ESBD_549439_1786758294927_TSC RFI 358-26-002 Appendix J Planning Schedule-Critical Path-Decsion Gates.pdf

PDF 124 KB Posted

Attached to
Vibroacoustic, Vibration, and Electromagnetic Interference/Compatibility (EMI/EMC) Mobile Test Capabilities
Solicitation number
RFI-TSC-358-26-02
Issued by
Texas

About this file

This is an appendix to a Request for Information (RFI) issued by the Texas Space Commission regarding Electromagnetic Interference/Compatibility (EMI/EMC) mobile test capabilities. Appendix J establishes the planning schedule, critical path, and decision gates required for proposing minimum viable, preferred, and expansion alternatives. The document requires respondents to provide a planned-level schedule using calendar dates or months from authorization, identify all dependencies, and designate responsible parties for each phase. The key phases outlined include site control and due diligence, programming and feasibility assessment, environmental review and permitting, concept and final design, long-lead procurement, construction or renovation, equipment fabrication, installation and integration, commissioning and calibration, acceptance and validation, workforce training, initial user campaigns, and full shared-user operations, with provisions for future expansion decisions.

The appendix requires specific documentation of critical and long-lead items with current lead times, required-by dates, single-source determinations, and mitigation strategies that may affect schedule. Additionally, respondents must identify expansion triggers by phase, including the specific metrics, thresholds, decision authority, and any associated additional costs or schedule impacts. The document does not contain explicit pricing information, set-asides, funding amounts, or contract term details within this particular appendix, as it focuses solely on scheduling framework and critical path analysis for project implementation.

View the file

Other files

Show all 13

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

TEXAS SPACE COMMISSION | RFI #358-26-002 | Electromagnetic Interference/Compatibility (EMI/EMC)

Electronic State Business Daily (ESBD) Texas Comptroller of Public Accounts Office Page 30 of 38

Appendix J - Planning Schedule, Critical Path, and Decision Gates.

Provide a planned-level schedule for the minimum viable, preferred, and expansion alternatives.

Use calendar dates or months from authorization. Identify dependencies and the party responsible for each gate.

Phase / Gate Start Finish Duration Predecessor Responsible Party Gate / Evidence

Authority / governance / funding decision

Site control / due diligence

Programming / feasibility

Environmental review / permits

Concept design

Final design

Long-lead procurement

Construction / renovation / site work

Equipment fabrication

Installation / integration

Commissioning / calibration

Acceptance / validation

Workforce training / operating procedures

Initial user campaign

Full shared-user operations

Expansion decision

J.1. Critical and Long-Lead Items:

Item Current Lead Time Required-By Date Single Source? Mitigation / Advance Action Schedule Effect

TEXAS SPACE COMMISSION | RFI #358-26-002 | Electromagnetic Interference/Compatibility (EMI/EMC)

Electronic State Business Daily (ESBD) Texas Comptroller of Public Accounts Office Page 31 of 38

J.2. Expansion Triggers:

Phase / Expansion Trigger Metric Threshold Decision Authority Additional Cost / Schedule

File details come from the government source that posted it. Updated .