2-Firm Data Sheet and Requested Criteria for Firm’s Experience.docx.docx
DOCX document 17 KB Posted
- Solicitation number
- RPS-26-00274
- Issued by
- Hillsborough County, Florida
About this file
This is a Firm Data Sheet template from Hillsborough County Engineering and Operations Department in Florida, designed to evaluate consultant qualifications for professional services related to the County's Waste-to-Energy Facility, Resource Recovery Facility, and solid waste management systems. The County is requesting proposals for a five-year term contract estimated at $6 million to provide independent consulting engineer services, annual inspections of the RRF and two transfer stations, quarterly facility punch list reviews, environmental testing and monitoring, monthly facility meetings, bond compliance reporting, service agreement development, project development and permitting support, technical training, and ash and metals recovery optimization. The RRF comprises four boilers—three 400 ton-per-day units and one 600 ton-per-day unit—with two General Electric turbines generating approximately 46 megawatts gross electrical capacity. Proposals are due electronically by July 24, 2026, at 2:00 p.m. Eastern Time, limited to 40 pages maximum (resumes and organizational charts excluded), with oral presentations to be conducted with at least three shortlisted firms.
Compensation is structured as a term agreement with individual work orders issued as needed by the Director of Engineering and Construction, with study work orders not to exceed $500,000 and professional services for construction projects up to $7.5 million permissible. Payment is negotiated work order-by-work order based on direct salary rates by personnel classification, audited/certified overhead and profit multipliers, and reimbursable costs. Evaluation criteria total 100 points, comprising Ability of Firm and Professional Personnel (45 points), Firm's Experience with Similar Projects (40 points), Willingness and Ability to Meet Schedule and Budget (5 points), and Effect of Recent and Projected Workload (10 points), with additional scoring for Volume of Work (5 points maximum) and Past Performance Rating (5 points maximum). A Small Business Enterprise (SBE) bonus points program provides 5 percent of maximum evaluation criteria points for commitments of 10 percent or greater SBE participation. Consultants must hold engineering certification, demonstrate experience with municipal solid waste combustion systems and waste-to-energy service agreements, maintain comprehensive liability insurance with Professional Liability coverage of $1 million per claim with Hillsborough County named as additional insured, comply with E-Verify and IMAGE Best Practices, and adhere to Cone of Silence restrictions.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Firm Data Sheet and Requested Criteria for Firm’s Experience
Firm Data Sheet
Personnel by Discipline: (For submitting office) List each person only once, by primary function.
Administrative
Engineers
Geologists
Architects
Chemical
Hydrologists
CADD Operators
Civil
Interior Designers
Construction
Electrical
Landscape Architects
Inspectors
Mechanical
Land Surveyors
Draftsmen
Mining
Oceanographers
Ecologists
Sanitary
Planner
Economists
Soils
Urban/Regional
Structural
Specification Writers
Transportation
Others (Specify)
Subconsultant Firms:
| FIRM NAME AND ADDRESS | SERVICES TO BE PROVIDED | |
| 1. | 1. | |
| 2. | 2. | |
| 3. | 3. | |
| 4. | 4. | |
| 5. | 5. |
Firm's Experience with Projects of a Similar Size and Type
Project Title:
| 2. | Project Location: |
| 3. | Project Description: |
| 4. | Owner's Contact Name and Address: |
Contact Person/Phone No.:
Contact eMail Address:
| 5. | Project Duration (Dates): |
| 6. | Was the project completed within schedule? |
If not, what was the original completion date?
| 7. | Location of office performing work: |
| 8. | Was applicant the prime firm, or Subconsultant firm? |
| 9. | Was work performed in-house? |
| 10. | Type/Scope of services provided? |
| 11. | Names of key team personnel for this project? |
| 12. | Which members of your proposed team worked on this project? |
File details come from the government source that posted it. Updated .