About this file

This document outlines requirements for launch range support services for an expendable launch vehicle mission from Wallops Flight Facility. The scope includes staffing, resources, schedules, test procedures, and usage operations plans. Requirements are allocated to the range and assigned an identification along with the source, type, and verification method. Sources are explicit stakeholder requirements or derived internally. Types are mandatory or desired capabilities. Verification methods involve test, demonstration, analysis, or inspection. Applicable contractors must provide range instrumentation, engineering, and operations support in accordance with this document and resolve any conflicts with other mission documentation through the NASA Project Manager.

The related federal contract opportunity is solicitation number 80GSFC23R0009FRFP for Wallops Range Contract support services issued by NASA Goddard Space Flight Center.

View the file

Other files for this federal contract opportunity

Other files attached to Wallops Range Contract (WRC), newest first.
File Type Posted
80GSFC23R0009 RFI-6.pdf PDF
80GSFC23R0009 RFI-5.pdf PDF
80GSFC23R0009 - SF33 - 11-27-2023.pdf PDF
80GSFC23R0009 Amendment 003.pdf PDF
80GSFC23R0009 RFI-3.pdf PDF
80GSFC23R0009 Amendment 002.pdf PDF
Attachment A - WRC SOW 9NOV2023.pdf PDF
Attachment S - OCI-Plan-Data-Requirements - Rev.1.pdf PDF
Plug Numbers for Cost Exhibits A and B - Rev.1.pdf PDF
Enclosure 1 - Phase-in SOW - Rev. 1.pdf PDF
Exhibit A - Cost Plus FF Hybrid CORE 10-6-2023 - Rev. 1.pdf PDF
Exhibit B - WRC Exh RTO Cost - Rev. 1.pdf PDF
Plug Numbers for Cost Exhibits A and B.pdf PDF
80GSFC23R0009 RFI-1.pdf PDF
80GSFC23R0009 Amendment 001.pdf PDF
ROC II Contract Historical Data - 2.pdf PDF
ROC II Contract Historical Data - 1.pdf PDF
Exhibit C - PPQ.pdf PDF
Enclosure 2 RTO-Sounding Rocket 46-031 Requirements.pdf PDF
Attachment L - Contract Historical Data.pdf PDF
CBA-2023-222 KBR.pdf PDF
Attachment F - IT Security Management Plan REV.pdf PDF
Final Request for Proposal (RFP) Cover Letter signed.pdf PDF
Exhibit A - Cost Plus FF Hybrid CORE 10-6-2023.pdf PDF
Exhibit B - WRC Exh RTO Cost 9-15-23.pdf PDF
Enclosure 3 - Government WRC QASP.pdf PDF
Enclosure 2 RTO-RTO (Campaign and ELV) 7SEP2023 Final.pdf PDF
Attachment S - OCI-Plan-Data-Requirements.pdf PDF
Attachment O - GFP.pdf PDF
Attachment E - Small Business Subcontracting Plan.pdf PDF
Attachment B - Direct Labor Rates_Indirect Rates and Fee.pdf PDF
Attachment N - Contractor Proposed Enhancements.pdf PDF
IAM AW and Saalex- ROC II - CBA -Final (signed).pdf PDF
Attachment K - OCI Avoidance Plan.pdf PDF
Enclosure 1 - Phase-in SOW 28MAR.pdf PDF
Attachment Q - DEIA Plan.pdf PDF
IAM AW and KBR - ROC II - Fully Executed CBA - 2022.PDF PDF
CBA-2023-223 Saalex Solutions Inc..pdf PDF
CBA-2023-224 Rothe Enterprises Inc..pdf PDF
Attachment A-WRC SOW_GO_Chem 11SEP2023FINAL.pdf PDF
Attachment G-533 Attach Core and IDIQ--Both Onsite and Offsite.pdf PDF
Attachment C - IAGP.pdf PDF
WRC - FRFP-80GSFC23R0009 Final.pdf PDF
Enclosure 4 - IT Security Management Plan Template.pdf PDF
Enclosure 2 RTO-Sounding Rocket 36-360 Requirements.pdf PDF
Attachment R - DEIA Plan.pdf PDF
Attachment P - Requirements Statements List.pdf PDF
Attachment M IT Security Applicable Docs.pdf PDF
Attachment J - DD254 - WRC.pdf PDF
Attachment I - Quality Assurance Plan.pdf PDF
Show all 50

Wallops Range Contract (WRC) has more files on GovTribe.

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

RTO ELV Requirements Document

Table of Contents

Table of Contents

Section 1. Overview

1.1 Purpose

1.2 Scope

1.3 Objectives

1.4 Applicability

Section 2. Summary of Range Services Requirements

2.1 Detailed Requirements Matrices

2.2 Associated Operations Requirements

Section 1. Overview

1.1 Purpose

The purpose of this document is to define the requirements for the ELV launch mission; to take place from Pad-0A located at Wallops Flight Facility (WFF).

1.2 Scope

The scope of this document is to identify mission requirements. These requirements cover staffing, resources, and schedules. Detailed test procedures and usage operations plans, along with vehicle or mission specific details (beside those necessary for providing range support) are out of the scope of this document; they are addressed in associated documents

1.3 Objectives

The objectives of this document are to list all requirements allocated to the Range, assign each a trackable identification, identify the source or traceability of the requirement, identify the type of requirement, and identify how the requirements will be verified.

The source of requirements is broken into the following categories

Source Description

Explicit Explicit requirements are most commonly found in documents communicated by stakeholders to the development team.

Derived Requirement that is not explicitly stated in the set of stakeholder requirements and is inferred or derived from a stakeholder requirement. The requirement may also be developed during the design activities as a result of the design team, not the stakeholder.

As a result, the derived requirement may not directly trace to a stakeholder requirement, but it will not conflict with a stakeholder requirement or a constraint.

The types of requirements are broken into the following categories

Type Description

Mandatory Requirement specified by the customer and those listed in the PRD and/or other requirements documents must be met.

Desired Desired capability to improve utility of system; does not need to be met for project success.

The types of verification methods are broken into the following categories:

Type Description

Test (T) Verification by test consists of operations of all or part of the subsystem under controlled conditions to determine that qualitative design or performance requirements have been met. It includes the collection and subsequent examination of quantitative data. Test may rely on the use of instrumentation and special test equipment to measure the parameter(s) that characterize the requirement.

Demonstration (D) Verification by demonstration consists of operations of all or part of the subsystem under controlled conditions to determine that qualitative design or performance requirements have been met. Demonstration relies on observation/recording of functional operation not requiring the use of elaborate instrumentation, special test equipment, or quantitative evaluation of data.

Analysis (A) Verification by evaluation of data by generally accepted analytical techniques to determine that the item will meet specified requirements. Analytical techniques may include systems engineering analysis, statics, analog modeling, similarity, and computer simulation.

Inspection (I) Verification of compliance by the examination of documentation or direct examination of an attribute (dimension, weight, physical characteristics, computer program code, etc.).

1.4 Applicability

This requirements document applies to contractors responsible for range instrumentation, engineering and operations support

If a conflict is discovered between this requirement document and any other approved mission documentation, the conflict shall be immediately identified to the NASA Project Manager for resolution