SF_30 _Amend_0002.pdf

PDF 80 KB Posted

Attached to
Drydock Repairs to NOAA Ship NANCY FOSTER
Solicitation number
EA-133M-15-RP-0119
Issued by

About this file

SF-30

View the file

Other files

File Type Posted
SF_30 _Amend_0003.pdf PDF
NOAA_Ship_Nancy_Foster_Tank_Sounding_Tables_GSSP_2005_9-4-2009.pdf PDF
Drawing_NF-100-004_Starboard_Exhaust_Stack_Mod_Rev_03-19-2015.pdf PDF
Drawing_601130_Zinc_Anode_Installation.pdf PDF
NF-533-002_Potable_Water_Piping_System.pdf PDF
NFFY16DD_Repair_Index_and_Spec_Package_with_Forms_Rev_08-28-2015_for_Amend_0002.pdf PDF
Std_Spec_573-1C_Testing_of_Davits_and_Weight_Handling_Gear.pdf PDF
Std_Spec_533-1_Potable_Water_Tank_Disinfection.pdf PDF
Std_Spec_300-1_Overhaul_of_Electrical_Rotating_Machinery.pdf PDF
Std_Spec_510-1B_HVAC_Cleaning.pdf PDF
Std_Spec_581-1A_Inspection___Preservation_of_Ground_Tackle.pdf PDF
Technical_Manual_NF-243-01_Shaft_Seal_TM.pdf PDF
Std_Spec_000-2C_Temporary_Services_at_Contractor_Facilities.pdf PDF
Std_Spec_631-2D_Coating_Systems_for_Steel_Surfaces.pdf PDF
Photo_100_2119_DESH-5_Winch_as_installed_aboard_M2_08-17-2007.pdf PDF
Std_Spec_583-1b_General_Requirements_for_Liferaft_Inspections.pdf PDF
Section_B..pdf PDF
Std_Spec_635-1_Thermal_Insulation_for_Piping.pdf PDF
NF-555-6500975_Halon_1501_Fire_Suppression_System.pdf PDF
Std_Spec_997-1A_Drydocking_and_Routine_Drydock_Work.pdf PDF
Section_G..pdf PDF
Technical_Namual_for_GoodCrane_Model_40KSC10000_Crane.pdf PDF
NF-555-001-1I-SHT_1_Fire_Plan.pdf PDF
Photo_100_2120_DESH-5_Winch_as_installed_aboard_M2_08-17-2007.pdf PDF
Std_Spec_505-1B_Valve_Overhaul_and_Test.pdf PDF
Std_Spec_631-3B_Underwater_Ablative_Coating_System.PDF PDF
Std_Spec_573-2_Overhaul___Repair_of_Hydraulic_Cylinders.pdf PDF
Drawing_101-6500833_Model_E_ structural .pdf PDF
Std_Spec_505-2_Hydrostatic_Pressure_Tests.pdf PDF
NF-561-001_Rev._C. _Steering_System_Installations.pdf PDF
NF_512-003 _HVAC_System.pdf PDF
Std_Spec_635-2_Thermal_Insulation_for_Compartments.pdf PDF
Technical_Manual_NF-561-001_Rev._C_Steering_System_Installation.pdf PDF
SF_30 _Amend_0001.pdf PDF
NF-555-001-2I-SHT_2_Fire_Plan.pdf PDF
Photo_100_2118_DESH-5_Winch_as_installed_aboard_M2_08-17-2007.pdf PDF
Std_Spec_602-1_Weight_Test_Data_Plates.pdf PDF
Std_Spec_100-1A_ABS_Load_Line_Survey.pdf PDF
Std_Spec_240-1_Propulsion_Shafts_and_Propellers.pdf PDF
Drawing_101-6500837_Aft_Foc'sle_House_Module_(Module_J).pdf PDF
NFFY16DD_Repair_Index_and_Spec_Package_with_Forms_Rev_08-19-2015.pdf PDF
Std_Spec_300-3_General_Requirements_for_Electrcial_Electronic_Items.pdf PDF
NF-555-6500976_AFFF_System.pdf PDF
NF-243-001_Shafting_Arrangement_and_Details.pdf PDF
NF-461-002___EM710_-_Multibeam_Echo_Sounder__Installation_85767775.pdf PDF
NF-424-001___DSN-450_-_Doppler_Speed_Log_Installation_85770548.pdf PDF
Desh5_Winch_Addition_and_Operations.pdf PDF
Technical_Manual_YTT-243-034_Propeller_Removal-Installation_System.pdf PDF
Drawing_214-MS_Watertight_Spring_Assist_Raised_Hatch_with_Dogs.pdf PDF
Drawing_C34842_DESH-5_Turntable_-_19000OL_CERT.pdf PDF
Show 40 more

Latest 50 of 84 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

1. CONTRACT ID CODE PAGE OF PAGES

1 9

2. AMENDMENT/MODIFICATION NO.

3. EFFECTIVE DATE

09/01/2015

4. REQUISITION/PURCHASE REQ. NO. 5. PROJECT NO. (If applicable)

6. ISSUED BY CODE AJ930073 7. ADMINISTERED BY (If other than Item 6) CODE

NOAA/ERAD

200 GRANBY STREET

NOROFLK, VA 23510

See Block 6

8. NAME AND ADDRESS OF CONTRACTOR (No., street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION

NO.

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NO.

EA133M-15-RP-0119

10B. DATED (SEE ITEM 13)

08/06/2015

CODE 00008411 FACILITY CODE

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended, is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE

PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment your desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

N/A

13. THIS ITEM ONLY APPLIES TO MODIFICATION OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER NO.

IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

SEE PAGES 3 THROUGH 9

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

NSN 7540-01-152-8070

Previous edition unusable

STANDARD FORM 30 (REV. 10-83)

Prescribed by GSA FAR (48 CFR) 53.243

INSTRUCTIONS

Instructions for items other than those that are self-explanatory, are as follows:

(a)

(b)

Item 1 (Contract ID Code). Insert the contract type identification code that appears in the title block of the contract being modified.

Item 3 (Effective date).

(2) Accounting classification Net decrease $

NOTE: If there are changes to multiple accounting classifications that cannot be placed in block 12, insert an asterisk and the words "See continuation

(1)

(2)

(3)

For a solicitation amendment, change order, or administrative change, the effective date shall be the issue date of the amendment, change order, or administrative change.

For a supplemental agreement, the effective date shall be the date agreed to by the contracting parties.

For a modification issued as an initial or confirming notice of termination for the

(g)

(h) sheet".

Item 13. Check the appropriate box to indicate the type of modification. Insert in the corresponding blank the authority under which the modification is issued. Check whether or not contractor must sign this document. (See FAR 43.103.)

Item 14 (Description of Amendment/Modification).

(4)

(5) convenience of the Government, the effective date and the modification number of the confirming notice shall be the same as the effective date and modification number of the initial notice.

For a modification converting a termination for default to a termination for the convenience of the Government, the effective date shall be the same as the effective date of the termination for default.

For a modification confirming the contacting officer's determination of the amount due in settlement of a contract termination, the effective date shall be the same as the effective date of the initial decision.

(1)

(2)

Organize amendments or modifications under the appropriate Uniform Contract Format (UCF) section headings from the applicable solicitation or contract. The UCF table of contents, however, shall not be set forth in this document

Indicate the impact of the modification on the overall total contract price by inserting one of the following entries:

(i) Total contract price increased by $

(ii) Total contract price decreased by $

(iii) Total contract price unchanged.

(c)

(d)

(e)

(f)

Item 6 (Issued By). Insert the name and address of the issuing office. If applicable, insert the appropriate issuing office code in the code block.

Item 8 (Name and Address of Contractor). For modifications to a contract or order, enter the contractor's name, address, and code as shown in the original contract or order, unless changed by this or a previous modification.

Item 9, (Amendment of Solicitation No. - Dated), and 10, (Modification of Contract/Order No. - Dated). Check the appropriate box and in the corresponding blanks insert the number and date of the original solicitation, contract, or order.

Item 12 (Accounting and Appropriation Data).

When appropriate, indicate the impact of the modification on each affected accounting classification by inserting one of the following

(3)

(4)

(5)

(6)

State reason for modification.

When removing, reinstating, or adding funds, identify the contract items and accounting classifications.

When the SF 30 is used to reflect a determination by the contracting officer of the amount due in settlement of a contract terminated for the convenience of the Government, the entry in Item 14 of the modification may be limited to --

(i) A reference to the letter determination; and

(ii) A statement of the net amount determined to be due in settlement of the contract.

Include subject matter or short title of solicitation/contract where feasible.

entries.

(1) Accounting classification Net increase $

(i) Item 16B. The contracting officer's signature is not required on solicitation amendments. The contracting officer's signature is normally affixed last on supplemental agreements.

STANDARD FORM 30 (REV. 10-83) BACK

SF-30 (continued) EA-133M-15-RP-0119 Amendment 0002

Question #1

Please provide tank capacity and location plan.

Answer #1

See tank locations indicated on Drawing NF-085-001 Booklet of General Plans posted in the original solicitation package. See tank capacities indicated in “NOAA Ship NANCY FOSTER Tank Sounding Tables GSSP2005 9-4-2009” posted in Amendment 0002.

Question #2

Please forward correct part number for paragraph 7/12/5/1 – bushings. The part number in the specs is apparently for a square key instead.

Answer #2

Basic Item 016 Paragraph 7.12.5.1 should have indicated part #100972-26 [not #100972-24] for these bushings, SAE 660, bronze. [Note: part #100972-24 is the squared key]

Question #3

Do you have any information on the sea water pumps? Manufacturer or model number?

Answer #3

Main engine gear driven raw water [sea water] pump is manufactured by Gilbert Gilkes & Gordon with model number 103030 6B, 44951-035.

Question #4

Do you have tank capacity drawings to attach to the solicitation also?

Answer #4

See tank locations indicated on Drawing NF-085-001 Booklet of General Plans posted in the original solicitation package. See tank capacities indicated in “NOAA Ship NANCY FOSTER Tank Sounding Tables GSSP2005 9-4-2009” posted in Amendment 0002.

Question #5

Unable to locate drawing NF-533-022 (Potable Water System) ref. 2.3 – item 013.

Answer #5

Drawing number is NF-533-002 [not NF-533-022] Potable Water Pipe Systems. This drawing is posted in Amendment 0002.

Question #6

I do not see the drawing for the Stbd stack mods (NF-100-004).

Answer #6

Drawing NF-100-004 Starboard Exhaust Stack Mods is posted in Amendment 0002.

Question #7

On item 012 section 7.7 page 012-4 I don’t see an attached sketch for the Jack Staff.

Answer #7

Basic Item 012 Sketch 7.7 for the Jack Staff is included in NOAA Ship NANCY FOSTER Drydock and Repairs Specifications FY16 Revised 30 August 2015 and posted in Amendment 0002.

Question #8

Can you resubmit DWG 601130 as it will not open and states that the file is damaged or has not been uploading correctly?

Answer #8

Drawing 601130 Zinc Anode Installation is converted from the original .tiff format into Adobe .pdf format and posted in Amendment 0002.

Question #9

Item No.003, paragraph 7.17 requires contractor to "Revise Reference 2.1to include the following updates:". Reference 2.1is NOAA Standard Specification AMC-997-lA.Are you asking the contractor to revise the NOAA's Standard Specifications?

Answer #9

Paragraph 7.17 should read to revise Reference 2.2 [not Reference 2.1]. See paragraph 7.17.4 with the requirement, “Update this drawing’s Revision Block from “E” to “F.” The intent is to revise Reference 2.2 NF-085-002 Rev E. Docking Plan, not to revise Reference 2.1 NOAA Standard Specification AMC-997-1A.

Question #10

Item No.005, paragraph 7.14.7 requires the contractor to "Repeat the above steps until an acceptable fit is obtained". How many fits will the contractor be required to accomplish before it deemed excessive and beyond normal costs?

Answer #10

The fit up process is required to be repeated as written in the specification. For estimating purposes, use seven fit ups as reasonable. Additional repeats more than seven may be deemed excessive beyond normal costs.

Question #11

Item No.009, paragraph 7.6 requires the contractor to "Conduct deflection readings on the crank shaft..." The manufacturer's authorized repair facility states that this is not done for this make and model engine. Please clarify intent.

Answer #11

Crankshaft deflection readings are required in accordance with the original equipment manufacturer (OEM) recommendations and is an industry standard for this make and model engine for top end overhauls at this upcoming 10,000 hour interval.

Question #12

Item No. 009, paragraphs 7.14.3 thru 7.14.3.6 - The manufacturer's authorized repair facility states that these load build-ups are excessive for this make and model engine. Contractor assumes that NOAA will accept the authorized manufacturer's repair facility's recommendations for accomplishing these load tests. Please acknowledge.

Answer #12

The requirements for engine operational load testing remain as written. For estimating purposes, contractors should price this work item as stated in the specification.

Question #13

Item No. 009, paragraph 7.15 requires the contractor to "Re-torque head bolts and rocker bolts". The authorized manufacturer's repair facility states that this effort cannot be accomplished on this make and model engine without almost completely disassembling the engine again and that it will not be included in their proposal for this specification. Does the government want the engine re-disassembled and re-assembled to accomplish this effort after all repairs and tests have been accomplished? Please clarify.

Answer #13

The requirement and the intent is to re-torque head bolts and rocker assembly bolts after 500-1000 hours of operation in accordance with Cummins engine OEM recommendations. For estimating purposes, contractors should price this work item as stated in the specification.

Question #14

Item No.400 provides for an additional 1,400 man-hours of labor to be used for emergent work. How late into the contract availability will the government invoke the use of any or all for these man-hours?

Will the contractor be required to work "overtime" in utilizing these man-hours? If so, will the contractor be additionally compensated for the extra costs of working overtime?

Answer #14

The additional 1,400 man hours of labor is an estimate only for possible growth work. The government can authorize additional man-hours during any part of the 56 day performance period.

Depending on the scope of the growth work the Government may require overtime or extend the period of performance in order to have the work completed. Either would result in compensation accordingly. Shipyard work schedules are established during the Arrival Conference.

Question #15

Item No. 502, paragraph 7.1.1requires contractor to provide an estimated 24 rooms per day for crew members (when/if needed).Contractor assumes that there will be no more than 2 persons per room.

Please clarify.

Answer #15

Correct, there will be no more than two persons per room.

Question #16

Item No. 503, paragraph 7.1.26 requires contractor to provide the services of an ABS surveyor to witness steel plate installations and testing, and to schedule the inspections and "provide payment to ABS" for Surveyor services. Shouldn't all ABS fees for this work item be the responsibility of the Government the same as they are for all of the other work items in this repair package?

Contractors don't normally reimburse ABS directly. Please clarify.

Answer #16

See revised Item 503 Starboard Exhaust Stack Modifications as listed in the specification attached with Amendment 0002. The Government will be responsible for these ABS fees.

Question #17

Item No. 504, paragraph 7.2.2 requires contractor to install the re-located Markey COM-15 winch to centerline between frames 61 and 64. Paragraph 7.3.2 requires contractor to install the new Markey DESH-5 winch on centerline between frames 61 and 64. Both winches can't go in the same spot. Please clarify.

Answer #17

The requirements are to provide the new government furnished Markey DESH-5 winch and the existing Markey COM-15 winch with new turntable and foundation assemblies. Provide each winch with new independent bolt-on-bolt-off capabilities in the same spot on centerline between frames 61 and 64 for different mission capabilities. See Option Item 504 Oceanographic Winch Installation and Testing in revised specification included with Amendment 0002.

Question #18

Item No. 504, paragraph 7.4 requires contractor to provide the on-site services of an authorized technical representative or field service engineer from the Original Equipment Manufacturer to supervise the installation, operation, testing, and re-commissioning of both winches. Markey has stated that they typically do not provide on-site service during the installation phase. They attend after installation to verify proper installation and then test and commission. Please acknowledge that this is acceptable.

Answer #18

Option Item 504, paragraph 7.4 is revised for clarification as follows:

7.4 Provide the services of an authorized technical representative or field service engineer from the Original Equipment Manufacturer (OEM) as follows:

7.4.1 For guidance in all installations and all wiring connections.

7.4.2 On-site for operational testing and re-commissioning of the Markey COM-15 winch and for commissioning the DESH-5 winch.

Question #19

Item No. 505, paragraph 7.4 requires contractor to renew the upper and lower Thordon bearings on the rudder. The upper bearing does not appear to be a Thordon bearing iaw the referenced drawings.

Please clarify.

Answer #19

The rudder stock upper bearing is made of Thordon material and is grease lubricated. The lower bearing is made of Thordon material and is water lubricated. The requirement includes replacing both of these bearings. There is also a grease lubricated carrier bearing to support the weight of the rudder and rudder stock made by another manufacturer.

Question #20

Item No. 509, paragraph 2.1- reference drawing 601130 provided on FBO cannot be opened and has an error message associated with it when trying to open. Please provide a readable copy of this drawing.

Answer #20

Drawing 601130 Zinc Anode Installation is converted from the original .tiff format into Adobe .pdf format and included in Amendment 0002.

Question #21

Item No. 510, paragraph 7.2.3 - what is the required size and type cable that needs to be run from the emergency switchboard to the new junction box? What is the voltage for this new circuit? Is there an existing spare circuit breaker available on the emergency switchboard for this installation?

Answer #21

The cable route is between the Ships Service Switchboard Panel in the Engineers Operating Station (2-46- 1-C) to a new junction box in the Engineers Office (1-43-2-Q). The intent is to replace the existing single phase input power and transformer with new three phase input power and transformer. Electrical rating requirements are for 450 volt, 125 amp, 3 phase service. See Option Item 510 Mission UPS Wiring and VSAT Antenna Wiring Upgrades in revised specification included with amendment 0002. There is no requirement to connect to the Emergency Switchboard.

Question #22

Item No. 510, paragraph 7.2.4 - is replacing the existing panel with a new three phase panel vice modifying the existing an acceptable option?

Answer #22

The requirement is to replace the existing panel. The Government will accept using the existing panel as long as it will accommodate rated circuit breakers required for the new Mission UPS.

Question #23

Item No. 510, paragraph 7.2.8 - is the CET definitely going to terminate and connect the new coax cables, meaning the contractor only has to run the cables from the equipment rack to the antenna?

Please clarify.

Answer #23

Correct, the Chief Electronics Technician (CET) will terminate and connect the new coax cables.

Question #24

Spec Item 504 – Winch Install: 7.2.2 indicates to install on certerline fr’s 61 & 64, 7.3.2 indicates the same thing, 7.3.3 indicates stbd, 7.3.5 relocates wiring for a new winch? Please advise.

Answer #24

The requirements are to provide the new government furnished Markey DESH-5 winch and the existing Markey COM-15 winch with new turntable and foundation assemblies. Provide each winch with new independent bolt-on-bolt-off capabilities in the same spot on centerline between frames 61 and 64 for different mission capabilities. See Option Item 504 Oceanographic Winch Installation and Testing in revised specification included with Amendment 0002. In the same spot on centerline between frames 61 and 64 for different mission capabilities.

Relocate existing wiring for the Markey COM-15 winch and install all new wiring, controls and display for the Markey DESH-5 winch.

*****END AMENDMNET 0002*****