Enclosure 1 - Summary of Significant Changes from the Draft RFP.pdf

PDF 123 KB Posted

Attached to
Consolidated Operations, Management, Engineering, and Test (COMET) Federal contract opportunity
Solicitation number
80KSC022R0004
Issued by
National Aeronautics and Space Administration Kennedy Space Center

About this file

This document summarizes significant changes between the draft request for proposal and final request for proposal for the Consolidated Operations, Management, Engineering, and Test requirement. Key details include that the final RFP removed CLIN 0004 for Electrical Development Laboratory services and clarified terms for task orders under the IDIQ portion. Several clauses and sections throughout were also updated, including revisions to cost templates and instructions, management and technical approach requirements, and the evaluation factors. Attachments regarding wage determinations, the statement of work, and lists of government property were replaced in their entirety in the final RFP to capture requirements changes.

View the file

Other files for this federal contract opportunity

Other files attached to Consolidated Operations, Management, Engineering, and Test (COMET), newest first.
File Type Posted
80KSC022R0004 Amend 0004 Replacement Page Update.pdf PDF
80KSC022R0004 Amendment 0004 SF30.pdf PDF
80KSC022R0004 Amend 0004 Section B-M.docx DOCX document
80KSC022R0004 Amend 0003 Replacement Pages Portfolio.pdf PDF
80KSC022R0004 Amend 0003 Section B-M.docx DOCX document
80KSC022R0004 Amend 0003 SF30.pdf PDF
Responses to Questions - 04.08.2022.pdf PDF
80KSC022R0004 Amend 0002 SF30.pdf PDF
80KSC022R0004 Amend 0002 Tracked Changes Portfolio - Informational Only.pdf PDF
80KSC022R0004 Amend 0002 Replacement Pages Portfolio.pdf PDF
80KSC022R0004 Amend 0002 Section B-M.docx DOCX document
Responses to Questions.pdf PDF
80KSC022R0004 Amend 0001 SF30.pdf PDF
L-07 Government Standard Labor Categories and Qualifications Amend 0001.xlsx XLSX spreadsheet
80KSC022R0004 Amend 0001 Section B-M.docx DOCX document
Responses to RFP Questions.pdf PDF
80KSC022R0004 Amend 0001 Replacement Pages Portfolio.pdf PDF
J-18 Contract Schedule Tables Amend 0001.xlsx XLSX spreadsheet
80KSC022R0004 Amend 0001 Tracked Changes Portfolio - Informational Only.pdf PDF
RFP Cover Letter.pdf PDF
Enclosure 3 - RFP Question Form.xlsx XLSX spreadsheet
COMET RFP 80KSC022R0004 Appendix Portfolio.pdf PDF
L-04 Rates and Factors Template.xlsx XLSX spreadsheet
L-05 SubK-Hourly FBLR Details Template.xlsx XLSX spreadsheet
Appendix 04 ISS Flight Certified Hardware.xlsx XLSX spreadsheet
Enclosure 2 - COMET Questions and Responses.pdf PDF
L-02 Phase-In Template.xlsx XLSX spreadsheet
L-03 Basic Cost Price Template.xlsx XLSX spreadsheet
L-06 FFP Work Units Template.xlsx XLSX spreadsheet
Appendix 10 Contractor-Managed Property.xlsx XLSX spreadsheet
COMET RFP No. 80KSC022R0004.pdf PDF
COMET RFP No. 80KSC022R0004 J-Attachments Portfolio.pdf PDF
J-18 Contract Schedule Tables.xlsx XLSX spreadsheet
Appendix 07 OMEU Matrix.xlsx XLSX spreadsheet
L-01 COMET Past Performance Questionnaire.docx DOCX document
L-07 Government Standard Labor Categories and Qualifications.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

COMET RFP No. 80KSC022R0004 1 Summary of Significant Changes from Draft RFP to RFP

Enclosure 1

Provided below is a summary of the significant changes (i.e., not an exhaustive list of all changes) that have been incorporated into solicitation number 80KSC022R0004, Consolidated Operations, Management, Engineering, and Test (COMET). These revisions are the result of requirements changes, questions and comments received from industry, and internal reviews performed by the Government. Grammatical and other editorial changes have been corrected throughout the solicitation. Offerors are highly encouraged to examine the solicitation carefully and in its entirety to discern all changes.

Section B. Supplies and/or Services to be Provided

• B.1 Supplies and/or Services to be Provided: removed CLIN 0004 Electrical Development Laboratory

• B.6 Indefinite-Delivery Indefinite-Quantity Services: clarified terms for task orders

• B.7 Level of Effort/Flex Option: removed clause

• B.9 Special Cost Requirements: removed paragraphs (c)(1) and (c)(2)

Section E. Inspection and Acceptance

• E.1 FAR 52.246-8 Inspection of Research and Development–Cost Reimbursement:

removed clause

• E.1 FAR 52.246-5 Inspection of Services–Cost Reimbursement: added clause

• E.1 FAR 52.246-11 Higher Level Contract Quality Requirement: revised fill-in

Section G. Contract Administration Data

• G.4 NFS 1852.245-71 Installation–Accountable Government Property–Alternate I:

updated paragraph (a)

• G.7.1 NFS 1852.245-83 Real Property Management Requirements: added clause

Section H. Special Contract Requirements

• H.6.1 KSC 52.222-6 Special Enclave Status for Kennedy Space Center: added clause

Section I. Contract Clauses

• I.1 FAR 52.243-2 Changes–Cost Reimbursement: removed Alternate III

• I.4 FAR 52.216-19 Order Limitations: revised clause for clarification

Section J. List of Attachments

• Attachment J-01 Performance Work Statement

• Section 1.0 Program Management and Administration: updated paragraph 1.1.0.2 and added paragraph 1.1.5.4.5

• Section 2.0 Program Support: updated or added paragraphs 2.1.1 (opening paragraph), 2.1.1.4.4, 2.2.6.6, 2.2.7.5, and 2.4.2.5

COMET RFP No. 80KSC022R0004 2

Enclosure 1

• Section 3.0 Ground Systems

• Updated paragraphs 3.0.3, 3.0.4, and 3.2.4.4

• Removed paragraphs 3.2.0.1–3.2.0.3 and replaced with 3.2.1.4–3.2.1.6.

• Renamed and renumbered section 3.3.2

• Removed paragraphs 3.3.0.1–3.3.0.8 and replaced with 3.3.2.3–3.3.2.10

• Section 5.0 Operations, Processing and Maintenance

• Updated paragraph 5.1.2.10

• Removed paragraph 5.2.1.7 and added paragraph 5.2.1.12

• Added paragraphs 5.5.0.10 and 5.5.0.11

• Removed paragraph 5.5.3.5.2, and renumbered sections 5.5.3.4–5.5.3.6

• Updated paragraphs 5.5.4.2.1 and 5.5.4.2.4

• Attachment J-02 Data Requirements List/Data Requirements Description: added, removed, or clarified requirements for DRDs 1.0-1, 1.1-1, 1.1-7, , 2.1-1, 2.1-3, and 3.0-1

• Attachment J-04 Electrical Development Laboratory: removed attachment

• Attachment J-06 Award and Incentive Fee Plan

• Attachment J-09 Register of Service Contract Wage Determination: replaced in its entirety

• Attachment J-10 Register of Davis Bacon Wage Determination: replaced in its entirety

• Attachment J-18 Contract Schedule Tables: updated to remove CLIN 0004

• Appendix 01 EGS Insight-Oversight: removed appendix

• Appendix 05 Government Furnished Facilities: added an “Access Control” column

• Appendix 06 Support Shops and Laboratories

• Shops&Labs pages (see footer): added the Engineering Development Lab

• EDL Option pages (see footer): removed in its entirety

• Appendix 07 OMEU Matrix: updated to add, remove, or clarify requirements

• Appendix 08 Active Development Projects: updated in its entirety

• Appendix 10 Contractor-Managed Property (FAR 52.245-1): replaced in its entirety

Section K. Representations, Certifications, and Other Statements of Offerors or Respondents

• Removed FAR 52.204-19 Incorporation by Reference of Representations and Certifications

Section L. Instructions, Conditions, and Notices to Offerors or Respondents

• L.19 List of Section L Attachments

• Attachment L-03 Basic Cost Price Template: replaced template in its entirety

• “Instructions” Tab:

COMET RFP No. 80KSC022R0004 3

Enclosure 1

• COMET General Pricing Information section: added paragraph G

• Pricing Instructions by Worksheet section:

• Pricing instruction No. 17: removed in its entirety

• Pricing instructions Nos. 11 and 25: updated instructions

• “Table of Contents” Tab: removed hyperlink No. 93 CLIN 0004-EDL

• “CLIN 0004 – EDL” Tab: removed in its entirety

• “CLIN 0002-IDIQ Burdened Labor” Tab: removed formula from cells C11:C201

• “Prime Crosswalk & Prop Hrs” Tab: added narrative to cell B3

• “SubK Crosswalk & Prop Hrs” Tab: added narrative to cell B3

• Attachment L-05 SubK-Hourly FBLR Details Template: updated classification titles

• Attachment L-06 FFP Work Units Template: replaced template in its entirety

• “Instructions” Tab: updated instructions

• Consolidated base and option tabs and revised input requirements

• Attachment L-07 Government Standard Labor Categories and Qualification: replaced in its entirety

• L.20 NFS 1852.215-81 Proposal Page Limitations: updated page requirements

• L.21.1 Management Approach: updated or added paragraphs (a)(6), (a)(7), (d)(2), (e)(1)(vi), and (f)(1)(vii)

• L.21.2 Technical Approach: updated or removed paragraphs (a)(3)(i), (a)(4), and (b)(1)

• L.22 Past Performance Volume Instructions: updated paragraph (a)

• L.23.1 General Cost Instructions: updated paragraph (b)(2)

• L.23.2 Specific Cost Instructions: updated paragraphs (c)(1)(v) and (e)

Section M. Evaluation Factors for Awards

• M.3.1 Management Approach: updated paragraph (f)

• M.5 Cost Factor: removed paragraph (c)(5)

File details come from the government source that posted it. Updated .