Std_Spec_583-1b_General_Requirements_for_Liferaft_Inspections.pdf

PDF 23 KB Posted

Attached to
Drydock Repairs to NOAA Ship NANCY FOSTER
Solicitation number
EA-133M-15-RP-0119
Issued by

About this file

Standard Spec.

View the file

Other files

File Type Posted
SF_30 _Amend_0003.pdf PDF
SF_30 _Amend_0002.pdf PDF
NOAA_Ship_Nancy_Foster_Tank_Sounding_Tables_GSSP_2005_9-4-2009.pdf PDF
Drawing_NF-100-004_Starboard_Exhaust_Stack_Mod_Rev_03-19-2015.pdf PDF
Drawing_601130_Zinc_Anode_Installation.pdf PDF
NF-533-002_Potable_Water_Piping_System.pdf PDF
NFFY16DD_Repair_Index_and_Spec_Package_with_Forms_Rev_08-28-2015_for_Amend_0002.pdf PDF
Std_Spec_573-1C_Testing_of_Davits_and_Weight_Handling_Gear.pdf PDF
Std_Spec_533-1_Potable_Water_Tank_Disinfection.pdf PDF
Std_Spec_300-1_Overhaul_of_Electrical_Rotating_Machinery.pdf PDF
Std_Spec_510-1B_HVAC_Cleaning.pdf PDF
Std_Spec_581-1A_Inspection___Preservation_of_Ground_Tackle.pdf PDF
Technical_Manual_NF-243-01_Shaft_Seal_TM.pdf PDF
Std_Spec_000-2C_Temporary_Services_at_Contractor_Facilities.pdf PDF
Std_Spec_631-2D_Coating_Systems_for_Steel_Surfaces.pdf PDF
Photo_100_2119_DESH-5_Winch_as_installed_aboard_M2_08-17-2007.pdf PDF
Section_B..pdf PDF
Std_Spec_635-1_Thermal_Insulation_for_Piping.pdf PDF
NF-555-6500975_Halon_1501_Fire_Suppression_System.pdf PDF
Std_Spec_997-1A_Drydocking_and_Routine_Drydock_Work.pdf PDF
Section_G..pdf PDF
Technical_Namual_for_GoodCrane_Model_40KSC10000_Crane.pdf PDF
NF-555-001-1I-SHT_1_Fire_Plan.pdf PDF
Photo_100_2120_DESH-5_Winch_as_installed_aboard_M2_08-17-2007.pdf PDF
Std_Spec_505-1B_Valve_Overhaul_and_Test.pdf PDF
Std_Spec_631-3B_Underwater_Ablative_Coating_System.PDF PDF
Std_Spec_573-2_Overhaul___Repair_of_Hydraulic_Cylinders.pdf PDF
Drawing_101-6500833_Model_E_ structural .pdf PDF
Std_Spec_505-2_Hydrostatic_Pressure_Tests.pdf PDF
NF-561-001_Rev._C. _Steering_System_Installations.pdf PDF
NF_512-003 _HVAC_System.pdf PDF
Std_Spec_635-2_Thermal_Insulation_for_Compartments.pdf PDF
Technical_Manual_NF-561-001_Rev._C_Steering_System_Installation.pdf PDF
SF_30 _Amend_0001.pdf PDF
NF-555-001-2I-SHT_2_Fire_Plan.pdf PDF
Photo_100_2118_DESH-5_Winch_as_installed_aboard_M2_08-17-2007.pdf PDF
Std_Spec_602-1_Weight_Test_Data_Plates.pdf PDF
Std_Spec_100-1A_ABS_Load_Line_Survey.pdf PDF
Std_Spec_240-1_Propulsion_Shafts_and_Propellers.pdf PDF
Drawing_101-6500837_Aft_Foc'sle_House_Module_(Module_J).pdf PDF
NFFY16DD_Repair_Index_and_Spec_Package_with_Forms_Rev_08-19-2015.pdf PDF
Std_Spec_300-3_General_Requirements_for_Electrcial_Electronic_Items.pdf PDF
NF-555-6500976_AFFF_System.pdf PDF
NF-243-001_Shafting_Arrangement_and_Details.pdf PDF
NF-461-002___EM710_-_Multibeam_Echo_Sounder__Installation_85767775.pdf PDF
NF-424-001___DSN-450_-_Doppler_Speed_Log_Installation_85770548.pdf PDF
Desh5_Winch_Addition_and_Operations.pdf PDF
Technical_Manual_YTT-243-034_Propeller_Removal-Installation_System.pdf PDF
Drawing_214-MS_Watertight_Spring_Assist_Raised_Hatch_with_Dogs.pdf PDF
Drawing_C34842_DESH-5_Turntable_-_19000OL_CERT.pdf PDF
Show 40 more

Latest 50 of 84 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMC-583-1B

DECEMBER 1998

SUPERSEDING

AMC-583-1A

JULY 1995

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

ATLANTIC MARINE CENTER

STANDARD SPECIFICATION AMC-583-1B

GENERAL REQUIREMENTS FOR LIFERAFT INSPECTIONS

1. SCOPE. This specification contains the general requirements and procedures to be used for performing U.S. Coast Guard inspections on NOAA liferafts and hydraulic releases.

2. REFERENCE.

(a) Code of Federal Regulations Title 46, Part 160, section 151, "Inflatable Liferafts (SOLAS)"

(b) Code of Federal Regulations Title 46, Part 160, Section 062, "Releases. Lifesaving Equipment, Hydraulic, and Manual."

3. REQUIREMENTS.

3.1. General. The following requirements apply to all work.

3.1.1. Except as otherwise specified, the contractor shall

provide all labor, material, services, tools, supervision, and technical expertise needed to accomplish the work required by this specification.

3.1.2. All work shall be performed by an authorized service

facility of the liferaft manufacturer.

3.1.3. Provide and install parts and components during

servicing of the liferafts as required by this specification, the Detail Specification, and other procurement documents. Renewal of other parts and components determined to be needed, as a result of servicing the liferafts will be negotiated by the Contracting Officer as an additional cost to the purchase order or contract. Provide a list of renewal parts and components which have not reached their expiration date to the COTR for disposition.

3.1.4. The Contractor shall remove all the ocean liferafts and associated hydraulic releases from the ship to the contractors facility for inspection.

3.1.5. Service the liferaft in accordance with reference (a)

and this specification.

3.1.6. Stamp the metal inspection plate in accordance with

reference (a).

3.1.7. Reinstall all liferafts and hydraulic releases in their original locations.

3.2. Annual Inspection. Perform an annual U.S. Coast Guard

inspection on the required ocean liferafts in accordance with reference (a). Renew or provide the following items as part of the inspection:

3.2.1. All bands.

3.2.2. All clips.

3.2.3. All required instruction labels.

3.2.4. All certifications (including U.S. Coast Guard) for

inspected items.

3.2.5. Deleted.

3.2.6. All flashlight batteries.

3.2.7. All repair kit cement.

3.2.8. A report for each liferaft with a cost breakdown for

all renewed items and an inventory of all dated items with their expiration date.

3.3. Special Five-Year Inspection. In addition to the above

annual inspection, perform a five-year U.S. Coast Guard inspection on the required ocean liferafts in accordance with reference (a). In addition to all renewals identified in reference (a), provide a CO2 recharge of the inflation cylinder with certification of the cylinder’s weight prior to and after the two week stand period as part of the inspection.

3.4. Hydraulic Release Inspection. Perform an annual U.S. Coast Guard inspection on all hydraulic releases in accordance with reference (b).

4. NOTES.

4.1. The following information will be provided by the Detail Specification or other procurement document:

4.1.1. The quantity, capacity, and manufacturer of each

liferaft being serviced.

4.1.2. The location of each liferaft being services.

4.1.3. The type of servicing (annual inspection or special

five-year inspection) required for each of the liferafts being serviced.

4.1.4. The quantity and manufacturer of the hydraulic

releases being serviced.

END OF SPECIFICATION