80KSC022R0004 Amend 0001 Replacement Pages Portfolio.pdf

PDF 2 MB Posted

Attached to
Consolidated Operations, Management, Engineering, and Test (COMET) Federal contract opportunity
Solicitation number
80KSC022R0004
Issued by
National Aeronautics and Space Administration Kennedy Space Center

About this file

This is a request for proposal for the Consolidated Operations, Management, Engineering, and Test (COMET) contract issued by the National Aeronautics and Space Administration Kennedy Space Center. The COMET contract supports flight hardware processing, ground systems development, and launch operations and maintenance for NASA programs. Services include assembly, hazardous operations, launch operations, and sustainment. The incumbent contractor is Jacobs Technology, Inc. Responses are due within 90 calendar days, and the contract period of performance is 10 years with award anticipated in 2023. Pricing will be cost-reimbursable. Small businesses are encouraged to participate as subcontractors.

View the file

Other files for this federal contract opportunity

Other files attached to Consolidated Operations, Management, Engineering, and Test (COMET), newest first.
File Type Posted
80KSC022R0004 Amendment 0004 SF30.pdf PDF
80KSC022R0004 Amend 0004 Section B-M.docx DOCX document
80KSC022R0004 Amend 0004 Replacement Page Update.pdf PDF
80KSC022R0004 Amend 0003 Replacement Pages Portfolio.pdf PDF
80KSC022R0004 Amend 0003 Section B-M.docx DOCX document
80KSC022R0004 Amend 0003 SF30.pdf PDF
Responses to Questions - 04.08.2022.pdf PDF
80KSC022R0004 Amend 0002 SF30.pdf PDF
80KSC022R0004 Amend 0002 Replacement Pages Portfolio.pdf PDF
80KSC022R0004 Amend 0002 Tracked Changes Portfolio - Informational Only.pdf PDF
80KSC022R0004 Amend 0002 Section B-M.docx DOCX document
Responses to Questions.pdf PDF
80KSC022R0004 Amend 0001 SF30.pdf PDF
J-18 Contract Schedule Tables Amend 0001.xlsx XLSX spreadsheet
L-07 Government Standard Labor Categories and Qualifications Amend 0001.xlsx XLSX spreadsheet
80KSC022R0004 Amend 0001 Section B-M.docx DOCX document
Responses to RFP Questions.pdf PDF
80KSC022R0004 Amend 0001 Tracked Changes Portfolio - Informational Only.pdf PDF
RFP Cover Letter.pdf PDF
Enclosure 3 - RFP Question Form.xlsx XLSX spreadsheet
COMET RFP 80KSC022R0004 Appendix Portfolio.pdf PDF
L-04 Rates and Factors Template.xlsx XLSX spreadsheet
L-05 SubK-Hourly FBLR Details Template.xlsx XLSX spreadsheet
Appendix 04 ISS Flight Certified Hardware.xlsx XLSX spreadsheet
Appendix 10 Contractor-Managed Property.xlsx XLSX spreadsheet
Enclosure 1 - Summary of Significant Changes from the Draft RFP.pdf PDF
Enclosure 2 - COMET Questions and Responses.pdf PDF
L-02 Phase-In Template.xlsx XLSX spreadsheet
L-03 Basic Cost Price Template.xlsx XLSX spreadsheet
L-06 FFP Work Units Template.xlsx XLSX spreadsheet
COMET RFP No. 80KSC022R0004.pdf PDF
COMET RFP No. 80KSC022R0004 J-Attachments Portfolio.pdf PDF
J-18 Contract Schedule Tables.xlsx XLSX spreadsheet
Appendix 07 OMEU Matrix.xlsx XLSX spreadsheet
L-01 COMET Past Performance Questionnaire.docx DOCX document
L-07 Government Standard Labor Categories and Qualifications.xlsx XLSX spreadsheet
Show all 36

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

For the best experience, open this PDF portfolio in

Acrobat X or Adobe Reader X, or later.

Get Adobe Reader Now!

http://www.adobe.com/go/reader

COMET RFP No. 80KSC022R0004 AMENDMENT 0001 APPENDIX 02

APPENDIX 02

COMPLIANCE AND REFERENCE

DOCUMENTS

Document Number Document Name Compliance/Reference/Tailorable

14 CFR Part 1232 Care and Use of Animals in the Conduct of NASA Activities C

15 CFR Parts 730-774 Export Administration Regulations (EAR). C

22 CFR Parts 120-130 International Traffic in Arms Regulations (ITAR) C

27 CFR § 447.53 Exemptions C

29 CFR 1926.20 General Safety And Health Provisions C

36 CFR Parts 1220-1238 Federal Records; General R

44 U.S.C. 3501 et seq Paperwork Reduction Act R

44 U.S.C. Chapters 29, 31, 33 Records Management R

48 CFR Chapter 18 Records R

ANSI S20.20 Standard for the Development of an Electrostatic Discharge Control Program

C

ANSI/EIA-859 Data Management R

COMPLIANCE AND REFERENCE DOCUMENTS

Appendix 2, Compliance and Reference Documents , contains a listing of documents referenced within the COMET Performance Work Statement and Data Requirement Deliverables.

The list stipulates whether the document is a compliance, reference or tailorable (see PWS 1.0.4). The contractor shall use the latest approved version available.

DoD 5220.22 National Industrial Security Program C

DoD 8523.01 Communications Security (COMSEC) C

EIA-836 Configuration Management Data Exchange and Interoperability C

ESD 10009 ESD Human Rating Certification Package C

ESD 10010 Exploration Systems Development Safety and Mission Assurance Plan C

ESD 10020 ESD Certification of Flight Readiness (CoFR) Plan R

ESD 10020 ANX02 ESD CoFR Plan, Annex 02; Pre-Flight Readiness Review Plan R

ESD 10020 ANX03 ESD CoFR Plan, Annex 03; Agency Flight Readiness Review (FRR) Plan R

ESD 10020 ANX04 ESD CoFR Plan, Annex 04; Integrated System and Mission Certification (ISMC) Review Plan

R

Executive Order 13693 Planning for Federal Sustainability in the Next Decade C

Executive Order 12656 Assignment of Emergency Preparedness Responsibilities Sections 201, 202, 1901 and 2001

FIPS Pub 140-2 Federal Information Processing Standards - Security Requirements for Cryptographic Modules

FITARA Federal IT Acquisition Reform Act (FITARA) C

GEIA-HB-859 Implementation Guide for Data Management R

GSDO-ACO-1010 EGS Program Architectures and Concept of Operations R

GSDO-ANA-1056 EGS Program System Safety Assessment Report, Stacking System Acceptance Review/Operational Readiness Review Maturity

GSDO-ICD-1250 EGS Program Element-to-Element Interface Control Document R

GSDO-ICD-1250 Appendix A EGS Program ICD, Appendix A - ML TO VAB Interfaces R

GSDO-ICD-1250 Appendix B EGS Program ICD, Appendix B -ML TO Pad Interfaces R

GSDO-ICD-1250 Appendix C EGS Program ICD, Appendix C - ML TO CT Interfaces R

GSDO-ICD-1250 Appendix D EGS Program ICD, Appendix D -ML TO Parksite Interfaces R

GSDO-ICD-1250 Appendix E EGS Program ICD, Appendix E - ML TO VAB Interface Drawings R

GSDO-ICD-1250 Appendix F EGS Program ICD, Appendix F -ML TO Pad Interface Drawings R

GSDO-PLN-1001 EGS Program Information and Configuration Management Plan R

GSDO-PLN-1002 EGS Program Systems Engineering Management Plan (Sec 3.6.2 & 7.4 Excluded)

GSDO-PLN-1013 EGS Program Risk Management Plan R

GSDO-PLN-1024 EGS Program Integrated Logistics Support Plan R

GSDO-PLN-1027 Cross-Program Ground Hardware/Software Acceptance Data Package Plan C

GSDO-PLN-1036 EGS Program Safety and Mission Assurance Plan R

GSDO-PLN-1043 EGS Program Master Subsystems List R

GSDO-PLN-1043-ANX-01 EGS Program Subsystem Certification Log for Artemis I R

GSDO-PLN-1046 EGS Program Software Management Plan R

GSDO-PLN-1047-ANX01 GSDO Program Schedule Management Plan Annex 1: Schedule Standards and Guidelines

GSDO-PLN-1070 Cross-Program Logistics Integration Plan C

GSDO-PLN-1073 Cross Program Launch Site Integrated Test and Checkout Plan R

GSDO-PLN-1075 Cross-Program Ground Support Equipment Sustaining Engineering Plan C

GSDO-PLN-1076 Cross-Program Operations and Maintenance Requirements and Specifications Management Plan

GSDO-PLN-1077 EGS Program Launch Control Center Firing Room Management Plan R

GSDO-PLN-1079 EGS Program Requirements Management Plan R

GSDO-PLN-1083 EGS Program Mishap Preparedness and Contingency Plan R

GSDO-PLN-1088 Kennedy Space Center and Exploration Ground Systems Program Certification of Flight Readiness Plan

GSDO-PLN-1094 GSDO Electromagnetic Environmental Effects Control Plan R

GSDO-PLN-1129 Cross-Program Integrated Launch Operations Implementation Plan R

GSDO-PLN-1129-ANX-01 Cross-Program Integrated Launch Operations Implementation Plan, Annex- 01; Launch Control Team Firing Room Seating Plan

GSDO-PLN-1142 EGS Program Operations and Maintenance Controlled Requirements Management Plan

GSDO-PLN-1143 Cross-Program Flight Hardware and Software Acceptance Data Package Plan

GSDO-PLN-1155 Cross-Program Landing and Recovery Nominal End-of-Mission Recovery Plan

GSDO-PLN-1157 EGS Program Space Launch System/Orion Launch and Recovery Team Training Plan

GSDO-PLN-1160 Cross-Program Interface Verification Test - Test Plan R

GSDO-PLN-1173 EGS Program Orion Crew Module Transportation Plan Naval Base San Diego to Kennedy Space Center – Over Road

GSDO-PLN-1181 Cross-Program Facilities Contamination Control Implementation Plan C

GSDO-PLN-1183 EGS Program Ground Operations Management Plan R

GSDO-PLN-1195 Cross-Program Processes and Agreements for Launch Site Ground Operations

GSDO-PLN-1211 EGS Program Launch Control Center Firing Room Set Scheduling Plan R

GSDO-PLN-1229 EGS Program Sustaining Engineering Plan R

GSDO-PLN-1232 Cross-Program Quality Planning Requirements Document Plan C

GSDO-PLN-1242 GSDO Program Payload Integration Plan R

GSDO-PLN-1244 EGS Program Export Control Plan R

GSDO-PLN-1260 Cross-Program Flight Asset Turnover Plan C

GSDO-PLN-1261 EGS Program Post-Flight Assessment Plan C

GSDO-PLN-1276 EGS Program Human Systems Integration Plan R

GSDO-RQMT-1080 Cross-Program Contamination Control Requirements C

GSDO-RQMT-1146 Cross-Program Launch Commit Criteria Management System Data Requirements and Design Specifications

GSDO-RQMT-1243 EGS Program Generic Launch Site Support and Requirements Document C

GSDO-RQMT-1243-02 EGS Program Launch Site Support and Requirements Document Volume 02;

Outstanding Moon Exploration Technologies Demonstrated by Nano Semi- Hard Impactor

GSDO-RQMT-1243-03 EGS Program Launch Site Support and Requirements Document Volume 03;

Artemis I Internal

GSDO-RQMT-1256 EGS Program Operational Safety Requirements C

GSDO-SPEC-1262 EGS Program Engineering Model Delivery Standard C

GSDO-SPEC-1290 EGS Program Technical Operating Procedure Requirements R

JPD 357 Delegation of Scrap and Downgrade Cost-Approval and Signature Authority C

K0000111995-SPC SCCS Project System Build Software Design Description (SDD) R

K0000112994-PLN Ground Elements Command Control & Communications Project Lunch Control Subsystem (LCS) Build Plan

K0000112995-SPC SCCS Project System Design Document Volume 1 R

K0000118138-SPC SCCS Project System Design Document Volume 2 R

K0000118139-SPC SCCS Project System Design Document Concepts of Execution Development Offline Support and Training Volume 4

K0000119370-PLN SCCS Project Hardware Development Plan (HDP) R

K0000136630-PLN E2E Command and Control (E2E CC) System Hardware Assurance Plan R

K0000137694-PLN SCCS Configuration Management Plan (CMP) R

K0000143173-PLN E2E Command and Control (E2E CC) Software Development Plan for Ground Support Equipment (GSE) Subsystem Software (Volume 3)

K0000143172-PLN E2E Command and Control (E2E CC) System Software Development Plan (SDP) Spaceport Command and Control System (SCCS) Software (Volume 2)

K0000143174-PLN E2E Command and Control (E2E CC) Software Development Plan for Models and Simulation (Volume 4)

K0000148049-PLN E2E Command and Control (E2E CC) System Software Development Plan Customer Avionics Interface, Development and Analysis (CAIDA) (Volume 5)

K0000222197-PLN E2E Command and Control (E2E CC) Software Development Plan for Special GSE Subsystem Software (Volume 6)

K0000254500-GEN

E2E Command and Control (E2ECC) Ground Support Equipment (GSE)/Ground & Flight Application Software Team (GFAST) Subsystem implementation standards

K0000258867-SPC CDIT - Facility Breathing Air Subsystem R

K0000257459-SPC CDIT - Fire Suppression Subsystem R

K0000258868-SPC CDIT - Facility Gaseous Helium (GHe) R

K0000258869-SPC CDIT - Facility Gaseous Nitrogen (GN2) R

K0000258870-SPC CDIT - Compressed Air (CAIR) Subsystem R

K0000258871-SPC CDIT - Crawler Transporter R

K0000258872-SPC CDIT - Heating Ventilation Air Conditioning (HVAC) Subsystem R

K0000258873-SPC CDIT - KCCS R

K0000258875-SPC CDIT - 60Hz Power Interface Table R

K0000263040-SPC CDIT - Kennedy Integrated Transmission System R

741EMM00001 CDIT - Mobile Launcher Physical Data Interface (MPDI) R

K0000261886-PLN E2E Command and Control Software Development Plan, Ground Flight Applications Software (Volume 7)

K0000349708-PLN E2E Command and Control Software Development Plan Recording & Playback Subsystem (Volume 9)

K0000435411-PLN E2E Command and Control Software Development Plan EGS Simulation Subsystem (Volume 8)

K0000064476-PLN E2E Command and Control System Software Development Plan (Volume 1) R

KDP-KSC-P-1284 General Services Administration (GSA)/NASA Vehicle Process C

KDP-KSC-P-1319 Facility Project Approval and Implementation Guidance for Local Authority (LA) Projects

KDP-KSC-P-1537 Document Release Authorization (DRA) Process R

KDP-KSC-P-2393 KSC Lessons Learned System R

KDP-KSC-P-3339 KSC Information Technology Acquisition Management (ITAM) Process for Information Technology (IT) Good or Services

KDP-KSC-P-3621 Ground Based Pressure Vessels and Pressurized Systems (PVS)Certification R

KDP-KSC-P-6000.1 Requests for Government Owned Vehicles License Plates C

KDP-P-1702 Risk Assessment ER&T/ISS Program R

KDP-P-1763 Customs Support Imports R

KDP-P-1788 Customs Support Exports R

KDP-P-2712 Process for Assigning Document Numbers In KDDMS T

KDP-P-2713 Technical Review Process T

KDP-P-2718 Engineering Documentation Electronic Approval, Release and Revision Process

T

KDP-P-2723 Streamlined Design Process T

KDP-P-3627 NASA Corrective Action Request (NCAR) R

KDP-P-3929 Software Sustainment R

KDP-P-5031 Concept Development Process T

KDP-P-5032 Preliminary Design Process T

KDP-P-5033 Final Design Process T

KDP-P-5034 System Implementation Process T

KDP-P-5035 System Acceptance Process T

KDP-P-5036 System Transition Process T

KDP-P-5037 System Sustainment Process T

KDP-P-5038 Project Close-out Process T

KNPD 1860.1 KSC Radiation Protection Program R

KNPR 1040.3 Continuity of Operations Planning (COOP) Procedural Requirements R

KNPR 1440.6 KSC Records Management Programs R

KNPR 1600.1 KSC Security Procedural Requirements C

KNPR 1820.3 KSC Hearing Loss Prevention Program T

KNPR 1820.4 KSC Respiratory Protection Program T

KNPR 1840.1 KSC Hazard Communication Program R

KNPR 1840.19 KSC Industrial Hygiene Programs T

KNPR 1860.1 KSC Ionizing Radiation Protection Program C

KNPR 1860.2 KSC Nonionizing Radiation Protection Program C

KNPR 2570.1 KSC Radio Frequency Spectrum Management Procedural Requirements R

KNPR 6000.1 Transportation Support System Manual C

KNPR 8040.1 KSC, Configuration Management Procedural Requirements C

KNPR 8040.4 International Space Station/Spacecraft Processing Configuration Management Procedural Requirements

KNPR 8500.1 KSC Environmental Requirements C

KNPR 8700.2 KSC System Safety and Reliability Analysis Methodology Procedural Requirements

T

KNPR 8715.2 Comprehensive Emergency Management Plan (CEMP) C

KNPR 8715.3 -1_COMET KSC Safety Procedural Requirements for the Consolidated Operations Management Engineering and Test (COMET) Contract

KNPR 8715.7 KSC Construction Contractor Safety and Health Practices Procedural Requirements

KNPR 8719.9 Examination and Licensing of KSC Operators of Special and Heavy Equipment, Cranes, and Hoists

KNPR 8730.1 KSC Metrology and Calibration Procedural Requirements C

KNPR 8830.1 Facility Asset Management Procedural Requirements C

KPL-PLN-50001 Kennedy Space Center ISS Exploration Research and Technology Programs Certification of Flight Readiness (CoFR) Implementation Plan

KPL-PLN-50007 KSC Payload Facility Contamination Control Requirements/Plan C

KPL-PLN-50008 Payload Facility Contamination Control Implementation Plan C

KPL-UG-50001 Requirements/Guide for Spacecraft Processing at KSC R

KSC-DE-512-SM Ground Systems Development Standard T

KSC-GP-435_Vol_1 Engineering Drawing Practices, Volume I T

KSC-GP-435_Vol_2 Engineering Drawing Practices, Volume II T

KSC-NE-10074 Electrical Ground Support Equipment (EGSE) Qualification Test Plan T

KSC-PLN-2322-EDL Electrical Development Laboratory Management Plan R

KSC-PLN-2807 Mishap Preparedness and Contingency Plan T

KSC-PLN-2807-Notification Safety and Mission Assurance Mishap Notification C

KSC-PLN-5400 Technical Authority Implementation Plan R

KSC-PLN-5403_SysEngMgmt Kennedy Space Center Engineering Directorate Systems Engineering Management Plan

KSC-PLN-5434 Sustaining Engineering Plan R

KSC-PLN-8730.5 NASA John F. KSC QPRD for the Test and Operations Support Contract and NASA Led Tasks at KSC in support of the ISS Program

KSC-STD-164 Standard for Environmental Test Methods for Ground Support Equipment R

KSC-STD-E-0022 Bonding, Grounding, Shielding, Electromagnetic Interference, Lightning and Transient Protection, Design Requirements for Ground Systems

KSC-STD-G-0003 Qualification of Launch Support and Facility Components T

KSC-STD-Z-0015 Standard for Engineering Analysis T

KTI-2712 KSC Engineering Directorate (NE) Document and Part Number Assignment KSC Technical Instruction

KTI-2718 Engineering Directorate (NE) KSC DDMS Electronic Notification, Peer Review, Approval, Release and Revision KSC Technical Instruction

KTI-5031 Engineering Directorate Design and Development Technical Instructions R

LSP-PLN-353.01 LSP Risk Management Plan R

NAII 2190.1 NASA Export Control Program Operation Manual R

NAII 1600.4 Foreign National Access Management R

NASA Fleet Management Handbook

NASA Fleet Management Handbook C

NASA/SP-2010-3403 NASA Schedule Management Handbook R

NASA-HDBK-1004 NASA Digital Engineering Acquisition Framework Handbook R

NASA-STD-2602 Minimum Information System Owner and End User Security for Data At Rest

NASA-STD-2804 Minimum Operability Software Suite R

NASA-STD-5008 Protective Coating of Carbon Steel, Stainless Steel, and Aluminum on Launch Structures, Facilities, and Ground Support Equipment

NASA-STD-7009 Standard for Models and Simulations R

NASA-STD-8719.11 Safety Standard for Fire Protection C

NASA-STD-8719.12 Safety Standard for Explosives, Propellants, and Pyrotechnics C

NASA-STD-8719.17 NASA Requirements for Ground-Based Pressure Vessels and Pressurized Systems (PV/S)

NASA-STD-8719.9 Standard for Lifting Devices and Equipment C

NASA-STD-8729.1 NASA Reliability And Maintainability (R&M) Standard For Spaceflight And Support Systems

NASA-STD-8739.8 NASA Software Assurance and Software Safety Standard C

NASA-STD-8739.6 Implementation Requirements for NASA Workmanship Standards T

NDAA Section 889 Prohibition On Certain Telecommunications and Video Surveillance Services or Equipment

NID 1600.55 RESERVED Sensitive But Unclassified (SBU) Controlled Information RESERVED C

NID 2540.138 Acceptable Use of Government Office Property Including Information Technology.

NID 2810.135 RESERVED Controlled Unclassified Information RESERVED C

NID 6200-118 NASA Transportation and General Traffic Management R

NID 8800.114 National Historic Preservation Act Leases R

NID 8800.115 Real Estate Management Program to Add Decommission of Facilities R

NID 8800.119 Policy for Removing Items from the Agency Disposal List and Incentivizing the Disposal of Real Property

NID 8800.120 Process for Maintaining Abandoned Facilities R

NID 9250.137 Property, Plant, and Equipment and Operating Materials and Supplies C

NIST SP 800-53 Security and Privacy Controls for Information Systems and Organizations R

NIST SP 800-64 Security Considerations in the System Development Life Cycle R

NPD 1040.4 NASA Continuity of Operations R

NPD 1382.1 NASA Privacy Requirements C

NPD 1382.17 NASA Privacy Policy C

NPD 1440.6 NASA Records Management C

NPD 1600.2 NASA Security Policy R

NPD 2190.1 NASA Export Control Program R

NPD 2540.1 Acceptable Use of Government Office Property Including Information Technology

NPD 2800.1 Managing Information Technology C

NPD 4100.1 Supply Support and Material Management Policy R

NPD 7120.6 Knowledge Policy for Programs and Projects R

NPD 7500.1 Program and Project Logistics Policy R

NPD 8710.1 Emergency Management Program C

NPD 8820.2 Design and Construction of Facilities C

NPD 8910.1 Care and Use of Animals C

NPR 1040.1 NASA Continuity of Operations (COOP) Planning Procedural Requirements R

NPR 1382.1 NASA Privacy Procedural Requirements C

NPR 1441.1 NASA Records Management Program Requirements C

NPR 1600.1 NASA Security Program Procedural Requirements R

NPR 1600.4 Identity and Credential Management R

NPR 1600.6 Communications Security (COMSEC) C

NPR 1620.2 Facility Security Level Determinations R

NPR 1620.3 Physical Security Requirements for NASA Facilities and Property C

NPR 1660.1 NASA Security Program Procedural Requirements R

NPR 2190.1 NASA Export Control Program C

NPR 2810.1 Security of Information and Information SystemsTechnology C

NPR 2810.7 Controlled Unclassified Information C

NPR 2810.2 Possession and Use of NASA Information and Information Systems Outside of the United States and United States Territories

NPR 2830.1 NASA Enterprise Architecture Procedures R

NPR 2841.1 Identity, Credential, and Access Management C

NPR 5200.1 Industrial Labor Relations R

NPR 6000.1 Requirements for Packaging, Handling, and Transportation for Aeronautical and Space Systems, Equipment, and Associated Components

NPR 6200.1 NASA Transportation and General Traffic Management R

NPR 7120.5 NASA Space Flight Program and Project Management Requirements R

NPR 7123.1 NASA Systems Engineering Processes and Requirements T

NPR 7150.2 NASA Software Engineering Requirements C

NPR 8000.4 Agency Risk Management Procedural Requirements C

NPR 8530.1 NASA Sustainable Acquisition C

NPR 8621.1 NASA Procedural Requirements for Mishap and Close Call Reporting, Investigating, and Recordkeeping

NPR 8621.1 Appendix H NASA Procedural Requirements for Mishap and Close Call Reporting, Investigating, and Recordkeeping, Appendix H - Data Entry Elements and Recording Requirements

NPR 8705.2 Human-Rating Requirements for Space Systems C

NPR 8705.6 Safety and Mission Assurance (SMA) Audits, Reviews, and Assessments R

NPR 8715.1 NASA Safety and Health Programs T

NPR 8715.2 NASA Emergency Management Program Procedural Requirements C

NPR 8715.3 NASA General Safety Program Requirements R

NPR 8715.7 Payload Safety Program T

NPR 8735.1 Exchange of Problem Data Using NASA Advisories and the Government- Industry Data Exchange Program (GIDEP)

NPR 8800.15 Real Estate Management Program R

NPR 8820.2 Facility Project Requirements (FPR) C

NPR 8831.2 Facilities Maintenance and Operations Management R

NPR 8910.1 Care and Use of Animals C

NPR 9250.1C Property, Plant, and Equipment and Operating Materials and Supplies C

NPR 9501.2 NASA Contractor Financial Management Reporting C

NRRS 1441.1 NASA Record Retention Schedules C

OLAW U.S. Department of Health and Human Services (DHHS) National Institutes of Health (NIH) PHS Office of Laboratory Animal Welfare (OLAW)

APHIS 41-35-076 U.S. Department of Agriculture (USDA) Animal and Plant Health Inspection Service (APHIS); Animal Welfare Act and Animal Welfare Regulations

PDM 2013-127-EUS Alternate Data At Rest (DAR) Encryption Products C

PHS Policy Public Health Service (PHS) Policy on Humane Care and Use of Laboratory Animals (PHS Policy)

S0300-BT-PRO-010 Government-Industry Data Exchange Program (GIDEP) Operations Manual C

SAE AS 9100 Quality Management Systems – Requirements for Aviation, Space and Defense Organizations

SAE EIA 649-2 Configuration Management Requirements for NASA Enterprises C

SSP 30223 Problem Reporting and Corrective Action for the Space Station Program C

SSP 30234 Failure Modes and Effects Analysis and Critical Items List Requirements (for Space Station)

SSP 30237 Space Station Electromagnetic Emission and Susceptibility Requirements C

SSP 30238 Space Station Electromagnetic Techniques C

SSP 30243 Space Station Requirements for Electromagnetic Compatibility C

SSP 30309 Safety Analysis and Risk Assessment Requirements Document (for ISS Program)

SSP 30599 Safety Review Process (for ISS processing) C

SSP 30695 Acceptance Data Package Requirements Specification (for ISS Program) C

SSP 41170 Configuration Management Requirements (for ISS Program) C

SSP 41173 Space Station Quality Assurance Requirements C

SSP 50004 Ground Support Equipment Design Requirements (for ISS Program) C

SSP 50108 ISS Program Certification of Flight Readiness Process Document C

SSP 50110 RESERVED Multi Increment Manifest (MIM) Document RESERVED C

SSP 50175 ISS Risk Management Plan R

SSP 50200-01 ANXB Station Program Implementation Plan, Volume 1: Station Program Management Plan Annex B: Vehicle Office Plan

SSP 50200-10 Station Program Implementation Plan, Volume 10, Sustaining Engineering C

SSP 50234-001 Sustaining Engineering Implementation Plan (for ISS Program) C

SSP 50450 Multi-increment Payload Resupply and Outfitting Model C

SSP 50502 International Space Station Hardware Preflight Imagery Requirements C

SSP 50520 International Space Station Logistics and Maintenance Operational Support Concepts and Requirements

SSP 50745 ISS Sustaining Engineering Interface Procedures C

SSP 50902 Transportation Integration Office/Commercial Vehicle Certification of Flight Readiness Implementation Plan (ISSP)

SSP 52054 ISS Program Payloads Certification of Flight Readiness Implementation Plan C

SSP 50502 International Space Station Hardware Preflight Imagery Requirements C

SSP 52000-PAH- KSC International Space Station Payload Accommodation Handbook R

COMET RFP No. 80KSC022R0004 AMENDMENT 0001 Appendix 08 Rev A

APPENDIX 08

ACTIVE DEVELOPMENT PROJECTS

COMET RFP No. 80KSC022R0004 AMENDMENT 0001 APPENDIX 08

PM

Project Management - support includes managing contractor resources, providing support to NASA PM

SE Systems Engineer - provides subsystem level systems engineering support Engr Engineering - provides technical expertise for affected subsystems CM Construction Management

O&M Operations and Maintenance - provides insight to design, construction, V&V based on O&M perspective and expertise

Y Yes, responsible for this role -- No responsibility in this area S Provide support only. Main responsibility is covered by others.

SME Subject matter expertise is provided

Effectivity Project is based on requirements driven by this mission. The timing of turnover to operations is closely tied to the manifest.

O Operations M Maintenance E Sustaining Engineering Responsibility U User

Project Information

This area defines current NASA managed development projects. It provides a high level scope of the project and the current phase of the project. Support and activities will vary dependent on the current phase (design, construction, V&V). The list of projects is subject to change based on manifest and new vehicle or ground systems requirements. Sustaining projects are not represented in this file, but are provided for reference elsewhere in the Bidders Library (Current Task List).

Responsibility Levels

This area defines the current (FY21) and forecasted OMEU responsibility for the new or modified systems that are part of current NASA managed projects. Forecasts are tied to the current manifest and associated effectivity and are subject to change. The current OMEU responsibilities are covered in Appendix 7.

This area defines the current areas of support by the contractor on NASA managed projects. Support is typically at the subsystem level and is dependent on the scope of the project.

COMET Functional Roles/Support

COMET OMEU Responsibility

3/22/2022

ITEM

# Element/Fac Project Current Phase Scope PWS Secn PM SE Engr CM O&M Effectivity O M E U

1 ML-2 Mobile Launcher 2 (ML2) Design/Build

Design/build of a new Mobile Launcher (ML2) to provide the launch platform and physical interfaces from the KSC launch site ground systems to the SLS Block 1B. The ML2 includes approximately 50 facility and Ground Support Equipment (GSE) subsystems. 3.1 2 (NASA Managed) S Y S -- Y Artemis IV FY24 FY24 FY24 NASA

2 ML-1 ML-1 Modifications for Artemis II Construction/Fab

Modifications to ML-1 to accommodate the Emergency Egress System along with numerous modifications to existing ML-1 subsystems (LRS, HGLDS, HITS, SDAS, CAA, LH2 Bleed Sensor, RSCS, and IOP/SS) required to meet Artemis II requirements. 3.1 2 (NASA Managed) S Y S -- Y Artemis II

Contract Start

Start FY23 NASA

3 ML-1 Emergency Egress System - Conveyance Fabrication

Emergency escape conveyance system that is installed on the ML while at the Pad. System includes baskets, cables, cable pullers, braking system. 3.1 2 (NASA Managed) S Y S -- Y Artemis II FY23 FY23 FY23 NASA

4 Pad B Emergency Egress Landing Zone Construction

The terminus and landing zone at Pad B including the cable support structure.

Also includes lightning protection system modifications. 3.1 2 (NASA Managed) -- Y S -- Y Artemis II

Start NASA

5 Pad B LH2 Upgrade Construction

Construction of 1.4M gal Liquid Hydrogen sphere, flare stack, electrical equipment building, and all supporting electrical GSE, communications, facility systems 3.1 2 (NASA Managed) S Y S -- Y Artemis II

6 Pad B Environmental Control System Upgrades Construction

Provides for the modification of the Pad ECS to accommodate both ML-1 or ML- 2 and their associated vehicle blocks in a crew or cargo configuration. Includes reconfiguring downstream ducting, replacing upstream manifold and ducting, replacing cooling tower, and modifying GN2 supply. 3.1 2 (NASA Managed) S Y S -- Y Artemis II

7 Pad B Converter Compressor Facility Upgrades Construction

Provides for installation of upgrades to the CCF including new LGHe supplies and facility revitalization. Also demolishes existing CCF systems. 3.1 2 (NASA Managed) -- Y -- -- -- Artemis II -- -- -- NASA

8 Pad B Liquid Nitrogen Cold Gaseous Helium System Design

Provides for the installation of a new LN2 system required to provide EUS RL10 chill down including all facility and GSE modifications. Also provides the design and fabrication of the GFE LN2 Heat Exchanger. 3.1 2 (NASA Managed) -- Y Y -- Y Artemis IV FY24 FY24 FY24 NASA

COMET Functional Roles/Support COMET OMEU Responsibility

Active Development Projects

Project Information

ITEM

# Element/Fac Project Current Phase Scope PWS Secn PM SE Engr CM O&M Effectivity O M E U

COMET Functional Roles/Support COMET OMEU ResponsibilityProject Information

9 VAB High Bay 3 B1B Platforms Fabrication

Modify the VAB HB-3 platforms and the transfer aisle to support Space Launch System Block 1B processing.

Modifications include the installation of two new SLS Platform Levels and vertical relocation and/or modification of four existing SLS Platforms levels, for stacking and processing of the Block 1B SLS Crew Vehicle and modification of the VAB Transfer Aisle floor to support the SRM SLAP Stand. 3.1 2 (NASA Managed) -- Y -- -- Y Artemis IV FY25 FY25 FY25 NASA

10 VAB High Bay 4 EUS Upgrades Design Modifications to HB4 to allow processing of EUS on B1B vehicle 3.1 2 (NASA Managed) -- Y -- -- Y Artemis IV FY25 FY25 FY25 NASA

11 VAB Environmental Control System Construction

Install Environmental Control System (ECS) in VAB F tower. This system will provide 10 circuits of purge air to the flight vehicle and will include 2 spare circuits. Major components include (3) 250 Ton chillers, (3) 450 hp blowers, 2 air chambers, 3 cooling tower cells, medium voltage feeder, outdoor substation, and a new control room in F tower. 3.1 2 (NASA Managed) -- Y S -- Y Artemis II

12 VAB 325T Crane Upgrade Design Upgrade the 325 Ton crane in the VAB 3.1 2 (NASA Managed) S Y SME Y Y Artemis II FY23 FY23 FY23 NASA

13 RPSF 200T Crane Upgrade Design Upgrade the 200 Ton crane in the RPSF 3.1 2 (NASA Managed) S Y SME Y Y Artemis IV FY24 FY24 FY24 NASA

14 RPSF RPSF Fire Protection System Replacement Construction

Removal and replacement of the fire suppression system within the main processing facility and the OPF Fire Pump House 3 1 2 (NASA Managed) -- Artemis II NASA

15 L&R Landing and Recovery Artemis II Projects Fabrication

Subsystem projects Crew Egress Stand, Side Hatch MGSE, Open Water hardware 3.1 2 (NASA Managed) S Y Y Y Y Artemis II

16 SOPE Crew Transportation Vehicle Fab/Build Completion of a new transportation vehicle for flight crew 3.1 2 (NASA Managed) -- -- -- -- Y Artemis II

17 SOPE MPPU-RPU Replacement Design

Replace the MMPUs with a new Rollout Purge unit to provide a supply of conditioned air for maintaining required temperature, pressure, and humidity levels to fulfill the purge requirements.

3.1.1 (Contractor Managed) Y Y Y Y Y Artemis IV FY24 FY24 FY24 NASA

Title Page

Definitions

Projects

WLI for PWS 3.1.2

COMET RFP No. 80KSC022R0004 AMENDMENT 0001 ATTACHMENT J-01

2.3.4 Information Technology (IT) Security Compliance

2.3.4.1 The Contractor shall develop, implement, and maintain an IT Security Management Plan (DRD 2.3-2) and IT System Security Documents (DRD 2.3-3) for systems developed or operated in performance of this contract.

2.3.4.2 The Contractor shall install the NASA-provided Continuous Diagnostics and Mitigation (CDM) solutions on all supported IT devices and integrate with the Agency reporting mechanisms, including Risk Information Security Compliance System (RISCS) and IT Security Enterprise Data Warehouse (ITSEC-EDW).

2.3.4.3 The Contractor shall configure all applicable IT systems, applications, and services based on the security configuration standards defined by the Cybersecurity Standards and Engineering Team (CSET)’s Agency Security Configuration Standards (ASCS).

2.3.4.4 The Contractor shall comply with NPR 2810.1, Security of Information and Information Systems assessment and Authorization requirements.

2.3.4.5 The Contractor shall protect all sensitive information in accordance with (NPR 2810.7, Controlled Unclassified Information.

2.3.4.6 The Contractor shall ensure all sensitive data is protected with NASA-approved Federal Information Processing Standards (FIPS) 140-2 compliant solutions.

2.3.4.7 The Contractor shall plan for and implement the full System Development Life Cycle (SDLC) maintenance and updates, including End of Life and End of Support product replacement strategy, of Contractor-managed operating systems, platforms, and applications in accordance with NPR 2810.1, Security of Information Technology. Reference National Institute of Standards Technology (NIST) Special Publication (SP) 800-64, Security Considerations in the System Development Life Cycle for additional information.

2.3.4.8 The Contractor shall implement the full SDLC maintenance and updates of custom, Government Off-The-Shelf (GOTS), Commercial Off-The-Shelf (COTS), and open source software installed on Government-furnished systems and devices such as non-NEST (NASA End-User Services and Technology) desktop/laptop computers.

2.3.4.9 The Contractor shall comply with the current Office of the Cyber Security Services (OCSS), Supply Chain Risk Management Program processes on required assessments before procuring any IT applications, services, or systems, including hardware or software components. All procured IT shall meet National Defense Authorization Act (NDAA) section 889, Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment.

2.3.4.10 The Contractor shall comply with PDM 2013-127-EUS, Data At Rest (DAR) Waiver Process, and ensure that all appropriate computers with NASA data have DAR installed. For reference see NASA Technical Standard NASA-STD-2602, Minimum Information System Owner and End User Security for Data at Rest.

System Design Document Concepts of execution: Development Offline Support and Training - Volume 4.

4.2.5 The Contractor shall build Spaceport Command and Control System (SCCS) software for operational support. For reference see K0000112994-PLN, Ground Elements Command Control and Communications Project LCS Build Plan.

4.2.6 The Contractor shall provide Firing Room support capabilities necessary to ensure day-to-day operations such as: console operations and reconfiguration, set initialization and provisioning, troubleshooting, hardware replacement and hardware maintenance on a real-time basis.

4.2.7 The Contractor shall maintain command and control system hardware and software. For reference see GSDO-PLN-1142, EGS Program Operations and Maintenance Controlled Requirements Management Plan and GSDO-PLN-1076, Cross-Program Operations and Maintenance Requirements and Specifications Management Plan.

4.2.8 The Contractor shall maintain LCS and Kennedy Ground Control System (KGCS) hardware (examples include, but are not limited to servers, switches, routers, consoles, work stations, firewalls, gateways, local control distributors and end items) and software (examples include, but are not limited to configuration identifiers, CSCIs, GFAS, GSE remote and test code) while minimizing impact on operations.

4.2.9 The Contractor shall maintain the SCCS-Dev environment, Customer Avionics Interface Development and Analysid (CAIDA), GSDO Advance Hardware LCS Emulator (GAHLEs), and other remote integration test lab assets, Simulation Framework.

4.2.10 The Contractor shall maintain System Identifiers capabilities (examples include, but are not limited to, Operating System Identifier (OSID), External Enclave Identifier (EEID), System Configuration Identifier (SCID), and Test Configuration Identifier (TCID). For reference see:

K000112995-SPC, C3 System Design Document Volume 1 K0000111995-SPC, System Build Software Design Description K0000112994-PLN, Ground Elements Command Control and Communications Project LCS

Build Plan

5.2.2 Corrosion Control

5.2.2.1 The Contractor shall develop, implement, and maintain a Corrosion Control Plan (DRD 5.2-2) on Contractor-maintained ground systems.

5.2.2.2 The Contractor shall perform corrosion control activities in accordance with NASA-STD- 5008, Protective Coating of Carbon Steel, Stainless Steel, and Aluminum on Launch Structures, Facilities, and Ground Support Equipment and NPR 8530.1, NASA Sustainable Acquisition.

5.3 INTERNATIONAL SPACE STATION (ISS)

5.3.0.1 The Contractor shall perform processing operations for pressurized and unpressurized cargo and provide support for utilization payloads and research for the ISS. The Contractor shall disposition and resolve anomalies and NC(s) on flight systems and hardware (reference PWS section 2.1).

5.3.0.2 The Contractor shall develop, implement and maintain work instructions for flight system processing activities to ensure work complies with all design specifications, drawings, and operational and maintenance requirements.

5.3.0.3 The Contractor shall process pressurized and unpressurized ISS ORUs and Flight Support Equipment (FSE) as necessary to meet ISS manifest requests and any tasks needed for supporting the ISS vehicle on orbit. The Contractor shall support ISS Utilization activities including host-role support for customer-led or Government-led testing and checkout of Expedite the Processing of Experiments to the Space Station (EXPRESS) rack payloads, EXPRESS Logistics Carrier (ELC) payloads, Columbus-External Payload Facility (COL-EPF), and Japanese Experiment Module-Exposed Facility (JEM-EF) as required by KPL-UG-50001, Requirements/Guide for Spacecraft Processing at KSC and SSP-52000-PAH-KSC, International Space Station Payload Accommodation Handbook.

5.3.0.4 The Contractor shall process ISS flight hardware and payloads as identified in Appendix 03, COMET Manifest and SSP 50450, Multi-Increment Payload Resupply and Outfitting Model.

5.3.0.5 The Contractor shall provide payload laboratory support for ISS life science payloads including pre-flight, in-flight, post-flight, ground control, and simulation activities. The Contractor shall provide support to other NASA-directed science missions (such as planetary protection; reference PWS section 5.4.2).

5.3.0.6 The Contractor shall provide mission integration to ISS Research life science and similar payloads. ISS mission platforms include non-ISS sorties, sorties to ISS, and on-orbit ISS facilities launched on commercial and international partner launch vehicles.

5.3.0.7 The Contractor shall provide a focal to coordinate or perform ISS host role services from other areas of the contract or other contractors, including services that:

COMET RFP No. 80KSC022R0004 AMENDMENT 0001 ATTACHMENT J-02

Data Requirement

Contract Application Information for DRL COMET A. Item Number 1.1-7

B. Line Item Title Diversity, Equity, and Inclusion (DEI) Plan

C. OPR

OP-MS

D. Type

E. Inspect / Accept

F. Frequency

AN

G. Initial Sub.

See Block I

H. As of Date

I. Remarks The DE&I plan demonstrates the contractor’s commitment to fairness regarding diversity, equity, and inclusion. This plan will provide NASA with an understanding of how the contractor plans to recruit, retain, and develop a diverse high performing workforce from underserved communities. The plan shall include measurable performance metrics and objectives. The DE&I plan will be utilized as an assessment tool by the contracting officer to monitor the contractor’s progression in its commitment to diversifying its workforce. The Plan will be submitted within 30 days after contract award. Changes shall be incorporated by change page or complete reissue. The contractor shall publish this DRD electronically in the MIS.

J. Distribution

MIS notification to email address(es) identified by the COR

Totals

No. Typ e

1 D

Data Requirement Description

1. Title Plan, Diversity, Equity, and Inclusion (DEI)

2. Number 1.1-7

3. Use In support of the Executive Order 13985, Advancing Racial Equity and Support for Underserved Communities Through the Federal Government, NASA is seeking to advance equity or remove barriers for members of underserved communities to access procurement opportunities. Underserved communities refer to populations sharing a particular characteristic, as well as geographic communities, that have been systematically denied a full opportunity to participate in aspects of economic, social, and civic life.

Underserved Communities include Black, Latino, Indigenous, Native American, Asian Americans and Pacific Islanders and other persons of color; members of religious minorities; lesbian, gay, bisexual, transgender, and queer (LGBTQ+) persons; persons with disabilities; persons who live in rural areas; and persons otherwise adversely affected by persistent poverty or inequality.

4. Date

5. Organization

KSC

7. Interrelationship N/A.

6. References See Block 8

8. Preparation Information

The DE&I Plan shall identify qualitative and quantitative approaches utilized to measure progress in the areas of Leadership and Commitment, Diverse Talent, and Culture and Sustainability. The following shall be addressed annually:

Leadership and Commitment – Demonstrate leadership’s commitment and accountability to diversity, equity, and inclusion. Identify quantitative approaches utilized to measure progress of a Diversity and Inclusion program

1. What is the operational status of, and level of resources available to, offices or divisions within the organization that are responsible for advancing civil rights or whose mandates specifically include serving underrepresented or disadvantaged communities?

2. What actions has the organization taken to implement affirmative equity-enhancing policies, regulations, guidance, and approaches to emphasizing equity in policy- and rule-making processes?

3. Describe how the organization’s commitment will be communicated internally and externally from leadership to employees and stakeholders.

2.1-3

Quality Management System

SA-F

RT

The Quality Management System (items a,b,c in section 8) shall be submitted at proposal. The Quality Management System (items a-n in section

8) shall be submitted at contract start. The contractor shall review the Quality Management System (QMS) at the beginning of each contract year and revise as required (including revisions to comply with the latest revision of AS9100). The contractor shall also revise the QMS when major organizational, process or procedural changes affect the organization implementing the requirements, the quality management functions including the process through which management decisions will be made, the lines of communication between management and other organizational elements, or the organizational responsibility, authority and accountability. The contractor shall submit the revised QMS to NASA for approval within 30 days after the revision. The contractor shall submit type “D”, electronic copies that are compatible with Microsoft Office software or Adobe (*.pdf). The contractor shall publish this DRD electronically in the MIS.

MIS notification to email address(es) identified by the COR

No. Type

System, Quality Management

2.1-3

To document a formalized system of processes, procedures, and responsibilities for achieving and implementing quality policies, objectives, and requirements throughout all phases of contract performance.

DRD 2.1-4 Inspection Plan, DRD 1.1-1 Insight Plan, DRD 1.0-1 Tailor Compliance Doc

See Block 8

The QMS shall describe the policies and processes which ensure compliance with the requirements listed herein to include, but not limited to:

(a) Organizational charts which illustrate the functional relationships and lines of communication (including alternate opinions) between the organizations implementing the requirements, COMET Program Manager, and other organizational elements including all subcontracts, Government, and other relevant interfaces.

(b) Descriptions of the quality management functions within the contract team including the process through which management decisions will be made.

(c) Description of the responsibility, authority and accountability of personnel who perform a quality function within the QMS.

(d) Description of the quality assurance methodologies including management controls, inspections, tests, and records review, which demonstrate contract, drawing, and specification requirements have been met on all articles and materials produced for NASA programs.

(e) Description of the organization’s boards, panels and committees used in the implementation of the QMS.

(f) Description of methodologies, metrics, and leading indicators used to measure the effectiveness of the QMS throughout the contractor organization to assess the quality of processes and products. Example measurements include data on adherence to QMS requirements, product and service quality, workmanship errors and rework.

(g) Develop and implement a documented process/system that effectively controls nonconforming supplies and services, including activities for the identification, reporting, segregation, disposition, and disposal. The Contractor shall notify NASA SMA personnel of nonconforming products or failures that affect safety, reliability, or functionality.

(h) Reserved.

(i) Develop and implement a documented process to conduct internal audits to determine the QMS is effectively implemented and maintained through the contract performance period.

2.3-2

Information Technology Security Management Plan (ITSMP)

IT-B

AN

The ITSMP shall be submitted within 60 days after contract start. “The contractor shall review annually and if changes submit revisions for Government approval by 1 October.” The contractor shall submit type “D”, electronic copies that are compatible with Microsoft Office software or Adobe (*.pdf). The contractor shall also publish this DR electronically in the MIS.

MIS notification to email address(es) identified by the COR. OPR/Mail Code: IT-B(1D) COMET CO/ Mail Code: OP-MS (1D) COMET COR/Mail Code: LX-B3 (1D)

No. Type

Plan, Information Technology Security Management

2.3-2

To document the processes and procedures the contractor will follow to ensure appropriate security of IT resources developed, processed, or used under this contract.

N/A

PWS 2.3.4.1

The IT Security Plan (ITSMP) shall describe the processes and procedures that will be followed to ensure appropriate security of IT resources developed, processed, or used under this contract. This plan addresses how the contractor will manage personnel and processes associated with IT Security.

The plan shall address:

1.1 NASA Policy Compliance

• NPD 1382.17, NASA Privacy Policy

• NPR 1382.1, NASA Privacy Procedural Requirements

• NPD 2841.1, Identity, Credential, and Access Management

• NID 2810.7, Controlled Unclassified Information

• NPD 2540.1, Acceptable Use of Government Office Property Including Information Technology

1.2 NASA Memorandum

• Subject: Web Site Modernization and Enhanced Security Protocols, May 15, 2019, From NASA Administrator

• Subject: Use of Unauthorized Devices, April 16, 2018, From NASA Chief Information Officer

1.3 Points of Contact (name and contact information) for the following IT services:

• Networks Communications

• Computing/Data Center

• End User Services

• Applications

• Information Technology Security and Privacy

• Information Management

REGISTER OF WAGE DETERMINATION UNDER | U.S. DEPARTMENT OF LABOR

THE SERVICE CONTRACT ACT |EMPLOYMENT STANDARDS ADMINISTRATION

By direction of the Secretary | WAGE AND HOUR DIVISION of Labor | WASHINGTON D.C. 20210 | Wage Determination No.: CBA-2021-522

Diane Koplewski Division of | Revision No.: 1 Director Wage Determinations| Date Of Last Revision: 12/28/2021 State: Florida

Area: Brevard

Employed on NATIONAL AERONAUTICS AND SPACE ADMINISTRATION contract for flight hardware processing, ground systems development, and support services for launch vehicles, spacecraft and payloads (i.e., assembly, hazardous commodity servicing/ de-servicing, launch operations, and operations maintenance).

Collective Bargaining Agreement between contractor: Jacobs Technology, Inc. and ERC, Inc., and union: International Association of Machinist and Aerospace Workers, District 166 Local Lodge Local 2061, effective 10/01/2017 through 09/30/2023.

In accordance with Section 2(a) and 4(c) of the Service Contract Act, as amended, employees employed by the contractor(s) in performing services covered by the Collective Bargaining Agreement(s) are to be paid wage rates and fringe benefits set forth in the current collective bargaining agreement and modified extension agreement(s).

COMET RFP No. 80KSC022R0004 AMENDMENT 0001 TABLE OF CONTENTS

TABLE OF CONTENTS

SECTION A. SOLICITATION/CONTRACT FORM

SECTION B. SUPPLIES OR SERVICES AND PRICES/COSTS

B.1 SUPPLIES AND/OR SERVICES TO BE PROVIDED

B.2 NFS 1852.216-84 ESTIMATED COST AND INCENTIVE FEE (OCT 1996)

B.3 INCENTIVE FEE AND AWARD FEE

B.4 STANDARDIZED VALUES

B.5 NFS 1852.232-81 CONTRACT FUNDING (JUN 1990)

B.6 INDEFINITE-DELIVERY INDEFINITE-QUANTITY SERVICES

B.7 RESERVED

B.8 SPECIAL PROVISIONS REGARDING CONTRACT ADJUSTMENTS

B.9 SPECIAL COST REQUIREMENTS

SECTION C. DESCRIPTION/SPECIFICATIONS/STATEMENT OF WORK

C.1 SCOPE OF WORK

C.2 DATA REQUIREMENTS LIST/DATA REQUIREMENTS DESCRIPTION

SECTION D. PACKAGING AND MARKING

D.1 NFS 1852.211-70 PACKAGING, HANDLING, AND TRANSPORTATION (SEP 2005)

D.2 NFS 1852.245-74 IDENTIFICATION AND MARKING OF GOVERNMENT

EQUIPMENT (JAN 2011)

SECTION E. INSPECTION AND ACCEPTANCE

E.1 CLAUSES INCORPORATED BY REFERENCE

E.2 HIGHER LEVEL CONTRACT QUALITY COMPLIANCE AUDITS

SECTION F. DELIVERIES OR PERFORMANCE

F.1 CLAUSES INCORPORATED BY REFERENCE

F.2 PERIOD OF PERFORMANCE

F.3 PLACE OF PERFORMANCE

SECTION G. CONTRACT ADMINISTRATION DATA

G.1 CLAUSES INCORPORATED BY REFERENCE

G.2 NFS 1852.216-76 AWARD FEE FOR SERVICE CONTRACTS (JUN 2018)

G.3 NFS 1852.232-80 SUBMISSION OF VOUCHERS/VOUCHERS FOR PAYMENT (APR

2018)

G.4 NFS 1852.245-71 INSTALLATION–ACCOUNTABLE GOVERNMENT PROPERTY

(JUN 2018)–ALTERNATE I (JAN 2011)

G.5 NFS 1852.245-73 FINANCIAL REPORTING OF NASA PROPERTY IN THE

CUSTODY OF CONTRACTORS (JAN 2017)

G.6 NFS 1852.245-76 LIST OF GOVERNMENT PROPERTY FURNISHED PURSUANT

TO FAR 52.245-1 (JAN 2011)

G.7 NFS 1852.245-82 OCCUPANCY MANAGEMENT REQUIREMENTS (SEPT 2017).. 26

G.7.1 NFS 1852.245-83 REAL PROPERTY MANAGEMENT REQUIREMENTS (JAN

2011)

G.8 POST PRODUCTION SUPPORT (PPS) PROPERTY MANAGEMENT

G.9 PAYMENT AND SUBMISSION OF VOUCHERS (INFORMATION IN ADDITION

NFS 1852.232-80 SUBMISSION OF VOUCHERS/VOUCHERS FOR PAYMENT)

G.10 GOVERNMENT INDUSTRY DATA EXCHANGE PROGRAM (GIDEP)

SECTION H. SPECIAL CONTRACT REQUIREMENTS

H.1 CLAUSES INCORPORATED BY REFERENCE

H.2 NFS 1852.209-71 LIMITATION OF FUTURE CONTRACTING (DEC 1988)

H.3 NFS 1852.225-70 EXPORT LICENSES (FEB 2000)

H.4 NFS 1852.228-76 CROSS-WAIVER OF LIABILITY (OCT 2012) (DEVIATED)

H.5 NFS 1852.232-77 LIMITATION OF FUNDS (FIXED-PRICE CONTRACT) (MAR

1989)

H.6 NFS 1852.235-71 KEY PERSONNEL AND FACILITIES (MAR 1989)

H.6.1 KSC 52.222-6 SPECIAL ENCLAVE STATUS FOR KENNEDY SPACE CENTER

(JUL 2018)

H.7 KSC 52.223-121 REPORTING OF INCIDENTS INVOLVING WORKPLACE

VIOLENCE (JUL 2018)

H.8 KSC 52.242-90 CONTROLS APPLICABLE TO CONTRACTOR'S ACTIVITIES (JUL

2018)

H.9 KSC 52.242-93 CONTRACTOR WORKFORCE REPORT–ONSITE CONTRACTORS

AND SUBCONTRACTORS (JUL 2018)–ALTERNATE I (JUL 2011) AND ALTERNATE II

(NOV 2019)

H.10 KSC 52.245-90 MANAGEMENT OF NASA-OWNED/CONTRACTOR-HELD

RECORDS (JUL 2018)

H.11 KSC 52.245-97 RECORDS MANAGEMENT (JUL 2018)

H.12 ASSOCIATE CONTRACTOR AGREEMENT

H.13 ORGANIZATIONAL CONFLICT OF INTEREST MITIGATION PLAN

H.14 ENVIRONMENTAL PROTECTION

H.15 COMPUTING SERVICES

H.16 NASA’S TECHNOLOGY TRANSFER PROGRAM

H.17 GOVERNMENT’S RIGHTS TO INFORMATION INCIDENTAL TO CONTRACT

ADMINISTRATION

H.18 INDEMNIFICATION OF UNUSUALLY HAZARDOUS RISKS

H.19 POLICY DIRECTIVES, PROCEDURES, AND REQUIREMENTS

H.20 GOVERNMENT PERFORMANCE OF ACTIVITIES

H.21 USE OF GOVERNMENT RESOURCES

H.22 CONTRACT CHANGES PROCEDURE

SECTION I. CONTRACT CLAUSES

I.1 CLAUSES INCORPORATED BY REFERENCE

I.2 FAR 52.204-21 BASIC SAFEGUARDING OF COVERED CONTRACTOR

INFORMATION SYSTEMS (NOV 2021)

I.3 FAR 52.216-18 ORDERING (AUG 2020)

I.4 FAR 52.216-19 ORDER LIMITATIONS (OCT 1995)

I.5 FAR 52.216-22 INDEFINITE QUANTITY (OCT 1995)

I.6 RESERVED

I.7 FAR 52.217-8 OPTION TO EXTEND SERVICES (NOV 1999)

I.8 FAR 52.217-9 OPTION TO…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .