ESBD_474660_1767973310183_Attachment 4-Proposal Submission Checklist.docx

DOCX document 96 KB Posted

Attached to
Fort Worth 1st Floor Restroom Renovation
Solicitation number
3202600095
Issued by
Tarrant County, Texas

About this file

This file is a Proposal Submission Checklist designed to assist respondents in preparing submissions for a state or local contract opportunity. The checklist serves as a reference guide to ensure comprehensive proposal preparation and includes required forms and documentation such as the Execution of Response (Form 1), Cost Proposal (Form 2), Past Project Performance Sheet (Form 3, with three examples required), Financial Questionnaire (Form 4), Project Milestone Schedule, Title Page (Form 5), and Executive Summary. Additional required submissions include a Letter of Bonding Capacity, Substitute W-9 and Direct Deposit Form (Form 6), HUB Subcontracting Plan also known as VHSP (Form 7), Safety Plan, Organization Profile, and any Public Information Act redacted copies if applicable. The checklist is provided as a planning tool only and is not itself a required submission or attachment to the proposal.

Respondents are responsible for reviewing all solicitation requirements independently and ensuring all materials necessary for a complete proposal submission are included. The checklist does not impose mandatory compliance but rather serves as a comprehensive reference to support thorough proposal preparation and reduce the likelihood of missing critical documentation or forms required by the soliciting agency.

View the file

Other files

File Type Posted
ESBD_474660_1767973649582_Form 7- HUB Subcontracting Plan.pdf PDF
ESBD_474660_1768501789909_Attachment B - Preproposal Conference Presentation.pdf PDF
ESBD_474660_1770408135871_Attachment D-Questions and Answers.pdf PDF
ESBD_474660_1767975765005_RFP-3202600095 Solicitation.pdf PDF
ESBD_474660_1770642060524_Addendum 4 Notice-3202600095.pdf PDF
ESBD_474660_1768332630978_Addendum 1 Notice-320260095.docx DOCX document
ESBD_474660_1770408136127_Addendum 3 Notice-3202600095.pdf PDF
ESBD_474660_1767973257835_Attachment 2- Uniform General Conditions.pdf PDF
ESBD_474660_1767973344457_Attachment 5- Supplementary General Conditions .docx DOCX document
ESBD_474660_1767973672884_TWC Procurement Portal Instructions to Respondents.docx DOCX document
ESBD_474660_1767973550443_Form 3- Past Project Performance.pdf PDF
ESBD_474660_1767973672884_Attachment 7- Project Drawings.pdf PDF
ESBD_474660_1767973424005_Attachment 10- HSP SubContracting Plan Guide.pdf PDF
ESBD_474660_1767973399390_Attachment 9- Asbestos Documents.pdf PDF
ESBD_474660_1767973625174_Form 6-Substitute W-9.docx DOCX document
ESBD_474660_1767973507164_Form 1- Execution of Response.docx DOCX document
ESBD_474660_1767973449199_Attachment 11- Overview of PAR.pdf PDF
ESBD_474660_1767973378991_Attachment 6- Prevailing Wage Scale.pdf PDF
ESBD_474660_1768501707252_Attachment A- Preproposal Sign in Sheet.pdf PDF
ESBD_474660_1767973486708_Attachment 13- Substitute W-9 Instructions.pdf PDF
ESBD_474660_1767973276170_Attachment 3-Evaluation Scoring Matrix.docx DOCX document
ESBD_474660_1767973467840_Attachment 12- Progress Assessment Report.xls XLS spreadsheet
ESBD_474660_1767973569557_Form 4-Financial Questionnaire.docx DOCX document
ESBD_474660_1767973588477_Form 5-Title Page.pdf PDF
ESBD_474660_1767973531424_Form 2 - Cost Proposal .docx DOCX document
ESBD_474660_1767973672884_Attachment 8- Project Manual.pdf PDF
ESBD_474660_1768501809858_Attachment C- Updated Form 7 - HSP.pdf PDF
ESBD_474660_1767973160748_Attachment 1- T&C Architect & Engineer Version (12-18-2025).pdf PDF
ESBD_474660_1768501680323_Addendum 2 Notice-3202600095.docx DOCX document
Show all 29

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Attachment 4 - Proposal Submission Checklist This Proposal Submission Checklist is provided to assist a Respondent in preparing a responsive Proposal. The checklist is not a requirement and does not need to be attached to a Proposal. Respondent is responsible for reviewing all Solicitation requirements and ensuring it submits all materials for a complete Proposal.

· Form 1- Execution of Response, List Exceptions, if any,

· Written Narrative of Qualifications (See Section 6.1- Narrative Proposal)

· Form 2 - Cost Proposal

· Form 3 - Past Project Performance Sheet (x3)

· Form 4 - Financial Questionnaire

· Project Milestone Schedule

· Form 5 - Title Page

· Executive Summary

· Letter of Bonding Capacity

· Form 6 – Substitute W-9 and Direct Deposit Form

· Form 7 - HUB Subcontracting Pan (VHSP)

· Safety Plan

· Organization Profile

· Public Information Act redacted copies, if applicable

· Other information (list)

File details come from the government source that posted it. Updated .