Exhibit 4 - L10 Gate Criteria Fill In Rev.pdf

PDF 55 KB Posted

Attached to
Landsat 10 Spacecraft
Solicitation number
80GSFC26R0015
Issued by

About this file

This document is a gate criteria evaluation template for assessing spacecraft bus qualifications in response to a federal Request for Proposals (RFP).

The template requires offerors to demonstrate that their spacecraft bus was produced by the offeror and meets four mandatory gate criteria: (1) performed operations for at least three years; (2) accommodated an Earth-observing instrument payload of at least 200 kilograms; (3) operated at an altitude between 500-2000 kilometers; and (4) operated with an Instrument Orbital Average Power of at least 250 watts. The launch date of the spacecraft bus must fall within ten years prior to RFP release. Offerors are instructed to reference specific missions in a data table containing columns for mission name, brief description, launch date, years in operation, payload mass, operational altitude, and instrument orbital average power. Grayed-out cells in the template are provided for informational purposes only and do not factor into gate criteria evaluation. If a single mission satisfies multiple criteria, offerors must list that mission separately for each applicable criterion. This template serves as an evaluation mechanism to establish baseline technical qualifications for prospective contractors' spacecraft bus capabilities in Earth-observation applications.

View the file

Other files

File Type Posted
Amnd 2 - RFP 80GSFC26R001 L10 Sgn.pdf PDF
Amnd 1 - Exhibit 3 - L10 Spacecraft Master Equipment List (MEL) Fill In - V2.xlsx XLSX spreadsheet
RFP 80GSFC26R0015 L10 - Questions with Govt Responses 1-7.pdf PDF
Exhibit 7 - Spacecraft Contractor Standards.pdf PDF
80GSFC26R0015 _ L10 Final RFP _ Terms and Conditions.pdf PDF
Attachment C - L10 Spacecraft Requirements Document (SC SRD) Rev E.pdf PDF
Attachment I - L10 Payload to Launch Services Interface Description Doc (LS IDD) Rev.pdf PDF
Attachment P - L10 Acronym List.pdf PDF
Attachment Q - LandIS Simplified Mechanical Interface Control Drawing (MICD) Rev A.pdf PDF
Attachment W - Non-Technical Contract Data Requirements List.pdf PDF
Enclosure 2 - L10 Observatory Quality Assurance Surveillance Plan Rev A.pdf PDF
Attachment H - L10 Spacecraft Deliverable Items List (DIL) Rev D.pdf PDF
Attachment O - L10 Lexicon Rev A.pdf PDF
Attachment T - L10 OCI Plan.pdf PDF
Attachment U - L10 C-SCRM Plan.pdf PDF
Attachment W DRD 2 - NASA C-SCRM Plan Questionnaire.xlsx XLSX spreadsheet
Attachment W DRD 3 - CPIC DRD.pdf PDF
Attachment W DRD 5 - CAIRIA DRD.pdf PDF
Attachment W DRD 6 - SCV Reporting.pdf PDF
Enclosure 3 - L10 DRC-18_version 2.0.xlsx XLSX spreadsheet
Exhibit 1 - L10 Pricing Template.xlsx XLSX spreadsheet
Exhibit 2 - L10 Spacecraft and Observatory Environmental Testing Matrix Fill-in.pdf PDF
Exhibit 3 - L10 Spacecraft Master Equipment List (MEL) Fill In.xlsx XLSX spreadsheet
L10 DRFP Question and Govt Responses.pdf PDF
Attachment A - L10 Statement of Work (SOW) Rev C.pdf PDF
Attachment B - L10 CDRL and DID Rev A.pdf PDF
Attachment E - L10 Spacecraft to Ground Interface Req Document (SC to GND IRD) Rev.pdf PDF
Attachment G - L10 Spacecraft Simulator Req Document (SC Sim RD) Rev C.pdf PDF
Attachment J - L10 Radiation Environments Description (LRED) Rev.pdf PDF
Attachment K - L10 Space Environmental Req Document (LSERD).pdf PDF
Attachment M - L10 Spacecraft Government Furnished Equipment Information List (SC GFEGFI).pdf PDF
Attachment N - L10 World Reference System - 3 Definition Rev.pdf PDF
Attachment R - L10 Time and Materials Rate Matrices Rev.pdf PDF
Attachment V - Small Business Subcontracting Plan.pdf PDF
Attachment W DRD 2 - Security Requirements for Unclassified IT Resources DRD C-SCRM requirements.pdf PDF
Attachment W DRD 4 - CITAR DRD updated.pdf PDF
Enclosure 1 - L10 Mission Synopsis Rev.pdf PDF
Enclosure 3 - L10 Design Reference Case - DRC-18 Definition.pdf PDF
Enclosure 5 - Geometric Budget (GEB) Support Presentation.pdf PDF
Enclosure 6 -Government Owned Direct To Earth (G-DTE) Services Users Guide (UG) Baseline.pdf PDF
Exhibit 5 - L10 Spacecraft Specifications Fill-in.xlsx XLSX spreadsheet
Exhibit 6 - L10 Past Performance Questionnaire Rev A.pdf PDF
80GSFC26R0015 _ L10 Final Cover Letter.pdf PDF
SF 1449.pdf PDF
Attachment D - L10 Spacecraft Interface Requirements Document (SCIRD) Rev A.pdf PDF
Attachment F - L10 Observatory Environment Req Document (ObsERD) Rev B.pdf PDF
Attachment L - L10 Analytical Math Model Definitions (LAMMD) Rev.pdf PDF
Attachment S - L10 Spacecraft Major Payment Events Completion Criteria Rev.pdf PDF
Attachment W DRD 1 - OCI Plan Rev A.pdf PDF
Attachment W DRD 3 - CPIC DRD Template for IT Portfolio PPM Data Collection.xlsx XLSX spreadsheet
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Gate Criteria Name Brief Description

(Spacecraft Bus MUST have been produced by Offeror )

Launch Date (MUST be within ten years prior to RFP release )

Years in Operation Payload Mass (kg) Operational Altitude (km) Instrument Orbital Avg. Power (W)

1. Performed Operations for at least three (3) years

2. Accommodated an Earth-observing instrument payload of at least 200kg

3. Operated at an altitude of 500-2000km

4. Operated with an Instrument Orbital Average Power of at least 250W

Notes:

1. Grayed out cells are not required to be filled in. Data provided in these cells will be used for information only and is not considered for meeting gate criteria.

2. If referencing a single mission to meet multiple criteria, list it multiple times in the row for each criteria

Mission

File details come from the government source that posted it. Updated .