Drawings Boiler Replacement_Part2.pdf
PDF 12 MB Posted
- Solicitation number
- 36C25921R0071
About this file
This solicitation notice is for a coal boiler replacement and plant improvements project at a Veterans Affairs medical center. The contractor shall provide all necessary materials, labor, tools, equipment, and supervision to replace coal boilers in building 90 and conduct related work as specified in the drawings. The project value is between $1 million and $5 million. The solicitation number is 36C25921R0071 and will be set aside 100% for Service-Disabled Veteran-Owned Small Businesses. The point of contact is Joseph Wingfield, who can be reached at 303-712-5769 or joseph.wingfield@va.gov. Apparent successful offerors must be verified by the Department of Veterans Affairs Center for Verification and Evaluation and visible in the Vendor Information Pages database prior to contract award. The work is to be performed at the Sheridan VA Healthcare System for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 19.
View the file
Other files
Show all 42
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
T
TT
M
MT
PT
TT
FT
IT
CT
SPS
SD
PDT
KR
TSL
HS
ZC
LC
LT
PDS
TSH
EPT
AT
CO2
AT
CO
AT
OC
LTCP
HVAC
ECC
TC
VSMC
PC
SC
FC
PSH
FSH
PSL
CONTROLS SYMBOLS
DRAWING SYMBOLS
26-SF 3
26-TU-I-I
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
SUPPLY FAN NO. 3 IN BUILDING NO. 26
EQUIPMENT ABBREVIATION (SUPPLY FAN)
ITEM NUMBER (TERMINAL UNIT NO. 1)
ITEM (TERMINAL UNIT SHOWN)
SERVED BY AIR HANDLER UNIT NO. 1
DRAWING NUMBER WHERE DRAWN
BUILDING NO. WHERE EQUIPMENT IS LOCATED
H4
H7
A
DUCTWORK SYMBOLS
BDD
FD
VD
SUPPLY
RETURN
45°
45°
N
1/24
F/S DPR
GENERAL PIPING SYMBOLS
FE
AV
MV
SCH
SH
TH
PS
RC
WB
CSH
SS
* TYPE NUMBERS REFER TO MANUFACTURER'S STANDARDIZATION SOCIETY STANDARD PRACTICE SP-58
VR
CTPS
CTPD
FWPS
FWPD
CF
FWS
BWS
CBD
BO
TC
A
OFL
HW
SW
CW
FOR
FOS
LP
G(I)
G
HVAC PIPING SYMBOLS
HPS
HPR
MPS
MPR
LPS
LPR
PC
HWS
HWR
GHS
GHR
V
SWS
SWR
CWR
CHR
GCR
RL
RS
RHG
CWS
CHS
GCS
MW
D
GRR
GRS
X
TERMINAL UNIT SYMBOLS
A
PTAC
A
TWU
A
FCU
FCU
A
PTAC
A
AIR TERMINAL SYMBOLS
MB
KC
FSL
A
M
BAS
HIGH PRESSURE STEAM (60 PSIG AND ABOVE)
HIGH PRESSURE STEAM CONDENSATE RETURN
MEDIUM PRESSURE STEAM (16 PSIG THRU 59 PSIG)
MEDIUM PRESSURE STEAM CONDENSATE RETURN
LOW PRESSURE STEAM (15 PSIG AND BELOW)
LOW PRESSURE STEAM CONDENSATE RETURN
CONDENSATE PUMP DISCHARGE
HEATING WATER SUPPLY
HEATING WATER RETURN
GLYCOL-WATER HEATING SUPPLY
GLYCOL-WATER HEATING RETURN
SOLAR WATER SUPPLY
SOLAR WATER RETURN
REFRIGERANT LIQUID
REFRIGERANT SUCTION
REFRIGERANT HOT GAS
CONDENSER WATER SUPPLY (FROM TOWER)
CONDENSER WATER RETURN (TO TOWER)
CHILLED WATER SUPPLY
CHILLED WATER RETURN
CHILLED GLYCOL-WATER SUPPLY
CHILLED GLYCOL-WATER RETURN
MAKE-UP WATER
DRAIN LINE
VENT LINE
GLYCOL-WATER RUN AROUND SUPPLY
GLYCOL-WATER RUN AROUND RETURN
EXISTING PIPE TO BE REMOVED
FEEDWATER PUMP DISCHARGE
FEEDWATER PUMP SUCTION
CONDENSATE TRANSFER PUMP DISCHARGE
CONDENSATE TRANSFER PUMP SUCTION
VACUUM CONDENSATE RETURN
TUBE CLEANER WATER SUPPLY
BOILER BLOWOFF
CONTINUOUS BLOWDOWN
BOILER WATER SAMPLE
FEEDWATER SAMPLE (FROM DEAERATOR)
CHEMICAL FEED
OVERFLOW
COMPRESSED AIR
NATURAL GAS MAIN FUEL
NATURAL GAS IGNITER FUEL
LIQUEFIED PETROLEUM
LIQUEFIED PETROLEUM GAS IGNITER FUEL
LIQUEFIED PETROLEUM GAS AIR MIXTURE
FUEL OIL SUPPLY
FUEL OIL RETURN
COLD WATER (CITY WATER)
SOFTENED WATER
HOT WATER
ROLLER-TYPE HANGER
VARIABLE SPRING-TYPE HANGER (TYPE 51)*
SPRING CUSHION-TYPE HANGER (TYPE 48 OR 49)*
CLEVIS-TYPE HANGER
TRAPEZE HANGER (PROVIDE U-BOLT PIPE ATTACHMENT
TO TRAPEZE EXCEPT WHERE RH ARE INDICATED)
FLOOR-SUPPORTED PIPE STAND
RISER CLAMP (TYPE 42)*
WALL BRACKET (TYPE 31, 32, 33)*
CONSTANT SUPPORT HANGER (TYPE 54, 55, 56)*
SLIDING SUPPORTS (TYPE 35)*
RH
DIRECTION OF PIPE PITCH (DOWN)
DIRECTION OF FLOW
ANCHOR
REDUCER OR INCREASER
ECCENTRIC REDUCER
TOP CONNECTION, 45° OR 90°
BOTTOM CONNECTION, 45° OR 90°
SIDE CONNECTION
CAPPED OUTLET
RISE OR DROP IN PIPE
UNION
PIPE UP
PIPE DOWN
INVERTED BUCKET TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
FLOAT & THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
THERMOSTATIC TRAP SET INCLUDING
PIPING ACCESSORIES SEE DETAIL
THERMOMETER
PRESSURE GAGE
FLOW ELEMENT
REFRIGERANT SIGHT GLASS
TEST PLUG (PRESSURE/TEMPERATURE)
AUTOMATIC AIR VENT
MANUAL AIR VENT
QUICK-COUPLE HOSE CONNECTOR
CONNECT TO EXISTING
LIMIT OF DEMOLITION
AIR SEPERATOR
TERMINAL UNIT WITH REHEAT COIL
DOUBLE DUCT MIXING BOX.
FAN POWERED VARIABLE VOLUME
TERMINAL UNIT WITH HEATING COIL.
EXISTING DUCT TO BE REMOVED
LOUVER (LOUVER SPECIFIED IN ARCHITECTURAL
SECTION.)
FLEXIBLE DUCTWORK (INSULATED)
DUCT WITH SOUND LINING
MANUAL VOLUME DAMPER
FIRE DAMPER
BACK DRAFT DAMPER
COMBINATION FIRE/SMOKE DAMPER
POINT OF CHANGE IN DUCT CONSTRUCTION BY
STATIC PRESSURE CLASS. THE NUMBER ASSIGNS
PRESSURE CLASS (IN. OF WATER) WHICH WILL
ACCOMMODATE MAXIMUM OPERATING PRESSURE
IN THE DUCT SUBSECTION. THE SYMBOL CONTINUES
THE ASSIGNMENT UNTIL THE DUCT TERMINATES OR
ANOTHER SYMBOL APPEARS. A "N" SUPERSCRIPT
INDICATES NEGATIVE PRESSURE.
AUTOMATIC CONTROL DAMPER MODULATING
AUTOMATIC CONTROL DAMPER TWO POSITION
MANUAL SPLITTER DAMPER
STANDARD BRANCH SUPPLY OR RETURN, NO
SPLITTER (45° TAP)
DUCT MOUNTED COIL (HOT WATER OR STEAM
COIL)
DUCT MOUNTED COIL (ELECTRIC)
CONVECTOR OR RADIATOR (RECESSED)
CONVECTOR OR RADIATOR (WALL HUNG)
FLOOR MOUNTED VERTICAL RECESSED FAN COIL UNIT.
LETTER INDICATES UNITSIZE.
FLOOR MOUNTED VERTICAL CABINET FAN
COIL UNIT. LETTER INDICATES UNIT SIZE.
THRU WALL AIR CONDITIONING UNIT.
LETTER INDICATES UNIT SIZE.
WINDOW TYPE AIR CONDITIONING UNIT.
LETTER INDICATES UNIT SIZE.
FLOOR MOUNTED HEAT PUMP. LETTER
INDICATES UNIT SIZE.
AIR CURTAIN
UNIT HEATER (HORIZONTAL)
UNIT HEATER (VERTICAL)
2'x2' RADIANT CEILING PANEL
2'x4' RADIANT CEILING PANEL
SUPPLY DUCT (UP & DOWN)
EXHAUST DUCT (UP & DOWN)
RETURN DUCT (UP & DOWN)
ROUND AND SQUARE 4-WAY CEILING DIFFUSERS
SQUARE 3-WAY CEILING DIFFUSERS
SQUARE 2-WAY CEILING DIFFUSERS
SQUARE 1-WAY CEILING DIFFUSERS
LINEAR SLOT DIFFUSER
SUPPLY TOP REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN CEILING
REGISTER OR GRILLE
EXHAUST OR RETURN BOTTOM
REGISTER OR GRILLE (WALL TYPE)
EXHAUST OR RETURN REGISTER OR TOP GRILLE
(WALL TYPE)
VANED ELBOW & AIR SPLIT TYPE DUCT TAKE-OFF
CONNECT NEW DUCT TO EXISTING DUCT
INCLINED RISE, IN DIRECTION OF AIR FLOW
INCLINED DROP, IN DIRECTION OF AIR FLOW
LIMIT OF DEMOLITION
FLEXIBLE CONNECTION, EQUIPMENT, VIBRATION,
OR SEISMIC
VANED ELBOW (PROVIDE ALL SQUARE OR
RECTANGULAR ELBOWS WITH VANES EVEN IF
SYMBOL IS MISSING)
VANED ELBOW (SHORT RADIUS)
STANDARD RADIUS ELBOW (LONG RADIUS)
NEW DUCT (INSIDE DIMENSIONS: WIDTH x DEPTH)
EXISTING DUCT TO REMAIN
DN
DN
UP
UP
D
R
DNUP
FC
10x8
LC
M
VALVE SYMBOLS
GATE VALVE - THREADED/FLANGED
GLOBE VALVE - THREADED/FLANGED
GATE VALVE WITH 3/4" HOSE ADAPTER
CHECK VALVE
WYE STRAINER (WITH BALL VALVE & HOSE CONNECTION)
WYE STRAINER WITH VALVED DRAIN AND QUICK-COUPLE
FLEXIBLE CONNECTION
ANGLE GLOBE VALVE
BUTTERFLY VALVE
BALL VALVE
MODULATING CONTROL VALVE
MODULATING CONTROL BUTTERFLY VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
THREE-WAY TWO POSITION CONTROL VALVE
PRESSURE REGULATING VALVE
PRESSURE SAFETY VALVE
AUTOMATIC BALANCING CONTROL VALVE
WATER BALANCE DEVICE
CIRCUIT SETTER VALVE
GATE VALVE WITH GLOBE-VALVED BYPASS
PLUG VALVE
CONTROL VALVE (CV) - FLOAT-OPERATED
PRESSURE REDUCING VALVE (PRV)
WATER LEVEL CONTROLLER
FLOW METER
ROOM THERMOSTAT/TRANSMITTER - WALL MOUNT
ROOM HUMIDISTAT (MOISTURE)/TRANSMITTER - WALL
MOUNT
TEMPERATURE TRANSMITTER
TEMPERATURE TRANSMITTER, AVERAGING ELEMENT
MOISTURE (HUMIDITY) TRANSMITTER
PRESSURE TRANSMITTER
STATIC PRESSURE SENSOR
FLOW TRANSMITTER
CURRENT TRANSMITTER
CONDUCTIVITY TRANSMITTER
SMOKE DETECTOR
PRESSURE DIFFERENTIAL TRANSMITTER
PRESSURE DIFFERENTIAL SWITCH
HAND SWITCH (HAND-OFF-AUTO SWITCH)
VALVE OR DAMPER POSITION CONTROLLER
LOCAL RECORDING TIME CLOCK (RUNTIME)
TEMPERATURE SWITCH, LOW (FREEZESTAT)
TEMPERATURE SWITCH, HIGH (FREEZESTAT)
LEVEL CONTROLLER
LEVEL TRANSMITTER
PRESSURE SWITCH HIGH
PRESSURE SWITCH LOW
ELECTRONIC TO PNEUMATIC TRANSDUCER
CARBON DIOXIDE TRANSMITTER
CARBON MONOXIDE TRANSMITTER
OCCUPANCY SENSOR
LOCAL TEMPERATURE CONTROL PANEL
HVAC CONTROL PANEL
VARIABLE SPEED MOTOR CONTROLLER
INTEGRATE CONTROL POINT ON REMOTE
GRAPHICS WORKSTATION AT ENERGY
CONTROL CENTER
TEMPERATURE CONTROLLER. SEE
SEQUENCE OF OPERATION
PRESSURE CONTROLLER. SEE SEQUENCE
OF OPERATION
SPEED CONTROLLER. SEE SEQUENCE OF
OPERATION
FLOW CONTROLLER. SEE SEQUENCE OF
OPERATION
FLOW SWITCH HIGH
FLOW SWITCH LOW
TIME CLOCK CONTROLLING EQUIPMENT ON
A SCHEDULE
TEMPERATURE SENSING ELEMENT FOR
TRANSMITTING TEMPERATURE TO EMCS
(PROVIDE 12 INCHES MINIMUM
LENGTH IN DUCT WHEN SPACE PERMITS.)
SENSOR WITH AVERAGING ELEMENT
TO TRANSMIT TEMPERATURE TO EMCS
MOTOR STARTER
ELECTRIC OPERATED CONTROL
DAMPER/OR VALVE
BUILDING AUTOMATION SYSTEM
01/15/2021 DD MDR
M-002
MECHANICAL SYMBOLS
VEG 20.07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
666-18-114
VAMC SHERIDAN, WYOMING
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
BUILDING 90 REPLACE COAL
BOILERS DESIGN
LPG(I)
LPA
UP
32 4 5 6 7 81 1.1
D.9
F
A
B B
E
G
C
D
F.9
HPSHPSHPS
C W
C W
C W
C W
C W
LPR
L P
R
LPR
MPSMPSMPS
PCPC
P C
PC PC PC
P C
P C
P C
SANSAN
S A
N
CWCW
CW
C W
CW
C W
C W
CW CW
C W
CW
01/15/2021 DD MDR
MD102
PUMP LEVEL MECHANICAL DEMO
PLAN
VEG 20.07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
666-18-114
VAMC SHERIDAN, WYOMING
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
BUILDING 90 REPLACE COAL
BOILERS DESIGN
SCALE: 1/4" = 1'-0"
1' 2' 4' 8' 16'0
PUMP LEVEL MECHANICAL DEMO PLAN
P l a n
N o r t h
True North
1. DEMO BUCKET ELEVATOR AND ASH AUGER SYSTEM. REUSE AUGER
TRENCH COVER.
2. DEMO FEEDWATER PRE-HEATER. DEMO SURFACE BLOW DOWN BACK
TO WALL AND DEMO WATER PIPING BACK TO BYPASS VALVES.
3. REPLACE EXISTING CONDENSATE RECEIVER PUMPS.
4. DEMO LPR, CONDENSATE RETURN INTO HOT TANK. DEMO DISCHARGE
PUMP PIPING FROM HOT TANK INTO PC LINE THAT FEEDS
CONDENSATE TANK ON MEZZANINE LEVEL.
5. SEAL AUGER TRENCH WALL PENETRATION AT GRID B. RE
STRUCTURAL
KEY NOTES: -
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. COORDINATE ALL FLOOR AND ROOF PENETRATIONS WITH FLOOR AND
ROOF STRUCTURE. REFER TO STRUCTURAL DRAWINGS.
C. REFER TO M-001 AND M-002 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES AND PHASING.
GENERAL MECHANICAL NOTES:
4" HPS
6" CR
8" MPS
4" CR
2 1/2"
CONDENSATE
TANKS
FEEDWATER
PRE-HEATER
2" CW 3" CW
3" CWBLOW DOWN
SEPARATOR
1 1/2" CA
BUCKET
ELEVATORAUGER
AUGER
2 1/2"
BLOW DOWN
2" PC
2 12" Vent
3'5" AFF BOP
WATER
METER
WATER
SOFTENER
SUMP 3'
HOT TANK AND
DUPLEX PUMPS
DN
DN
UP
32 4 5 6 7 81
A
B B
E
G
C
D
1.1
D.9
F
F.9
BUCKET
ELEVATOR
01/15/2021 DD MDR
MD103
MAIN LEVEL MECHANICAL DEMO
PLAN
VEG 20.07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
666-18-114
VAMC SHERIDAN, WYOMING
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
BUILDING 90 REPLACE COAL
BOILERS DESIGN
SCALE: 1/4" = 1'-0"
1' 2' 4' 8' 16'0
MAIN LEVEL MECHANICAL DEMO PLAN
P l a n
N o r t h
True North
1. DEMO BUCKET ELEVATOR.
2. DEMO ELBOW TO ALLOW FOR NEW CONNECTION FOR LAUNDRY
STEAM LINE. SEE DRAWING MP103 FOR NEW STEAM LINE
CONNECTION.
3. DEMO BOILER 1 AND ALL ASSOCIATED COAL EQUIPMENT, PIPING, AND
CONTROLS. EXISTING CONCRETE PAD TO REMAIN FOR FUTURE USE.
4. DEMO BOILER 2 AND ALL ASSOCIATED COAL EQUIPMENT, PIPING, AND
CONTROLS. EXISTING CONCRETE PAD TO REMAIN FOR FUTURE USE.
5. DEMO HAYS CLEVELAND CONTROL PANEL.
6. DEMO AIR COMPRESSORS, RECEIVER TANKS, AND ALL ASSOCIATED
PIPING AND CONTROLS.
7. DEMO BOILER 3 HAYS CLEVELAND CONTROL PANEL.
8. DEMO BAG HOUSE AND ASSOCIATED PIPING, DUCTWORK AND
CONTROLS.
9. RELOCATE LPS/LPR PIPING SERVING GLYCOL WATER HEAT
EXCHANGER ABOVE.
10. DEMO EXISTING 4" VENT REUSE PENETRATION FOR NEW VENT
11. DEMO ALL CA PIPING AND EQUIPMENT IN MAIN BOILER PLANT. PIPING
AND EXISTING RECEIVER TANK SHALL REMAIN FOR FUTURE USE.
12. EXISTING FEEDWATER DISCHARGE IS NOT PIPED PER VA STANDARD.
DEMO NEW TAKE OFF AND FEEDWATER PUMPS PER MP602.
13. DEMO AIR RECEIVER TANKS AND ALL ASSOCIATED PIPING AND
CONTROLS FOR AIR COMPRESSOR SYSTEM.
14. EXISTING RECEIVER TANK SHALL BE REUSED. PIPING TO TANK SHALL
BE REMOVED AND PREPARED FOR NEW PIPING.
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. COORDINATE ALL FLOOR AND ROOF PENETRATIONS WITH FLOOR AND
ROOF STRUCTURE. REFER TO STRUCTURAL DRAWINGS.
C. REFER TO M-001 AND M-002 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES AND PHASING.
GENERAL MECHANICAL NOTES:
KEY NOTES:
EMERGENCY GENERATOR
ROOM
CHEMICAL FEED ROOM
A A
AIR
COMPRESSOR
ø
22"ø
COMPUTER
WORKSTATION
CONTROL ROOM
OFFICE
BAG
HOUSE
BAG
HOUSE
4" NG B-3(E)
DUST
COLLECTOR
DUST
COLLECTOR
RECEIVER
TANK
AIR
DRYER
RECEIVER
TANK
2" A UP.
2" A UP.
AIR
DRYER
AIR
COMPRESSOR
CONDENSATE
TRANSFER
PUMPS
2"
3" FWPD
4"
2 1/2" PC
4" CT
3" D
6" OFL
3" 2"
4"
2" CW
4" HPS
3" CTPD
4" CTPS
FEED
WATER
PUMPS
4"
1 1/4"
LPS/LPR
T-2
UH-2
1 1/4" LPS UP.
1 1/4"
LPS
UH
1 1/4"
LPR
SAMPLE COOLER
CHEMICAL
FEEDERS
FIREYE
BURNER
CONTROL
PANEL
HAYES CLEVELAND
BOILER CONTROL PANEL
HAYS
CLEVELAND
MASTER
CONTROL
PANEL
MO
SS
C
ON
TR
OL
P
AN
EL
(S
1 2 3 4
1 2 3
1 2
B-2 B-1
4 3
CA 2"
RT
32 4 5 6 7 81
A
B B
E
G
C
D
1.1
D.9
F
F.9
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DN
DNDNDN DN
DN
DN
DN
DN
G H
R G
H R
G H
R G
H R
G H
S G
H S
G H
S G
H S
G H
S G
H S
G H
S
01/15/2021 DD MDR
MD104
MEZZANINE LEVEL MECHANICAL
DEMO PLAN
VEG 20.07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
666-18-114
VAMC SHERIDAN, WYOMING
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
BUILDING 90 REPLACE COAL
BOILERS DESIGN
SCALE: 1/4" = 1'-0"
1' 2' 4' 8' 16'0
MEZZANINE LEVEL MECHANICAL DEMO PLAN
P l a n
N o r t h
True North
1. DEMO COAL CHUTE. GC SHALL PATCH PENETRATIONS AND MATCH
EXTERIOR FINISHES. RE: STRUCTURAL
2. DEMO COAL EQUIPMENT AND SUPPORTS.
3. DEMO BUCKET ELEVATOR. GC SHALL PATCH INTERIOR WALL/FLOOR
PENETRATIONS. RE: STRUCTURAL
4. DEMO ASH DISCHARGE. GC SHALL PATCH PENETRATION AND MATCH
EXTERIOR FINISHES. RE: STRUCTURAL
5. DEMO BOILER 1 AND ASSOCIATED DUCTWORK, PIPING, SUPPORTS.
DEMO PIPING BACK TO MAINS ACROSS THE BUILDING. PROVIDE VALVE
OR CAP TO ALLOW FOR FUTURE USE.
6. DEMO BOILER 2 AND ASSOCIATED DUCTWORK, PIPING, SUPPORTS.
DEMO PIPING BACK TO MAINS ACROSS THE BUILDING. PROVIDE VALVE
OR CAP TO ALLOW FOR FUTURE USE.
7. DEMO HPS PIPING BACK TO THIS LOCATION. PROVIDE VALVE OR CAP
AT LIMIT OF DEMOLITION. DEMO SHALL BE PHASED PER PHASING
PLAN.
8. DEMO VENT PIPING AND VALVE PER PHASING PLAN.
9. DEMO ECONOMIZERS AND ASSOCIATED PIPING, DUCTWORK AND
CONTROLS. DEMO FEEDWATER PIPING FROM MAIN TO BOILER.
10. DEMO AIR COMPRESSOR AND ALL ASSOCIATED PIPING AND
CONTROLS FOR AIR COMPRESSOR SYSTEM.
11. DEMO EXHAUST FANS SERVING BAG HOUSES AND ALL ASSOCIATED
CONTROLS AND DUCTWORK.
12. DEMO DUCT PENETRATION INTO EXISTING STACK. GC SHALL PATCH
PENETRATIONS AND MATCH EXTERIOR FINISHES. RE: STRUCTURAL
13. DEMO BAG HOUSE AND ASSOCIATED PIPING, DUCTWORK AND
CONTROLS.
14. DEMO BAG HOUSE AND ASSOCIATED PIPING, DUCTWORK AND
CONTROLS.
15. DEMO DUCTWORK. GC SHALL PATCH PENETRATION AND MATCH
EXTERIOR FINISHES. RE: STRUCTURAL
16. RELOCATE UH TO BE SUPPORTED ON WALL.
17. DEMO MPS/MPR SERVING COAL CHUTE.
18. DEMO EXISTING 4" VENT. REUSE PENETRATIONS FOR NEW VENT.
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. COORDINATE ALL FLOOR AND ROOF PENETRATIONS WITH FLOOR AND
ROOF STRUCTURE. REFER TO STRUCTURAL DRAWINGS.
C. REFER TO M-001 AND M-002 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES AND PHASING.
GENERAL MECHANICAL NOTES:
KEY NOTES:
47/33
46/32
BAG
HOUSE
BAG
HOUSE
22"ø ø
18/20
46/32
SURGE
TANK
8"
8" HPS
3"
4"
EXISTING
STACK
UH
UH
UH
8"
22"ø
8"
8"
6"
3/4"
2"
3"
3"
2"
6" 8"
1"
C
F
E-2 E-1
MPS3"
ø
B-3(E)
9"R
3" B
FS 3" BFS 3" BFS 3" BFS
2" B
O
2" B
O
2" B
O
SF-2
SF-1
26"ø
E-3(E)
3" R
1" 2 1/2" 3"
2"
6"
DEARATOR
6"
3"
3"
3"
PRV-2A
PRV-2B
3"
PRV-1A
PRV-1B
COAL
CHUTE
EXISTING
SILO
1 1/2"
1 1/4"
LPS/LPR DN.
3" MPS
1 1/2"
UHUHUH
1 1/2"1 1/2"1 1/2"
1 1/2"
1 1/2" MPS1 1/2" MPS1 1/2" MPS1 1/4"
LPS/LPR
DN.
1 1/2" MPS3" MPS3" MPS
8" HPS
B-1
SV-1
T-9
DC-1
8" HPS
B-2
SV-1
DC-2
47/33
2" A
2" A
VS-1
3" A
3" MPR
3" MPS
2" A
A
1111111111111111111111111111111111111111111
BUCKET
ELEVATOR
RECEIVER
TANK
GLYCOL WATER HEATER:
RELOCATE
HPS
S
S
S
H P
S
H P
S
H P
S
HPSHPS
MPS
HPS
LPS
L P
S
HPS
CF
M P
S
MPS
S
L P
R
M P
S
L P
S
MPR
M P
R M
P R
M P
R
M P
S
M P
S
MPS
MPR
H P
S
S S
SS S
SS S
01/15/2021 DD MDR
MD601
STEAM FLOW DEMO DIAGRAM
VEG 20.07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
666-18-114
VAMC SHERIDAN, WYOMING
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
BUILDING 90 REPLACE COAL
BOILERS DESIGN
V
PLATFORM
4"
6"
4"
6"
2" 2"
8"
4"
3"
4"
6"
ROOF
8"
8"
8"
8"
8"
4"
8"
LPR
VTR
VTR
VTR
2"
2"
1-1/4" 1-1/2" 2"
1-1/2"
2"
1-1/2"
1-1/4"
1-1/2" 1-1/2"
VTR
M
M
M
M
VTR VTR
VTRVTR VTR
VTRVTR VTR
PRV-1B
PRV-1A
PRV-2B
PRV-2A
DEAERATORBOILER #3
BOILER #2
BOILER #1
ROOF
TO HOSPITAL
TO LAUNDRY
BOILER ROOM PUMP ROOM
" MPS TO
COAL SILO.
BOILER ROOM MEZZANINE
BOILER ROOM MEZZANINE
UH-3
UH-1
UH-4
UH-5
UH-6
UH-7
UH-2
UH-8
T-8
T-2
T-7
T-6
T-5
T-4
T-1
T-3
T-9
T-10
T-11
T-13
T-12
T-14
T-15
FT-1
FT-2
M-4
M-1
M-2
M-3
EL-1
EL-2
VS-1
SV-1
SV-2
SV-3
SV-4
SV-5
SV-6
SCALE: NO SCALE
STEAM FLOW DEMO DIAGRAM
SBD
1. DEMO STEAM HEADER, VENT VALVE AND BOILERS 1 AND 2. REFER TO
PHASING PLAN FOR PHASING OF THIS WORK. RE: M-001.
2. DEMO SURFACE BLOWDOWN SEPARATOR AND ASSOCIATED VENT UP
TO PRV STATION.
3. DEMO MPS PIPING TO COAL SILO.
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. COORDINATE ALL FLOOR AND ROOF PENETRATIONS WITH FLOOR AND
ROOF STRUCTURE. REFER TO STRUCTURAL DRAWINGS.
C. REFER TO M-001 AND M-002 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES AND PHASING.
GENERAL MECHANICAL NOTES:
KEY NOTES:
01/15/2021 DD MDR
MD602
FEEDWATER FLOW DEMO
DIAGRAM
VEG 20.07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
666-18-114
VAMC SHERIDAN, WYOMING
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
BUILDING 90 REPLACE COAL
BOILERS DESIGN
M
M
" FROM DRIP
TRAPS.
TO OTHER CW
CONNECTIONS.
BELL AND SPIGOT
CONNECTION.
BACKFLOW
PREVENTOR.
DOMESTIC WATER.
CHEMICAL FEED TANKS
#4 #3
2" 3"
3"
3"
2"
SITE FLOW
INDICATOR
STEAM HEADER
BLR #1
BLR #2
BLR #3
AUTOMATIC
FLOW RATE
CONTROLLER
3"
4"
DEAERATOR
COND. STORAGE
TANK
3"
SAMPLE WATER
COOLER
BOILER #3
BOILER #2 BOILER #1
3"
BLR RM.
BDS-1
BLOWDOWN
SEPARATOR
2"
1"
1"
NC
3"
3"
4"
FROM PUMPS
FWP-1 FWP-2 FWP-3 CTP-1 CTP-2
BOILER FEEDWATER PUMPS CONDENSATE TRANSFER
PUMPS
2"
NC
4"
2"
1"
SINK
1"
6"
6" HEADER
PUMP RM. FLR.
3"
1"
2"2"
4"
2"
STEAM HEADER
SITE FLOW
INDICATOR
VAC BREAKER
4"
PUMP RM.
2"
4"
BLR RM.
FLOOR
1"
3"
WS-1
FD
PUMP RM. FLR.
#2 #1
1"
BOILER #3
BOILER #2 BOILER #1
ECONOMIZER
ECONOMIZER ECONOMIZER
3"
CP-1
EXISTING
CONDENSATE
RETURNS FROM
TUNNEL
CP-2
NC
WATER
METER
WATER
METER
SS
S
SW
S W
S W
SW
HPR
PC
HPR
HPR
FWS
BWS
BWS
B W
S
BWS
B W
S
B W
S
FWS
BO
BO
O F
L
P C
SW
R
CTPD
CTPS
R
P C
O F
L
C T
P S
C T
P D
D
O F
L
F W
P D
FWPD
F W
P D
F W
P D
D
CTPD
F W
P S
FWPS
F W
P S
F W
P S
FWPD
C F
R
R
R
CF
CF
CF
C F
C F
F W
P S
FWPD
1 "
1 "
D
O F
L
OFL
PC
1 "
V
1 "
1 "
CF
CR
C B
D
C B
D
C B
D
SCALE: NO SCALE
FEEDWATER FLOW DEMO DIAGRAM
SBD-1 SURFACE BLOWDOWN
SEPARATOR (HEAT
RECOVERY BLEED SYSTEM)
P
VTR
NC
SAN
HOT TANK
SUMP PUMPS
1. DEMO BWS PIPING FROM BOILERS 1 AND 2.
2. DEMO BOILER 1 AND 2, ECONOMIZERS, FEEDWATER, AND BLOWDOWN
PIPING FROM MAIN TO BOILER.
3. DEMO EXISTING SURFACE BLOW DOWN SEPARATOR AND PREHEATER
AND ASSOCIATED PIPING BACK TO MAIN.
4. DEMO COMBINED VENT AND OFL PIPING. PREPARE PIPE FOR NEW
VENT THRU ROOF AND OFL TO CONDENSATE RECEIVERS.
5. DEMO CONDENSATE PUMPS. SEQUENCE WORK SO THAT PLANT
REMAINS OPERATIONAL. RECEIVER TANKS AND CONTROLLER SHALL
REMAIN.
6. DEMO PIPING HEADER FROM BOILER FEEDWATER PUMPS.
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. COORDINATE ALL FLOOR AND ROOF PENETRATIONS WITH FLOOR AND
ROOF STRUCTURE. REFER TO STRUCTURAL DRAWINGS.
C. REFER TO M-001 AND M-002 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES AND PHASING.
GENERAL MECHANICAL NOTES:
KEY NOTES:
2 2
MD603
COMPRESSED AIR DEMO DIAGRAM
VEG 20.07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
666-18-114
VAMC SHERIDAN, WYOMING
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
BUILDING 90 REPLACE COAL
BOILERS DESIGN
A
CONTROL WIRE
CONTROL WIRE
C O
N T
R O
L
W
I R
E
C O
N T
R O
L
W
I R
E
C O
N T
R O
L
W
I R
E
C O
N T
R O
L
W
I R
E
A
A
A
A
A
A
A
A
A
A
A
A
2"
3"
4" 4"4"4"4"
3"
4"
4" 4"
4"
4"
D D
D D
D
D D D D
D DD D
D
D D D D
DD
DD
SCALE: NO SCALE
COMPRESSED AIR DEMO DIAGRAM
BH-2
BAGHOUSE
(OUTSIDE)
BH-1
BAGHOUSE
(OUTSIDE)
200 GALLON
RECEIVER TANK
120 GALLON
RECEIVER TANK
E-2
ECONOMIZER
B-2
BOILER
120 GALLON
RECEIVER TANK.
AC-1
AIR COMPRESSOR 1
104 SCFM
130 PSI
AC-2
AIR COMPRESSOR 2
104 SCFM
130 PSI
10 SCFM, 125 PSI
32 SCFM
80-90 PSI
32 SCFM
80-90 PSI
10 SCFM, 125 PSI
CONTROL PANEL,
TYPICAL.
PIPE DRAIN TO
FLOOR DRAIN,
TYPICAL.
AD-1
AIR DRYER
AD-2
AIR DRYER
RT-1
PRESSURE GAGE,
TYPICAL
BUILDING WALL
RT-5
RELIEF VALVE,
TYPICAL
RT-3
RELIEF VALVE,
TYPICAL
B-1
BOILER
10 SCFM, 100 PSI
RT-4
RELIEF VALVE,
TYPICAL
120 GALLON
RECEIVER TANK.
DUAL SELECTABLE
PRE-FILTERS
DUAL SELECTABLE
AFTER-FILTER
DUAL SELECTABLE
PRE-FILTERS
DUAL SELECTABLE
AFTER-FILTER
CONCRETE PAD,
TYPICAL.
ISOLATION
VALVE, TYPICAL.
FLEX
CONNECTOR,
TYPICAL.
EQUIPMENT SOOT BLOWERS
AND MANIFOLD.
LINE SIZE COALESCING
FILTER.
4" HEADER.
EQUIPMENT SOOT BLOWERS
AND MANIFOLD.
EQUIPMENT SOOT BLOWERS
AND MANIFOLD.
RELIEF VALVE,
TYPICAL
COMPRESSED AIR
REGULATOR, TYPICAL
PLC CONTROLLER
PROVIDED WITH
CONTROLS SYSTEM
PRESSURE SWITCH
120 GALLON
RECEIVER TANK
E-1
ECONOMIZER
10 SCFM, 125 PSI
RT-2
PILOTED
SOLENOID
PRESSURE
CONTROL
VALVE
EQUIPMENT SOOT BLOWERS
AND MANIFOLD.
PNEUMATIC
VALVE
PNEUMATIC
CONTROL TUBING
PNEUMATIC
VALVE
PNEUMATIC
CONTROL TUBING
QUICK CONNECT COUPLER
MOUNTED AT 48" AFF FOR
PLANT USE. PIPING TO BE
ROUTED ON WALL .
QUICK CONNECT
COUPLER MOUNTED AT
48" AFF FOR PLANT USE.
PIPING TO BE ROUTED ON
WALL .
FILTERS
& LUBRICATOR
ASSEMBLY
FILTERS &
LUBRICATOR
ASSEMBLY
PRESSURE SWITCH
RELIEF VALVE,
TYPICAL
PIPE DRAINS
TO EXTERIOR
DRAIN
AUTOMATIC DRAIN
VALVE WITH
ADJUSTABLE (THROUGH
DDC) 24 VOLT TIMER,
TYPICAL.
AUTOMATIC DRAIN VALVE WITH
ADJUSTABLE (THROUGH
CONTROLS SYSTEM) 24 VOLT
TIMER, TYPICAL.
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. COORDINATE ALL FLOOR AND ROOF PENETRATIONS WITH FLOOR AND
ROOF STRUCTURE. REFER TO STRUCTURAL DRAWINGS.
C. DEMO ALL EXISTING PNEUMATIC SYSTEM COMPONENTS.
C. REFER TO M-001 AND M-002 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES AND PHASING.
GENERAL MECHANICAL NOTES:
MD604
MECHANICAL CONTROLS DEMO
DIAGRAM
VEG 20.07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
666-18-114
VAMC SHERIDAN, WYOMING
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
BUILDING 90 REPLACE COAL
BOILERS DESIGN
SCALE: NO SCALE
CONTROL SYSTEM ARCHITECTURE DEMO DIAGRAM
STEAM
PRESSURE
HPS
LAUNDRY
METER
MPS HOSPITAL
LOOP
METER
MPS
PLANT
METER
LPS
DEAERATOR
METER
FEEDWATER
METER
DEAEARATOR
CONTROLLER
BOILER 1
PLC
AIR DRYER 1
CONTROLLER
AIR
COMPRESSOR
CONTROLLER
OA TEMP
ROOM TEMP
DEGREE DAY
ELECTRICAL
KW
KWH/MONTH
MAU
COMBUSTION
AIR
LOCAL
COMPUTER
WORKSTATION
REMOTE
WORKSTATION
(VIEW ONLY
NO CONTROL)
CONDENSATE
PUMPS
CONTROLLER
REDUNDANT
ETHERNET SWITCH
STACK
EMISSIONS
MONITOR-
O2, CO, SO2
SURGE TANK
CONTROLELR
TELEPHONE
ALARM
HMI - HUMAN MACHINE INTERFACE
BAGHOUSE 1
CONTROLLER
AUGER 1
BUCKET
ELEVATOR
AUGER 2
BAGHOUSE 2
CONTROLLER
BOILER FEED
PUMPS
CONDENSATE
TRANSFER
PUMPS
BURNER
FAN
AIR DRYER 2
CONTROLLER
BOILER 3
PLC
CO SPACE
ALARM
ECONOMIZER
PLC
BALANCE
OF
PLANT
PLC
AIR
COMPRESSOR
AIR
COMPRESSOR
COAL
FEED
FAN
OVER
FIRE
FANS
UNDER
FIRE
FANS
SOOT
BLOWERS
COAL
FIRE
GRATE
PRESSURE
STACK
FAN 1
BOILER 2
PLC
COAL
FEED
FAN
OVER
FIRE
FANS
UNDER
FIRE
FANS
SOOT
BLOWERS
COAL
FIRE
GRATE
PRESSURE
STACK
FAN 2
ECONOMIZER 1
ECONOMIZER 2
CONDENSATE
PUMP 1
CONDENSATE
PUMP 2
COAL
AUGER 1
COAL
AUGER 2
POINT DESCRIPTION
GENERAL CONTROL POINTS
BOILER FEED PUMPS BFP-1,2,3
CONDENSATE TRANSFER PUMPS CTP-1,2
CONDENSATE PUMPS CP-1,2
SURGE TANK ST-1
DEAERATOR DA-1
COAL BOILER B-1
COAL BOILER B-2
AI
CONTROL POINTS LIST
AO DI DO TREND NOTES
OUTDOOR AIR TEMPERATURE
DEGREE DAY CALCULATION
ROOM TEMPERATURE
CONDENSATE RETURN TEMPERATURE
HIGH PRESSURE STEAM SUPPLY PRESSURE
MEDIUM PRESSURE STEAM SUPPLY PRESSURE
LOW PRESSURE STEAM SUPPLY PRESSURE
FEED WATER TEMPERATURE
MAKE UP WATER METER READOUT
WATER SOFTENER WATER METER READOUT
BOILER ROOM GAS METER READOUT
ELECTRIC METER READOUT
HPS LAUNDRY METER READOUT
MPS PLANT METER READOUT
MPS HOSPITAL LOOP METER READOUT
LPS DEAERATOR METER READOUT
BOILER ROOM CO & COMBUSTIBLE GAS HIGH LEVEL ALARM
BOILER FEED PUMP 1 START/STOP
BOILER FEED PUMP 1 VFD STATUS
BOILER FEED PUMP 1 VFD SPEED
BOILER FEED PUMP 1 ALARM
BOILER FEED PUMP 2 START/STOP
BOILER FEED PUMP 2 VFD STATUS
BOILER FEED PUMP 2 VFD SPEED
BOILER FEED PUMP 2 ALARM
BOILER FEED PUMP 3 START/STOP
BOILER FEED PUMP 3 VFD STATUS
BOILER FEED PUMP 3 VFD SPEED
BOILER FEED PUMP 3 ALARM
CONDENSATE TRANSFER PUMP 1 START/STOP
CONDENSATE TRANSFER PUMP 1 STATUS
CONDENSATE TRANSFER PUMP 1 ALARM
CONDENSATE TRANSFER PUMP 2 START/STOP
CONDENSATE TRANSFER PUMP 2 STATUS
CONDENSATE TRANSFER PUMP 2 ALARM
CONDENSATE PUMP 1A START/STOP
CONDENSATE PUMP 1A STATUS
CONDENSATE PUMP 1A ALARM
CONDENSATE PUMP 1B START/STOP
CONDENSATE PUMP 1B STATUS
CONDENSATE PUMP 1B ALARM
CONDENSATE PUMP 2A START/STOP
CONDENSATE PUMP 2A STATUS
CONDENSATE PUMP 2A ALARM
CONDENSATE PUMP 2B START/STOP
CONDENSATE PUMP 2B STATUS
CONDENSATE PUMP 2B ALARM
MAKE UP VALVE COMMAND
LOW WATER ALARM
HIGH WATER ALARM
MAKE UP VALVE COMMAND
LOW WATER ALARM
HIGH WATER ALARM
OVERFLOW ALARM
BOILER 1 FIRING RATE
BOILER 1 STEAM PRESSURE
BOILER 1 GENERAL ALARM
BOILER 1 COMBUSTION CHAMBER TEMPERATURE
DUST COLLECTOR 1 ROTARY AIR LOCK
BOILER 1 COAL FEED FAN
BOILER 1 COAL FIRING GRATES HYDRAULIC PUMPSET
BOILER 1 UNDERFIRE FANS
BOILER 1 OVERFIRE FANS
STACK FAN 1 START/STOP
STACK FAN VFD SPEED
BOILER 1 CO/SO2 SENSORS
BOILER 1 SOOT BLOWER A
BOILER 1 SOOT BLOWER B
BOILER ASH AUGERS
BOILER 1 BLOW DOWN VALVE COMMAND
BOILER 1 FEEDWATER VALVE COMMAND & PUMP CONTROL
BOILER 1 LOW WATER ALARM
BOILER 1 LOW WATER CUTOFF
BOILER 1 HIGH WATER CONTROL & ALARM
BOILER 2 FIRING RATE
BOILER 2 STEAM PRESSURE
BOILER 2 GENERAL ALARM
BOILER 2 COMBUSTION CHAMBER TEMPERATURE
DUST COLLECTOR 2 ROTARY AIR LOCK
BOILER 2 COAL FEED FAN
BOILER 2 COAL FIRING GRATES HYDRAULIC PUMPSET
BOILER 2 UNDERFIRE FANS
BOILER 2 OVERFIRE FANS
STACK FAN 2 START/STOP
STACK FAN 2 VFD SPEED
BOILER 2 CO/SO2 SENSORS
BOILER 2 SOOT BLOWER A
BOILER 2 SOOT BLOWER B
BOILER ASH AUGERS
BOILER 2 BLOW DOWN VALVE COMMAND
BOILER 2 FEEDWATER VALVE COMMAND & PUMP CONTROL
BOILER 2 LOW WATER ALARM
BOILER 2 LOW WATER CUTOFF
BOILER 2 HIGH WATER CONTROL & ALARM
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
1,3
1,4
1,3
1,3
1,3
1,3
POINT DESCRIPTION
COAL FEED AUGER 1,2
GAS BOILER B-3
BAGHOUSE BG-1,2
AIR COMPRESSOR AC-1,2
AIR DRYER AD-1,2
AUGER AG-1,2
BUCKET ELEVATOR BE-1
(E) MAKE-UP AIR UNIT
STACK EMISSIONS
ECONOMIZER E-1,2
AI
CONTROL POINTS LIST
AO DI DO TREND NOTES
COAL FEED AUGER 1 START/STOP
COAL FEED AUGER 1 STATUS
COAL FEED AUGER 1 SPEED
COAL FEED AUGER 1 ALARM
COAL FEED AUGER 2 START/STOP
COAL FEED AUGER 2 STATUS
COAL FEED AUGER 2 SPEED
COAL FEED AUGER 2 ALARM
COAL WEIGHT CALCULATION AUGER 1 & 2
HOPPER MINIMUM
HOPPER MAXIMUM
BURNER FAN STATUS
BURNER FAN VFD SPEED
FEED WATER VALVE COMMAND
SURFACE BLEED VALVE COMMAND
FLUE STACK TEMPERATURE
STEAM PRESSURE
LOW WATER ALARM
GAS PRESSURE ALARM
BOILER HEAT EXCHANGER STEAM VALVE COMMAND
GENERAL ALARM
BAGHOUSE 1 DIFFERENTIAL PRESSURE
BAGHOUSE 1 TIMER
BAGHOUSE 1 DIFFERENTIAL PRESSURE ALARM
BAGHOUSE 1 LEAK DETECTION
BAGHOUSE 2 DIFFERENTIAL PRESSURE
BAGHOUSE 2 TIMER
BAGHOUSE 2 DIFFERENTIAL PRESSURE ALARM
BAGHOUSE 2 LEAK DETECTION
AIR COMPRESSOR 1 STATUS
AIR COMPRESSOR 1 ALARM
AIR COMPRESSOR 2 STATUS
AIR COMPRESSOR 2 ALARM
AIR DRYER 1 STATUS
AIR DRYER 1 ALARM
AIR DRYER 2 STATUS
AIR DRYER 2 ALARM
AUGER 1 START/STOP
AUGER 1 STATUS
AUGER 1 ALARM
AUGER 2 START/STOP
AUGER 2 STATUS
AUGER 2 ALARM
BUCKET ELEVATOR 1 START/STOP
BUCKET ELEVATOR 1 STATUS
BUCKET ELEVATOR 1 ALARM
DISCHARGE AIR TEMPERATURE
DISCHARGE AIR LOW TEMPERATURE ALARM
STATUS
CO LEVEL
SO2 LEVEL
O2 LEVEL
ECONOMIZER 1 INLET FLUE GAS TEMPERATURE
ECONOMIZER 1 OUTLET FLUE GAS TEMPERATURE
ECONOMIZER 1 INLET WATER TEMPERATURE
ECONOMIZER 1 OUTLET WATER TEMPERATURE
ECONOMIZER 1 FREEZE PROTECTION VALVE COMMAND
ECONOMIZER 1 PRESSURE SWITCH
ECONOMIZER 1 PRESSURE CONTROL VALVE COMMAND
ECONOMIZER 2 INLET FLUE GAS TEMPERATURE
ECONOMIZER 2 OUTLET FLUE GAS TEMPERATURE
ECONOMIZER 2 INLET WATER TEMPERATURE
ECONOMIZER 2 OUTLET WATER TEMPERATURE
ECONMIZER 2 FREEZE PROTECTION VALVE COMMAND
ECONOMIZER 2 PRESSURE SWITCH
ECONOMIZER 2 PRESSURE CONTROL VALVE COMMAND
ECONOMIZER 3 INLET FLUE GAS TEMPERATURE
ECONOMIZER 3 OUTLET FLUE GAS TEMPERATURE
ECONOMIZER 3 INLET WATER TEMPERATURE
ECONOMIZER 3 OUTLET WATER TEMPERATURE
ECONMIZER 3 FREEZE PROTECTION VALVE COMMAND
GENERAL NOTES:
A. REMAINING POINTS WILL BE CONTROLLED BY NEW BOILER CONTROL PANEL.
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
X
O
O
O O
O O
O O
O
O
O
O
O
O
O O
O O
O O
O O
O O
O O
O
O
O
O
O
O
LPA
LPA
LPA
LPA
LPA
LPA
LP
LP
LP
LP
01/15/2021 DD MDR
MP101
MECHANICAL SITE PLAN
VEG 20.07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
666-18-114
VAMC SHERIDAN, WYOMING
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
BUILDING 90 REPLACE COAL
BOILERS DESIGN
1. MODIFY AND REUSE COAL PIT FOR PROPANE TANKS. SEE CIVIL
DRAWINGS.
KEY NOTES: -
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. COORDINATE ALL FLOOR AND ROOF PENETRATIONS WITH FLOOR AND
ROOF STRUCTURE. REFER TO STRUCTURAL DRAWINGS.
C. REFER TO M-001 AND M-002 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES AND PHASING.
GENERAL MECHANICAL NOTES:
SCALE: 1/16" = 1'-0"
4' 8' 16' 32' 64'0
MECHANICAL SITE PLAN
P l a n
N o r t h
True North
EXISTING TEMP BOILER FOR
USE DURING CONSTRUCTION
EXISTING
FUEL OIL
STORAGE
SERVING
TEMP BOILER
BLDG 91 NOT IN SCOPE
EXISTING
SILO
1" LP TO MIXER
TRANSPORT
UNLOADING
BULKHEAD
LPA UP OVER CONTROL
ROOM ROOF
LPA THRU WALL INTO BOILER
PLANT. SEE MP103 FOR
CONTINUATION
VAPORIZER
AND AIR MIXER SKID
PT-2 PT-1
4"
LP PUMP SKID
CONTROL PANEL (2)
3" LP TO PUMP.
1" LP BACK TO TANKS.
32 4 5 6 7 81 1.1
D.9
F
A
B B
E
G
C
D
F.9
BO BO BO BO BO BO BO
HPSHPSHPS
C W
C W
C W
C W
C W
LPR
MPSMPSMPS
PCPC
P C
PC PC PC
P C
P C
P C
SANSAN
S A
N
CWCW
CW
C W
CW
C W
C W
CW CW
C W
CW
01/15/2021 DD RT
MP102
PUMP LEVEL MECHANICAL PLAN
VEG 20.07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
666-18-114
VAMC SHERIDAN, WYOMING
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
BUILDING 90 REPLACE COAL
BOILERS DESIGN
SCALE: 1/4" = 1'-0"
1' 2' 4' 8' 16'0
PUMP LEVEL MECHANICAL PLAN
P l a n
N o r t h
True North
1. ROUTE NEW BLOWDOWN PIPING FROM BOILERS TO FEEDWATER
PRE-HEATER INLET.
2. BLOWDOWN FROM BOILER 1
3. BLOWDOWN FROM BOILER 2
4. REPLACE EXISTING CONDENSATE RETURN PUMPS
5. PROVIDE NEW VENT FOR BLOW DOWN SEPARATOR AND
CONDENSATE RECEIVER TANKS THRU ROOF.
6. PROVIDE OFL PIPING FROM EXISTING DRAIN ON MAIN LEVEL AND
DISCHARGE TO HOT TANKS. PROVIDE ARMSTRONG CC-12, 12 GPM
CONDENSATE COOLER, OR APPROVED EQUAL. PIPE PER
MANUFACTURER RECOMMENDED DETAIL AND SPECIFICATION. PIPE
DOMESTIC WATER LINE SIZED AS REQUIRED BY MANUFACTURER.
7. PROVIDE 90-ST2 FOR HPS MAIN SERVING CAMPUS. ROUTE PIPING
ABOVE TRAP FOR MPS MAIN AND TERMINATE AT CONDENSATE
RECEIVER TANKS.
KEY NOTES: -
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. COORDINATE ALL FLOOR AND ROOF PENETRATIONS WITH FLOOR AND
ROOF STRUCTURE. REFER TO STRUCTURAL DRAWINGS.
C. REFER TO M-001 AND M-002 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES AND PHASING.
GENERAL MECHANICAL NOTES:
3 2
4" HPS
6" CR
8" MPS
4" CR
2 1/2"
CONDENSATE
TANKS2" CW 3" CW
3" CWBLOW DOWN
SEPARATOR
1 1/2" CA
2 1/2"
BLOW DOWN
2" PC
3'5" BOP AFF
WATER
METER
WATER
SOFTENER
SUMP 3'
CRP-1
CRP-4
CRP-3
CRP-2
HOT TANK AND
DUPLEX PUMPS
6 7
6" OFL
DN
DN
UP
32 4 5 6 7 81
A
B B
E
G
C
D
1.1
D.9
F
F.9
HPS HPS
H P
S H
P S
A A
A A A
F W
P D
F W
P D
AAAAAAAAAAA
A A
A A
A
A A
A A
HPR
A
A
A
01/15/2021 DD MDR
MP103
MAIN LEVEL MECHANICAL PLAN
VEG 20.07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
666-18-114
VAMC SHERIDAN, WYOMING
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
BUILDING 90 REPLACE COAL
BOILERS DESIGN
SCALE: 1/4" = 1'-0"
1' 2' 4' 8' 16'0
MAIN LEVEL MECHANICAL PLAN
P l a n
N o r t h
True North
1. PROVIDE NG TEE. PIPING TO BOILERS 1 AND 2 CONTINUES ON MP504.
2. EXISTING FEEDWATER DISCHARGE IS NOT PIPED PER VA STANDARD.
PROVIDE NEW TAKE OFF PER MP602. PROVIDE FWP-1, FWP-2, FWP-3.
3. PROVIDE BOILER HEADER PER SHEET MP603 AND SPECIFICATIONS.
4. HPS FOR EMERGENCY BOILER CONNECTION.
5. HPS UP TO BOILER 3.
6. HPS UP TO BOILER 2.
7. HPS UP TO BOILER 1.
8. HPS UP TO VENT THRU ROOF.
9. HPS FOR FUTURE CONNECTION.
10. HPS TO LAUNDRY STEAM LINE.
11. HPS UP TO PRV STATION.
12. PROVIDE PIPING FROM WATER BLOW DOWN AND GAUGE GLASS
BLOWDOWN. PROVIDE NEW PIPING THROUGH EXITING TRENCH TO
EXISTING BLOWDOWN SEPARATOR IN PUMP ROOM.
13. MODIFY BOILER 3 GAS TRAIN TO ACCEPT 3 WAY VALVE FOR LPA
CONNECTION.
14. BOILER PLANT MAIN CONTROL PANEL.
15. BOILER 3 BOILER CONTROL PANEL.
16. NG AND LPA TO BOILER FUEL TRAIN. MANUAL 3-WAY VALVE REQUIRED
FOR FUEL CHANGEOVER.
17. FEEDWATER CONNECTION TO BOILER.
18. PROVIDE COVER OVER TRENCH AREA. SEE STRUCTURAL.
19. PROVIDE NEW COMPRESSED AIR PIPING TO 3 NEW HOSE REELS.
PROVIDE COMPRESSED AIR PIPING TO THE O2 ANALYZERS SIZED AS
REQUIRED BY EQUIPMENT MANUFACTURER. COORDINATE LOCATION
IN FIELD.
20. 1" HPR TO FLASH TANK.
21. PROVIDE CA PIPING TO EXISTING RECEIVER TANK.
22. PROVIDE CA PIPING FROM AC-1 TO EXISTING CA PIPING.
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. COORDINATE ALL FLOOR AND ROOF PENETRATIONS WITH FLOOR AND
ROOF STRUCTURE. REFER TO STRUCTURAL DRAWINGS.
C. PROVIDE ADDITIONAL REMOVABLE LAGGING PADS FOR EXISTING
VALVES AS REQUIRED BY SPECIFICATION 23 07 11.
D. REFER TO M-001 AND M-002 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES AND PHASING.
GENERAL MECHANICAL NOTES:
KEY NOTES:
CONDENSATE
TRANSFER
PUMPS
FEED
WATER
PUMPS
CHEMICAL
FEEDERS
1 2 3
1 2
B-2 B-1
4" NG B-3(E)
2"
3" FWPD
4"
2 1/2" PC
4" CT
3" D
6" OFL
3" 2"
4"
2" CW
4" HPS
3" CTPD
4" CTPS
FEED
WATER
PUMPS
4"
1 1/4"
LPS/LPR
T-2
UH-2
1 1/4" LPS UP.
1 1/4"
LPS
UH
1 1/4"
LPR
SAMPLE COOLER
CHEMICAL
FEEDERS
1 2 3 4
1 2 3
1 2
M P
M P
12 12
MP301
16 16 17 17
AC-1
EXISTING
RECEIVER TANK
O2 ANALYSER FEEDWATER FEEDWATER GAS DETECTION
SENSORO2 ANALYSER
GAS DETECTION
SENSOR
NEW VENT
1"1" 2"
4" HPS
2"
2"21
B B
E
G
C
D
1.1
D.9
F
F.9
DN
DN
DN
DN
DN
LP
A
LP
A
LP
A
LPALPALPALPALPALPALPALPALPALPALPALPALPALPA
LP
A
LP
A
LP
A
LP
A
N G
N G
NG NG NG NG NG NG NG NG
N G
LP
A
LP
A
N G
HPS HPS
H P
S H
P S
H P
S
H P
S H
P S
H P
S
H P
S
H
P
S
HPS
H
P
S
LPA
G H
R G
H R
G H
R G
H R
G H
S G
H S
G H
S G
H S
G H
S G
H S
GHR GHR
GHS GHS GHS GHS
01/15/2021 DD RDT
MP104
MEZZANINE LEVEL MECHANICAL
PLAN
VEG 20.07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
666-18-114
VAMC SHERIDAN, WYOMING
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
BUILDING 90 REPLACE COAL
BOILERS DESIGN
SCALE: 1/4" = 1'-0"
1' 2' 4' 8' 16'0
MEZZANINE LEVEL MECHANICAL PLAN
P l a n
N o r t h
True North
1. RELOCATE GLYCOL WATER HEATER. PROVIDE CONNECTIONS TO
EXISTING LPS/LPR SERVICE BELOW AND GHS/GHR SERVICE AT
EXISTING LOCATION. REPLICATE EXISTING CONNECTIONS WITH NEW
PIPING AND PIPE PER MANUFACTURER'S RECOMMENDATION.
2. NOT USED.
3. BOILER STEAM OUTLET CONNECTION POINT. PROVIDE 2 SHUT OFF
VALVES FOR BOILER ISOLATION.
4. BOILER STACK UP THROUGH ROOF. STRUCTURALLY SUPPORT ON THE
ECONOMIZER, PROVIDED BY BOILER MANUFACTURER.
5. REPLACE DA HEADER NOZZLE DURING BOILER SHUT DOWN.
6. NOT USED.
7. NG FROM NG MAIN BELOW. RE: MP103
8. LPA THRU WALL TO AIR MIXER SKID. RE: MP101
9. BOILER 3 HPS DOWN TO HEADER.
10. BOILER 2 HPS DOWN TO HEADER.
11. BOILER 1 HPS DOWN TO HEADER.
12. VENT DOWN TO HEADER.
13. HPS FROM PRVS DOWN TO HEADER.
14. CONNECT NEW HPS PIPING FROM BOILER 3. REFER TO PHASING PLAN
FOR PHASING REQUIREMENTS.
15. HPS PIPING FROM HEADER TO PRV STATION.
16. RELOCATE DANGEROUS GAS SENSORS A CA PIPING
17. PIPE LPA DOWN TO NEW 3-WAY VALVE IN BOILER 3 GAS TRAIN.
18. RELOCATED UH AND PIPING TO NEW WALL SUPPORTS
19. 4" V FROM BLOWDOWN AND CONDENSATE PUMPS
20. LPA AND NG PIPING DOWN TO 3-WAY VALVE FOR GAS TRAIN SERVING
BOILER.
21. REPLACE EXISTING 3" PRV THAT IS PART OF THE EXISTING HPS TO
MPS PRV STATION. SEE SCHEDULE FOR MORE INFORMATION.
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. COORDINATE ALL FLOOR AND ROOF PENETRATIONS WITH FLOOR AND
ROOF STRUCTURE. REFER TO STRUCTURAL DRAWINGS.
C. VENTS NOT SHOWN. SHALL BE PROVIDED PER SPECIFICATION
SECTION 23 52 39.
GENERAL MECHANICAL NOTES:
KEY NOTES:
4 4
8"
3"
4"
UH
UH
UH
8"
3/4"
3"
2"
6" 8"
1"
C
F
MPS3"
B-3(E)
26"ø
E-3(E)
1" 2 1/2" 3"
2"
6"
6"
3"
3"
MPS TO LPS
PRV STATION
3"
HPS TO MPS
PRV STATION
EXISTING
SILO
1 1/2"
1 1/4"
LPS/LPR DN.
3" MPS
1 1/2"
UHUHUH
1 1/2"1 1/2"1 1/2"
1 1/2"
1 1/2" MPS1 1/2" MPS1 1/2" MPS1 1/4"
LPS/LPR
DN.
1 1/2" MPS3" MPS3" MPS
3" MPR
3" MPS
B-2 B-1
SURGE TANK
DEARATOR
11 1312
MP301
M P
M P
6"
8"
8"
E-2 E-1
PRV STATION
GLYCOL WATER HEATER
4"V
GAS SENSOR
GAS SENSOR
GAS SENSOR16
8"
2"
3"
1.5"
3"
1.5" 1.5"
4"
20 20
B B
E
G
C
D
1.1
D.9
F
F.9
01/15/2021 DD MDR
MP105
ROOF LEVEL MECHANICAL PLAN
VEG 20.07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
666-18-114
VAMC SHERIDAN, WYOMING
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
BUILDING 90 REPLACE COAL
BOILERS DESIGN
SCALE: 1/4" = 1'-0"
1' 2' 4' 8' 16'0
ROOF LEVEL MECHANICAL PLAN
P l a n
N o r t h
True North
1. BOILER STACK DOWN THROUGH ROOF. STRUCTURALLY SUPPORT ON
THE ECONOMIZER, FURNISHED BY BOILER MANUFACTURER. RE:
STRUCTURAL AND SPECIFICATION 23 51 00.
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. COORDINATE ALL FLOOR AND ROOF PENETRATIONS WITH FLOOR AND
ROOF STRUCTURE. REFER TO STRUCTURAL DRAWINGS.
C. VENTS NOT SHOWN. SHALL BE PROVIDED PER SPECIFICATION
SECTION 23 52 39.
GENERAL MECHANICAL NOTES:
KEY NOTES:
1 1
432 5 61 1.1
HPSHPS
H P
S
H P
S H
P S
HPS HPS
H P
S
H P
S
F W
P S
NG NG NG NG NG NG NG NG
LPALPALPALPALPALPALPALPALPALPALPALPALPALPA
BO BO BO BO BO BO BO
N G
LPA
LPA
N G
LPA
LPA
01/15/2021 DD MDR
MP301
STEAM GENERATION SECTION
VEG 20.07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
666-18-114
VAMC SHERIDAN, WYOMING
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
BUILDING 90 REPLACE COAL
BOILERS DESIGN
TOP OF SLAB
0' - 0"
(E1984) 58.5 MEZZ
6' - 6"
UPPER PART OF MEZZ
21' - 7 1/2"
(E1984) 86.1 PENTHOUSE FLOOR
34' - 1 1/2"
TOP OF PARAPET
36' - 7"
(E1973) 77.4 TOS
25' - 4 1/2"
(E1984) 63.5 TS
11' - 6"
SCALE: 1/4" = 1'-0"
1' 2' 4' 8' 16'0
STEAM GENERATION SECTION 1
1. PROVIDE 4" HPS FROM LAUNDRY CONNECTION TO HEADER BELOW.
2. PROVIDE FWPD TO BOILER AND ECONOMIZER.
3. PROVIDE 8" HPS PRV STATION TO HEADER BELOW.
4. PROVIDE BLOW OFF PIPING FROM SURFACE BLOW OFF TO
CONNECTION SHOWN.
5. PROVIDE HPS BOILER PLANT HEADER.
6. PROVIDE 8" HPS FROM BOILER 3 EXISTING PIPING TO HEADER BELOW.
7. PROVIDE 8" VENT PIPING FROM EXISTING VENT CONNECTION TO
HEADER BELOW.
8. MAIN STACK FURNISHED, DESIGNED, AND SUPPORTED BY BOILER
MANUFACTURER PER SPEC SECTION 23 51 00. RE: STRUCTURAL
9. BOILER MANUFACTURER PROVIDED, BOILER MOUNTED CONTROL
PANEL.
10. HIGH PRESSURE STEAM BEHIND ECONOMIZER
11. REPLACE EXISTING 3" PRV THAT IS PART OF THE EXISTING HPS TO
MPS PRV STATION. SEE SCHEDULE FOR MORE INFORMATION.
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. COORDINATE ALL FLOOR AND ROOF PENETRATIONS WITH FLOOR AND
ROOF STRUCTURE. REFER TO STRUCTURAL DRAWINGS.
C. VENTS NOT SHOWN. SHALL BE PROVIDED PER SPECIFICATION
SECTION 23 52 39.
D. REFER TO M-001 AND M-002 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES AND PHASING.
GENERAL MECHANICAL NOTES:
KEY NOTES:
B-2 B-1
8 8
9 9
M P
M P
HPS HPS HPS
B D.9 EC D
H P
S
BOBO
LPA LPA LPALPALPA
LP
A
LP
A
NG
N G
F W
P D
FWPD
BD.9E CD
H P
S
H P
S H
P S
HPS HPS HPS
HPS HPS
BOBO
FWPD
FWPD
LPA LPA
NG
01/15/2021 DD MDR
MP302
STEAM GENERATION SECTIONS
VEG 20.07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
666-18-114
VAMC SHERIDAN, WYOMING
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
BUILDING 90 REPLACE COAL
BOILERS DESIGN
TOP OF SLAB
0' - 0"
(E1984) 58.5 MEZZ
6' - 6"
UPPER PART OF MEZZ
21' - 7 1/2"
(E1984) 86.1 PENTHOUSE FLOOR
34' - 1 1/2"
TOP OF PARAPET
36' - 7"
(E1973) 77.4 TOS
25' - 4 1/2"
(E1984) 63.5 TS
11' - 6"
TOP OF SLAB
0' - 0"
(E1984) 58.5 MEZZ
6' - 6"
UPPER PART OF MEZZ
21' - 7 1/2"
(E1984) 86.1 PENTHOUSE FLOOR
34' - 1 1/2"
(E1984) 63.5 TS
11' - 6"
SCALE: 1/4" = 1'-0"
1' 2' 4' 8' 16'0
STEAM GENERATION SECTION 2
SCALE: 1/4" = 1'-0"
1' 2' 4' 8' 16'0
STEAM GENERATION SECTION 1
TOP OF PARAPET
36' - 7"
(E1973) 77.4 TOS
25' - 4 1/2"
1. HPS TO LAUNDRY.
2. FEEDWATER CONNECTION.
3. BLOWDOWN TO BLOWDOWN SEPARATOR.
4. STACK UP THRU ROOF.
5. LPA THRU WALL TO AIR MIXER SKID. RE: MP101
6. PROVIDE NEW STEAM HEADER.
7. PROVIDE 8" STEAM VENT PIPING TO EXISTING STEAM VENT
CONNECTION.
8. PROVIDE 8" STEAM FROM BOILER 3 TO STEAM HEADER.
9. PROVIDE HPS FROM HEADER TO PRV STATION.
10. PROVIDE HPS PIPING FROM BOILER 1 TO HEADER.
11. PROVIDE 3-WAY VALVE FOR LPA- NO CHANGEOVER
A. CONTRACTOR SHALL FIELD VERIFY ALL EXISTING CONDITIONS AND
REPORT ANY DISCREPANCIES TO THE VHA COR BEFORE PROCEEDING
WITH WORK.
B. COORDINATE ALL FLOOR AND ROOF PENETRATIONS WITH FLOOR AND
ROOF STRUCTURE. REFER TO STRUCTURAL DRAWINGS.
C. VENTS NOT SHOWN. SHALL BE PROVIDED PER SPECIFICATION
SECTION 23 52 39.
D. REFER TO M-001 AND M-002 FOR ABBREVIATIONS, SYMBOLS, GENERAL
NOTES AND PHASING.
GENERAL MECHANICAL NOTES:
KEY NOTES:
B-2B-1
E-1 E-2
M P
M P
1 1
3 3
9 10 10
FPWD 2
22" FWPD FWPD2" FWPD
MP501
MECHANICAL DETAILS
VEG 20.07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
666-18-114
VAMC SHERIDAN, WYOMING
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
BUILDING 90 REPLACE COAL
BOILERS DESIGN
SIDE VIEW TRAPEZE HANGER FOR UP TO 1000 LB.
UNIFORM LOAD
ADJUSTABLE CLEVIS HANGER TYPE 1 -
SEE SPECIFICATIONS
ADJUSTABLE CLEVIS HANGER TYPE 43 -
SEE SPECIFICATIONS
PROVIDE INSULATION SHIELD
& INSERT FOR ALL PIPING
(8" MIN.)
BAND
1-5/8" 12 GAUGE
CHANNEL OR 2"x2"x1/4" ANGLE
1/2" DIA.
HANGER RODS WITH
36" MAX. SPACING ON EACH
CHANNEL
WELD
SADDLE
INSULATION SHIELD
AT HANGER
PROVIDE HIGH COMPRESSIVE
STRENGTH INSULATION (9 PSF MIN.
DENSITY) UNDER INSULATION SHIELD
INSULATION (VAPOR
BARRIER TYPE IS
REQUIRED FOR LOW
TEMPERATURE PIPE)
HANGER ROD
1" M
AX
NOTES:
SEE SPECIFICATIONS FOR DETAILED
HANGER REQUIREMENTS
8 97
THRU 3/4 1 1/41 1 1/2 2 1/22 3 54 6 108 12 1614 18 2420
30 322825 27
2319 221714 16
-16 -1412 13 -
1210 119
5 FTFT.
FT.
IN.
TUBING
PIPE
NOM. SIZE
NOTE: FOR TRAPEZE HANGER TAKE SPACING OF SMALLEST SIZE ON TRAPEZE.
MAXIMUM PIPE/TUBING SUPPORT SPACING
P C N S
4 5/8 3/4 4 3/4
BOLT PATTERN
3 1/2 1/2 4 5/8
21/2
3/8
3/8
3/8
3/8
3/8
1/4
5/8
5/8
1/2
INININININ
PIPE ANCHOR SCHEDULE
D
NOTE:
A. WHERE USED FOR COPPER TUBE OR PIPE, BRAZE TO FABRICATED STEEL
ANCHOR
INSULATE AS INDICATED FOR ALL
CHILLED WATER. INSULATE PIPE
ONLY FOR STEAM & CONDENSATE STL PIPE OR
COPPER TUBED=PIPE O.D.
ANCHOR BOLTS
N=NUMBER
S=SIZE DRILL Ø =
S+1/16"
5/16"
D+1 1/2" D+3 3/4"
D+
P
D+2 1/2" D+4 3/4"
C
NOTE A
D+1"
" 5/8" Ø ROD
FLANGED
CONNECTION
1/4"x1 1/4"
IRON PIPE
CLAMP
1/4"x1 1/4" IRON
PIPE STRAP
WATER STOP
EXTERIOR WALL
PIPE SLEEVE
HIGH DENSITY
POLYETHYLENE (HDPE)
SLEEVE WITH INTEGRAL
HOLLOW MOLDED WATER
STOP RING 4" LARGER
THAN OUTSIDE DIAMETER
OF PIPE
NOTES:
1.
2.
PROVIDE ANCHORS ONLY
WHERE SHOWN ON
DRAWINGS.
EXTEND SLEEVE ABOVE
FLOOR WHERE SPECIFIED.
INSULATION BOLT (TYPICAL)
FLOOR SLAB
FIRE-STOPPING
MATERIAL
BOLT
PIPEPIPE SLEEVE
WHERE SPECIFIED
RISER
CLAMP
RISER
PIPE SLEEVE
WHERE
SPECIFIED RISER CLAMP.
BOTTOM CLAMP
REQUIRED AT
ANCHOR POINTS
ONLY.
ELEVATION
PLAN
RISER
CLAMP
SECTION A-A (BASE NOT POURED WITH SLAB)
SECTION A-A (BASE POURED WITH FLOOR SLAB)
PLAN
TYPICAL ANCHOR
BOLT NUT & WASHER
SECTION B-B
EQUIPMENT BASE PLATE
PROVIDE #3 BARS 12" O.C. EACH
WAY IN THE BASE & DOWEL BASE
TO FLOOR
EQUIPMENT BASE PLATE
PROVIDE DOUBLE SLAB
REINFORCING IN BASE AREA
WELD HEAD TO PLATE
OR BEND OVER END 5D
FLOOR
PIPE SLEEVE (5D, 3"
MIN.)
ANCHOR
BOLT (TYP)
CONCRETE BASE
NOTE:
L & W DIMENSIONS SHALL
BE 6" GREATER THAN THE
EQUIPMENT BASE PLATE.
L
W
A
A
BB
D
16"
5" M
IN
L/
5" M
IN
L/
5D
TYPICAL ANCHOR
BOLT NUT & WASHER
1"
5D
STEEL EXPANSION SHIELD FOR EXISTING CONSTRUCTION AND
INSERTS FOR NEW CONSTRICTION THIS TYPE SHALL BE USED
ONLY IN SLABS OR BEAMS OF 4" MIN DEPTH
CONCRETE
FLOOR SLAB
CLIP ANGLE
FOR PIPES UNDER 2" IN SIZE USE 1
1/2"x1 1/2"x1/4" ANGLE. ALL PIPES 2" &
LARGER USE 3"x3"x1/4" ANGLE
3/8" MIN DIA
HANGER RODS
TURNBUCKLE
3/8" MIN DIA INSERTS NEW
CONSTRUCTION ONLY.
3/8" MIN DIA
HANGER RODS
NUT & WASHERS
3/8" MIN DIA EXPANSION BOLTS FOR
EXISTING CONSTRUCTION AND
INSERTS FOR NEW CONSTRUCTION
NOTE:
1. MAINTAIN UPSTREAM AND DOWN STREAM DISTANCES RECOMMENDED BY METER
MANUFACTURES
TT
PT
PRESSURE
TRANSMITTER
TEMPERATURE
TRANSMITTER
FLOW METER
INTERFACE WITH
BACNET SYSTEM
DIFFERENTIAL PRESSURE (DP) CEL
STEAM FLOW MEASUREMENT
SHUTOFF VALVE
TO METERING
SYSTEM
BUILDING INCOMING
MAIN STEAM
1" M
IN
24" MAX.
3"
NOTES:
1. UNLESS OTHERWISE SHOWN ON THE DRAWINGS, SIZE THE VENT PIPE SO THAT STEAM
IS NOT BLOWN OUT AT THE VENT PIPE ENTRANCE. UTILIZE THE CALCULATION METHOD
CONTAINED IN ANSI B31.1. POWER PIPING CODE, APPENDIX II.
2. VENT PIPE SHALL TERMINATE 6' MIN. ABOVE FINISHED ROOF.
3. DISCHARGE OF DRAIN MUST BE DIRECTED AWAY FROM PLATFORMS OR OTHER AREAS
WHICH PERSONNEL MAY OCCUPY.
4. DO NOT CONNECT ANY OTHER DRAIN TO THE DRIP PAN ELBOW DRAIN PIPE.
3/4" DRAIN TO FLOOR DRAIN OR
OPEN SIGHT DRAIN (NOTE 4)
FLEXIBLE
CONNECTOR
DRIP PAN ELBOW (SECTIONAL VIEW)
PIPE THREADED INTO ELBOW
(SAME SIZE AS ELBOW)
VENT PIPE THROUGH ROOF SUPPORT
AS INDICATED ON DWGS. (NOTES 1, 2)
PROVIDE UNION UNLESS SAFETY
VALVE HAS FLANGED OUTLET
SAFETY VALVE
OPEN DRAIN (NOTE 3)
CONNECTION TO PRESSURE
VESSEL OR PIPE
ELEVATION
D
ELEVATION
WELDED
PIPING
ELEVATION
THREADED
PIPING
NOTES:
1. DRAIN ALL LOW POINTS AS INDICATED ABOVE.
2. WHERE SCALE POCKETS ARE SHOWN ON PIPE RISER DIAGRAMS AND/OR
PLANS LOCATE DRAIN AT BOTTOM OF SCALE POCKET.
NOTES:
1. VENT ALL HIGH POINTS.
2. IF AUTOMATIC AIR VENTS ARE USED, PIPE DISCHARGE TO
DRAIN.
TYPICAL MANUAL OR AUTOMATIC
AIR VENT
ELEVATION
TYP. WATER PIPING
REDUCER IF NEEDED.
3/4" BALL VALVE
ADAPTER TO 3/4" HOSE
THREAD-PROVIDED HOSE
CAP NUT
TYPICAL CHILLED AND HOT WATER PIPING DRAIN
VALVE CONNECTIONS.
AIR VENT
MV
OR
AV
1/2" BALL VALVE
CIRCULATING WATER PIPING
1/4" COPPER TUBING
1/2" X 4" NIPPLE
SCALE: NO SCALE
PIPE HANGERS
SCALE: NO SCALE
SMALL PIPE ANCHOR 1-1/2" - 4"
SCALE: NO SCALE
SUPPORT ANCHOR
SCALE: NO SCALE
CONCRETE EQUIPMENT BASES
SCALE: NO SCALE
STEAM SAFETY VALVES
SCALE: NO SCALE
SUPPORT ANCHOR FOR PIPE RISERS
SCALE: NO SCALE
SECURING HANGER RODS IN CONCRETE
SCALE: NO SCALE
STEAM METER DETAILS
SCALE: NO SCALE
DRAIN VALVE AND AIR VENT CONNECTIONS
(HYDRONIC SYSTEMS)
DOMESTIC COLD WATER INLET
1" AIR GAP TO PREVENT BACK
SIPHONAGE
TEMPERED WATER DRAIN
TO DRAIN
8" MIN.
FROM DEAERATOR OFL
ARMSTRONG CC-12 OR EQUAL.
SCALE: NO SCALE
CONDENSATE COOLER
MP502
MECHANICAL DETAILS
VEG 20.07
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
F i l e
P a t h
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
321 4 5 6 7 8 9 10
Project Director
Issued: Date:
750 W HAMPDEN AVE
SUITE #300
ENGLEWOOD CO 80110
(720) 550-6307
WWW.VALHALLAENGINEERING.COM
666-18-114
VAMC SHERIDAN, WYOMING
CONSULTANTS: ARCHITECT/ENGINEERS: STAMP: 100% CONSTRUCTION
DOCUMENTS
BUILDING 90 REPLACE COAL
BOILERS DESIGN
SCALE: NO SCALE
FIRE TUBE BOILER
ELEVATION
CONCRETE
BASE
BOILER
ROOM
FLOOR
BURNER
2' MAX.
SIGHTFLOW INDICATOR WITH
ROTOR (ORIENT WINDOWS TO
FACE UP AND DOWN)
3/4" TO BLOWOFF LINE1/2"
STEAM PRESSURE GAGE 0-300 PSIG
HIGH PRESSURE CUTOUTS
FEEDWATER LEVEL CONTROL
UNIT LOW WATER CUTOFF
BOILER
1 1/4"
PLUGGED CROSS (TYPICAL)
AUXILIARY LOW WATER
CUTOFF LOW WATER
ALARM HIGH WATER
ALARM
1 1/4"
AUXILIARY LOW WATER CUTOFF
SHUNT SWITCH (LOCATE WITHIN 3'
OF ALWCO DRAIN VALVE)
3/4" TO
BLOWOFF LINE
1"
SIGHTFLOW INDICATOR
WITH ROTOR (ORIENT
WINDOWS TO FACE UP
AND DOWN)
2' MAX.
1 1/4"
FLAT PLATE GAUGE GLASS
LOW WATER CUTOFF SHUNT SWITCH
(LOCATE WITHIN 3' OF LWCO AND
GAGE GLASS DRAIN VALVES)
BALL VALVES NOT PERMITTED (TYP)
LADDER
HANDRAIL BOILER
ACCESS PANEL
STACK
ECONOMIZER
SAFETY VALVE
VENT THRU
ROOF
VENT
MANWAY
NON-RETURN
STOP-CHECK VALVE
2'-6" PLATFORM
12"
BURNER
PLAN VIEW
HANDRAIL
PLATFORM
TOP OF BOILER
CASING
LADDER
STEAM
LEAD
NON-RETURN
STOP-CHECK
VALVE
1"
BOILER
CONCRETE PAD
BOILER ROOM FLOOR
BURNER
ELEVATION
NOTE: SUPPORT PLATFORM FROM FLOOR OR FROM BOILER IF BOILER MANUFACTURER
PROVIDES BOILER ATTACHMENTS AND APPROVES INSTALLATION.
SCALE: NO SCALE
ACCESS PLATFORM ARRANGEMENT
PLAN VIEW
HANDRAIL
PLATFORM
TOP OF BOILER
CASING
LADDER
STEAM LEAD
NON-RETURN
STOP-CHECK
VALVE
1"
BOILER
CONCRETE PAD
BOILER ROOM FLOOR
BURNER
ELEVATION
NOTE: SUPPORT PLATFORM FROM FLOOR OR FROM BOILER IF…
This is the start of the file's text. The full file is on GovTribe.