Exhibit B - Drawings.pdf
PDF 2 MB Posted
- Attached to
- Lab A Electric Heat Install
- Solicitation number
- ISD-378581-RO
About this file
These are final design drawings for Project 8-2-242, the Lab A Electric Heat project at Fermilab's Infrastructure Services Division. The drawing set includes general cover sheets, mechanical plans for three laboratory areas (Lab A, Lab AB Connector, and Lab C), and electrical plans with panel schedules and specifications, all marked "NOT FOR CONSTRUCTION" and issued for comment and compliance review on December 22, 2025.
The mechanical work involves replacing existing hydronic baseboard heating systems with electric heating infrastructure across multiple laboratory spaces. Lab A requires demolition of existing hydronic equipment and installation of electric baseboard heaters (EBB-4, EBB-6, EBB-10 models), electric unit heaters (EUH-1, EUH-2), electric wall heaters (EWH-1), and destratification fans (DSF-1). The project includes provision of a JCI Model TEC3000 BACnet MSTP thermostat with integration into Fermilab's Niagara N4 building automation system, daisy-chained BACnet MSTP trunk wiring to existing JACE equipment, and development of soft and hard alarm lists for owner approval. The electrical infrastructure consists of a new 45 kVA transformer (TR-PP-NL-5) stepping down from 480V to 120/208V, feeding a new 54-space panel board (PP-NL-5A) with 225A bus rating and 125A main breaker, and a new 30-space panel board (PP-AB-2B) with 100A rating in the Lab A-B connector area. All electrical work requires copper wiring (THHN/THWN, minimum 12 AWG for power), 3/4-inch minimum metallic conduit, equipment grounding conductors, and compliance with NEC standards and Fermilab's ES&H safety protocols.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P-112
WILSON ST.
RING RD.
HWY. 56 BUTTERFIELD RD.
TO
IN
TE
RS
TA
TE
I-
FA
RN
SW
O
RT
H
CONSTRUCTION
KAUTZ RD.
ENTRANCE
ROAD B
KI
RK
R D.
(NO TRUCKS)
PINE ST.
ENTRANCE
AREA
MAIN
INJECTOR
MAIN
KA
UT
Z
RD
PINE ST. (OUT)
PINE ST. (IN) LABORATORY
AREA
HOLTER RD
CENTRAL
WILSON ST.
ENTRANCE
BURLINGTON NORTHERN R.R.
BATAVIA RD.
RECEIVING
ENTRANCE
BATAVIA RD.
(LOAD LIMIT-6 TONS)
EL
G
IN
J
O
LI
ET
E
AS
TE
RN
R .R
CO
M
M O
NW
EA
LT
H
ED
IS
O N
PO
W
ER
L
IN
ES
ROAD
C
BATAVIA RD.
SWENSON
D-0 FA
RM
R D
FE
LD
O
TT
R D
CDF
ROAD D
EO
LA
R D.
TO RT. 59
FERMILAB
VILLAGE
TO HWY 59
T
LOCKED
GATE
RAILYARD
STORAGE
WILSON ST.
HWY 38 ROOSEVELT RD.
TRAFFIC
CONSTRUCTION
MUON
CAMPUS
DISC
OVE
RY R
D.
PI
P
II
FE
YN
MAN
C.C
FIXED TARGET AREA
NEUTRINO AREA
PROTON AREA
INDUSTRIAL
AREA
SITE BOUNDARY LINES
ON SITE CONST. ROUTES
HOURS
LEGEND
EOLA RD. ENTRANCE
(NO ACCESS)
WILSON ST………….6 AM- 4:30 PM M-F / ALL DELIVERIES
PINE ST………………..24HR/7 DAYS A WEEK /NO TRUCKS ALLOWED
BATAVIA RD………...6 AM to 10 PM / 7 DAYS A WEEK/ NO TRUCKS ALLOWED
VICINITY PLAN
NTS
LAB A ELECTRIC HEAT
Project No. 8-2-242
DRAWING LIST
Sheet Number Sheet Title
GENERAL
G-01 COVER SHEET
MECHANICAL
M-01 LAB A MECHANICAL PLAN
M-02 LAB AB MECHANICAL PLAN
M-03 LAB C MECHANICAL PLAN
ELECTRICAL
E-01 ELECTRICAL PLAN
E-02 ELECTRICAL PANEL SCHEDULES AND
SPECIFICATIONS
NOT FOR
CONSTRUCTIO
N
PROJECT
NORTH
E S
W
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
INFRASTRUCTURE
SERVICES DIVISION
12/22/2025A TAYLOR
A HEIDER
A BIELSKUS
J WILLS
12/22/2025
12/22/2025
12/22/2025
8-2-242
LAB A ELECTRIC HEAT
G-01
D
EC
. 2 2, IS
SU
ED
F O
R C
O M
M
EN
T
AN
D C
O M
PL
IA
N C
E R
EV
IE
W
COVER SHEET
600, 601, 0-00-0000
Ja n.
0,
- 1
0:
A M
Z :\F
ES
S_
EN
G
\A ct iv e
Pr oj ec ts
\8 \2
N
EU
TR
IN
O L
AB
O
R
AT
O R
Y (N
M L)
\2
L ab
A E le ct ric H ea t\3
Fi na l D es ig n\
D ra w in gs
\8 -2
-2
G en er al
.d w g
AutoCAD SHX Text
INDIAN CREEK ROAD
MECHANICAL
ROOM
MEN'S
RESTROOM
UNISEX
RESTROOM
UNISEX
RESTROOM
WATER
SOFTENER
WOMEN'S
RESTROOM
WATER
HEATER
WATER
METER
LAB
SPACE
LAB
SPACE
LAB
SPACE
LAB
SPACE
PRIVATE
OFFICE
MECHANICAL
ROOM
MEN'S
RESTROOM
UNISEX
RESTROOM
UNISEX
RESTROOM
WATER
SOFTENER
WOMEN'S
RESTROOM
WATER
HEATER
WATER
METER
LAB
SPACE
LAB
SPACE
LAB
SPACE
LAB
SPACE
PRIVATE
OFFICE
- EBB-6
EBB-6EBB-6
EBB-6
EBB-6
EUH-1
EWH-1
EWH-1
EWH-1
EBB-4
EBB-4
EBB-6
EBB-4
DEMOLISH EXISTING HYDRONIC
BASEBOARD AND ASSOCIATED
HYDRONIC PIPING
DEMOLISH EXISTING HYDRONIC
BASEBOARD AND ASSOCIATED
HYDRONIC PIPING
LAB A FIRST FLOOR - DEMO
1/8" = 1'-0"
LAB A FIRST FLOOR - NEW WORK
1/8" = 1'-0"
T
T
T
T
T
T
T
EBB-6
DSF-1
EBB-10
EBB-10
EBB-10
DEMOLISH EXISTING HYDRONIC
UNIT VENTILATOR
CUH-1
T
EUH-2 EUH-2
EUH-2
DSF-1
DSF-1
1 SUPPORT NEW DESTRATIFICATION FAN
FROM EXISTING COLUMN ANGLE BRACE.
REFER TO DETAIL 1 ON SHEET M-04 FOR
MORE INFORMATION.
2 SUPPORT NEW UNIT HEATER FROM
EXISTING STRUCTURAL BEAM. REFER TO
DETAIL 2 ON SHEET M-03 FOR MORE
INFORMATION.
3 SUPPORT NEW UNIT HEATER FROM
EXISTING COLUMN. REFER TO DETAIL 2
ON SHEET M-04 FOR MORE
INFORMATION.
5 DO NOT DISTURB BUILDING INSULATION
IN MECHANICAL SPACE.
4 DEMOLISH PIPING ON FIRST FLOOR. CAP
AT CEILING. MEZZANINE PIPING TO
REMAIN.
X KEY NOTES
DEMOLISH ALL REMAINING
ABANDONED HYDRONIC PIPING AND
EQUIPMENT IN MECHANICAL ROOM
DEMO EXISTING
SUSPENDED
EXPANSION TANK
EXISTING WALL HEATER
TO REMIAIN
4 5
EBB-4
MOUNT
THERMOSTAT
TO EXISTING
COLUMN
EXISTING WALL HEATER
TO REMIAIN
CUT AND CAP
ONICON FLOW
METER TO REMAIN
EXISTING
TO REMAIN
REMOVE SIDE STREAM FILTER
AND RETURN TO FERMILAB
REPRESENTATIVE
CAP AT
WALL
T
DEMO EXISTING
TSTAT
CUT AND CAP AT FLOOR OF
MEZZANINE LEVEL
SSS
T
T
1. PROVIDE JCI MODEL TEC3000 BACNET MSTP
COMPATIBLE THERMOSTAT.
2. PROVIDE NIAGARA BAS INTEGRATION,
INCLUDING POINTS, ALARMS, TRENDS, AND
REFLOW GRAPHICS WITH FLOOR PLANS ON
EXISTING NIAGARA N4 SERVER. (CONTACT DAN
FRANZO AT INTELLI-BUILDING).
3. PROVIDE DAISY CHAINED BACNET MSTP TRUNK
WIRING TO EXISTING JACE. LOCATION NOTED
ON PLANS.
4. VALIDATE THAT CONTROLS ARE COMPATIBLE
WITH THE OWNER SITE BUILDING AUTOMATION
SYSTEM AND BACNET.
5. SUBCONTRACTOR TO DEVELOP BOTH SOFT
AND HARD ALARMS LIST AND SUBMIT FOR
APPROVAL
CONTROLS NOTES
EXISTING JACE EXISTING JACE
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
INFRASTRUCTURE
SERVICES DIVISION
NOT FOR
CONSTRUCTIO
N
1/8"=1'-0" 8 0 8 16
SCALE FEET
W
S
E
PN
TN
12/22/2025A TAYLOR
A HEIDER
A BIELSKUS
J WILLS
12/22/2025
12/22/2025
12/22/2025
8-2-242
LAB A ELECTRIC HEAT
M-01
D
EC
. 2 2, IS
SU
ED
F O
R C
O M
M
EN
T
AN
D C
O M
PL
IA
N C
E R
EV
IE
W
LAB A MECHANICAL PLAN
600, 601, 0-00-0000
Ja n.
0,
- 9
:2
AM
Z
:\F
ES
S_
EN
G \A ct iv e Pr oj ec ts \8
\2 N
EU
TR
IN
O
L
AB
O R
AT
O
R Y
(N M
L) \2
L ab A
E le ct ric
H ea t\3
Fi na l D es ig n\
D ra w in gs \8
-2 -2
M ec ha ni ca l.d w g
13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4"±7"
151'-7"
A B C D E F G H J K L M
N
7' -0
'-0
3'-9" ±7"
LAB A-B CONNECTOR FIRST FLOOR
1/8" = 1'-0"
EBB-10 EBB-10 EBB-10 EBB-10 EBB-10 EBB-10 EBB-10 EBB-10 EBB-10 EBB-10
DEMOLISH EXISTING HOT
WATER BASEBOARD HEATER
AND INSTALL NEW ELECTRIC
BASEBOARD HEATER (TYP.)
T T T
T
DEMOLISH EXISTING HOT
WATER BASEBOARD HEATER
CUT AND
CAP
EXISTING HEATER
TO REMAIN
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
INFRASTRUCTURE
SERVICES DIVISION
NOT FOR
CONSTRUCTIO
N
1/8"=1'-0" 8 0 8 16
SCALE FEET
W
S
E
PN
TN
12/22/2025A TAYLOR
A HEIDER
A BIELSKUS
J WILLS
12/22/2025
12/22/2025
12/22/2025
8-2-242
LAB A ELECTRIC HEAT
M-02
D
EC
. 2 2, IS
SU
ED
F O
R C
O M
M
EN
T
AN
D C
O M
PL
IA
N C
E R
EV
IE
W
LAB AB MECHANICAL PLAN
600, 601, 0-00-0000
Ja n.
0,
- 9
:2
AM
Z
:\F
ES
S_
EN
G \A ct iv e Pr oj ec ts \8
\2 N
EU
TR
IN
O
L
AB
O R
AT
O
R Y
(N M
L) \2
L ab A
E le ct ric
H ea t\3
Fi na l D es ig n\
D ra w in gs \8
-2 -2
M ec ha ni ca l.d
LAB C CONNECTOR FIRST FLOOR
1/8" = 1'-0"
DSF-1
CLAMP UNISTRUT
TO BEAM
THREADED
ROD
ANGLE DOWN TOWARD
CENTER OF HIGH BAY
THREADED
ROD
DOUBLE UNISTRUT
BRACKET
UNIT HEATER
EXISTING BEAM
BOLT NEW BRACKET TO
BEAM
DOUBLE UNISTRUT
BRACKET
DETAIL 1
NO SCALE
DETAIL 2
NO SCALE
DETAIL 3
NO SCALE
BACK-TO-BACK
UNISTRUT CHANNEL
ANGLED THREADED
ROD HANGER
ANGLED BEAM
BEAM
COLUMN
MOUNT DESTRATIFICATION FAN TO
EXISTING STRUCTURE ABOVES
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
INFRASTRUCTURE
SERVICES DIVISION
NOT FOR
CONSTRUCTIO
N
1/8"=1'-0" 8 0 8 16
SCALE FEET
W
S
E
PN
TN
12/22/2025A TAYLOR
A HEIDER
A BIELSKUS
J WILLS
12/22/2025
12/22/2025
12/22/2025
8-2-242
LAB A ELECTRIC HEAT
M-03
D
EC
. 2 2, IS
SU
ED
F O
R C
O M
M
EN
T
AN
D C
O M
PL
IA
N C
E R
EV
IE
W
LAB C MECHANICAL PLAN
600, 601, 0-00-0000
Ja n.
0,
- 9
:2
AM
Z
:\F
ES
S_
EN
G \A ct iv e Pr oj ec ts \8
\2 N
EU
TR
IN
O
L
AB
O R
AT
O
R Y
(N M
L) \2
L ab A
E le ct ric
H ea t\3
Fi na l D es ig n\
D ra w in gs \8
-2 -2
M ec ha ni ca l.d
NEW 45 kVA
TR-NL-5
PP-NL-5A
EX. PP-NL-23D
13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4" 13'-4"±7"
151'-7"
3'-9" ±7"
NEW PANEL
PP-AB-2B
75kVA
TR-PP-AB-2
TO
PP-NL-5A
NEW 125A BREAKER
FOR SWITCHBOARD
SWBBNL-4
TO
TR-PP-AB-2
LAB A FIRST FLOOR - NEW WORK
1/8" = 1'-0"
LAB A-B CONNECTOR FIRST FLOOR
1/8" = 1'-0"
LAB C CONNECTOR FIRST FLOOR
1/8" = 1'-0"
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-NL-5A
TO
PP-AB-2B
TO
PP-AB-2B
TO
PP-AB-2B
TO
PP-AB-2B
TO
PP-AB-2B
TO
PP-AB-2B
TO
PP-AB-2B
TO
PP-AB-2B
TO
PP-AB-2B
TO
PP-AB-2B
TO
PP-NL-23D
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
INFRASTRUCTURE
SERVICES DIVISION
NOT FOR
CONSTRUCTIO
N
241684
FEETSCALE
12 282004 3/32"=1'-0"
W
S
E
PN
TN
12/22/2025A BECKER
A HEIDER
R WIELGOS
J WILLS
12/22/2025
12/22/2025
12/22/2025
8-2-242
LAB A ELECTRIC HEAT
E-01
D
EC
. 2 2, IS
SU
ED
F O
R C
O M
M
EN
T
AN
D C
O M
PL
IA
N C
E R
EV
IE
W
ELECTRICAL PLAN
600, 601, 0-00-0000
Ja n.
0,
- 9
:2
AM
Z
:\F
ES
S_
EN
G \A ct iv e Pr oj ec ts \8
\2 N
EU
TR
IN
O
L
AB
O R
AT
O
R Y
(N M
L) \2
L ab A
E le ct ric
H ea t\3
Fi na l D es ig n\
D ra w in gs \8
-2 -2
E le ct ric al
.d
1. LOCATION OF FIXTURES AND OTHER PIECES OF ELECTRICAL
EQUIPMENT AS SHOWN ON THE DRAWINGS ARE
APPROXIMATE AND SHALL BE COORDINATED IN THE FIELD
WITH THE LOCATION OF PIPES, VENTILATION DUCTS AND
MECHANICAL EQUIPMENT TO AVOID INTERFERENCES. ANY
CONFLICTS DERIVING FROM EQUIPMENT INSTALLATION SHALL
BE BROUGHT IMMEDIATELY TO THE ATTENTION OF THE
FERMILAB CONSTRUCTION COORDINATOR.
2. ALL CONDUITS SHALL CONTAIN AN INSULATED, GREEN
COLORED EQUIPMENT GROUNDING CONDUCTOR.
3. ALL WIRING SHALL BE COPPER, 600 VOLTS, TYPE THHN/THWN
INSULATION. MINIMUM SIZE SHALL BE NO. 12 AWG. FOR
POWER AND NO. 14 FOR CONTROL, UNLESS NOTED
OTHERWISE.
4. FINAL CONNECTION TO TRANSFORMERS, MOTORS OR OTHER
VIBRATION GENERATING DEVICES SHALL BE MADE WITH USE
OF STRANDED CONDUCTORS IN LIQUID TIGHT FLEXIBLE
CONDUIT.
5. ALL EQUIPMENT SHALL BE CONNECTED TO AN EQUIPMENT
GROUNDING CONDUCTOR AT THE EQUIPMENT'S GROUNDING
LUG OR BY SPLICE TO THE EQUIPMENT'S GREEN COLORED
OR BARE COPPER FIXTURE GROUNDING WIRE.
6. ALL CONDUCTORS TO BE RUN IN 3/4" MINIMUM METALLIC
CONDUIT.
6.1. EMT INDOOR, DRY, LOCATIONS NOT SUBJECT TO DAMAGE
6.2. RGS OUTDOOR, WET, LOCATIONS SUBJECT TO DAMAGE
7. ALL PULL BOXES AND JUNCTION BOXES SHALL BE SIZED PER
THE LATEST EDITION OF THE NEC. SUBCONTRACTOR SHALL
SIZE, FURNISH AND INSTALL ALL PULL BOXES OR JUNCTION
BOXES AS REQUIRED BY Y THE NEC.
8. ALL MATERIAL AND ELECTRICAL EQUIPMENT SHALL BE LISTED
BY UNDERWRITERS LABORATORIES, INC. OR CERTIFIED BY A
NATIONALLY RECOGNIZED TESTING LABORATORY. ALL
INSTALLATIONS SHALL COMPLY WITH THE RULES AND
REGULATIONS OF THE LATEST EDITION OF THE NEC AND
OSHA.
9. ALL ELECTRICAL INSTALLATIONS SHALL BE SUBJECT TO THE
REVIEW AND APPROVAL OF THE FERMILAB CONSTRUCTION
COORDINATOR. ANY ELECTRICAL INSTALLATION NOT MEETING
THE APPROVAL OF THE FERMILAB CONSTRUCTION
COORDINATOR SHALL BE REMOVED AND REINSTALLED TO
THE SATISFACTION OF FERMILAB BY THE SUBCONTRACTOR,
AT NO COST TO FERMILAB.
10. SUBCONTRACTOR TO SEAL AROUND CONDUIT PENETRATION
THROUGH FIREWALL WITH UL APPROVED FIRE BARRIER
CAULKING.
11. COORDINATE ALL CIRCUIT NUMBERS FOR NEW RECEPTACLES
WITH CONSTRUCTION COORDINATOR.
12. PANELS, RECEPTACLES, LIGHT SWITCHES, EQUIPMENT, ETC.
TO BE LABELED WITH POWER SOURCE. LABELING TAPE SHALL
BE USED FOR DEVICE LABELING AND LAMACOID SHALL BE
USED FOR EQUIPMENT LABELING. TAPES SHALL INDICATE THE
FULL PANEL DESIGNATION AND INDICATED ON THE DRAWINGS
AS WELL AS THE CIRCUIT BREAKER NUMBER AND VOLTAGE.
13. NO ELECTRICAL WORK SHALL BE PERFORMED ON ENERGIZED
CIRCUITS. ALL CIRCUITS MUST BE LOCKED OUT AND TAGGED
OUT BEFORE WORK CAN BEGIN. AFTER CIRCUITS ARE
LOCKED OUT, VERIFY WITH A TEST INSTRUMENT THAT ALL
CONDUCTORS ARE ACTUALLY DE-ENERGIZED. ALL WORK
SHALL BE PERFORMED IN ACCORDANCE WITH FERMILAB'S (ES
& H) SAFETY PROGRAM.
14. RECEPTACLES SHALL HAVE THE FOLLOWING
CHARACTERISTICS:
14.1. ALL RECEPTACLES SHALL BE FROM THE SAME
MANUFACTURER AND HAVE IDENTICAL PHYSICAL
APPEARANCE AND CHARACTERISTIC.
14.2. CONVENIENCE RECEPTACLES FOR BUILDING SERVICES
SHALL BE GROUNDING TYPE, RATED AS SPECIFIED AND
NEMA PERFORMANCE SPECIFICATION GRADE.
14.3. CONVENIENCE RECEPTACLES HOUSINGS SHALL BE
HEAVY GRADE UREA OR CERAMIC, IVORY COLOR.
14.4. THE FOLLOWING STANDARD RECEPTACLES OR THEIR
EQUIVALENT SHALL BE USED AS INDICATED ON THE
DRAWINGS, COMPLETE WITH BOXES, ANGLE ADAPTERS
AND ASSOCIATED HARDWARE:
14.4.1. CONVENIENCE (DUPLEX): 120V, 20A, 1Ø, 2-WIRE WITH
GROUND, HUBBELL HBL5362W.
14.5. ALL COVERS FOR WIRING DEVICES HOUSING
RECEPTACLES SHALL BE OF THE METALLIC TYPE.
PLASTIC COVERS ARE UNACCEPTABLE.
15. PROVIDE NEW CIRCUIT DIRECTORIES IN ACCORDANCE WITH
NEC.
15.1. EVERY CIRCUIT AND CIRCUIT MODIFICATION SHALL BE
LEGIBLY IDENTIFIED AS TO ITS CLEAR, EVIDENT, AND
SPECIFIC PURPOSE OR USE.
15.2. THE IDENTIFICATION SHALL INCLUDE SUFFICIENT DETAIL
TO ALLOW EACH CIRCUIT TO BE DISTINGUISHED FROM
ALL OTHERS.
15.3. SPARE POSITIONS THAT CONTAIN UNUSED
OVERCURRENT DEVICES OR SWITCHES BE DESCRIBED
ACCORDINGLY.
15.4. THE IDENTIFICATION SHALL BE INCLUDED IN A CIRCUIT
DIRECTORY THAT IS LOCATED ON THE FACE OR INSIDE
OF THE PANEL DOOR AND LOCATED AT EACH SWITCH ON
A SWITCH BOARD.
15.5. NO CIRCUIT SHALL BE DESCRIBED IN A MANNER THAT
DEPENDS ON TRANSIENT CONDITIONS OF OCCUPANCY
(I.E OCCUPANT OR OFFICE NAME OR NUMBER).
15.6. SUBMIT DIRECTORY FOR REVIEW AND APPROVAL PRIOR
TO INSTALLATION.
16. TRANSFORMER “TR-PP-NL-5” TO HAVE THE FOLLOWING
CHARACTERISTICS
16.1. COPPER WINDINGS
16.2. 45KVA, 3PH
16.3. 480-120/208V
16.4. 115° RISE
16.5. BOD: SQUARE D EXN45T3HFCU
17. PANEL BOARD “PP-NL-5A” TO HAVE THE FOLLOWING
CHARACTERISTICS
17.1. COPPER BUS WITH 225A BUS RATING
17.2. MAIN BREAKER CONFIGURATION WITH 125A BREAKER
17.3. BOD:BREAKER SQUARE D QDL22125
17.4. NUMBER OF SPACES: 54
17.5. NEMA 1 RATED
17.6. 208Y/120 3PH 4W
17.7. 22KA
17.8. BOD: SQUARE D NQ454L2C
18. PANEL BOARD “PP-AB-2B” TO HAVE THE FOLLOWING
CHARACTERISTICS
18.1. COPPER BUS WITH 100A BUS RATING
18.2. MAIN BREAKER CONFIGURATION WITH 100A BREAKER
18.3. BOD: BREAKER SQUARE D HDL36100U31X
18.4. NUMBER OF SPACES: 30
18.5. NEMA 1 RATED
18.6. 208Y/120 3PH 4W
18.7. 22KA
18.8. BOD: SQUARE D NQ430L1C
ELECTRICAL SPECIFICATIONS
SCALE:
PROJECT NO.
SHEET NO.
DESIGNED
DRAWN
CHECKED
APPROVED
ISD ENGINEERING DATE
PROJECT NAME.
SHEET NAME:
REVISIONS
REV. DESCRIPTION DATE
REVISION NO.FIMS. NO.
ISD
INFRASTRUCTURE
SERVICES DIVISION
NOT FOR
CONSTRUCTIO
N
1/8"=1'-0" 8 0 8 16
SCALE FEET
W
S
E
PN
TN
12/22/2025A BECKER
A HEIDER
R WIELGOS
J WILLS
12/22/2025
12/22/2025
12/22/2025
8-2-242
LAB A ELECTRIC HEAT
E-02
D
EC
. 2 2, IS
SU
ED
F O
R C
O M
M
EN
T
AN
D C
O M
PL
IA
N C
E R
EV
IE
W
ELECTRICAL PANEL
SCHEDULES AND
SPECIFICATIONS
CCR REV 1 1/7/2026
600, 601, 0-00-0000
Ja n.
0,
- 9
:2
AM
Z
:\F
ES
S_
EN
G \A ct iv e Pr oj ec ts \8
\2 N
EU
TR
IN
O
L
AB
O R
AT
O
R Y
(N M
L) \2
L ab A
E le ct ric
H ea t\3
Fi na l D es ig n\
D ra w in gs \8
-2 -2
E le ct ric al
.d
| Sheets and Views |
| 8-2-242 General-G-01 |
File details come from the government source that posted it. Updated .