Evaluation Criteria Attachment C.pdf

PDF 642 KB Posted

Attached to
Professional Services for Waste to Energy and Solid Waste Systems
Solicitation number
RPS-26-00274
Issued by
Hillsborough County, Florida

About this file

This is an Evaluation Criteria document for a Request for Proposals (RFP) issued by Hillsborough County Engineering and Operations Department in Florida for professional services related to the County's Waste-to-Energy Facility, Resource Recovery Facility, and Solid Waste Management Systems. The evaluation criteria establish four primary scoring categories: Ability of Firm and Its Professional Personnel (maximum 45 points), Firm's Experience with Projects of Similar Size and Type (maximum 40 points), Firm's Willingness and Ability to Meet Schedule and Budget Requirements (maximum 5 points), and Effect of Firm's Recent, Current, and Projected Workload (maximum 10 points), for a total of 100 possible points. Responding firms must submit resumes for key personnel, organizational charts for both construction and design services as applicable, up to 10 representative projects completed within the past five years, and detailed narratives addressing project approach, methodology, schedule and budget management, personnel allocation, and current workload capacity with graphical representations.

Proposing firms must limit their primary submittal to 40 pages maximum (with resumes and organizational charts excluded from page count), provide project experience responses in 5 pages maximum, schedule and budget narratives in 5 pages maximum, and workload documentation in 5 pages maximum including one-page graphics. The evaluation prioritizes demonstrated experience with similar-sized and complex infrastructure projects, proven ability to manage costs and timelines, availability of qualified personnel, and superior understanding of waste-to-energy and solid waste management operations. The estimated contract value is $6,000,000, and evaluation will assess firms on their capability to provide comprehensive engineering and technical services including operations support, permitting assistance, design, planning, inspection, and assessment functions for the County's waste management systems.

View the file

Other files

File Type Posted
Firm Data Sheet and Requested Criteria for Firm’s Experience.docx.docx DOCX document
Drug Free Workplace Form.doc.doc DOC document
16-Addendum 1.pdf PDF
4-Substitute W9 Form.pdf.pdf PDF
12-Insurance Requirements Attachment B.pdf PDF
1-Standard Form 330 Part II.pdf.pdf PDF
Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
Substitute W9 Form.pdf.pdf PDF
5-Direct Deposit Authorization Form 5.15.2025.pdf.pdf PDF
10-Subcontractor Letter of Intent .pdf PDF
Standard Form 330 Part II.pdf.pdf PDF
Insurance Requirements Attachment B.pdf PDF
SBE Request for Bonus Points Tutorial.mp4 MP4 file
Agreement - Professional Services - Term Contract-RPS-26-00274.pdf PDF
15-RPS-26-00274 Terms Conditions.pdf PDF
13-Agreement - Professional Services - Term Contract-RPS-26-00274.pdf PDF
8-Drug Free Workplace Form.doc.doc DOC document
2-Firm Data Sheet and Requested Criteria for Firm’s Experience.docx.docx DOCX document
14-Attachment A - Scope of Services.pdf PDF
6-AFFIDAVIT OF COMPLIANCE - Denying Doing Business with a Foreign Country of Concern 02.26.2026.docx DOCX document
Subcontractor Letter of Intent .pdf PDF
Attachment A - Scope of Services.pdf PDF
RPS-26-00274 Terms Conditions.pdf PDF
Request For Bonus Points SBE-2 Form .pdf PDF
Insurance Certificate.doc.doc DOC document
11-Evaluation Criteria Attachment C.pdf PDF
7-SBE Request for Bonus Points Tutorial.mp4 MP4 file
9-Request For Bonus Points SBE-2 Form .pdf PDF
3-Insurance Certificate.doc.doc DOC document
Show all 30

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

EVALUATION CRITERIA

EVALUATION CRITERIA NUMBER. 1

ABILITY OF FIRM AND ITS PROFESSIONAL PERSONNEL

Maximum Point Value: 45

Responses limited to 40 page(s) maximum, plus resumes for key personnel

Attach resumes only for key personnel of the Project Team, detailing past experience as it relates to projects of a similar size and type.

Submit separate organizational charts delineating personnel assigned to both construction and design services, if applicable. Clearly indicate the role of each member of the proposed project team. Resumes and organizational charts do not count against the maximum page limit. Indicate that the team has a clear understanding of the County's project and requirements.

0-5 Project team personnel do not have appropriate level of qualifications and experience. Project team does not contain all critical disciplines. Organization of project team is inappropriate. Prime firm lacks adequate professional resources to properly provide services. Prime firm lacks understanding of the proposed project and what will be required to complete it. Proposed project manager is not appropriate.

6-10 Some project team personnel have adequate level of qualifications and experience.

Project team lacks minor disciplines. Organization of project team is marginal.

Prime firm's professional resources to properly provide services are marginal. Prime firm has a marginal understanding of the proposed project and what will be required to complete it. Proposed project manager's qualifications are marginal.

11-20 Project team personnel have adequate level of experience. Project team contains all necessary disciplines. Organization of project team is adequate to the project. Prime firm has adequate professional resources to properly provide services. Prime firm has an adequate understanding of the proposed project and what will be required to complete it. Proposed project manager's qualifications are adequate.

21-29 Project team personnel have above average level of experience, and the project manager is uniquely qualified. Project team contains all necessary disciplines.

Organization of project team is adequate to the project. Prime firm has superior professional resources to properly provide services. Prime firm has an above average understanding of the proposed project and what will be required to complete

it. Proposed Project Manager's qualifications are above average.

30-45 Project team personnel have exceptional level of experience, and several are uniquely qualified. Project team contains all necessary disciplines. Organization of project team is superior. Prime firm has a superior understanding of the proposed project and what will be required to complete it. Prime firm has superior professional resources to properly provide services. Proposed project manager.is uniquely qualified. , EVALUATION CRITERIA NUMBER 2

FIRM'S EXPERIENCE WITH PROJECTS OF A SIMILAR SIZE AND TYPE

0-5

6 -10

11-20

21-25

26-40

Maximum Point Value: 40

Maximum number of projects to be included:

Responses limited to 5 page(s) maximum� project

List a maximum of 10 recent projects, preferably during the past five (5) years, to indicate proficiency in similar work. For each representative project, indicate your Firm's role (Prime, Sub-Consultant, etc.), your Firm's project manager and key personnel, total cost of the project, length of the contract, and a summary of the work performed by your Firm." Show your firm's approach to the project and methods used to plan, design, and administer the project.

Prime firm has marginal experience with projects of a similar size and type.

Prime firm has minor successful experience with projects of a similar size and type.

Prime firm's approach and methods proposed are inadequate to provide the level of service required for the project. Scope of services provided for representative projects vary from RPS Scope.

Prime firm has adequate successful, recent (within past five (5) years) experience with projects of a similar size and type. Prime firm's approach and methods proposed are adequate to provide the level of service required for the project. Some of the scope of services provided for representative projects are similar to RPS scope.

Prime firm has more than adequate successful, recent (within past five (5) years) experience with projects of a similar size and type. Prime firm's approach and methods proposed are above average to provide the level of service required for the project. Most of the scope of services provided for representative projects are similar to RPS scope.

Prime firm has superior past and recent successful experience with projects of a similar size and type. Prime firm's approach and methods proposed are superior to provide the level of service required for the project. All of the scope of services provided for representative projects are similar to RPS scope.

EVALUATION CRITERIA NUMBER 3

FIRM'S WILLINGNESS AND ABILITY TO MEET SCHEDULE AND BUDGET

REQUIREMENTS

Maximum Point Value: 5

Response limited to 5 page(s) maximum

Provide a short narrative outlining how you propose to manage the project in order to meet schedule and budget requirements.

Indicate the controls to be utilized to maintain both schedule and budget for this project.

Describe how personnel will be assigned, and tasks effectively handled, in order to provide the most efficient service on the project (during both the design and the construction phases, if applicable). Describe any unique issues and/or items of focus based on your understanding of the project scope. Describe any suggestions on how the proposed project schedule could be further accelerated. Describe your Firm's unique abilities, innovative approaches, and/or special considerations.

Describe your firm's ability to provide the required services and provide them within a schedule and budget.

0 Submittal does not address either the schedule or budget.

Submittal shows inadequate understanding of scope, schedule and budget requirements.

2 Submittal shows adequate schedule approach, understanding of budget control, and understanding of scope. Project budget and schedule can be met or modified to meet project intent.

3 Submittal shows good understanding of and approach to scope, schedule and budget.

Project budget and schedule can be met.

4-5 Submittal shows superior understanding of and approach to scope, schedule and budget with potential improvements for project delivery and cost savings.

EVALUATION CRITERIA NUMBER4

EFFECT OF FIRM'S RECENT, CURRENT AND PROJECTED WORKLOAD

Maximum Point Value: 10

Responses limited to 5 page(s) maximum, including a one-page graphic representation.

Describe the current workload and your daily ability to handle the scope of services.

Provide a graphic representation of your current commitment over the next one-year period for key members of the project team.

0 Submittal shows that consultant does not have sufficient available personnel to complete services on schedule.

1 Submittal shows that consultant's workload commitments will impact its ability to complete services on schedule.

2-3 Submittal shows that while consultant has adequate time and available personnel, prior workload commitments may impact its ability to complete services on schedule.

4-6 Submittal shows that consultant's project team has adequate time and available personnel to complete services on schedule.

7-10 Submittal shows that consultant's project team has adequate staffing available to complete services on schedule. Submittal indicates backup staffing capability in the event of unforeseen circumstances.

File details come from the government source that posted it. Updated .