11-Evaluation Criteria Attachment C.pdf
PDF 642 KB Posted
- Solicitation number
- RPS-26-00274
- Issued by
- Hillsborough County, Florida
About this file
This is an evaluation criteria attachment for a professional services contract issued by Hillsborough County Engineering and Operations Department in Florida for waste-to-energy and solid waste management consulting services. The county is soliciting proposals from qualified engineering and technical services firms to provide independent consulting engineer services for the County's Waste-to-Energy Facility and Resource Recovery Facility under a five-year term contract estimated at $6 million. Proposals are due electronically by July 24, 2026, at 2:00 p.m. Eastern Time, with a maximum of 40 pages (excluding resumes and organizational charts). The scope of services includes annual facility inspections, quarterly punch list reviews, environmental testing and monitoring, monthly facility meetings, bond compliance reporting, service agreement development, project development and permitting, technical training, and optimization of ash and metals recovery systems. The county will conduct oral presentations with at least three shortlisted firms prior to final award.
The evaluation of proposals will be scored on a total of 100 points across four primary criteria: Ability of Firm and Its Professional Personnel (45 points maximum), Firm's Experience with Projects of Similar Size and Type (40 points maximum), Firm's Willingness and Ability to Meet Schedule and Budget Requirements (5 points maximum), and Effect of Firm's Recent, Current, and Projected Workload (10 points maximum). Additional scoring includes Volume of Work (5 points maximum), Past Performance Rating (5 points maximum), and Small Business Enterprise (SBE) bonus points at 5 percent of maximum evaluation criteria points for firms committing 10 percent or greater of contract fees to SBE participation. Compensation will be negotiated work order-by-work order based on direct salary rates by personnel classification, audited/certified overhead and profit multipliers, and reimbursable costs. Study work orders shall not exceed $500,000, while professional services for construction projects with estimated construction costs up to $7.5 million are permissible. The consultant must maintain comprehensive liability insurance including Professional Liability at $1 million per claim, with Hillsborough County named as additional insured, and must comply with E-Verify, IMAGE Best Practices, Hillsborough County Business Tax requirements, and Cone of Silence restrictions.
View the file
Other files
Show all 30
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EVALUATION CRITERIA
EVALUATION CRITERIA NUMBER. 1
ABILITY OF FIRM AND ITS PROFESSIONAL PERSONNEL
Maximum Point Value: 45
Responses limited to 40 page(s) maximum, plus resumes for key personnel
Attach resumes only for key personnel of the Project Team, detailing past experience as it relates to projects of a similar size and type.
Submit separate organizational charts delineating personnel assigned to both construction and design services, if applicable. Clearly indicate the role of each member of the proposed project team. Resumes and organizational charts do not count against the maximum page limit. Indicate that the team has a clear understanding of the County's project and requirements.
0-5 Project team personnel do not have appropriate level of qualifications and experience. Project team does not contain all critical disciplines. Organization of project team is inappropriate. Prime firm lacks adequate professional resources to properly provide services. Prime firm lacks understanding of the proposed project and what will be required to complete it. Proposed project manager is not appropriate.
6-10 Some project team personnel have adequate level of qualifications and experience.
Project team lacks minor disciplines. Organization of project team is marginal.
Prime firm's professional resources to properly provide services are marginal. Prime firm has a marginal understanding of the proposed project and what will be required to complete it. Proposed project manager's qualifications are marginal.
11-20 Project team personnel have adequate level of experience. Project team contains all necessary disciplines. Organization of project team is adequate to the project. Prime firm has adequate professional resources to properly provide services. Prime firm has an adequate understanding of the proposed project and what will be required to complete it. Proposed project manager's qualifications are adequate.
21-29 Project team personnel have above average level of experience, and the project manager is uniquely qualified. Project team contains all necessary disciplines.
Organization of project team is adequate to the project. Prime firm has superior professional resources to properly provide services. Prime firm has an above average understanding of the proposed project and what will be required to complete
it. Proposed Project Manager's qualifications are above average.
30-45 Project team personnel have exceptional level of experience, and several are uniquely qualified. Project team contains all necessary disciplines. Organization of project team is superior. Prime firm has a superior understanding of the proposed project and what will be required to complete it. Prime firm has superior professional resources to properly provide services. Proposed project manager.is uniquely qualified. , EVALUATION CRITERIA NUMBER 2
FIRM'S EXPERIENCE WITH PROJECTS OF A SIMILAR SIZE AND TYPE
0-5
6 -10
11-20
21-25
26-40
Maximum Point Value: 40
Maximum number of projects to be included:
Responses limited to 5 page(s) maximum� project
List a maximum of 10 recent projects, preferably during the past five (5) years, to indicate proficiency in similar work. For each representative project, indicate your Firm's role (Prime, Sub-Consultant, etc.), your Firm's project manager and key personnel, total cost of the project, length of the contract, and a summary of the work performed by your Firm." Show your firm's approach to the project and methods used to plan, design, and administer the project.
Prime firm has marginal experience with projects of a similar size and type.
Prime firm has minor successful experience with projects of a similar size and type.
Prime firm's approach and methods proposed are inadequate to provide the level of service required for the project. Scope of services provided for representative projects vary from RPS Scope.
Prime firm has adequate successful, recent (within past five (5) years) experience with projects of a similar size and type. Prime firm's approach and methods proposed are adequate to provide the level of service required for the project. Some of the scope of services provided for representative projects are similar to RPS scope.
Prime firm has more than adequate successful, recent (within past five (5) years) experience with projects of a similar size and type. Prime firm's approach and methods proposed are above average to provide the level of service required for the project. Most of the scope of services provided for representative projects are similar to RPS scope.
Prime firm has superior past and recent successful experience with projects of a similar size and type. Prime firm's approach and methods proposed are superior to provide the level of service required for the project. All of the scope of services provided for representative projects are similar to RPS scope.
EVALUATION CRITERIA NUMBER 3
FIRM'S WILLINGNESS AND ABILITY TO MEET SCHEDULE AND BUDGET
REQUIREMENTS
Maximum Point Value: 5
Response limited to 5 page(s) maximum
Provide a short narrative outlining how you propose to manage the project in order to meet schedule and budget requirements.
Indicate the controls to be utilized to maintain both schedule and budget for this project.
Describe how personnel will be assigned, and tasks effectively handled, in order to provide the most efficient service on the project (during both the design and the construction phases, if applicable). Describe any unique issues and/or items of focus based on your understanding of the project scope. Describe any suggestions on how the proposed project schedule could be further accelerated. Describe your Firm's unique abilities, innovative approaches, and/or special considerations.
Describe your firm's ability to provide the required services and provide them within a schedule and budget.
0 Submittal does not address either the schedule or budget.
Submittal shows inadequate understanding of scope, schedule and budget requirements.
2 Submittal shows adequate schedule approach, understanding of budget control, and understanding of scope. Project budget and schedule can be met or modified to meet project intent.
3 Submittal shows good understanding of and approach to scope, schedule and budget.
Project budget and schedule can be met.
4-5 Submittal shows superior understanding of and approach to scope, schedule and budget with potential improvements for project delivery and cost savings.
EVALUATION CRITERIA NUMBER4
EFFECT OF FIRM'S RECENT, CURRENT AND PROJECTED WORKLOAD
Maximum Point Value: 10
Responses limited to 5 page(s) maximum, including a one-page graphic representation.
Describe the current workload and your daily ability to handle the scope of services.
Provide a graphic representation of your current commitment over the next one-year period for key members of the project team.
0 Submittal shows that consultant does not have sufficient available personnel to complete services on schedule.
1 Submittal shows that consultant's workload commitments will impact its ability to complete services on schedule.
2-3 Submittal shows that while consultant has adequate time and available personnel, prior workload commitments may impact its ability to complete services on schedule.
4-6 Submittal shows that consultant's project team has adequate time and available personnel to complete services on schedule.
7-10 Submittal shows that consultant's project team has adequate staffing available to complete services on schedule. Submittal indicates backup staffing capability in the event of unforeseen circumstances.