This solicitation requests design-build proposals to upgrade the electrical system at the 911 Federal Building in Portland, Oregon. The scope of work includes replacing all medium and low-voltage switchgear, switchboards, and panel boards throughout the building; replacing the motor control centers; replacing the emergency generator; and installing a new lightning protection system. Tenants in the building include the U.S. Congress, Department of Interior, Department of Labor, General Services Administration, and Department of Homeland Security. Proposals are requested to replace aging electrical distribution equipment beyond its useful life with new switchgear, switchboards, panel boards, and motor control centers. The emergency generator system will also be replaced with a larger 250kW unit to provide additional capacity. A new lightning protection system will be installed on the roof and connected to grounding components around the building perimeter. The design-build contractor will be responsible for all design and construction aspects to complete the project in collaboration with stakeholders.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
KEY PERSONNEL RESUME FORMAT
Provide information, listed below, on separate sheets showing qualifications of each key personnel individual. NOTE: Resumes shall only be provided for positions identified on the list of key personnel identified in the Solicitation.
(a) Name:
(b) Current Position/Title:
(c) Proposed Assignment on this Project, including specific duties proposed to be performed on this Project while in this proposed role: __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
(d) No. of Years in Same Assignment as Proposed on the Project__________________________
(e) Name of Your Firm___________________________________________________________
(f) No. of Years: With this Firm__________ With other Firms____________
(g) Education:
Degree(s) earned: _______________________________________________________________ School attended: ________________________________________________________________ Year Degree granted: ____________________________________________________________ Degree field/specialization: ________________________________________________________ Specialized Training: ____________________________________________________________
(h) Active Registration, if any:
Type: _______ No.____________, State(s) __________, First Year/ Current Year ______/_____
(i) Describe Your Specific Experience and Qualifications Relevant to this Project: __________________________________________________________________________________________________________________________________________________________________________________________________________________________________________
(j) Up to three (3) relevant project examples:
Project Title: ___________________________________________________________________ Project Location: ________________________________________________________________ Project Dollar Value:_____________________________________________________________ Project Size (SF): _______________________________________________________________ Delivery Method (i.e. D/B, DBB, CMc, etc.): _________________________________________ Position Held: __________________________________________________________________ Duties performed: _______________________________________________________________ Company employed with during Project: _____________________________________________