SF_30 _Amend_0003.pdf

PDF 47 KB Posted

Attached to
Drydock Repairs to NOAA Ship NANCY FOSTER
Solicitation number
EA-133M-15-RP-0119
Issued by

About this file

SF-30 Amendment 0003

View the file

Other files

File Type Posted
SF_30 _Amend_0002.pdf PDF
NOAA_Ship_Nancy_Foster_Tank_Sounding_Tables_GSSP_2005_9-4-2009.pdf PDF
Drawing_NF-100-004_Starboard_Exhaust_Stack_Mod_Rev_03-19-2015.pdf PDF
Drawing_601130_Zinc_Anode_Installation.pdf PDF
NF-533-002_Potable_Water_Piping_System.pdf PDF
NFFY16DD_Repair_Index_and_Spec_Package_with_Forms_Rev_08-28-2015_for_Amend_0002.pdf PDF
Std_Spec_573-1C_Testing_of_Davits_and_Weight_Handling_Gear.pdf PDF
Std_Spec_533-1_Potable_Water_Tank_Disinfection.pdf PDF
Std_Spec_300-1_Overhaul_of_Electrical_Rotating_Machinery.pdf PDF
Std_Spec_510-1B_HVAC_Cleaning.pdf PDF
Std_Spec_581-1A_Inspection___Preservation_of_Ground_Tackle.pdf PDF
Technical_Manual_NF-243-01_Shaft_Seal_TM.pdf PDF
Std_Spec_000-2C_Temporary_Services_at_Contractor_Facilities.pdf PDF
Std_Spec_631-2D_Coating_Systems_for_Steel_Surfaces.pdf PDF
Photo_100_2119_DESH-5_Winch_as_installed_aboard_M2_08-17-2007.pdf PDF
Std_Spec_583-1b_General_Requirements_for_Liferaft_Inspections.pdf PDF
Section_B..pdf PDF
Std_Spec_635-1_Thermal_Insulation_for_Piping.pdf PDF
NF-555-6500975_Halon_1501_Fire_Suppression_System.pdf PDF
Std_Spec_997-1A_Drydocking_and_Routine_Drydock_Work.pdf PDF
Section_G..pdf PDF
Technical_Namual_for_GoodCrane_Model_40KSC10000_Crane.pdf PDF
NF-555-001-1I-SHT_1_Fire_Plan.pdf PDF
Photo_100_2120_DESH-5_Winch_as_installed_aboard_M2_08-17-2007.pdf PDF
Std_Spec_505-1B_Valve_Overhaul_and_Test.pdf PDF
Std_Spec_631-3B_Underwater_Ablative_Coating_System.PDF PDF
Std_Spec_573-2_Overhaul___Repair_of_Hydraulic_Cylinders.pdf PDF
Drawing_101-6500833_Model_E_ structural .pdf PDF
Std_Spec_505-2_Hydrostatic_Pressure_Tests.pdf PDF
NF-561-001_Rev._C. _Steering_System_Installations.pdf PDF
NF_512-003 _HVAC_System.pdf PDF
Std_Spec_635-2_Thermal_Insulation_for_Compartments.pdf PDF
Technical_Manual_NF-561-001_Rev._C_Steering_System_Installation.pdf PDF
SF_30 _Amend_0001.pdf PDF
NF-555-001-2I-SHT_2_Fire_Plan.pdf PDF
Photo_100_2118_DESH-5_Winch_as_installed_aboard_M2_08-17-2007.pdf PDF
Std_Spec_602-1_Weight_Test_Data_Plates.pdf PDF
Std_Spec_100-1A_ABS_Load_Line_Survey.pdf PDF
Std_Spec_240-1_Propulsion_Shafts_and_Propellers.pdf PDF
Drawing_101-6500837_Aft_Foc'sle_House_Module_(Module_J).pdf PDF
NFFY16DD_Repair_Index_and_Spec_Package_with_Forms_Rev_08-19-2015.pdf PDF
Std_Spec_300-3_General_Requirements_for_Electrcial_Electronic_Items.pdf PDF
NF-555-6500976_AFFF_System.pdf PDF
NF-243-001_Shafting_Arrangement_and_Details.pdf PDF
NF-461-002___EM710_-_Multibeam_Echo_Sounder__Installation_85767775.pdf PDF
NF-424-001___DSN-450_-_Doppler_Speed_Log_Installation_85770548.pdf PDF
Desh5_Winch_Addition_and_Operations.pdf PDF
Technical_Manual_YTT-243-034_Propeller_Removal-Installation_System.pdf PDF
Drawing_214-MS_Watertight_Spring_Assist_Raised_Hatch_with_Dogs.pdf PDF
Drawing_C34842_DESH-5_Turntable_-_19000OL_CERT.pdf PDF
Show 40 more

Latest 50 of 84 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 3

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

09/04/2015

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE AJ930073 7. ADMINISTERED BY (If other than Item 6) CODE

NOAA/ERAD

200 GRANBY STREET

NOROFLK, VA 23510

See Block 6

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

EA133M-15-RP-0119

10B. DATED (SEE ITEM 13)

08/06/2015

CODE 00008411 FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE

PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SEE PAGE 3

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

INSTRUCTIONS

Instructions for items other than those that are self-explanatory, are as follows:

(a)

(b)

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(2) Accounting classification Net decrease $

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation

(1)

(2)

(3)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the

(g)

(h) sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

(4)

(5) convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(1)

(2)

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following

(3)

(4)

(5)

(6)

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

Include subject matter or short title of solicitation/contract where feasible.

entries.

(1) Accounting classification Net increase $

(i) Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

STANDARD FORM 30 (REV. 10-83) BACK

SF-30 (continued) EA-133M-15-RP-0119 Amendment 0003

Question #1

In regards to Amendment 0002, Questions and Answer #11 – The OEM states that crank shaft deflections can only be done “in shop”, not “in frame”, which is what this repair specification is requiring.

Answer #1

For estimating purposes, contractors should price this work item as stated in the specification for “in frame” crankshaft deflection measurements.

Question #2

In regards to Amendment 0002, Question and Answer #13 – Is the Government stating that contractor and/or his OEM subcontractor are to return to the vessel weeks, maybe months, after this repair period to re-torque head bolts and rocker assembly bolts?

Answer #2

Confirmed as correct. The requirement and the intent is to re-torque head bolts and rocker assembly bolts after 500-1000 hours of operation in accordance with Cummins engine OEM recommendations. For estimating purposes, contractors should price this work item as stated in the specification.

Question #3

In regards to Amendment 0002 , Question and Answer #17 & #24 – These answers do not make sense now that paragraph 7.3.2 has been revised to direct contractor to install the new GFM Markey DESH-5 winch to starboard between frames 61 and 64 where the Markey COM-15 was removed. We assume that the new specification is correct and that we are providing and installing two (2) separate new foundations and new turntables in two (2) different locations for the new Markey DESH-5 (starboard between frames 61 and 64) and the re-located Markey COM-15 (centerline between frames 61 and 64) Please confirm if this is correct.

Answer #3

Confirmed as correct. The requirements are to provide and install two separate new foundations and new turntables in two different locations for the new Markey DESH-5 (starboard between frames 61 and 64) and the re-located Markey COM-15 (centerline between frames 61 and 64).