Excel_Bid_Form_North_Grove_Park.xlsx
XLSX spreadsheet 24 KB Posted
- Attached to
- North Grove Park
- Solicitation number
- ITB - 2025-08-22
- Issued by
- Ellis County, Texas
About this file
This document is an Excel Bid Form for the North Grove Park project issued by the City of Waxahachie, Texas. The comprehensive bid form details a base bid and alternate bid for a park construction project encompassing multiple site improvements and amenities. The base bid includes 44 line items covering site preparation, demolition, concrete work, landscaping, irrigation, playground equipment, shade structures, pavilions, electrical components, and various site furnishings. Quantities range from individual lump sum items to specific measurements like 19,500 square feet of 4" concrete sidewalk, 23 canopy trees, and 42,200 square feet of Bermuda grass sod. An owner's contingency of $50,000 is included in the base bid.
The bid form includes alternate proposals with five additional line items such as cantilever shade sail structures, decomposed granite trails, a prefabricated restroom, and associated utility connections. The project appears to be a comprehensive park development with multiple functional areas including parking, trails, playground, seating areas, and recreational amenities. Pricing is to be determined by bidders, with each line item requiring a unit price. The total bid amount is not populated in the document, with all price fields showing an "#VALUE!" error, indicating this is likely a template for bidders to complete. The project seems to be fully funded and seeking competitive bids for a complete park infrastructure and amenity development.
View the file
Other files
Show 40 more
50 files listed here. See the rest on GovTribe.
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Sheet1
| Base Bid Proposal | |||||
| NORTH GROVE PARK | |||||
| Item | Description of Items with Unit Prices in Written Words | Quantity | Unit of Measure | Unit Price | Total Price |
| 1 | Mobilization / General Conditions | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 2 | Temporary Construction Fence / Tree Protection Fence | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 3 | Temporary Silt Fence and Erosion Control Logs (Install / Remove) | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 4 | Demolition | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 5 | Site Grading (rough grading and fine grading) | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 6 | Stabilized Decomposed Granite | 5,600 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 7 | 4” Concrete Sidewalk | 19,500 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 8 | 4” Concrete Sidewalk – Integral Colored Concrete | 5,800 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 9 | 12” Concrete Mowstrip | 650 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 10 | 18” Concrete Mowstrip | 1,780 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 11 | Concrete - Vehicular (7" Depth with Curb/Median-20 Spaces) | 13,400 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 12 | Concrete – Vehicular Integral Colored and Stamped | 430 | SF | $ | ERROR:#VALUE! |
| (7" Depth Crosswalk) conplete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 13 | Parking Lot Signage (ADA) | 2 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 14 | Thermoplastic striping | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 15 | Concrete wheel stops | 20 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 16 | Benches | 4 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 17 | Trash Receptacles | 2 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 18 | Picnic Tables | 2 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 19 | Restroom Structure Enclosure (10’x18’) | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 20 | Pipe Rail Fence | 980 | LF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Linear Foot | |||||
| 21 | 5 Gallon Shrubs | 141 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 22 | 3 Gallon Ornamental Grasses | 43 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 23 | Canopy Trees | 23 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 24 | Screening Trees | 54 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 25 | Hardwood Mulch (3” Depth) | 85 | CY | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Cubic Yard | |||||
| 26 | Bermuda Grass Sod | 42,200 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 27 | Bermuda Grass Seed | 136,000 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 28 | Topsoil (4”) | 2,300 | CY | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Cubic Yard | |||||
| 29 | Permanent Irrigation | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 30 | Temporary Irrigation | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 31 | Shade Structures Over Benches (8’x9’) | 2 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 32 | Pavilions (12’x12’) | 3 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 33 | Round Pavilion (24’ Diameter) | 1 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 34 | Drinking Fountain & Water Service Tap | 1 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 35 | Bistro String Lighting | 275 | LF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Linear Foot | |||||
| 36 | String Light Poles (Black Powder Coated) | 12 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 37 | Adirondack Chair | 6 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| 38 | Rubberized surfacing w/ Aggregate Subbase | 3,300 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 39 | Rubberized surfacing play mounds w/ concrete subbase | 710 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 40 | Artificial Turf & Subbase | 1,200 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| 41 | Playground Equipment & Shade Sails over Playground | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 42 | Veneer Stone Seat Wall | 66 | FF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Face Foot | |||||
| 43 | Lighting & Electrical - Pavilion Outlets, Foot Truck Hook-Ups, Misc. Items | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| 44 | Storm, sewer, all drainage components complete for the sum of | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| Owner’s Contingency | $ 50,000.00 | $ 50,000.00 |
Total Base Bid Including Owner's Contingency: $ ERROR:#VALUE!
| Alternate Bid Proposal |
| NORTH GROVE PARK |
| Item | Description of Items with Unit Prices in Written Words | Quantity | Unit of Measure | Unit Price | Total Price |
| A1 | Cantilever Shade Sail Structure (16’x16’) | 2 | EA | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Each | |||||
| A2 | Decomposed Granite Trails (West Trails) | 7,600 | SF | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Square Foot | |||||
| A3 | 9’x16’ Trellis w/Two 4’ Gliders | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| A4 | CXT Prefabricated Restroom – Denali 10’-3” x 19’-8” | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum | |||||
| A5 | Restroom Pad Preparation, Water, Sewer, Utility Extension/Connections | 1 | LS | $ | ERROR:#VALUE! |
| complete for the sum of | |||||
| __________________________________ dollars, and | |||||
| __________________________ cents per Lump Sum |
Total Alternate Bid: $ ERROR:#VALUE!
File details come from the government source that posted it. Updated .