Standard Spec.

View the file

Other files

File Type Posted
SF_30 _Amend_0003.pdf PDF
SF_30 _Amend_0002.pdf PDF
NOAA_Ship_Nancy_Foster_Tank_Sounding_Tables_GSSP_2005_9-4-2009.pdf PDF
Drawing_NF-100-004_Starboard_Exhaust_Stack_Mod_Rev_03-19-2015.pdf PDF
Drawing_601130_Zinc_Anode_Installation.pdf PDF
NF-533-002_Potable_Water_Piping_System.pdf PDF
NFFY16DD_Repair_Index_and_Spec_Package_with_Forms_Rev_08-28-2015_for_Amend_0002.pdf PDF
Std_Spec_573-1C_Testing_of_Davits_and_Weight_Handling_Gear.pdf PDF
Std_Spec_300-1_Overhaul_of_Electrical_Rotating_Machinery.pdf PDF
Std_Spec_510-1B_HVAC_Cleaning.pdf PDF
Std_Spec_581-1A_Inspection___Preservation_of_Ground_Tackle.pdf PDF
Technical_Manual_NF-243-01_Shaft_Seal_TM.pdf PDF
Std_Spec_000-2C_Temporary_Services_at_Contractor_Facilities.pdf PDF
Std_Spec_631-2D_Coating_Systems_for_Steel_Surfaces.pdf PDF
Photo_100_2119_DESH-5_Winch_as_installed_aboard_M2_08-17-2007.pdf PDF
Std_Spec_583-1b_General_Requirements_for_Liferaft_Inspections.pdf PDF
Section_B..pdf PDF
Std_Spec_635-1_Thermal_Insulation_for_Piping.pdf PDF
NF-555-6500975_Halon_1501_Fire_Suppression_System.pdf PDF
Std_Spec_997-1A_Drydocking_and_Routine_Drydock_Work.pdf PDF
Section_G..pdf PDF
Technical_Namual_for_GoodCrane_Model_40KSC10000_Crane.pdf PDF
NF-555-001-1I-SHT_1_Fire_Plan.pdf PDF
Photo_100_2120_DESH-5_Winch_as_installed_aboard_M2_08-17-2007.pdf PDF
Std_Spec_505-1B_Valve_Overhaul_and_Test.pdf PDF
Std_Spec_631-3B_Underwater_Ablative_Coating_System.PDF PDF
Std_Spec_573-2_Overhaul___Repair_of_Hydraulic_Cylinders.pdf PDF
Drawing_101-6500833_Model_E_ structural .pdf PDF
Std_Spec_505-2_Hydrostatic_Pressure_Tests.pdf PDF
NF-561-001_Rev._C. _Steering_System_Installations.pdf PDF
NF_512-003 _HVAC_System.pdf PDF
Std_Spec_635-2_Thermal_Insulation_for_Compartments.pdf PDF
Technical_Manual_NF-561-001_Rev._C_Steering_System_Installation.pdf PDF
SF_30 _Amend_0001.pdf PDF
NF-555-001-2I-SHT_2_Fire_Plan.pdf PDF
Photo_100_2118_DESH-5_Winch_as_installed_aboard_M2_08-17-2007.pdf PDF
Std_Spec_602-1_Weight_Test_Data_Plates.pdf PDF
Std_Spec_100-1A_ABS_Load_Line_Survey.pdf PDF
Std_Spec_240-1_Propulsion_Shafts_and_Propellers.pdf PDF
Drawing_101-6500837_Aft_Foc'sle_House_Module_(Module_J).pdf PDF
NFFY16DD_Repair_Index_and_Spec_Package_with_Forms_Rev_08-19-2015.pdf PDF
Std_Spec_300-3_General_Requirements_for_Electrcial_Electronic_Items.pdf PDF
NF-555-6500976_AFFF_System.pdf PDF
NF-243-001_Shafting_Arrangement_and_Details.pdf PDF
NF-461-002___EM710_-_Multibeam_Echo_Sounder__Installation_85767775.pdf PDF
NF-424-001___DSN-450_-_Doppler_Speed_Log_Installation_85770548.pdf PDF
Desh5_Winch_Addition_and_Operations.pdf PDF
Technical_Manual_YTT-243-034_Propeller_Removal-Installation_System.pdf PDF
Drawing_214-MS_Watertight_Spring_Assist_Raised_Hatch_with_Dogs.pdf PDF
Drawing_C34842_DESH-5_Turntable_-_19000OL_CERT.pdf PDF
Show 40 more

Latest 50 of 84 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMC-533-1

AUGUST 1991

NATIONAL OCEANIC AND ATMOSPHERIC ADMINISTRATION (NOAA)

ATLANTIC MARINE CENTER

STANDARD SPECIFICATION AMC-533-1

POTABLE WATER TANK DISINFECTION

1. SCOPE. This specification contains the general requirements for disinfecting potable water tanks on NOAA ships.

2. REFERENCES.

None

3. REQUIREMENTS.

3.1 General Requirements.

3.1.1 When introducing chlorine treatment solution to a

potable water tank, ensure that the solution is diluted and is introduced only through a sounding tube or threaded connection.

Immediately after adding the treatment solution, add a rinse consisting of at least five gallons of potable water through the same sounding tube or threaded connection.

3.1.2 Isolate the tank(s) from the rest of the potable

water service system and thoroughly rinse and drain the tank interiors.

3.2 Disinfect Procedure.

3.2.1 Fill the potable water tank with potable water until

it overflows, exercising care not to pressurize the tank. As it fills, introduce sufficient chlorine solution to provide at least 100 parts-per-million (ppm) Free Available Chlorine (FAC) content in the completely filled tank.

3.2.2 Monitor the FAC content hourly for at least four

hours. If the FAC content drops below 50 ppm at any time, add additional chlorine solution to the tank to bring the FAC content back up to 100 ppm and begin the four-hour period anew. Continue until the FAC content remains at or above 50 ppm for a four-hour period.

3.2.3 If more than one tank is to be disinfected, repeat

the above procedure for the other tank. At the contractor's discretion, the same water used to disinfect the first tank may be used, as long as the initial FAC content in the second tank is increased to 100 ppm at the start of the four-hour test period.

AMC-533-1

AUGUST 1991

3.2.4 Drain the tank(s) and refill with potable water.

Repeat the above tests, except that an initial FAC content of

1.0 ppm or greater shall be provided, the monitoring period shall be 30 minutes, and the minimum allowable FAC content shall be

0.2 ppm.

3.2.5 After successfully completing the 30-minute test

period, drain and refill the tank(s) with potable water until the total FAC content falls to 1.0 ppm or less.

END OF SPECIFICATION