Exhibit 10. RLP - New Construction (May 2026).pdf
PDF 594 KB Posted
- Solicitation number
- 36C24W26R0017
- Issued by
-
Department of Veterans Affairs
About this file
This is a GSA Real Property Lease (RLP) Exhibit 10 template for new construction projects, specifically RLP No. 36C24W26R0017, effective February 2026.
The exhibit establishes documentation and submittal requirements for offerors proposing new construction. Offerors must submit a Department of Labor (DOL) Wage Determination document (5 pages, Exhibit 10A) as part of the required RLP documents. Additionally, offerors must provide two primary submittals: (1) a Fire Protection and Life Safety (FPLS) Submittal that includes documentation of the Building Code and edition to which the building will be constructed, along with a written commitment to meet all mandatory FPLS lease requirements; and (2) a Construction Schedule detailing the dates for permitting, design, and construction phases, including principal categories of work, coordinated with the Government's required occupancy date and specified lease milestones. These submittals are designated as Exhibits NC 1.02A and NC 1.02C, respectively, and are mandatory components of any offer for new construction under this lease solicitation.
View the file
Other files
Show all 24
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
RLP NO. 36C24W26R0017, PAGE 1 GSA TEMPLATE R100, NEW
CONSTRUCTION EXHIBIT 10 (5/26)
RLP EXHIBIT 10 NEW CONSTRUCTION
NC 1.01 LIST OF RLP DOCUMENTS – NEW CONSTRUCTION (FEB 2026)
The following is added to the RLP paragraph titled: “List of RLP Documents” in the table in sub-paragraph A:
Document Name No. of Pages Exhibit DOL Wage Determination 5 10 A
NC 1.02 INSTRUCTIONS FOR OFFEROR AND SUBMITTALS – NEW CONSTRUCTION (FEB 2026)
The following is added to the RLP paragraph titled: “Instructions for Offeror and Submittals” as a requirements and additional submittals.
Document Name Exhibit X: New Construction
FPLS Submittal for New Construction NC 1.02 A Construction Schedule for New Construction NC 1.02 C
A. Fire Protection and Life Safety (FPLS) Submittal for New Construction. As part of the FPLS Submittal Information, for offers of new construction, documentation indicating the Building Code (including edition) to which the Building is being constructed and a written commitment to meet all of the mandatory FPLS lease requirements in the Lease.
B. INTENTIONALLY DELETED
C. Construction Schedule for New Construction. A construction schedule giving the dates on which the various phases of permitting, design and construction (including principal categories of work) will be completed to coincide with the Government's required occupancy date and the milestones as outlined under the Lease.
RLP 36C24W26R0017
Exhibit 10
| 0BRLP EXHIBIT 10 NEW CONSTRUCTION |
| NC 1.01 LIST OF RLP DOCUMENTS – NEW CONSTRUCTION (FEB 2026) |
| NC 1.02 INSTRUCTIONS FOR OFFEROR AND SUBMITTALS – NEW CONSTRUCTION (FEB 2026) |
File details come from the government source that posted it. Updated .