Bridge Inspection Rpt_STR#5140-050P

View the file

Other files for this federal contract opportunity

Other files attached to Blue Ridge Parkway Preservation, newest first.
File Type Posted
DTFH71-17-R-00003-Amend_0001.pdf PDF
Bridge_Inspection_Rpt_STR_5140-053P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-018P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-042P.pdf PDF
VETS-4212.pdf PDF
Bridge_Inspection_Rpt_STR_5140-047P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-165P.pdf PDF
RFP_Solicitation_-_NP-BLRI_PV_PRES_FY16.pdf PDF
Bridge_Inspection_Rpt_STR_5140-043P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-040P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-049P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-038P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-044P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-017P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-046P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-052P.pdf PDF
FP14_Eng.pdf PDF
Bridge_Inspection_Rpt_STR_5140-037P.pdf PDF
Subcontracting_plan.doc DOC document
ADV_Offeror's_Qualifications_Form_-_NP-BLRI_PV_PRES_FY16.doc DOC document
Plans_-_NP-BLRI_PV_PRES_FY16.pdf PDF
Bridge_Inspection_Rpt_STR_5140-054P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-041P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-048P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-019P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-051P.pdf PDF
Report_NEPA.pdf PDF
Bridge_Inspection_Rpt_STR_5140-039P.pdf PDF
Bridge_Inspection_Rpt_STR_5140-045P.pdf PDF
Synopsis_NP-BLRI_PV_PRES_FY16-Rev.pdf PDF
Synopsis_NP-BLRI_PV_PRES_FY16.pdf PDF
Show all 31

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CULVERT INSPECTION REPORT

RENNET BAG CREEK CULVERT

BLUE RIDGE PARKWAY OVER RENNET BAG CREEK

BLUE RIDGE PARKWAY

LN

STRUCTURE NO. 5140-050P

INSPECTION TYPE: ROUTINE

INSPECTION DATE: 10/27/14

Report prepared by: WD

MILE POINT: 159.69

Federal Highway Administration KILOMETER POINT: 256.96 Federal Lands Bridge Office Bridge Inspection and Management Program 21400 Ridgetop Circle Sterling, Virginia 20166 https://bridge.flhd.fhwa.dot.gov

STRUCTURE SUMMARY STRUCTURE NO. 5140-050P

RENNET BAG CREEK CULVERT INSPECTION DATE: 10/27/14

CULVERT IDENTIFICATION AND DESCRIPTION

MAIN SPAN MATERIAL: ........ CONCRETE CONTINUOUS NO. OF BARRELS:

FOUNDATION: ....................... SPREAD FTG ON BEARING MAT'L BARREL LENGTH: ............... 59 FT (18 M)

STRUCT. TOTAL LENGTH: ... 40.2 FT (12.3 M) SKEW ANGLE: ..................... 44 °

MAX. SPAN LENGTH: ............ 18.1 FT (5.5 M) YEAR BUILT:

PROJ./PLAN REF. NO: .......... 000000000000 / NONE YEAR RECONSTRUCTED: .. N/A

NPS ROAD CLASS: ............... 1 - PRINCIPAL PARK ROAD

STRUCTURE HISTORY: ....... 1981-JOINT REPAIR.

LOCATION

BLUE RIDGE PARKWAY MILE POINT: ..................... 159.69 (KM PT 256.96)

STATE: .................................. VIRGINIA LOCATION: 1.5 MILES TO VA ROUTE 615

FACILITY CARRIED: ............. BLUE RIDGE PARKWAY

FEATURE INTERSECTED: ... RENNET BAG CREEK

STRUCTURE EVALUATION SUMMARY

This two barrel concrete box culvert is in fair condition overall. Problems include deterioration of the headwall and wingwall masonry mortar joints, and two utility lines lying in the south barrel and in the upstream channel.

There are several site-related issues, including silt and vegetation growth in the upstream channel which obstructs flow through the south barrel and directs the stream toward the northeast wingwall. This has resulted in sloughing along the north upstream channel bank adjacent to the wingwall, exposing the floor slab of the north barrel and northeast wingwall footing.

Repairs should be made as outlined in this report to prevent the possible development of more serious or costly problems in the future. In addition, a guardrail system should be installed to help improve motorist safety.

INSPECTION TEAM: A.D. MITCHEM, N.M. BOWE (CLARK NEXSEN)

CONDITION ASSESSMENT:

A. DWAYNE MITCHEM, PE, FIELD TEAM LEADER

REPORT REVIEW :

GARY J. GOODLIN, FIELD TEAM LEADER 703-404-6253

REPORT APPROVAL: DATE: 3/31/15

JORGOMAI CEESAY, PH.D., P.E., BIP SUPERVISORY ENGINEER 703-404-6244

RECOMMENDATIONS AND ESTIMATED COSTS STRUCTURE NO. 5140-050P

A (Critical) - Structure is closed, in imminent danger of collapse, or presents a critical safety hazard.

B (Major) - Structure is seriously deficient or presents a safety hazard, but can remain in service at reduced loads or with frequent inspections.

C (Moderate) - Structure is deficient, functionally obsolete, or requires substantial repairs to prevent a serious deficiency or unsafe condition.

D (Minor) - Structure is generally in good condition. Preventative maintenance may be required.

E (Special) - Structure is under construction or reconstruction.

D226 PRIORITY OF IMPROVEMENT

ITEM

NO.

MAINTENANCE RECOMMENDATIONS

(GENERALLY NOT FLHP ELIGIBLE)

QTY. UNIT COST

UNIT

ESTIMATE

COST

PRELIM.

62.3,4 CLEAN AND REPOINT HEADWALL AND WINGWALL MASONRY MORTAR JOINTS AS

NECESSARY.

150 LF

61.2, 62.6 PLACE ENGINEERED RIPRAP ALONG NORTH UPSTREAM CHANNEL BANK

ADJACENT TO WINGWALL.

10 CY

61.4, 62.5 REMOVE SILT ACCUMULATION FROM SOUTH BARREL. 1 LS

62 PERIODICALLY REMOVE VEGETATION GROWTH ON AND AROUND STRUCTURE

AND IN CHANNEL.

1 LS

61.4, 62.12 REMOVE UTILITY LINES IN SOUTH BARREL AND UPSTREAM CHANNEL. 1 LS

PRELIM. MAINTENANCE TOTAL :

ITEM

NO.

REHABILITATION/RECONSTRUCTION

(TYPICALLY NEEDED WITHIN 5 YEARS)

QTY. UNIT

UNIT

COST ESTIMATES

PRELIM. COST

REHAB. RECONSTR.

62.9, 222.3 INSTALL GUARDRAIL SYSTEM OVER STRUCTURE AND AT

APPROACHES.

1 LS $0

PRELIM. REHABILITATION/RECONSTRUCTION TOTAL : $0

COST ESTIMATE SUMMARY

PRELIM. MAINTENANCE TOTAL:

PRELIM. REHABILITATION TOTAL:

PRELIM. RECONSTRUCTION TOTAL: ...

TOTAL ITEMIZED COSTS:

$0

PRELIMINARY ESTIMATE TOTAL* :

(*Includes typical contract costs for mobilization, traffic control, and design/construction engineering; but does not include detour bridges, work beyond the bridge limits, or work not listed above. Estimates are approximate and are for preliminary planning purposes only; they should not be used as a complete or final engineers estimate.)

REMARKS: Cost estimates assume that recommended actions will be combined with similar work being performed on other structures.

FIELD INSPECTION REPORT STRUCTURE NO. 5140-050P

CONDITION RATING CODES FOR ITEMS 58 - 62, 222, 223

N

NOT APPLICABLE

EXCELLENT CONDITION

VERY GOOD CONDITION - no problems noted.

GOOD CONDITION - some minor problems.

SATISFACTORY CONDITION - structural elements show some minor deterioration.

FAIR CONDITION - all primary structural elements are sound but may have minor section loss, cracking, spalling, or scour.

POOR CONDITION - advanced section loss, deterioration, spalling, or scour.

SERIOUS CONDITION - loss of section, deterioration, spalling, or scour have seriously affected primary structural components. Local failures are possible.

Fatigue cracks in steel or shear cracks in concrete may be present.

CRITICAL CONDITION - advanced deterioration of primary structural elements. Fatigue cracks in steel or shear cracks in concrete may be present or scour may have removed substructure support. Unless closely monitored it may be necessary to close the structure until corrective action can be taken.

“IMMINENT” FAILURE CONDITION - major deterioration or section loss present in critical structural components or obvious vertical or horizontal movement affecting structure stability. Structure is closed to traffic but corrective action may return structure to light service.

FAILED CONDITION - out of service; beyond corrective action.

CONDITION RATING CODE EQUIVALENTS FOR SUB-ELEMENTS

G = GOOD (CODES 7 - 9) F = FAIR (CODES 5 - 6) P = POOR (CODES 0 - 4)

STREAM BED COMPOSITION :9.

AVG. CLEAR OPENING 8.

NORMAL VELOCITY 7.

ADEQUACY OF OPENING 6.

OTHER 5.

WATERWAY OBSTRUCTIONS 4.

CHANNEL PROTECTION 3.

EROSION AND/OR SCOUR 2.

ALIGNMENT 1.

61. CHANNEL 5

P F N F

7 FT.

MED

SUFF

N

ITEM REFERENCE AND REMARKS

62. CULVERT 6

PARAPETS AND/OR RAILINGS 9.

ADEQUACY OF COVER 8.

SETTLEMENT AND/OR DEFLECTION 7.

EROSION AND/OR SCOUR 6.

DEBRIS AND/OR SILT 5.

WINGWALLS 4.

HEADWALLS 3.

FOOTINGS 2.

BARREL(S)1.

ROADWAY SURFACE 10.

RIDEABILITY 11.

OTHER 12. (UTILITIES)

F N F F F F G G N G G P

222. APPROACHES 7

OTHER 9.

ALIGNMENT 8.

SIGNS 7.

SETTLEMENT 6.

EROSION 5.

SURFACING 4.

APPROACH GUARDRAIL 3.

RELIEF JOINTS 2.

1. APPROACH SLABS N

N N G G G N G N

223. RETAINING WALL N

OTHER 6.

SETTLEMENT OR DEFLECTION 5.

EROSION AND/OR SCOUR 4.

FOUNDATION 3.

WEEP HOLES 2.

1. WALL

36. TRAFFIC AND SAFETY FEATURES

APPROACH GUARDRAILS C.

TRANSITIONS B.

BRIDGE RAILINGSA.

APPROACH GUARDRAIL ENDS D.

SAND, STONES

61.1,2, 62.6 STREAM FLOW DIRECTED AT NORTHEAST WINGWALL; MODERATE

SLOUGHING OF NORTH UPSTREAM CHANNEL BANK AND ALONG

NORTH WINGWALLS; NORTHEAST WINGWALL FOOTING EXPOSED

(4'L X 1'H). MINOR SCOUR AT NORTH BARREL ENDS WITH FLOOR

SLAB EXPOSED (UP TO 7"H).

61.4, 62.12 TWO UTILITY LINES LYING ON GROUND IN SOUTH BARREL AND IN

UPSTREAM CHANNEL.

61.4, 62.5 STREAM ONLY FLOWS THROUGH NORTH BARREL DUE TO

APPROXIMATELY 1' TO 2' OF SILT ACCUMULATION WITH VEGETATION

GROWTH ON SOUTH CHANNEL BANKS; UP TO 1' OF SILT

ACCUMULATION IN SOUTH BARREL AND 2" OF SILT ACCUMULATION

IN NORTH BARREL. MINOR ACCUMULATION OF CUT TREES LYING

ON SOUTH DOWNSTREAM CHANNEL BANK.

62.1 MINOR EFFLORESCENCE FROM BARREL CONSTRUCTION JOINTS.

MINOR TO MODERATE TRANSVERSE CRACKING OF TOP SLAB IN

NORTH BARREL AT ENDS WITH MODERATE EFFLORESCENCE AND

WATER SEEPAGE; MODERATE DELAMINATION (1'L X 10"W) AT WEST

END OF TOP SLAB. MINOR SHRINKAGE CRACKING OF TOP SLAB AT

ENDS OF BARRELS, SOME AREAS WITH EFFLORESCENCE. MINOR

TO MODERATE SCALING OF FLOOR SLAB. SEVERE SCALING (UP TO

1-1/2"D) OF BARREL WALLS ALONG WATERLINE. MINOR SHRINKAGE

CRACKING OF BARREL WALLS NEAR ENDS, SOME AREAS WITH

EFFLORESCENCE. MINOR VERTICAL CRACKING OF BARREL WALLS

IN SEVERAL LOCATIONS, PRIMARILY INTERMEDIATE WALL AND

SOUTH END WALL NEAR EAST END. MINOR HORIZONTAL CRACKING

WITH EFFLORESCENCE ON INTERMEDIATE WALL. MINOR

EFFLORESCENCE ON MORTAR JOINTS ON INTERMEDIATE WALL.

MODERATE DETERIORATION OF PATCHING MATERIAL ON NORTH

FACE OF INTERMEDIATE WALL AT TRANSITION TO MASONRY NEAR

WEST END. MINOR VOIDS BETWEEN MASONRY AND CONCRETE

PORTION OF FLOOR SLAB AT EAST END OF NORTH BARREL.

TRAFFIC SAFETY RATING CODES

0 - Does not meet standards or a safety feature is required and none is provided.

1 - Meets currently acceptable standards.

N - Not applicable or a safety feature is not required. 3 OF 18

FIELD INSPECTION REPORT STRUCTURE NO. 5140-050P

ADDITIONAL ITEM REFERENCE AND REMARKS

62.3 MINOR TO MODERATE DETERIORATION OF HEADWALL MASONRY MORTAR JOINTS. MINOR TO MODERATE

EFFLORESCENCE ON HEADWALLS. MINOR VEGETATION GROWTH OVERHANGING HEADWALLS.

62.4 MODERATE DETERIORATION OF WINGWALL MASONRY MORTAR JOINTS IN SEVERAL LOCATIONS WITH MOSS

GROWTH. MODERATE VINE GROWTH ON WINGWALLS.

62.10, 222.4 MINOR LONGITUDINAL CRACKING OF PAVEMENT; MINOR TRANSVERSE CRACKING IN SEVERAL LOCATIONS.

222.7 NO HEADWALL MARKERS PRESENT.

36.A,B,C,D NO GUARDRAIL SYSTEM PRESENT.

STRUCTURE LOAD RATING STRUCTURE NO. 5140-050P

TRUCK TYPE

INVENTORY RATING (NORMAL TRAFFIC) OPERATING RATING (MAXIMUM LOAD)

TONS METRIC TONS TONS METRIC TONS

H 15 14 25 23

HS 27 24 45 41

TYPE 3 25 23 42 38

TYPE 3S2 40 36 67 61

TYPE 3-3 49 44 82 74

DESIGN LOADING: UNKNOW N (H15 ASSUMED - SEE REMARKS)

X CAPACITY MEETS OR EXCEEDS DESIGN LOAD

CAPACITY IS LESS THAN DESIGN LOAD

ORIGINAL LOAD RATING CALCULATION APPLICABLE

ORIGINAL LOAD RATING CALCULATION REVISED

DATE OF LOAD RATING CALCULATION:

LOAD RATING CONTROLLED BY:

REMARKS: DESIGN LOADING IS UNKNOWN; ASSUMPTION IS BASED ON STRUCTURE TYPE, LOCATION, AGE, AND

CONDITION.

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-050P

STRUCTURE IDENTIFICATION

(201) PARK: BLUE RIDGE PARKWAY (1) STATE: ....................................... 513 - VIRGINIA (VA)

(202) STRUCTURE NAME: .......... RENNET BAG CREEK CULVERT (2) STATE HWY. AGENCY DIST:

(203) STRUCTURE KIND: ............ 2 - CULVERT (3) COUNTY CODE: ........................ 063 - FLOYD

(204) STRUCTURE NUMBER: ..... 5140-050P (4) CITY/PLACE CODE:

(205) NPS REGION: .................... 4 - SOUTHEAST (5) INVENTORY ROUTE:

(206) ROUTE CODE NUMBER: ... 1 (6) FEATURES INTERSECTED:....... RENNET BAG CREEK

(207) ROAD SECTION NO: .......... 050P (7) FACILITY CARRIED: .................. BLUE RIDGE PARKWAY

(208) NPS ROAD CLASS: ............ 1 - PRINCIPAL PARK ROAD (8) STATE STRUCTURE NO: .......... 5140050P0000000

(209) WITHIN NPS BNDRY?: ....... YES (9) LOCATION: ................................ 1.5 MILES TO VA ROUTE 615

(210) OPERATING UNIT: ............. ROCKY KN (10) INV. RTE. - MIN. VERT. CLR: .. 99.99 FT (99.99 M)

(211) PROJECT NO(S): ................ 000000000000 (11) MILE POINT: ............................. 159.69 (KM PT 256.96)

(212) DRAWING NUMBERS: ....... NONE (27) YEAR BUILT:

(21) MAINTAINED BY: ................. 66 - NATIONAL PARK SERVICE (106) YEAR RECONSTRUCTED: .... N/A

(22) OWNER: ............................... 66 - NATIONAL PARK SERVICE (20) TOLL: ........................................ 3 - FREE ROAD

(37) HISTORICAL DESIGNATION: .. 5 - NOT ELIGIBLE

STRUCTURE DESCRIPTION, FOUNDATION, AND DECK TYPE

(43A) MAIN STR. MATERIAL: ..

(43B) MAIN STR. TYPE:

(45) NO. OF MAIN SPANS:

(48) MAX. SPAN LENGTH:

(49) STRUCTURE LENGTH:

(216A) ABUTMENT #1 FDN:

(216B) ABUTMENT #2 FDN:

(217A) PREDOM. PIER FDN.: ..

(217B) SECOND. PIER FDN: ...

(107) DECK TYPE:

2 - CONCRETE CONTINUOUS

19 - CULVERT

18.1 FT (5.5 M)

40.2 FT (12.3 M)

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

2 - SPREAD FTG ON BEARING MAT'L

6 - N/A

N - NOT APPLICABLE

(44A) APPR. STR. MATERIAL: ........ 0 - OTHER

(44B) APPR. STR. TYPE: ................ 00 - OTHER

(46) NO. OF APPROACH SPANS: .. 0

(108) WEAR SURFACE/PROTECT SYSTEM:

A) TYPE WEARING SURFACE: .. N - NOT APPLICABLE

B) TYPE MEMBRANE: ................. N - NOT APPLICABLE

C) TYPE PROTECTION: .............. N - NOT APPLICABLE

(218) IS SALT USED?: ..................... YES

LOAD RATING AND POSTING

(31) DESIGN LOAD: ................. 0 - UNKNOWN (41) LOAD RESTRICTION: ......... A - OPEN, NO RESTRICTION

(66) INVENTORY RATING: ...... 27.0 TONS (24.0 METRIC TONS) (70) BRIDGE POSTING: .............. 5 - NO POSTING REQUIRED

(64) OPERATING RATING: ...... 45.0 TONS (40.8 METRIC TONS)

INSPECTION DATES

(90) INSPECTION DATE: 10/14 (91) FREQ. OF INSP: 24 MONTHS (92 / 93) CRITICAL FEATURE INSPECTION (CFI):

(219) ADD. STUDIES NEEDED: N - 0 - NONE (A) FRACTURE CRITICAL: ... NO

INSP. EVERY: MONTHS - LAST INSP. : (220) SPECIAL STUDY TYPE: 0 - NONE

(B) UNDERWATER: .............. NO

(221) SPECIAL STUDY DATE: INSP. EVERY: MONTHS - LAST INSP. :

(C) SPECIAL INSPECTION: .. NO

INSP. EVERY: MONTHS - LAST INSP. :

STRUCTURE INVENTORY AND APPRAISAL STRUCTURE NO. 5140-050P

GEOMETRY, TRAFFIC, AND NAVIGATIONAL DATA

(16) LATITUDE: ............................. 36°53'38.80" (51) CURB TO CURB WIDTH: ........... 0.0 FT (0.0 M)

(17) LONGITUDE: ......................... 80°15'36.80" (52) DECK WIDTH: ............................ 0.0 FT (0.0 M)

(19) DETOUR LENGTH: ............... 3 MI (5 KM) (32) APPR. ROADWAY WIDTH: ........ 28.0 FT (8.5 M)

(28A) LANES ON STRUCT: .......... 02 (213) APPR. PAVEMENT WIDTH: ..... 22.0 FT (6.7 M)

(28B) LANES UNDER STRUCT: ... 00 LEFT SHOULDER: .................. 8.0 FT (2.4 M)

(42A) SERVICE ON: ..................... 1 - HIGHWAY RIGHT SHOULDER: ................ 8.0 FT (2.4 M)

(42B) SERVICE UNDER: .............. 5 - WATERWAY (33) BRIDGE MEDIAN: ....................... 0 - NO MEDIAN

(29) AVG. DAILY TRAFFIC: .......... 1061 (34) SKEW ANGLE: ............................ 44 °

(30) YEAR OF ADT: ...................... 2012 (35) DECK FLARE?: ........................... NO

(114) FUTURE ADT: ..................... 1167 (47) TOTAL HORIZ. CLEARANCE: .... 28.0 FT (8.5 M)

(115) YEAR OF FUTURE ADT: ..... 2032 (50) SIDEWALKS:

(101) PARALLEL STRUCTURE: ... N - NONE LEFT : ...................................... 0.0 FT (0.0 M)

(38) NAVIGATION CONTROL?: ... 0 RIGHT : ................................... 0.0 FT (0.0 M)

(39) VERTICAL CLEARANCE: ...... 0.0 FT (0.0 M) (214) BRIDGE RAIL TYPE:

(40) HORIZ. CLEARANCE: ........... 0.0 FT (0.0 M) RAIL CONFIGURATION: ......... 0 - N/A

(111) ABUT. OR PIER PROT: ....... MATERIAL: .............................. 0 - N/A

DESIGN TYPE: ........................ 0 - N/A

LATERAL UNDERCLEARANCE:

(55) RIGHT: ....................... 0.0 FT (0.0 M) (215) BRIDGE RAIL HEIGHT: ............ 0.00 FT (0.00 M)

(56) LEFT: ......................... 0.0 FT (0.0 M) (53) MIN. VRT. CLEAR. OVER DECK: 99.99 FT (99.99 M)

(54) MIN. VRT. UNDERCLEARANCE: 0.00 FT (0.00 M)

CONDITION AND APPRAISAL DATA, PROPOSED IMPROVEMENTS, AND COST

(58) DECK: ................................. N

(59) SUPERSTRUCTURE: ......... N

(60) SUBSTRUCTURE: .............. N

(61) CHANNEL:

(62) CULVERT:

(222) APPROACHES:

(223) RETAINING WALL: ........... N

(36) TRAFFIC SAFETY FEAT: ... 0000

(75A) TYPE OF WORK: .............. 35 - GENERAL REHAB

(75B) WORK DONE BY: ............. 1 - CONTRACT

(76) IMPROVEMENT LENGTH: ..

(67) STRUCTURAL EVALUATION:

(68) DECK GEOMETRY:

(69) UNDERCLEARANCES:

(71) WATERWAY ADEQUACY:

(72) APPROACH ALIGNMENT:

(113) SCOUR CRITICAL:

(225) PURPOSE OF IMPROVEMENT:

(226) PRIORITY OF IMPROVEMENT:

(227) MAINTENANCE COST:

(228) REHAB./RECONSTR. COST: ...

(229) CONSTRUCTION COST:

N

8 - Stable; scour above top of fo

2 - REHAB/RECONSTRUCTION

D - MINOR

$0

ADDITIONAL INFORMATION

(230) STRUCTURE HISTORY:

1981-JOINT REPAIR.

(231) ADDITIONAL CONSIDERATIONS:

(330) ADDITIONAL CONFIG. INFO.:

http:80�15'36.80 http:36�53'38.80

APPENDIX STRUCTURE NO. 5140-050P

PHOTOGRAPHS STRUCTURE NO. 5140-050P

PHOTO #1 - LOOKING SOUTHBOUND TOWARD CUMBERLAND KNOB

FLOW

PHOTO #2 - EAST (UPSTREAM) SIDE

PHOTO #3 - GENERAL TOPSIDE VIEW LOOKING SOUTH

PHOTO #4 - TYPICAL LONGITUDINAL CRACKING OF PAVEMENT; OVER

STRUCTURE SHOWN

PHOTO #5 - GENERAL UNDERSIDE VIEW LOOKING EAST, SOUTH

BARREL

PHOTO #6 - TYPICAL DETERIORATION OF HEADWALL MASONRY

MORTAR JOINTS; EAST HEADWALL OVER NORTH BARREL SHOWN;

ALSO NOTE TYPICAL VEGETATION GROWTH ON HEADWALLS

PHOTO #7 - TYPICAL VINE GROWTH ON

WINGWALLS; SOUTHEAST WINGWALL

SHOWN; ALSO NOTE TYPICAL

DETERIORATION OF WINGWALL MASONRY

MORTAR JOINTS

PHOTO #8 - TYPICAL EFFLORESCENCE FROM

BARREL CONSTRUCTION JOINTS; SOUTH

BARREL NEAR WEST END SHOWN

PHOTO #9 - TYPICAL TRANSVERSE CRACKING

OF TOP SLAB IN NORTH BARREL AT ENDS

WITH EFFLORESCENCE AND WATER

SEEPAGE; WEST END SHOWN; ALSO NOTE

DELAMINATION OF TOP SLAB

PHOTO #10 - VOIDS BETWEEN MASONRY AND

CONCRETE PORTION OF FLOOR SLAB AT

EAST END OF NORTH BARREL

PHOTO #11 - TYPICAL SCOUR AT NORTH BARREL ENDS WITH FLOOR

SLAB EXPOSED; EAST END SHOWN

PHOTO #12 - GENERAL VIEW OF BARREL WALL, SOUTH WALL OF

SOUTH BARREL

PHOTO #13 - TYPICAL SCALING OF BARREL WALLS ALONG WATERLINE;

NORTH SIDE OF CENTER BARREL WALL SHOWN; ALSO NOTE TYPICAL

HORIZONTAL CRACKING WITH EFFLORESCENCE ON INTERMEDIATE

PHOTO #14 - DETERIORATION OF PATCHING MATERIAL ON NORTH

FACE OF INTERMEDIATE WALL AT TRANSITION TO MASONRY NEAR

WEST END

PHOTO #15 - SLOUGHING OF NORTH UPSTREAM CHANNEL BANK;

NOTE NORTHEAST WINGWALL FOOTING EXPOSED

PHOTO #16 - UTILITY LINES LYING ON GROUND IN SOUTH BARREL

PHOTO #17 - SILT ACCUMULATION IN SOUTH BARREL; NOTE

VEGETATION ON SOUTH CHANNEL BANK

PHOTO #18 - UPSTREAM CHANNEL

PHOTO #19 - DOWNSTREAM CHANNEL

File details come from the government source that posted it. Updated .