Amd 01 Exhibit 6 Price and Services Schedule 4.2.20.docx
DOCX document 25 KB Posted
- Attached to
- 911 Fed Bldg Electrical System Upgrade Design Build Federal contract opportunity
- Solicitation number
- EQ10PCP-20-0005
About this file
This solicitation requests proposals for an electrical system upgrade design-build project at the 911 Federal Building in Portland, Oregon. The scope of work includes replacing all medium and low-voltage switchgear, switchboards, and panel boards throughout the building; replacing the motor control centers; replacing the emergency generator; and installing a new lightning protection system. Ten federal agencies are housed in the building including the U.S. Congress, Department of Interior, Department of Labor, General Services Administration, and Department of Homeland Security. The design-build contractor will be fully responsible for all design and construction efforts related to the project. GSA envisions a highly collaborative approach and expects the contractor to work closely with stakeholders to deliver a project meeting expectations and building requirements.
View the file
Other files for this federal contract opportunity
Show all 29
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SERVICES AND PRICE SCHEDULE
ITEM NO
SUPPLIES/SERVICES
PRICE
Electrical System Upgrades: Design Stage
Period of Performance: 8/12/2020 - 7/8/2022 (528 Calendar Days)
The Contractor shall provide all labor, equipment, materials, services and incidentals necessary and perform all work required to provide services throughout performance of all DESIGN STAGE phases of the contract.
Work shall be performed IAW this Statement of Work and the Contractor’s resulting contract.
0001 AA
Base Bid: Design Stage
The Contractor shall provide all labor, equipment, materials, services and incidentals necessary and perform all work required to provide services throughout performance of all DESIGN STAGE phases of the contract for all Base Bid Items as identified in the Statement of Work.
0001 AB
Additive Bid Item - Lightning Protection System (LPS): Design Stage
The Contractor shall provide all labor, equipment, materials, services and incidentals necessary and perform all work required to provide services throughout performance of all DESIGN STAGE phases of the contract for the LPS (Lightning Protection System scope) Item as identified in the Statement of Work.
Electrical System Upgrades: Construction Phase
Period of Performance: 8/12/2020 - 7/8/2022 (528 Calendar Days)
The Contractor shall provide all labor, equipment, materials, services and incidentals necessary and perform all work required to provide services throughout performance of all CONSTRUCTION STAGE phases of the contract.
Work shall be performed IAW the Statement of Work and the Contractor’s resulting contract.
0002 AA
Base Bid: Construction Phase
The Contractor shall provide all labor, equipment, materials, services and incidentals necessary and perform all work required to provide services throughout performance of all CONSTRUCTION STAGE phases of the contract for all Base Bid Items as identified in the Statement of Work
0002 AB
Additive Bid Item - Lightning Protection System (LPS): Construction Phase
The Contractor shall provide all labor, equipment, materials, services and incidentals necessary and perform all work required to provide services throughout performance of all CONSTRUCTION STAGE phases of the contract for the LPS (Lightning Protection System scope) Item as identified in the Statement of Work.
BONDS / INSURANCE
Cost for providing payment and performance bond premiums and insurance coverage as required under FAR 52.228-5, Insurance - Work on a Government Installation, also shown in Section III.F. Insurance Requirements within The Agreement.
HAZMAT ABATEMENT SERVICES
This CLIN is to be used solely and exclusively in the event that the Contractor encounters any ACM and/or miscellaneous, i.e. non-ACM, hazardous materials’ abatement-related service costs, where such services and costs have not been previously identified or referenced in the RFP documents provided prior to proposals due as part of the contract’s acquisition package.
The following protocol applies to this CLIN should its use become necessary:
a) Any funds remaining on this CLIN shall be de-obligated unilaterally upon definitization and/or contractual financial close-out.
b) The amount agreed to by both parties will be used to establish a NTE estimate used for pricing this work and shall form the basis for future negotiations when definitizing this SOW.
c) Any work accomplished related to this CLIN shall require a written work plan which will clearly identify: area(s) of work performed; schedule (start & end dates/times) for work; which trade(s) will be performing the work; and any specialized equipment which may be necessary while performing the work.
d) All Premium Time/OT rate work shall be proposed by the Contractor and approved by the CO/COR prior to execution.
INCURRENCE OF COSTS AND PAYMENTS. Until such time as the NTE amount may be definitized into a FFP amount, the Contractor shall not incur costs, nor shall the Government make any payments, for work in excess of 50% of the estimated amounts, until scope and pricing have been definitized into a FFP amount.
Work shall be performed IAW the Statement of Work and the Contractor’s resultant contract.
Note: Allowance CLINs will not count in the overall price evaluation as they are not designed as firm fixed price amounts. They are designed as an allowance (or contingency) for allocable costs that are not easily predicted at the time of award. All actual costs must be validated by the GSA project team prior to being allowed.
0004 AA
HAZMAT ABATEMENT ALLOWANCE [ACM]
This SLIN is hereby established as a pre-priced Not-to-Exceed (NTE) Allowance to be used solely and exclusively in the event that the Contractor encounters any ACM abatement-related service costs during performance of services associated with the Electrical System Upgrade (POR-0033-PO18) project.
For this SLIN, the pre-determined amount identified in the Price Schedule shall be $10,000.00.
NTE $10,000.00
0004 AB
HAZMAT ABATEMENT ALLOWANCE [non-ACM]
This SLIN is hereby established as a pre-priced Not-to-Exceed (NTE) Allowance to be used solely and exclusively in the event that the Contractor encounters any miscellaneous, i.e. non-ACM, hazardous materials’ abatement-related service costs during performance of services associated with the Electrical System Upgrade (POR-0033-PO18) project.
For this SLIN, the pre-determined amount identified in the Price Schedule shall be $10,000.00.
NTE $10,000.00
HSPD-12 ADJUDICATIONS ALLOWANCE
This CLIN is established as a Not to Exceed (NTE) Allowance line item to reimburse cost(s) incurred in order for their personnel to comply with GSA’s Office of Mission Assurance (OMA) security related clearance and adjudication functions in support of this project.
Work shall be performed IAW the Statement of Work and the Contractor’s BPA Contract.
Note: Allowance CLINs will not count in the overall price evaluation as they are not designed as firm fixed price amounts. They are designed as an allowance (or contingency) for allocable costs that are not easily predicted at the time of award. All actual costs must be validated by the GSA project team prior to being allowed.
NTE
TOTAL PROPOSED PRICE: $_____________________
Period of Performance offered: _______________Days
Future Modification Mark-up Rate offered: _______________%
Government Caused Delay Rate offered: $______________/Day