

S

E

PN

TN

12/22/2025A BECKER

A HEIDER

R WIELGOS

J WILLS

12/22/2025

12/22/2025

12/22/2025

8-2-242

LAB A ELECTRIC HEAT

E-02

D

EC

. 2 2, IS

SU

ED

F O

R C

O M

M

EN

T

AN

D C

O M

PL

IA

N C

E R

EV

IE

W

ELECTRICAL PANEL

SCHEDULES AND

SPECIFICATIONS

CCR REV 1 1/7/2026

600, 601, 0-00-0000

Ja n.

0,

- 9

:2

AM

Z

:\F

ES

S_

EN

G \A ct iv e Pr oj ec ts \8

\2 N

EU

TR

IN

O

L

AB

O R

AT

O

R Y

(N M

L) \2

L ab A

E le ct ric

H ea t\3

Fi na l D es ig n\

D ra w in gs \8

-2 -2

E le ct ric al

.d

Sheets and Views
8-2-242 General-G-01

File details come from the government source that posted it. Updated .