Drawings 614-19-102.pdf
PDF 5 MB Posted
- Solicitation number
- 36C24920B0003
About this file
This set of construction drawings and specifications is for renovations to the second floor Spinal Cord Injury Rehab area in Building 7 at the VA Medical Center in Memphis, Tennessee. The project involves renovations to patient rooms, clinics, corridors, and support spaces including installation of new flooring, walls, ceilings, casework, and furniture. Renovations will include upgrades to the physical therapy, kinesio-therapy, occupational therapy, and multi-purpose rooms along with supporting spaces such as storage, staff areas, and corridors. Deductive alternatives are provided to deduct certain materials and installation costs and add other material and labor costs. Finishes, fixtures, furniture, and other details are scheduled along with product data.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24920B0003 0007.docx | DOCX document | |
| 36C24920B0003 0006.docx | DOCX document | |
| 36C24920B0003 0005.docx | DOCX document | |
| 36C24920B0003 0004.docx | DOCX document | |
| Amendent_SPECS.pdf | ||
| Amend Rpt 0001.pdf | ||
| Amendment_DRAWINGS.pdf | ||
| 36C24920B0003 0003.docx | DOCX document | |
| RFI Form - Renovate Bldg. 7 SCI Rehab Area.docx | DOCX document | |
| Contractor EMR Certification Form 2020.docx | DOCX document | |
| 36C24920B0003 0002.docx | DOCX document | |
| 36C24920B0003 0001.docx | DOCX document | |
| Electric-Telecom Drawings.pdf | ||
| 36C24920B0003_1.docx | DOCX document | |
| Addendum G-101.pdf | ||
| Architectural Drawings 2.pdf | ||
| Wage Determination - Shelby County.pdf | ||
| Specifications.pdf | ||
| Architectural Drawings 1.pdf | ||
| Mechanical Drawings.pdf | ||
| Fire-Plumbing Drawings.pdf | ||
| General Drawings.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AREA OF WORK
2ND FLOOR
ELEVATOR ELEVATOR ELEVATOR
STAIR
NO 4
STAIR
NO 5
ELEVATOR ELEVATOR ELEVATOR
STAIR
NO 4
STAIR
NO 5
A-402B1
COMM
2C100
EC
2C101
COMM
2C100
EC
2C101
CORRIDOR
C2-30
CORRIDOR
C2-30
PRIVATE
TREATMENT
2C104
WAITING
2C102
CHECK-IN
DESK
2C103
STORAGE
2C105
DRIVER
THERAPY
2C106
MULTI-PURPOSE
ROOM
2C107
MEN
(PATIENT)
2C108
WOMEN
(PATIENT)
2C109
EQUIP.
STORAGE
2C110
PHYSICAL
THERAPY
(PT)
2C111
KINESIO-THERAPY
(KT)
2C112
OCCUPATIONAL
THERAPY
(OT)
2C113
BREAKROOM
2C114
WOMEN
(STAFF)
2C115
MEN
(STAFF)
2C116
COMM
2C117
EL
2C118
JAN
2C119
RECREATIONAL
THERAPY
2C120
STORAGE
2C121
CORRIDOR
C2-27
CORRIDOR
C2-28
A-402
E1
A-402 E6
A-401
C6
A-401
C3
E8
C1
2C104
2C105
2C106
2C108
2C109
2C107
2C110
2C117 2C118 2C110A
2C114
2C115
2C116 2C119 2C120
2C121
C2-28
C2-27
STORAGE
2C111A
CHARTING
2C112A
CHARTING
2C113A
/2
/2
/2
/2
/2
19' - 2" 8' - 6" 15' - 8" 10' - 9 1/2"
35' - 0 1/2"
A-402
E3
A
A
B2
A
A
A
B
B2
B
B
A
B
2C111A
A
D
D
D
D
15' - 2 1/2" 12' - 1"
9' - 0" 9' - 9" 8' - 11"
STORAGE
2C114A
2C114A
B2
A-402
F4
F1
9' - 10 1/2" 15' - 0" 2' - 9 1/2"
A-401
C8
FEC
OPEN COURTYARD
OPEN COURTYARD
OPEN COURTYARD
OPEN COURTYARD
/2
/2
/2
/2
FE
A-101
B5
B
B
B1
6' - 6"
7' - 6"
3' - 0" 3' - 10"
8' - 1"
3' - 0"
3'
0"
D
16' - 6"
1' - 4"
B
9'
6"
10' - 10"
D
D
D
D
M
IN
1. ALL DIMENSIONS ARE TO FACE OF GWB, U.N.O.
2. ALL NEW WALLS ARE TO BE PARTITION TYPE A, U.N.O. SEE A-371 FOR PARTITION TYPES.
3. ALL WALLS SHALL HAVE FULL HEIGHT SOUND ATTENUATION BLANKETS, TYP. U.N.O.
4. WHEN FLOOR, WALL, AND CEILING ARE REQUIRED TO BE PATCHED, THE CONTRACTOR SHALL PATCH WITH NEW
LIKE MATERIALS TO MATCH WITH THE EXISTING ADJACENT SURFACES, UNO.
5. ALL NEW WORK SHALL BE COMPLETE AND OPERATIONAL
6. CONTRACTOR IS RESPONSIBLE FOR REROUTING ANY CONDUITS, WIRING, PLUMBING, OR PIPING AS REQUIRED TO ACHIEVE THE DESIRED LAYOUT SHOWN. NEW REROUTING LOCATIONS SHALL BE CONCEALED WITHIN WALL. WHEN IT IS IMPOSSIBLE TO CONCEAL ITEMS, LOCATE ITEMS TIGHT AGAINST WALLS-ENCLOSE ITEMS WITH GWB WITHOUT
DISRUPTION OF SERVICE TO OTHER AREAS..
7. TYPICAL WALL JAMB TO BE 4" FROM WALL AT HINGE SIDE OF DOOR U.N.O.
8. ALL PENETRATIONS/HOLES IN EXISTING OR NEW WALLS & FLOORS SHALL BE PROPERLY PATCHED TO MATCH ADJACENT AREA OR FIRESTOPPED AS REQUIRED, EVEN IF PENETRATIONS/HOLES ARE COVERED BY NEW
MILLWORK.
9. PROVIDE ALL NEW WALLS AS SHOWN IN WALL TYPES, IF THICKNESS IS DIFFERENT FROM ADJACENT EXISTING WALL, CONTRACTOR IS REQUIRED TO ADD LAYERS OF GWB TO EXG. OR NEW WALLS AS REQ'D. FOR FLUSH
CONDITION.
10. SUPPORT ALL WALL AND CEILING MOUNTED ITEMS IN ACCORDANCE WITH MANUFACTURERS RECOMMENDATIONS.
COORDINATE WITH WALL AND CEILING TYPES, TYPICAL.
11. WHERE WALL, FLOOR, CEILING ARE SCHEDULED TO REMAIN OR PARTS OF WALLS ARE DAMAGED OR OPEN DUE TO CONSTRUCTION, CONTRACTOR SHALL PATCH AND REPAIR AS REQUIRED FOR A CLEAN FINISH LOOK AND SAME PREVIOUS CONDITION. PRE ALL SURFACES WHERE ARE SCHEDULED TO RECEIVE NEW FINISHES AS REQUIRED.
12. PROVIDE BLOCKING IN ALL WALLS WHERE CABINETRY, SPECIALTY SHELVING OR A/V EQUIPMENT IS TO BE
LOCATED.
13. PROVIDE ALL NONCOMBUSTIBLE TYPE BACKING AND BLOCKING IN WALLS AND CEILINGS AS REQ'D. TO RIGIDLY SECURE ALL WALL & CEILING MOUNTED ITEMS WITH ALL WOOD BLOCKING TO BE FIRE RETARDANT TYPE. COORD.
W/OWNER AND OWNER'S SPECIAL EQUIPMENT CONTRACTOR FOR LOCATION OF ALL WALL & CEILING MOUNTED
ITEMS OTHER THAN THOSE SCHEDULED.
14. SEE MATERIAL, FINISH SCHEDULES, AND FLOORING PLANS FOR ADDITIONAL FINISH INFORMATION AND LOCATIONS
15. PREPARE WALLS TO RECEIVE FINISH AS INDICATED ON THE FINISH SCHEDULE AND APPROPRIATE SPEC. SECTION IN ACCORDANCE WITH MANUF. RECOMMENDATIONS (U.O.N.). IF OTHERWISE NOTED INSTALLATION METHOD CONFLICTS WITH MANUF. RECOMMENDATIONS NOTIFY ARCHITECT IN WRITING PRIOR TO MATERIAL ORDER, FABRICATION OR INSTALLATION.
16. SEE REFLECTED CEILING PLANS FOR ADDITIONAL CEILING MATERIAL LOCATION, AND SOFFIT LOCATIONS/HEIGHTS.
17. SMOKE BARRIERS, FIRE BARRIERS, FIRE PARTITIONS, ETC. SHALL BE CONTINUOUS FROM SLAB TO UNDERSIDE OF ROOF DECK AND SHALL BE COMPLIANT WITH REGULATIONS SET FORTH IN FBC CHAPTER 7, NFPA 101 AND ALL FED., STATE AND LOCAL CODES. PERMANENTLY LABEL AND IDENTIFY ALL FIRE WALLS, FIRE BARRIERS, FIRE PARTITIONS, SMOKE BARRIERS, OR ANY OTHER PROTECTED ASSEMBLY ABOVE DECORATIVE CEILINGS AND IN CONCEALED
SPACES PER ALL FED., STATE AND LOCAL CODES.
18. PROVIDE 1/2" RADIUS BULL-NOSE CORNERS AT ALL VERTICAL GWB CORNER LOCATIONS (EXCLUDING DROP SOFFIT, CEILING LOCATIONS, AND CORNERS THAT ARE TO RECEIVE CORNER GUARDS - SEE SPECIFICATIONS FOR
ADDITIONAL INFORMATION)
19. DO NOT ATTACH AND/OR FASTEN LT. GAUGE FRAMING TO GWB WALL PARTITION MEMBRANES SUSPENDED/ FASTENED TO WALL STRUCTURE BY RESILIENT CLIPS, CHANNELS, FASTENERS, MTL FRAMING MEMBERS, ETC.-TYP.
20. PROVIDE UL APPROVED PENETRATION PROTECTION AT ALL RATED WALL ASSEMBLIES, RATED HORIZONTAL ASSEMBLIES AND ALL WALL DOUBLE TOP PLATE PENETRATIONS AS PER FBC CHAPTER AND ALL FED., STATE AND
LOCAL CODES - TYP.
GENERAL FLOOR PLAN NOTES:
NEW RATED WALL LEGEND
1-HR RATED FIRE BARRIER
2-HR RATED FIRE BARRIER
1-HR FIRE RATED SMOKE BARRIER
SMOKE PARTITION
GC TO MODIFY EXISTING REMAIN WALLS/PARTITIONS
AS REQUIRED TO MEET FIRE RATED REQUIREMENT AS
SHOWN ON NEW FLOOR PLAN
LEGEND
EXISTING CONCRETE AND / OR STUD
WALLS / PARTITIONS TO REMAIN
NEW STUD WALLS / PARTITIONS
EXISTING FIRE EXTINGUISHER
CABINET TO REMAIN
EXISTING WALL MOUNTED FIRE
EXTINGUISHER TO REMAIN
FEC
FE
24/48
3' - 4" 4' - 0"
30/36
34/41
2' - 6" 4' - 10"
ADA SIDE APPROACH
BBF
CHECK-IN
DESK
2C103
WAITING
2C102
PRIVATE
TREATMENT
2C104
D5
A-101
A D
A S
ID
E
A P
P R
O A
C H
7' - 4"
B A
D5
A-101
CRASH RAIL AS
SCHEDULED. GC TO
PROVIDE CONT. BLOCKING
AS REQUIRED FOR RIGID
CONDITION
8' CLEAR MIN. CORRIDOR
FURNITURE SYSTEM.
PROVIDE GROMMETS AS
REQUIRED. SEE ELECT.
DRAWINGS FOR ADDITIONAL
WORKS
SS-2
COORDINATE FURNITURE
SYSTEM MANUFACTURER
TO PROVIDE PL-2 WHERE
PLASTIC LAMINATE OCCURS
BBF
NOTES:
FIELD INSTALL GROMMET HOLES IN ALL BUILT
IN CABINETS FOR ELECTRICAL CORDS ALONG
WITH PROVIDING ADDITIONAL GROMMETS
WHERE INDICATED.
GROMMETS - PROVIDE A GROMMET SAT
EACH LOCATION WHERE POWER AND/OR
SIGNAL DEVICE OCCURS BELOW A
COUNTERTOP
THIS DETAIL IS TO PROVIDE CRITICAL
DIMENSIONS & NOTES. REFER TO
SPECIFICATIONS & MANUFACTURER DETAILS
FOR MORE INFORMATION.
2' - 6" OR 2'-0"
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Designed
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740
Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592Revisions: Date:
ORIGINAL DRAWING SIZE (30"X42")
B
IM
/1
V A
B ld g
S p in a l C o rd
I n ju ry
R e h a b A re a /1
V
A B ld g
A rc h
V
.r v t
/1
/2
:2
:2
P
M
A-101
PARTIAL 2ND LEVEL - FLOOR PLAN RENOVATE BUILDING 7 SPINAL
CORD INJURY (SCI) REHAB AREA
VA MEDICAL CENTER, MEMPHIS, TN
614-19-102
BLDG 7
4/22/2020 MWD QVL
SCALE: = 1'-0"
0 8 168
1/8"
KEYPLAN
N
SCALE: 1/8" = 1'-0"F1
PARTIAL 2ND LEVEL - NEW FLOOR PLAN
KEYNOTES - NEW
NO. DESCRIPTION
8 EXISTING 3'H POST. PROVIDE NEW DOOR OPENER
AT THE SAME LOCATION.
9 NEW PLUMBING FIXTURE AT THE EXISTING
LOCATION. REFER TO A-571 FOR MOUNTING
HEIGHTS INFORMATION
10 2 TIER METAL LOCKERS. PROVIDED & INSTALLTED
BY GC.
11 WALL MOUNTED PULLEYS AREA. PROVIDE 7' H
VENEER PLYWOOD SURFACE. COORDINATE WITH
VA FOR WIDTHS AND LOCATIONS.
KEYNOTES - NEW
NO. DESCRIPTION
1 NEW STOREFRONT PARTITION ON TOP OF 42"H
GWB PARTITION, TYP.
2 MODIFY EXISTING WALL / PARTITION TO MEET FIRE
RATED REQUIREMENT AS WALL LEGEND SHOWN.
3 REINSTALL EXISTING MEDICAL GAS RACKS.
4 PATCH AND REPAIR EXISTING WALL AS REQUIRED
TO RECEIVE NEW FINISHES AS SCHEDULED.
5 FURNITURE SYSTEM. VA PROVIDED, VA INSTALLED.
6 FURNITURE BY VA.
7 PROVIDE 3 LEVEL ADJUSTABLE METAL SHELVING
SYSTEM. MAXIMUM HEIGHT 7'-6" TO AVOID
CONFLICT WITH FIRE SPRINKLERS. REFER TO
F5/A-101 FOR BASIS OF DESIGN.
SCALE: 1/2" = 1'-0"B5
ENLARGED PLAN AT NURSE STATION
SCALE: = 1'-0"
0 2 42
1/2"
SCALE: 1 1/2" = 1'-0"D5
TYP. SECTION AT FURNITURE SYSTEM
SCALE: N.T.S.F5
BASIS OF DESIGN - ADJUSTABLE METAL SHELVING SYSTEM
SCALE: = 1'-0"1 1/2"
01 1
PROVIDED AND INSTALLED BY VA
PROVIDED AND INSTALLED BY VA
VHAMEMBUTLEJ3
Highlight
VHAMEMBUTLEJ3
Highlight
VHAMEMBUTLEJ3
Highlight
VHAMEMBUTLEJ3
Highlight
VHAMEMBUTLEJ3
Callout Included as part of DEDUCTIVE ALTERNATIVE #1. See sheet A-171
VHAMEMBUTLEJ3
Line
REF.
GENERAL FURNITURE PLAN NOTES:
1. ALL FURNITURE & EQUIPMENT BY VA / NIC, UNO.
2. REFER TO OTHER DRAWINGS FOR ELECTRICAL & SECURITY SYSTEM
3. PROVIDE BLINDS/SHADES FOR ALL WINDOWS
FURNITURE LEGEND
FURNITURE &
EQUIPMENT - N.I.C
WHITE BOARD - VA PROVIDED, GC
INSTALLED. COORDINATE WITH VA FOR
LOCATION.
TACK BOARD - VA PROVIDED, GC
INSTALLED. COORDINATE WITH VA
FOR LOCATION.
WALL MOUNTED TV/MONITORS. VA
PROVIDED, GC TO PROVIDE BLOCKING FOR
RIGID CONDITION. COORDINATE WITH VA
FOR LOCATION. GC TO PROVIDE POWER &
DATA
WB
TB
TV
CORRIDOR
C2-30
ELEVATOR ELEVATOR ELEVATOR
STAIR
NO 4
STAIR
NO 5
COMM
2C100
EC
2C101
PRIVATE
TREATMENT
2C104
WAITING
2C102
STORAGE
2C105
CORRIDOR
C2-27
PHYSICAL
THERAPY
(PT)
2C111
KINESIO-THERAPY
(KT)
2C112
OCCUPATIONAL
THERAPY
(OT)
2C113 EQUIP.
STORAGE
2C110
MULTI-PURPOSE
ROOM
2C107
WOMEN
(PATIENT)
2C109
MEN
(PATIENT)
2C108
EL
2C118
COMM
2C117
STORAGE
2C121
JAN
2C119
MEN
(STAFF)
2C116WOMEN
(STAFF)
2C115
RECREATIONAL
THERAPY
2C120
BREAKROOM
2C114
CORRIDOR
C2-28
DRIVER
THERAPY
2C106
A-171
C4
A-171
F4
A-171
F7
STORAGE
2C111A
CHARTING
2C112A
CHARTING
2C113A
A-171
D7
STORAGE
2C114A
OPEN COURTYARD
OPEN COURTYARD
1' - 4"
CHECK-IN
DESK
2C103
TV
TV
TV
TV
A-171
B7 AREA OF WORK
2ND FLOOR
PT16964
PT36094
PT24946
PT72999
PT45331
PT46605
PT71860
PT71861
PT72292
PHYSICAL
THERAPY
(PT)
2C111
PT74356
PT24946
STORAGE
2C111A
TB WB
KT12494
KT47530
KT14799
KT41181
KT56780
KT81652
KT12494
KINESIO-THERAPY
(KT)
2C112
CHARTING
2C112A
TB
W.C.
OT38603
OT44746 OT39162
OT25782
OT52473
OT39222
OT40176
OT49891
CHARTING
2C113A
OCCUPATIONAL
THERAPY
(OT)
2C113
TBWB
W.C.
DT00001
DRIVER
THERAPY
2C106
DT00002
TV
TV
TV
RT47806
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Designed
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740
Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592Revisions: Date:
ORIGINAL DRAWING SIZE (30"X42")
B
IM
/1
V A
B ld g
S p in a l C o rd
I n ju ry
R e h a b A re a /1
V
A B ld g
A rc h
V
.r v t
/1
/2
:2
:2
P
M
A-171
PARTIAL 2ND LEVEL - FURNITURE /
EQUIPMENT PLAN
RENOVATE BUILDING 7 SPINAL
CORD INJURY (SCI) REHAB AREA
VA MEDICAL CENTER, MEMPHIS, TN
614-19-102
BLDG 7
4/22/2020 MWD QVL
SCALE: = 1'-0"
0 8 168
1/8"
SCALE: 1/8" = 1'-0"F1
PARTIAL 2ND LEVEL - FURNITURE / EQUIPMENT PLAN
KEYPLAN
N
EQUIPMENT SCHEDULE
DT00001 DRIVER STIMULATOR - MEDIA
DT00002 DRIVER STIMULATOR - PHYSICAL
KT12494 WEIGHT SET EXCERCISE PT LATS BAR
KT14799 LIFE STEP
KT41181 EXER ARM & LEG PT
KT47530 TABLE PHYSICOTHERAPEUTIC
KT56780 RECUMBENT EXERCISE CYCLE
KT81652 TABLE STANDING AND TREATMENT TILT TABLE MORORIZED
OT25782 ARM SUSPENSION SLING MOBILE TYPE
OT38603 CABI STG FLAME LQD
OT39162 TABLE PHYSICOTHERAPEUTIC, MAT ELECTRIC
OT39222 ARM-WRIST SHOULDER, PHYSICAL
OT40176 EXERCISER, SHOULDER PHYSICAL THERAPY
OT44746 TABLE PHYSICOTHERAPEUTIC
OT49891 EXERCISER ASSEMBLY PHYSICAL THERAPY
OT52473 STIMULATOR NERVE
PT16964 WALKER, INVALID, SUSPENSION
PT24946 TABLE PHYSICOTHERAPEUTIC
PT36094 EXERCISE STAIRS - PT
PT45331 PARALLEL BARS WITH GLIDER (35847 & 35846)
PT46605 STAND APPARATUS STABILIZER
PT71860 VITQL SIGNS MONITOR
PT71861 VITQL SIGNS MONITOR
PT72292 EXCERCISE CHAIR
PT72999 WALKER, INVALID, SUSPENSION
PT74356 EXCERCISE CHAIR
RT47806 BICYCLE ARM POWER HAN
SCALE: 1/4" = 1'-0"C4
ENLARGED PLAN
SCALE: 1/4" = 1'-0"F4
ENLARGED PLAN
SCALE: 1/4" = 1'-0"F7
ENLARGED PLAN
SCALE: 1/4" = 1'-0"D7
ENLARGED PLAN
SCALE: = 1'-0"
0 4 84
1/4"
NOTES:
• FURNITURE & EQUIPMENT PROVIDED BY VA. GC TO COORDINATE WITH
VA WITH INSTALLATION AND REUSE EXISTING FURNITURE &
EQUIPMENT.
• COORDINATE WITH VA & EXISTING PATIENT LIFTS FOR FURNITURE &
EQUIPMENT LOCATION.
• REFER TO ELECTRICAL FOR POWER REQUIREMENT.
SCALE: 1/4" = 1'-0"B7
ENLARGED PLAN
KEYNOTES - FF&E
NO. DESCRIPTION
1 REINSTALL EXISTING MEDICAL GAS RACKS.
2 FURNITURE BY VA.
3 EXISTING S.S. 1 PIECE COUNTER TOP AND SINK TO REMAIN.
4 EQUIPMENT STORAGE FURNITURE BY VA. COORDINATE WITH VA FOR
STORAGE HEIGHT AND TV MOUNTED HEIGHT
5 WALL MOUNTED PULLEYS AREA. PROVIDE 7' H VENEER PLYWOOD
SURFACE. COORDINATE WITH VA FOR WIDTHS AND LOCATIONS
VHAMEMBUTLEJ3
Polygon
VHAMEMBUTLEJ3
Polygon
VHAMEMBUTLEJ3
Callout DEDUCTIVE ALTERNATIVE #1: Deduct 3-level shelving in 2C110. Water/ice machine plumbing, 2-tier lockers, PL-2 work counter surface, SS-1 counter top, and PL-1 casework in room 2C114 are deducted from the scope of the project.
VHAMEMBUTLEJ3
Line
VHAMEMBUTLEJ3
Line
VHAMEMBUTLEJ3
Line
VHAMEMBUTLEJ3
Rectangle
Polygon
OCCUPATIONAL THERAPY (OT)
28' - 8"
KINESIO-THERAPY (KT)
27' - 5"
PHYSICAL THERAPY (PT)
44' - 2 1/2"
1 2
T Y
P
3 4
OPEN
OPEN OPEN OPEN
B6
A-601
B9
A-601
F4
A-572
10 101010
B9
A-601
8 8 8 817 17 17 17 17
TYP.TYP.
WAITING
5' - 10"
CHECK-IN DESK
10' - 6"
STORAGE
10' - 11 1/2"
DRIVER THERAPY
16' - 0 1/2"
MEN / WOMEN (PATIENT)
18' - 7 1/2"
MULTI-PURPOSE ROOM
8' - 8 1/2"
EQUIP. STORAGE
28' - 2"
1 2 4
OPEN
D5
A-101
F4
A-572
12 13
MEMPHIS VA MEDICAL CENTER
SPINAL CORD INJURY (SCI) REHAB
2C104 2C105 2C106 2C108 2C109 2C107 2C110
B1
A-501
B3
A-501
3' - 0"
30" CLEAR WHEN OPEN
3' - 0"3' - 0"
F3
A-501
F1
A-501
N.I.C.
2C114A
2' - 9" 30" CLEAR WHEN OPEN 2' - 9"
2' - 9" 2' - 9" 1' - 0"
F1
A-501
N.I.C.
2' - 9" 2' - 9"
2' - 9"2' - 9"1' - 0"
B6
A-601
B9
A-601
B9
A-601
F6
A-501
9 14
F6
A-501
9 14
N.I.C.
FURNITURE LEGEND
FURNITURE &
EQUIPMENT - N.I.C
WHITE BOARD - VA PROVIDED, GC
INSTALLED. COORDINATE WITH VA FOR
LOCATION.
TACK BOARD - VA PROVIDED, GC
INSTALLED. COORDINATE WITH VA
FOR LOCATION.
WALL MOUNTED TV/MONITORS. VA
PROVIDED, GC TO PROVIDE BLOCKING FOR
RIGID CONDITION. COORDINATE WITH VA
FOR LOCATION. GC TO PROVIDE POWER &
DATA
WB
TB
TV
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Designed
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740
Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592Revisions: Date:
ORIGINAL DRAWING SIZE (30"X42")
B
IM
/1
V A
B ld g
S p in a l C o rd
I n ju ry
R e h a b A re a /1
V
A B ld g
A rc h
V
.r v t
/1
/2
:2
:3
P
M
A-402
INTERIOR ELEVATIONS RENOVATE BUILDING 7 SPINAL
CORD INJURY (SCI) REHAB AREA
VA MEDICAL CENTER, MEMPHIS, TN
614-19-102
BLDG 7
4/22/2020 MWD QVL
SCALE: = 1'-0"3/8"
0 2 4 62
SCALE: 3/8" = 1'-0"B1
INTERIOR ELEVATION - CORRIDOR C2-27
SCALE: 3/8" = 1'-0"C1
INTERIOR ELEVATION - CORRIDOR C2-27
SCALE: 1/2" = 1'-0"E1
INTERIOR ELEVATION - PT 2C111
SCALE: 1/2" = 1'-0"E6
INTERIOR ELEVATION - BREAKROOM 2C114
SCALE: 1/2" = 1'-0"E8
INTERIOR ELEVATION - BREAKROOM 2C114
SCALE: 1/2" = 1'-0"E3
INTERIOR ELEVATION - KT 2C112
SCALE: 1/2" = 1'-0"F4
INTERIOR ELEVATION - BREAKROOM 2C114
SCALE: 1/2" = 1'-0"F1
INTERIOR ELEVATION - BREAKROOM 2C114
SCALE: = 1'-0"
0 2 42
1/2"
KEYNOTES - INTERIOR ELEVATIONS
NO. DESCRIPTION
1 WALL BASE AS SCHEDULED.
2 HANDRAIL & CRASHRAIL AS SCHEDULED.
3 EXISTING FIRE EXTINGUISHER CABINET TO REMAIN.
4 CORNER GUARD AS SCHEDULED. NOTE THAT PROVIDE CORNER GUARDS AT ALL WALL
CORNERS IN CORRIDORS, EQUIPMENT STORAGE & CLINICS
5 GWB SOFFIT.
6 2 TIER METAL LOCKERS. PROVIDED & INSTALLTED BY GC.
7 PENDANT LIGHT
8 EXISTING EXTERIOR WINDOW TO REMAIN.
9 METAL BRACKET SUPPORT.
10 PROVIDE BLINDS AT EXTERIOR WINDOWS, TYP.
11 HI-LO SELF CONTAINED ELECTRIC WATER COOLERS. ELKAY EZSTL8WSLK - BASIS OF
DESIGN
12 NURSE CALL.
13 FURNITURE SYSTEM. VA PROVIDED, VA INSTALLED.
14 FURNITURE BY VA.
15 WATER & ICE MACHINE. VA PROVIDED. GC TO PROVIDE PLUMBING & ELECTRICAL OUTLET
AND PROVIDE BLOCKING /SUPPORTING AS REQUIRED.
16 WALL MOUNTED LOGO / TEXTS. PROVIDED & INSTALLED BY VA.
17 NEW STOREFRONT PARTITION ON TOP OF 42"H GWB PARTITION, TYP.
VHAMEMBUTLEJ3
Oval
VHAMEMBUTLEJ3
Highlight
VHAMEMBUTLEJ3
Highlight
VHAMEMBUTLEJ3
Highlight
VHAMEMBUTLEJ3
Highlight
VHAMEMBUTLEJ3
Highlight
VHAMEMBUTLEJ3
Highlight
VHAMEMBUTLEJ3
Callout
DEDUCTIVE ALTERNATIVE #3:
DEDUCT COSTS FOR MATERIAL AND LABOR TO PROVIDE NEW ALUMINUM STOREFRONT
ASSEMBLY AND ADD COSTS FOR MATERIALS AND LABOR TO PROVIDE NEW HOLLOW METAL
STOREFRONT ASSEMBLY. DEDUCT MATERIAL AND LABOR COSTS FOR INSTALLATION OF WATER COOLERS.
Line
VINYL "METALEDGE" STRIP
BY TANDUS CENTIVA
RESILIENT FLOOR;
AS SCHEDULED
CONCRETE SLAB
RUBBER; AS
SCHEDULED
*FEATHER FLOOR WITH LEVELING COMPOUND TO ALLOW SMOOTH
TRANSITION BETWEEN BOTH FLOORING SURFACES. CONTRACTOR
TO ENSURE SMOOTH TRANSITION BETWEEN MATERIALS.
RUBBER TO RESILIENT FLOORING
CONCRETE SLAB
RES-1RESILIENT
FLOORING;
AS SCHEDULED
1/8" TILE REDUCER STRIP
BEVELED EDGE (192Z BY
FLEXCO; COLOR TO MATCH
RESILIENT FLOORING)
1"
RESILIENT FLOORING TO EPOXY FLOOR
ELEVATOR ELEVATOR ELEVATOR
STAIR
NO 4
STAIR
NO 5
COMM
2C100
EC
2C101
CORRIDOR
C2-30
OPEN COURTYARD
OPEN COURTYARD
RF-1
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CG
CGCG
CG
CG
CG
CG CG
CG
CG
RF-1
RF-1
RES-1
LVT-1
RF-1
RF-1
LVT-1
LVT-1
LVT-1
RES-1
RES-1
RES-1
RES-1
RES-1
RES-1
RES-1
RES-1
PHYSICAL
THERAPY
(PT)
2C111
KINESIO-THERAPY
(KT)
2C112
STORAGE
2C111A
CORRIDOR
C2-27
PRIVATE
TREATMENT
2C104
STORAGE
2C105
DRIVER
THERAPY
2C106
CHARTING
2C112A
CHARTING
2C113A
EQUIP.
STORAGE
2C110
BREAKROOM
2C114
STORAGE
2C114A
RECREATIONAL
THERAPY
2C120
MEN
(STAFF)
2C116
WOMEN
(STAFF)
2C115
JAN
2C119
STORAGE
2C121
EL
2C118
COMM
2C117
OCCUPATIONAL
THERAPY
(OT)
2C113
MULTI-PURPOSE
ROOM
2C107
WOMEN
(PATIENT)
2C109
MEN
(PATIENT)
2C108
VS-1
PT-2
PT-3
PT-4
PT-2
PT-3
PT-3
PT-4
PT-4
PT-2
FLOOR FINISH LEGEND
RES-1
LVT-1
RF-1
EXISTING
TO REMAIN
NOTE: SEE FINISH LEGEND & SCHEDULE
CORNER
GUARD
HIWC
CG
AREA OF WORK
2ND FLOOR
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Designed
Drawing Title
Approved:
VA FORM 08 - 6231
A
BID DOCUMENTS
FULLY SPRINKLERED
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMP
321 4 5 6 7 8 9 10
Raymond-Pond SDVOSB JV, LLC 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592
POND & Company 3500 Parkway Lane, Suite 500 Peachtree Corners, GA 30092 678-336-7740
Raymond Engineering 1224 Royal Drive, Suite 100 Conyers, GA 30094 770-483-9592Revisions: Date:
ORIGINAL DRAWING SIZE (30"X42")
B
IM
/1
V A
B ld g
S p in a l C o rd
I n ju ry
R e h a b A re a /1
V
A B ld g
A rc h
V
.r v t
/1
/2
:2
:4
P
M
A-631
FINISH SCHEDULE & DETAILS RENOVATE BUILDING 7 SPINAL
CORD INJURY (SCI) REHAB AREA
VA MEDICAL CENTER, MEMPHIS, TN
614-19-102
BLDG 7
4/22/2020 MWD QVL
FINISH SCHEDULE
SPACE FLOOR WALLS CEILING
REMARKSROOM NO. ROOM NAME MAT. BASE NORTH EAST SOUTH WEST FIN.
2C102 WAITING LVT-1 RB-1 PT-1 PT-4 PT-1 PT-1 ACP-L
2C103 CHECK-IN DESK LVT-1 RB-1 PT-1 PT-4 PT-1 PT-1 ACP-L &
GWBC-1
2C104 PRIVATE TREATMENT LVT-1 RB-1 PT-1 PT-2 PT-1 PT-1 ACP-1
2C105 STORAGE LVT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1
2C106 DRIVER THERAPY RF-1 RB-1 PT-3 PT-1 PT-1 PT-1 ACP-1
2C107 MULTI-PURPOSE ROOM LVT-1 RB-1 PT-2 PT-1 PT-1 PT-1 ACP-1
2C108 MEN (PATIENT) RES-1 RES-1 PWT-1 & PT-E PWT-1 & PT-E PWT-1 & PT-E PWT-1 & PT-E GWBC-1
2C109 WOMEN (PATIENT) RES-1 RES-1 PWT-1 & PT-E PWT-1 & PT-E PWT-1 & PT-E PWT-1 & PT-E GWBC-1
2C110 EQUIP. STORAGE VS-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1
2C111 PHYSICAL THERAPY (PT) RF-1 RB-1 PT-2 PT-1 PT-1 PT-1 ACP-1
2C111A STORAGE RF-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1
2C112 KINESIO-THERAPY (KT) RF-1 RB-1 PT-3 PT-1 PT-1 PT-1 ACP-1
2C112A CHARTING RF-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1
2C113 OCCUPATIONAL THERAPY (OT) RF-1 RB-1 PT-1 PT-1 PT-4 PT-1 ACP-1
2C113A CHARTING RF-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1
2C114 BREAKROOM LVT-1 RB-1 PT-1 PT-1 PT-1 PT-3 ACP-1
2C114A STORAGE VS-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1
2C115 WOMEN (STAFF) RES-1 RES-1 PWT-1 & PT-E PWT-1 & PT-E PWT-1 & PT-E PWT-1 & PT-E GWBC-1
2C116 MEN (STAFF) RES-1 RES-1 PWT-1 & PT-E PWT-1 & PT-E PWT-1 & PT-E PWT-1 & PT-E GWBC-1
2C117 COMM -- RB-1 PT-1 PT-1 PT-1 PT-1 --
2C118 EL -- RB-1 PT-1 PT-1 PT-1 PT-1 --
2C119 JAN VS-1 RB-1 PT-1 PT-1 PT-1 PT-1 GWBC-1
2C120 RECREATIONAL THERAPY RF-1 RB-1 PT-1 PT-4 PT-1 PT-1 ACP-1
2C121 STORAGE VS-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1
C2-27 CORRIDOR LVT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1
C2-28 CORRIDOR LVT-1 RB-1 PT-1 PT-1 PT-1 PT-1 ACP-1
FINISH SCHEDULE - GENERAL NOTES
1. IN FINISH SCHEDULE, WHERE "--" IS SHOWN, IT DENOTES EXISTING TO REMAIN.
2. GC IS REQUIRED TO PREP., PATCH, & REPAIR ALL EXISTING SURFACES SCHEDULED TO REMAIN AS
REQUIRED TO RECEIVE NEW FINISHES AS REQUIRED FOR UNIFORM, INTEGRATED, CONSISTENT
CONDITION.
3. GC TO COORDINATE WITH DIVISION 9 SPECIFICATION SECTIONS.
4. PAINT ALL GWB CEILINGS & SOFFITS PER DESIGNATION "GWB" IN FINISH LEGEND, UNLESS NOTED
OTHERWISE, TYPICAL.
5. INFILL & FLOAT ALL LOW AREAS OF FLOOR WITH NEW SELF-LEVELING UNDERLAYMENT CONCRETE
AS APPROVED BY FLOORING MANUFACTURER AND AS REQUIRED FOR FLUSH & UNIFORM
CONDITION WITH THE EXISTING ADJACENT FLOOR LEVEL.
6. INSTALL FINISH MATERIAL PER MANUF. RECOMMENDATIONS AND RECOGNIZED INDUSTRY
STANDARDS UNLESS OTHERWISE SPECIFICALLY NOTED.
7. SEE INT. ELEVATIONS, PLANS, ENLARGED PLANS, ETC. FOR ADDITIONAL PAINT, ACCENT PAINT AND
FINISH LOCATIONS.
8. PREPARE SUB-FLOOR AS PER MANUF. RECOMMENDATIONS AND IN COMPLIANCE WITH INDUSTRY
STANDARD (RH%, SURFACE TEXTURE, ETC.)
9. SLOPE FLOORING 1:50 MAX AT FINISH FLOOR MATERIAL CHANGES (AND OTHER TRANSITIONS, DOOR THRESHOLDS, ETC.) AS NECESSARY.
10. PROVIDE SCHLUTER ROUND EC-EB BRUSHED STAINLESS STEEL OUTSIDE CORNER TRIM AT ALL
TILE TO TILE OUTSIDE EDGE CONDITIONS (U.O.N.).
11. SEE FLOORING PLANS FOR ADDITIONAL FLOOR FINISH INFORMATION.
12. ALL GWB. CEILINGS TO BE PAINTED PT-C
SCALE: N.T.S.B1
TRANSITION DETAILS
ACOUSTIC CEILING TILE AND GYPSUM BOARD CEILING
ACP-1: MANUF: ARMSTRONG
STYLE: ULTIMA HEALTH ZONE #1935
COLOR: WHITE - FINE TEXTURE; NRC 0.70; LR 0.86
SIZE: 24"X24" TEGULAR
NOTES: 15/16" CLEAN ROOM GRID
ACP-L: MANUF: ARMSTRONG
STYLE: ULTIMA #1991
COLOR: WHITE - FINE TEXTURE; NRC 0.65; LR 0.90
SIZE: 12"X60" - TEGULAR
NOTES: 15/16" PRELUDE GRID - AT WAITING 2C102
GWBC-1: GYPSUM BOARD CEILING & ALL SOFFIT
PAINT ALL GWB CEILING AND SOFFITS WITH PT-C.
INSTALL 5/8" WATER- RESISTANT GYPSUM BOARD AT THE
CEILINGS OF RESTROOMS ONLY. ALL OTHER ROOMS
INDICATED AS SUCH WILL BE STANDARD 5/8" GYPSUM BOARD
PAINT
PT-1: MANUF: SHERWIN WILLIAMS
COLOR: NACRE SW 6154
FINISH: EGGSHELL
NOTE: FIELD COLOR
PT-2: MANUF: SHERWIN WILLIAMS
COLOR: TIDEWATER SW6477
FINISH: EGGSHELL
NOTE: ACCENT - TBD BY VA
PT-3: MANUF: SHERWIN WILLIAMS
COLOR: CITRINE SW6714
FINISH: EGGSHELL
NOTE: ACCENT - TBD BY VA
PT-4: MANUF: SHERWIN WILLIAMS
COLOR: SMOKEHOUSE SW7040
FINISH: EGGSHELL
NOTE: ACCENT - TBD BY VA
PT-C: MANUF: SHERWIN WILLIAMS
COLOR: CEILING WHITE
FINISH: SATIN
PT-DT: MANUF: SHERWIN WILLIAMS
COLOR: TBD BY VA
FINISH: SATIN
NOTES: DOOR TRIM / DOOR FRAMES
PT-E: MANUF: SHERWIN WILLIAMS
COLOR: NACRE SW 6154
FINISH: EGGSHELL
NOTES: EPOXY PAINT - GWB WALLS ABOVE TILE & STORAGE ROOM
PLASTIC LAMINATE
PL-1: MANUF: WILSONART
COLOR: ART STUDIO TEAK
SOLID SURFACE
SS-1: MANUF: CORIAN
STYLE: SOLID SURFACE
COLOR: GRAPHITE
NOTE: COUNTERTOPS
LUXURY VINYL TILE FLOORING
LVT-1: MANUF: MANNINGTON
STYLE: WINDSOR
COLOR: OAK CHESTNUT
SIZE: 6X36
EPOXY FLOORING
RES-1: MANUF: INDUSTRIAL APPLICATIONS
COLOR: FLAKE F9303 PUMICE
RUBBER FLOORING
RF-1: MANUF: ROPPE FLOORING
STYLE: SLATE 991
COLOR: 114 LUNAR DUST
CERAMIC TILE
PWT-1: FIELD CERAMIC WALL TILE
MANUF: LUNGARNO
STYLE: URBAN TEXTURES
COLOR: UTT1011 GRAPHITE GRAY GLOSS
SIZE: 4X12
NOTE: TBD BY VA
PWT-2: ACCENT CERAMIC WALL TILE
MANUF: LUNGARNO
STYLE: URBAN TEXTURES
COLOR: UTT1005 GRAY GLOSSY BULLNOSE
SIZE: 4X12
NOTE: ACCENT - TBD BY VA
COVE BASE
RB-1: MANUF: JOHNSONITE
COLOR: TOAST 283
WINDOW TREATMENT
RS-1: MANUAL ROLLER SHADE
MANUF: TIMBER ROLLER SHADES
STYLE: 1% SABLE / ASH PEARL COLOR
NOTE: WITH 4" BRONZE FASCIAS
MISC.
HIWC-1: HIGH IMPACT WALL COVERING
MANUF: C/S GROUP - ACROVYN
STYLE:
COLOR: LATTICE QUARRY
SIZE: WAINSCOT 42" H AFF. PROVIDE WAINSCOT TRIM ON TOP
NOTE: PROVIDE ALL TRIM PIECES AT ALL CORNERS & JOINTS
CG-1: CORNER GUARDS
MANUF: C/S GROUP
STYLE: FULL HEIGHT - STAINLESS STEEL CO/SCO SERIES
NOTE: IN CORRIDOR C3-5
HR-1: HANDRAILS
MANUF: C/S GROUP - ACROVYN
STYLE: CHAMELEON P-OAAN-410
COLOR: BRUSHED STEEL SILVER 410 (TOP)
AND SMOKEY ELM 1351 (BOTTOM)
CR-1: CRASH RAILS
MANUF: C/S GROUP - ACROVYN 4000
STYLE: CHAMELEON P-OAAN-410
COLOR: BRUSHED SILVER 410
DS-1: DOOR STAIN
COLOR: MATCH EXISTING
VCT-1 : VINYL COMPOSITION TILE
TO MATCH EXISTING OR
MANNINGTON COMMERCIAL INSPIRATION 417 CREAM TONES
VB-1: VINYL BASE
TO MATCH EXISTING
FINISH LEGEND
SCALE: 1/8" = 1'-0"F1
PARTIAL 2ND LEVEL - FINISH FLOOR PLAN
KEYPLAN
SCALE: = 1'-0"
0 8 168
1/8"
N
N
VHAMEMBUTLEJ3
Text Box
DEDUCTIVE ALTERNATIVE #2:
DEDUCT ALL MATERIAL AND LABOR COST FOR INSTALLATION OF RF-1 FLOORING IN ALL CLINIC AREAS, AND ADD LABOR AND MATERIAL COSTS TO INSTALL LVT FLOORING IN ALL CLINIC AREAS.
VHAMEMBUTLEJ3
Highlight
VHAMEMBUTLEJ3
Highlight
VHAMEMBUTLEJ3
Highlight
VHAMEMBUTLEJ3
Highlight
VHAMEMBUTLEJ3
Highlight
VHAMEMBUTLEJ3
Highlight
VHAMEMBUTLEJ3
Highlight
VHAMEMBUTLEJ3
Highlight
Highlight
| 61419102_SCIRehab_Deducts.pdf |
| Pages from 614-19-102 - Bldg 7 SCI Rehab_Bid Documents 04.22.20_DRAWINGS.pdf |
| Pages from 614-19-102 - Bldg 7 SCI Rehab_Bid Documents 04.22.20_DRAWINGS-2.pdf |
Pages from 614-19-102 - Bldg 7 SCI Rehab_Bid Documents 04.22.20_DRAWINGS-3.pdf
File details come from the government source that posted it. Updated .