Sheet1
| For current info regarding AQC guidance and forms: |
| https://cs.eis.af.mil/airforcecontracting/knowledge_center/Pages/5336.aspx |
https://cs.eis.af.mil/airforcecontracting/knowledge_center/Pages/5336.aspx Material Submittals Schedule SCHEDULE OF MATERIAL SUBMITTALS PROJECT NUMBER MPYJ18006CA PROJECT TITLE TEMP LEASE FACILITY SOLICITATION / CONTRACT NO.
| (To be completed by Project Engineer) | (To be completed by Contract Administrator) | ||||||||||||||
| NUMBER OF COPIES REQUIRED | |||||||||||||||
| LINE NUMBER | ITEM OR DESCRIPTION OF ITEM, CONTRACT REFERENCE, TYPE OF SUBMITTAL | CERTIFICATION OF COMPLIANCE | SHOP DRAWINGS | SAMPLES | COLOR SELECTION | MANUFACTURER'S RECOMMENDATION | MANUFACTURER'S WARRANTY | CATALOG DATA | OPERATING INSTRUCTIONS | SCHEDULES, LISTINGS, REPORTS, PLANS | TECHNICAL DATA | TEST REPORTS | FIELD REPORTS | REQUIRED SUBMISSION DATE |
fergusog: Enter the due date from the Contractor (MM/DD/YY)
DATE RECEIVED IN CONTRACTING
fergusog: Enter the date received from the Contractor. (MM/DD/YY)
DATE TO CIVIL ENGINEERING
fergusog: Enter the date submittal was given to CE for review. (MM/DD/YY)
RETURN SUSPENSE DATE
fergusog: Enter the date the submittal is due back from CE
(MM/DD/YY)
SUBMITTAL NUMBERS
fergusog: Enter the Submittal Number
DATE CONTRACTOR NOTIFIED CONTRACTOR RESUBMITTAL
fergusog: Enter Resubmittal Number
FINAL APPROVAL
fergusog: Enter the submittal final approval date
(MM/DD/YY)
REMARKS
fergusog: Enter any comments pertaining to the submittal
APPROVED
fergusog: Enter date the Contractor was notified of submittal approval
(MM/DD/YY)
fergusog: Enter Resubmittal Number
DISAPPROVED
fergusog: Enter date the Contractor was notified of submittal disapproval
(MM/DD/YY)
fergusog: Enter the submittal final approval date
(MM/DD/YY)
fergusog: Enter any comments pertaining to the submittal
| 1 | BASIC LAYOUT OF FACILITY AND FOUNDATION | X | |||||||||
| 2 | EXTERIOR FINAL COLOR FINISHES MATCHING JBSA LACKLAND COLOR SCHEME | X | |||||||||
| 3 | PLUMBING ROUGH IN | X | X | ||||||||
| 4 | COOLING AND HEATING EQUIPMENT | X | X | X | X | X | |||||
| 5 | DOORS AND WINDOWS | X | X | ||||||||
| 6 | FIRE ALARM PANEL | X | X | ||||||||
| 7 | ELECTRICAL PANEL | X | X | X | |||||||
| 8 | FRP WET WALL PANEL FOR RESTROOMS | X | X | X | X | ||||||
| 9 | CARPET TILE FLOOR COVERING | X | X | X | |||||||
| 10 | SHEET VINYL FLOOR COVERING | X | X | X | |||||||
| 11 | VCT 12X12 | X | X | X | |||||||
| 12 | CEILING TILE 2X2 | X | X | ||||||||
| 13 | PAINT INTERIOR | X | X | X | X | ||||||
| 14 | RUBBER BASE 4 INCH | X | X | X | |||||||
| 15 | FIRE SPRINKLER SYSTEM | X | |||||||||
| 16 | PLUMBING FIXTURES | X | X | ||||||||
| 17 | PLUMBING FLUSH VALVES | ||||||||||
| 18 | BATH ROOM PARTITIONS | X | X | X | |||||||
| 19 | HANDI CAP RAMP | X | X | ||||||||
| 20 | TEST FIRE ALARM | X | X | X | |||||||
| 21 | FIRE SPRINKLER SYSTEM TEST | X | X | X | |||||||
| 22 | HVAC BALANCE TEST | X | X | X | |||||||
| 23 | ELECTRICAL PANEL TEST AND LABELING | X | X | X | |||||||
| 24 | OFFICE FURNITURE | X | X | X | |||||||
| Schedule of Material Submittals Template, Feb 05 (SAF/AQCP) |
&A
502 CONS/JBKAE
JBSA Lackland, TX 78236 Exhibit 1 Swing Space for SWTW 7 April 2022