Excel_Bid_Form_North_Grove_Park.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- North Grove Park
- Solicitation number
- ITB - 2025-08-22
- Issued by
- Ellis County, Texas
About this file
This is an Excel bid form for the North Grove Park project by the City of Waxahachie, Texas, detailing a comprehensive park construction opportunity. The bid form includes 44 base bid items and 5 alternate bid items covering extensive park infrastructure and amenities, such as concrete sidewalks, parking areas, playground equipment, landscaping, irrigation systems, pavilions, shade structures, lighting, electrical components, and site furnishings. The project requires electronic or paper sealed bids to be submitted by October 9, 2025, at 10:00 am Central Time, with a non-mandatory pre-bid virtual meeting scheduled for October 2, 2025, and all questions due by October 6, 2025. The contract duration is 180 calendar days for the base bid, with an additional 60 calendar days available for alternate bid items.
The project's estimated total value is approximately $3,365,600, with a base bid estimated at $2,900,000 and alternate bid items totaling $465,600. The bid requires a 5% bid bond, and contractors must provide performance and payment bonds at 100% of the contract price, plus a 2-year maintenance bond at 50% of the contract price. The city reserves the right to award a single contract, split awards, or make no award based on its interests. Partial payments will be structured with a 10% retainage for contracts between $25,000 and $400,000. Comprehensive insurance requirements include $2,000,000 in Comprehensive General Liability coverage, and bidders must demonstrate financial responsibility, experience, and necessary equipment, qualifying within five working days after bid opening.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Base Bid Proposal | |||||
| NORTH GROVE PARK | |||||
| Item | Description of Items with Unit Prices in Written Words | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Mobilization / General Conditions | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 2 | Temporary Construction Fence / Tree Protection Fence | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 3 | Temporary Silt Fence and Erosion Control Logs (Install / Remove) | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 4 | Demolition | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 5 | Site Grading (rough grading and fine grading) | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 6 | Stabilized Decomposed Granite | 5,600 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 7 | 4” Concrete Sidewalk | 19,500 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 8 | 4” Concrete Sidewalk – Integral Colored Concrete | 5,800 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 9 | 12” Concrete Mowstrip | 650 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 10 | 18” Concrete Mowstrip | 1,780 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 11 | Concrete - Vehicular (7" Depth with Curb/Median-20 Spaces) | 13,400 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 12 | Concrete – Vehicular Integral Colored and Stamped | 430 | SF | $ | ERROR:#VALUE! |
| (7" Depth Crosswalk) conplete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 13 | Parking Lot Signage (ADA) | 2 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 14 | Thermoplastic striping | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 15 | Concrete wheel stops | 20 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 16 | Benches | 4 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 17 | Trash Receptacles | 2 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 18 | Picnic Tables | 2 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 19 | Restroom Structure Enclosure (10’x18’) | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 20 | Pipe Rail Fence | 980 | LF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Linear Foot | |||||
| 21 | 5 Gallon Shrubs | 141 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 22 | 3 Gallon Ornamental Grasses | 43 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 23 | Canopy Trees | 23 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 24 | Screening Trees | 54 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 25 | Hardwood Mulch (3” Depth) | 85 | CY | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Cubic Yard | |||||
| 26 | Bermuda Grass Sod | 42,200 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 27 | Bermuda Grass Seed | 136,000 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 28 | Topsoil (4”) | 2,300 | CY | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Cubic Yard | |||||
| 29 | Permanent Irrigation | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 30 | Temporary Irrigation | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 31 | Shade Structures Over Benches (8’x9’) | 2 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 32 | Pavilions (12’x12’) | 3 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 33 | Round Pavilion (24’ Diameter) | 1 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 34 | Drinking Fountain & Water Service Tap | 1 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 35 | Bistro String Lighting | 275 | LF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Linear Foot | |||||
| 36 | String Light Poles (Black Powder Coated) | 12 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 37 | Adirondack Chair | 6 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 38 | Rubberized surfacing w/ Aggregate Subbase | 3,300 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 39 | Rubberized surfacing play mounds w/ concrete subbase | 710 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 40 | Artificial Turf & Subbase | 1,200 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 41 | Playground Equipment & Shade Sails over Playground | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 42 | Veneer Stone Seat Wall | 66 | FF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Face Foot | |||||
| 43 | Lighting & Electrical - Pavilion Outlets, Foot Truck Hook-Ups, Misc. Items | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 44 | Storm, sewer, all drainage components complete for the sum of | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| Owner’s Contingency | $ 50,000.00 | $ 50,000.00 |
Total Base Bid Including Owner's Contingency: $ ERROR:#VALUE!
| Alternate Bid Proposal |
| NORTH GROVE PARK |
| Item | Description of Items with Unit Prices in Written Words | Quantity | Unit of Measure | Unit Price | Total Price |
| A1 | Cantilever Shade Sail Structure (16’x16’) | 2 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| A2 | Decomposed Granite Trails (West Trails) | 7,600 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| A3 | 9’x16’ Trellis w/Two 4’ Gliders | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| A4 | CXT Prefabricated Restroom – Denali 10’-3” x 19’-8” | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| A5 | Restroom Pad Preparation, Water, Sewer, Utility Extension/Connections | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum |
Total Alternate Bid: $ ERROR:#VALUE!
File details come from the government source that posted it. Updated .