This is a Performance Based Payment Schedule for the Landsat 10 Spacecraft contract. The document defines 28 milestone payment events tied to specific completion criteria that the contractor must satisfy before invoicing NASA for reimbursement. Payment percentages, amounts, and timing for each milestone are designated as "To Be Priced" (TBP), indicating these terms will be negotiated and finalized during contract execution.

The payment milestones span the entire spacecraft development lifecycle, beginning with the Kick-off Meeting and Major Subcontracts Awarded, progressing through design reviews (SRR, PDR, CDR), subsystem and simulator deliveries (CTSS, OOpS, SoftSim, LVIS), critical testing phases (Comprehensive Performance Test, RF Compatibility Testing, System Operational Readiness Test), observatory environmental testing (Vibration, EMI/EMC, Thermal Vacuum, Acoustics), and culminating in pre-flight activities (Mission Readiness Test, Pre-Ship Review, Launch Site CPT), successful launch and on-orbit checkout, and final acceptance via On-Orbit Acceptance Review. A fixed Completion Incentive Payment of $1 million is included as Event 14. Each milestone includes detailed completion criteria requiring Contracting Officer Representative notification that specified technical, programmatic, and deliverable requirements have been met, with particular emphasis on design compliance, test performance, data deliverable acceptance, and resolution of critical action items before payment authorization.

View the file

Other files

File Type Posted
RFP 80GSFC26R0015 L10 - Questions with Govt Responses _ Set 9-10.pdf PDF
Amnd 2 - RFP 80GSFC26R001 L10 Sgn.pdf PDF
Amnd 1 - RFP 80GSFC26R001 L10.pdf PDF
RFP 80GSFC26R0015 L10 - Questions with Govt Responses 1-7.pdf PDF
Amnd 1 - Exhibit 3 - L10 Spacecraft Master Equipment List (MEL) Fill In - V2.xlsx XLSX spreadsheet
Exhibit 7 - Spacecraft Contractor Standards.pdf PDF
80GSFC26R0015 _ L10 Final Cover Letter.pdf PDF
SF 1449.pdf PDF
Attachment D - L10 Spacecraft Interface Requirements Document (SCIRD) Rev A.pdf PDF
Attachment F - L10 Observatory Environment Req Document (ObsERD) Rev B.pdf PDF
Attachment L - L10 Analytical Math Model Definitions (LAMMD) Rev.pdf PDF
Attachment W DRD 1 - OCI Plan Rev A.pdf PDF
Attachment W DRD 3 - CPIC DRD Template for IT Portfolio PPM Data Collection.xlsx XLSX spreadsheet
Attachment W DRD 4 - CITAR Report Template.xlsx XLSX spreadsheet
Enclosure 4 - L10 Geometric Error Budget (GEB).pdf PDF
Exhibit 4 - L10 Gate Criteria Fill In Rev.pdf PDF
Attachment A - L10 Statement of Work (SOW) Rev C.pdf PDF
Attachment B - L10 CDRL and DID Rev A.pdf PDF
Attachment E - L10 Spacecraft to Ground Interface Req Document (SC to GND IRD) Rev.pdf PDF
Attachment G - L10 Spacecraft Simulator Req Document (SC Sim RD) Rev C.pdf PDF
Attachment J - L10 Radiation Environments Description (LRED) Rev.pdf PDF
Attachment K - L10 Space Environmental Req Document (LSERD).pdf PDF
Attachment M - L10 Spacecraft Government Furnished Equipment Information List (SC GFEGFI).pdf PDF
Attachment N - L10 World Reference System - 3 Definition Rev.pdf PDF
Attachment R - L10 Time and Materials Rate Matrices Rev.pdf PDF
Attachment V - Small Business Subcontracting Plan.pdf PDF
Attachment W DRD 2 - Security Requirements for Unclassified IT Resources DRD C-SCRM requirements.pdf PDF
Attachment W DRD 4 - CITAR DRD updated.pdf PDF
Enclosure 1 - L10 Mission Synopsis Rev.pdf PDF
Enclosure 3 - L10 Design Reference Case - DRC-18 Definition.pdf PDF
Enclosure 5 - Geometric Budget (GEB) Support Presentation.pdf PDF
Enclosure 6 -Government Owned Direct To Earth (G-DTE) Services Users Guide (UG) Baseline.pdf PDF
Exhibit 5 - L10 Spacecraft Specifications Fill-in.xlsx XLSX spreadsheet
Exhibit 6 - L10 Past Performance Questionnaire Rev A.pdf PDF
Attachment H - L10 Spacecraft Deliverable Items List (DIL) Rev D.pdf PDF
Attachment O - L10 Lexicon Rev A.pdf PDF
Attachment T - L10 OCI Plan.pdf PDF
Attachment U - L10 C-SCRM Plan.pdf PDF
Attachment W DRD 2 - NASA C-SCRM Plan Questionnaire.xlsx XLSX spreadsheet
Attachment W DRD 3 - CPIC DRD.pdf PDF
Attachment W DRD 5 - CAIRIA DRD.pdf PDF
Attachment W DRD 6 - SCV Reporting.pdf PDF
Enclosure 3 - L10 DRC-18_version 2.0.xlsx XLSX spreadsheet
Exhibit 1 - L10 Pricing Template.xlsx XLSX spreadsheet
Exhibit 2 - L10 Spacecraft and Observatory Environmental Testing Matrix Fill-in.pdf PDF
Exhibit 3 - L10 Spacecraft Master Equipment List (MEL) Fill In.xlsx XLSX spreadsheet
L10 DRFP Question and Govt Responses.pdf PDF
80GSFC26R0015 _ L10 Final RFP _ Terms and Conditions.pdf PDF
Attachment C - L10 Spacecraft Requirements Document (SC SRD) Rev E.pdf PDF
Attachment I - L10 Payload to Launch Services Interface Description Doc (LS IDD) Rev.pdf PDF
Show 40 more

50 files listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment No. S

Landsat 10 Spacecraft

Major Payment Events, Performance Based Schedule, and Completion Criteria

June 30, 2026

National Aeronautics and Space Administration

Goddard Space Flight Center Greenbelt, Maryland

L10 Major Payments Events and Acceptance Criteria L10-SC-DESC-0058 Rev -

(This page intentionally left blank)

L10 Major Payments Events and Acceptance Criteria L10-SC-DESC-0058 Rev -

1. Performance Based Payment Schedule The contractor shall complete all activities required for each Milestone Payment Event prior to submitting the respective invoice. The payment schedules are defined in Table 1.1 and the completion criteria are defined in Table 1.2.

Table 1.1 – Landsat 10 Major Payment Events Payment

Event No.

Payment Event Payment Percent

Payment Amount

Months

ARO

1 Kick-off Meeting TBP $TBP TBP 2 Major Subcontracts Awarded TBP $TBP TBP

3 Spacecraft System Requirements Review (SRR) Completion

TBP $TBP TBP

4 Spacecraft Preliminary Design Review (PDR) Completion

TBP $TBP TBP

5 All Subcontracts Awarded TBP $TBP TBP

6 Spacecraft Critical Design Review (CDR) Completion

TBP $TBP TBP

7 CTSS Delivery to MOC (Qty2) and to EROS (Qty3) TBP $TBP TBP 8 OOpS Delivery to MOC (Qty 2) TBP $TBP TBP 9 SC SoftSim Delivery to MOC (Qty 3) TBP $TBP TBP 10 Launch Vehicle Interface Simulator (Qty 1) Delivery TBP $TBP TBP

11 SC Baseline Comprehensive Performance Test (CPT) Completion

TBP $TBP TBP

12 RF Suitcase Simulator Delivery to EROS (Qty1) TBP $TBP TBP 13 SC EIDP Delivery and Acceptance TBP $TBP TBP 14 SC Completion Incentive Payment 100% $1M TBP 15 Operational Development Tools Delivery TBP $TBP TBP 16 Instrument Integration Completion TBP $TBP TBP 17 RF Compat Testing Completion TBP $TBP TBP 18 SORTS Completion TBP $TBP TBP

19 Observatory Pre-Environmental Review (PER) Completion

TBP $TBP TBP

20 Observatory Vibration Test Completion TBP $TBP TBP 21 Observatory EMI/EMC Test Completion TBP $TBP TBP 22 Observatory TVac Test Completion TBP $TBP TBP 23 Acoustics Test Completion TBP $TBP TBP 24 MRT Completion TBP $TBP TBP 25 Observatory Pre-Ship Review (PSR) Completion TBP $TBP TBP 26 Launch Site CPT Completion TBP $TBP TBP 27 Successful Launch and Functional SC on Orbit TBP $TBP TBP

28 Final Acceptance – On-Orbit Acceptance Review (AOR) (Clasue H.16) (10%)

TBP $TBP TBP