ESBD_491035_1771529806938_ESBD ATTACHMENT 4.docx
DOCX document 41 KB Posted
- Solicitation number
- 601CT0000005606
- Issued by
- Texas
About this file
This document is an Attachment 4 form from a Texas state or local Request for Proposal (RFP) that outlines the qualifications and experience requirements for a Project Manager position on a stormwater-related project. The form requires proposers to submit information about a single Project Manager candidate, including educational background, work history, and stormwater experience. Proposers must demonstrate the Project Manager's qualifications through completion of the standardized form and may attach a resume for supplementary information only. Bonus points are available for Project Managers with experience on transportation right-of-way projects or those completed within the last ten calendar years.
The Project Manager qualifications must be supported by a minimum of two verifiable projects and a maximum of four projects. For each project, proposers must provide detailed information including project number, name, location, total cost, start and end dates, client contact information, and a description of the specific tasks performed by the Project Manager. The form requires brief narratives not exceeding specified word counts that describe the project purpose, the Project Manager's individual contributions, and any improvements or innovative practices implemented. Proposers are encouraged to attach supporting documentation (limited to five pages per project) such as report excerpts, client statements, or deliverable samples to verify project experience and qualifications.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| ESBD_491035_1771529517667_FINAL SM RFP.pdf | ||
| ESBD_491035_1771529909605_ESBD ATTACHMENT 5.docx | DOCX document | |
| ESBD_491035_1772835218600_576SM001 Addenda 1.pdf | ||
| ESBD_491035_1771529600415_Attachment I.pdf | ||
| ESBD_491035_1771529780943_ESBD ATTACHMENT 3.docx | DOCX document | |
| ESBD_491035_1773175891545_576SM001 Addenda 2.pdf | ||
| ESBD_491035_1773407578150_576SM001 Addenda 3.pdf | ||
| ESBD_491035_1771529748739_ESBD ATTACHMENT 2.docx | DOCX document | |
| ESBD_491035_1771529642398_ESBD ATTACHMENT 1.docx | DOCX document | |
| ESBD_491035_1771529962473_ESBD ATTACHMENT 6.docx | DOCX document | |
| ESBD_491035_1771529984540_ESBD ATTACHMENT 7.docx | DOCX document |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
ATTACHMENT 4
PROJECT MANAGER QUALIFICATIONS
INSTRUCTIONS:
| 1. | Complete a form in the format below with the Project Manager qualifications as listed in Appendix-1 of this RFP. A resume for the Project Manager position may be attached for additional information but shall not be a substitution for the completion of this form. Only one person shall be proposed as a Project Manager. |
| 1.1. | The proposer can receive bonus points for projects: |
· associated with transportation right-of-way.
· completed within the last ten calendar years.
| NAME |
| Current Employer |
EDUCATION
| Degree/Major |
| University |
| Date |
| Degree/Major |
| University |
| Date |
WORK EXPERIENCE
Number of years of stormwater experience _____ Identify each employer and dates of service for each year identified for stormwater experience listed above.
| Employer _______________________ | Dates of Service ___________________ |
| Employer _______________________ | Dates of Service ___________________ |
| Employer _______________________ | Dates of Service ___________________ |
| Employer _______________________ | Dates of Service ___________________ |
Provide a brief description of stormwater work experience (150 words or less).
ATTACHMENT 4
PROJECT MANAGER QUALIFICATIONS
INSTRUCTIONS
Complete this form with the projects to demonstrate the Project Manager qualifications as listed in Appendix-1 of this RFP. Minimum is two verifiable projects. Maximum is four verifiable projects.
PROJECT EXPERIENCE (repeat this section for each project)
Project Number
Project Name
| Project Location |
| Total Cost |
| Project Start Date |
| Project End Date |
Project Approval Date (if applicable)
Client Name
Client Contact Name
Contact Phone Number
Contract or Work Authorization # (For TxDOT projects only)
Proposer is encouraged to attach backup materials (maximum five pages) to support verification for each project (excerpts from reports, manuals, or training classes, screenshots from applications or videos, introduction/executive summary or table of contents, deliverables, statement from the client, etc.). Do not provide the entire document. Descriptive information that supports the project is preferred.
Provide a brief description of the above project. Be specific in purpose, need, and final deliverables or products (not to exceed 100 words).
Provide a brief description of the work performed by the Project Manager on the above project. Be specific on the tasks performed by the Project Manager, not by the members of their team. (not to exceed 150 words).
Provide a brief description of how the above project provided an improvement to the client’s processes or improved compliance with permit requirements. Highlight any innovative practices (not to exceed 100 words).
Scientific IndefDelwWA Page 6 of 3 Attachment H
File details come from the government source that posted it. Updated .