About this file

This document includes construction documents and specifications for replacing coal boilers at the Sheridan Veterans Affairs Medical Center in Sheridan, Wyoming. The project involves replacing existing coal boilers in Building 90 with related equipment and work. Subsurface soils at the site consist of clayey gravels, lean clays, and dense sands and gravels. Pavement sections specified include 8-inch concrete with 7-inch aggregate base for emergency coal dump and entrance improvements. The project is estimated to cost between $1 million and $5 million. Offerors must be verified as service-disabled veteran-owned small businesses by the Department of Veterans Affairs to be considered for this 100% set-aside contract opportunity.

View the file

Other files

File Type Posted
36C25921R0071 0012.docx DOCX document
CONTRACTOR spaces- 1-1-2022.pdf PDF
36C25921R0071 0011.docx DOCX document
36C25921R0071 0011.docx DOCX document
36C25921R0071 0010.docx DOCX document
Amendment 10 - Sheridan Boiler RFI responses.pdf PDF
Amendment 10 - B3 water level warrick dwg.pdf PDF
Amendment 10 - Hays Boiler 3 Mechanical.pdf PDF
Amendment 10 - Condensate Tank.pdf PDF
Amendment 10 - Submittal 36 B3 Burner_Part1.pdf PDF
Amendment 10 - Condensate tank specs.pdf PDF
Amendment 10 - Deaerator specs.pdf PDF
Amendment 10 - Submittal 36 B3 Burner_Part2.pdf PDF
Amendment 10 - Deaerator tank.pdf PDF
Amendment 10 - Final B3 fire eye loops.pdf PDF
Amendment 10 - S02 - Calculation Worksheet for Self-Performed and Subcontracted Work.docx DOCX document
36C25921R0071 0009.docx DOCX document
36C25921R0071 0008.docx DOCX document
36C25921R0071 0007.docx DOCX document
Instructions to Offerors - Coal Boilers Sheridan.pdf PDF
36C25921R0071 0006.docx DOCX document
36C25921R0071 0005.docx DOCX document
IMG_0217.jpg JPG image
Pre Bid Sign In Sheridan Boiler.pdf PDF
36C25921R0071 0004.docx DOCX document
IMG_0219.jpg JPG image
Pics - 1.docx DOCX document
Pics - 2.docx DOCX document
Pics - 3.docx DOCX document
IMG_0218.jpg JPG image
Pre Bid Sign In Sheridan Boiler 2.pdf PDF
Questions for Replace Coal Boilers and VA Answers Updated 10-15.docx DOCX document
DSC02962.jpg JPG image
36C25921R0071 0003.docx DOCX document
36C25921R0071 0002.docx DOCX document
36C25921R0071 0001.docx DOCX document
Drawings Boiler Replacement_Part1.pdf PDF
Drawings Boiler Replacement_Part2.pdf PDF
36C25921R0071_1.docx DOCX document
Specifications Boiler Replacement.pdf PDF
S02 - Calculation Worksheet for Self-Performed and Subcontracted Work.docx DOCX document
2015-06-05 Past Performance Questionnaire.docx DOCX document
Show all 42

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

FOURFRONT

D E S I G N I N C.

517 7th street rapid city sd 57701 p 605.342.9470 f 605.342.2377 www.4front.biz

CONSTRUCTION

DOCUMENTS

2/5/19

B-100

Note: Refer to geotechnical report in specifications for more information.

GEOTECHNICAL SUMMARY

A geotechnical study was conducted to determine the in situ soils within the Project Site. The majority of subsurface soils encountered within the borings consisted of about 1 to 3 ½ feet of clayey gravels and lean clays with coal fragments fill overlying terrace deposits of stiff hard lean clays, dense well graded sand, and very dense sandy gravels. At the time of the field work, ground water was encountered in five of the 6 borings, at a depth of 12 to 14 ½ feet below the existing surface. See plan sheet B1.00 for boring location map and the geotechnical report.

Based on the recommendations outlined within the geotechnical report; the pavement sections for improvement, and surfacing recommendations, are listed below.

1. 14” gravel surfacing for the coal delivery vehicle turnaround area expansion.

2. 8” concrete and 7” aggregate base course pavement section for improvements at the emergency coal dump area.

3. 8” concrete and 7” aggregate base course pavement section for the north and south approach entrances improvement.

4. 8” concrete and 7” aggregate base course pavement between the proposed coal delivery building/fines hopper and the coal storage bunker.

Due to the potential for pavement deterioration from turning movements, concrete is recommended for all pavement improvements within the Project Site.

All paving, base materials, and construction requirements for pavement sections will conform to the geotechnical recommendations, the City of Sheridan Specifications, and the VA Site

Development Design Manual. Subgrade shall conform to the recommendations outlined in the geotechnical report.

AutoCAD SHX Text Date

AutoCAD SHX Text Checked

AutoCAD SHX Text Building Number

AutoCAD SHX Text Project Number

AutoCAD SHX Text Drawing Number

AutoCAD SHX Text Drawn

AutoCAD SHX Text Dwg. of

AutoCAD SHX Text Revisions:

AutoCAD SHX Text Date

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text C

AutoCAD SHX Text D

AutoCAD SHX Text E

AutoCAD SHX Text F

AutoCAD SHX Text

VA FORM 08-6231, OCT 1978

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text F

AutoCAD SHX Text E

AutoCAD SHX Text D

AutoCAD SHX Text C

AutoCAD SHX Text B

AutoCAD SHX Text A

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text Initials

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

ARCHITECT/ENGINEERS:

AutoCAD SHX Text

CONSULTANTS:

AutoCAD SHX Text Project Title

AutoCAD SHX Text Drawing Title

AutoCAD SHX Text Approved: Project Director

AutoCAD SHX Text Location

AutoCAD SHX Text

SHERIDAN, WY

AutoCAD SHX Text

BOILER UPGRADE PHASE 3

AutoCAD SHX Text 02/5/2019

AutoCAD SHX Text 666-16-117

AutoCAD SHX Text

AutoCAD SHX Text

AutoCAD SHX Text

SM

AutoCAD SHX Text

JM

AutoCAD SHX Text Office of Construction and Facilities Management

AutoCAD SHX Text

BORING LOCATION MAP AND LOGS