This submittal register outlines the submittal requirements for a construction project to rehabilitate Building 7 at a Spinal Cord Injury Rehabilitation facility. The document specifies numerous submittals required prior to and during construction, including schedules, quality control plans, shop drawings, product data and samples, test reports, warranties, requests for information responses, operation and maintenance manuals, and closeout documents. Submittals are required for items like cast-in-place concrete, metal framing, gypsum board, flooring, lighting fixtures, fire detection systems, HVAC equipment and controls, and low-voltage electrical. The contractor must track submittals using the provided register and submit monthly updates documenting submission and approval dates. The VA will review submittals for compliance and provides timeframes for review and resubmittal responses.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C24920B0003 0007.docx | DOCX document | |
| 36C24920B0003 0006.docx | DOCX document | |
| 36C24920B0003 0005.docx | DOCX document | |
| 36C24920B0003 0004.docx | DOCX document | |
| Amend Rpt 0001.pdf | ||
| Amendment_DRAWINGS.pdf | ||
| 36C24920B0003 0003.docx | DOCX document | |
| RFI Form - Renovate Bldg. 7 SCI Rehab Area.docx | DOCX document | |
| Contractor EMR Certification Form 2020.docx | DOCX document | |
| 36C24920B0003 0002.docx | DOCX document | |
| 36C24920B0003 0001.docx | DOCX document | |
| Drawings 614-19-102.pdf | ||
| Electric-Telecom Drawings.pdf | ||
| 36C24920B0003_1.docx | DOCX document | |
| Addendum G-101.pdf | ||
| Architectural Drawings 2.pdf | ||
| Wage Determination - Shelby County.pdf | ||
| Specifications.pdf | ||
| Architectural Drawings 1.pdf | ||
| Mechanical Drawings.pdf | ||
| Fire-Plumbing Drawings.pdf | ||
| General Drawings.pdf |
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project No. 614-19-102 Amendment 0001
Building 7, SCI Rehabilitations February 05, 2021
00 01 10 - 1
DEPARTMENT OF VETERANS AFFAIRS
VHA MASTER SPECIFICATIONS
TABLE OF CONTENTS
Section 00 01 10
DIVISION 00 - SPECIAL SECTIONS DATE
00 01 07 Professional Seals N/A
00 01 10 Table of Contents 12-18
00 01 15 List of Drawing Sheets 07-15
DIVISION 01 - GENERAL REQUIREMENTS
01 00 00 General Requirements 12-18
01 32 16.15 Project Schedules (Small Projects – Design/Bid/Build) 04-13
01 33 23 Shop Drawings, Product Data, and Samples 05-17
Submittal Register
01 35 26 Safety Requirements 02-17
01 42 19 Reference Standards 05-16
01 45 00 Quality Control 03-19
01 45 29 Testing Laboratory Services 11-18
01 57 19 Temporary Environmental Controls 01-11
01 58 16 Temporary Interior Signage 07-15
01 74 19 Construction Waste Management 09-13
DIVISION 02 – EXISTING CONDITIONS
02 41 00 Demolition 08-17
02 82 13.19 Asbestos Floor Tile and Mastic Abatement 09-15
DIVISION 03 – CONCRETE
03 30 53 (Short-Form) Cast-in-Place Concrete 02-16
DIVISION 04 – MASONRY (NOT USED)
DIVISION 05 – METALS (NOT USED)
DIVISION 06 – WOOD, PLASTICS AND COMPOSITES
06 10 00 Rough Carpentry 10-17
06 20 00 Finish Carpentry 08-16
DIVISION 07 - THERMAL AND MOISTURE PROTECTION
07 21 13 Thermal Insulation 10-17
07 84 00 Firestopping 02-16
07 92 00 Joint Sealants 10-17
DIVISION 08 - OPENINGS
08 11 13 Hollow Metal Doors and Frames 08-16
McWhirterN Text Box Amdt. #0001
McWhirterN Text Box Amdt. #0001
00 01 10 - 2
08 14 00 Interior Wood Doors 02-16
08 31 13 Access Doors and Frames 02-16
08 41 13 Aluminum-Framed Entrances and Storefronts 08-16
08 71 00 Door Hardware 01-16
08 71 13.11 Low Energy Power Assist Door Operators 08-16
08 80 00 Glazing 10-15
DIVISION 09 – FINISHES
09 05 16 Subsurface Preparation for Floor Finishes 02-15
09 22 16 Non-Structural Metal Framing 06-18
09 29 00 Gypsum Board 06-18
09 30 13 Ceramic/Porcelain Tiling 09-15
09 51 00 Acoustical Ceilings 12-18
09 65 13 Resilient Base and Accessories 02-16
09 65 16 Resilient Sheet Flooring 05-18
09 65 19 Resilient Tile Flooring 05-18
09 67 23.20 Resinous (Epoxy Base) with Vinyl Chip Broadcast (RES-1) 07-14
09 91 00 Painting 01-16
DIVISION 10 – SPECIALTIES
10 14 00 Signage 10-15
10 21 23 Cubicle Curtain Tracks 05-15
10 26 00 Wall and Door Protection 10-15
10 28 00 Toilet, Bath, and Laundry Accessories 02-16
10 51 13 Metal Lockers N/A
10 56 13 Metal Storage Shelving N/A
DIVISION 11 – EQUIPMENT (NOT USED)
DIVISION 12 – FURNISHINGS
12 24 00 Window Shades 08-17
12 36 00 Countertops 12-18
DIVISION 13 - SPECIAL CONSTRUCTION
13 05 41 Seismic Restraint Requirements for Non-Structural
Components
01-14
DIVISION 14 – CONVEYING EQUIPMENT (NOT USED)
DIVISION 21 - FIRE SUPPRESSION
21 13 13 Wet-Pipe Sprinkler Systems 06-15
DIVISION 22 – PLUMBING
22 05 11 Common Work Results for Plumbing 07-16
22 05 23 General-Duty Valves for Plumbing Piping 09-15
22 07 11 Plumbing Insulation 09-15
McWhirterN Text Box Amdt. #0001
McWhirterN Text Box Amdt. #0001
McWhirterN Text Box Amdt. #0001
McWhirterN Text Box Amdt. #0001
McWhirterN Text Box Amdt. #0001
McWhirterN Text Box Amdt. #0001
00 01 10 - 3
22 08 00 Commissioning of Plumbing Systems 11-16
22 11 00 Facility Water Distribution 09-15
22 13 00 Facility Sanitary and Vent Piping 09-15
22 40 00 Plumbing Fixtures 09-15
DIVISION 23 – HEATING, VENTILATING, AND AIR
CONDITIONING (HVAC)
23 05 11 Common Work Results for HVAC 08-17
23 05 41 Noise and Vibration Control for HVAC Piping and
Equipment
02-15
23 05 93 Testing, Adjusting, and Balancing for HVAC 02-15
23 07 11 HVAC and Boiler Plant Insulation 02-15
23 08 00 Commissioning of HVAC Systems 11-16
23 09 23 Direct-Digital Control System for HVAC 09-11
23 21 13 Hydronic Piping 08-17 23 31 00 HVAC Ducts and Casings 03-13
23 36 00 Air Terminal Units 02-15
23 37 00 Air Outlets and Inlets 02-15
DIVISION 25 – INTEGRATED AUTOMATION (NOT USED)
DIVISION 26 – ELECTRICAL
26 05 11 Requirements for Electrical Installations 01-16
26 05 19 Low-Voltage Electrical Power Conductors and Cables 01-17
26 05 26 Grounding and Bonding for Electrical Systems 01-17
26 05 33 Raceway and Boxes for Electrical Systems 01-18
26 09 23 Lighting Controls 01-18
26 27 26 Wiring Devices 01-18
26 51 00 Interior Lighting 01-18
DIVISION 27 – COMMUNICATIONS
27 05 11 Requirements for Communications Installations 06-15
27 05 33 Raceways and Boxes for Communications Systems 10-18
27 10 00 Control, Communication and Signal Wiring 06-15
27 52 23 Nurse Call and Code Blue Systems 10-18
DIVISION 28 – ELECTRONIC SAFETY AND SECURITY
28 31 00 Fire Detection and Alarm 10-11
DIVISION 31 – EARTHWORK (NOT USED)
DIVISION 32 – EXTERIOR IMPROVEMENTS (NOT USED)
DIVISION 33 – UTILITIES (NOT USED)
DIVISION 34 – TRANSPORTATION (NOT USED)
DIVISION 48 – ELECTRICAL POWER GENERATION (NOT USED)
614-19-102 Building 7 SCI Rehab - VA Memphis Submittal Register
Contractor Action
Government Action
Submit Needed By
Approval Needed By
Material Needed By
VA Received Date
VA Returned Date
01 32 16.15 PROJECT SCHEDULES
1.5 A
Within 45 calendar days after receipt of Notice to Proceed, the Contractor shall submit for the Contracting Officer's review; three blue line copies of the interim schedule on sheets of paper 765 x 1070 mm (30 x 42 inches) and an electronic file in the previously approved CPM schedule program. [See complete requirements listed in spec]. Schedule
01 45 00 QUALITY CONTROL 1.3 1.a Interim CQC Plan Preconstruction 1.b CQC Plan Preconstruction 1.c Additional Requirements for Design Quality Control (DQC) Plan Preconstruction 2.a Discipline-Specific Checklists Design Data 2.b Design Quality Control Design Data 3.a Verification Statement Test Report
01 57 19 TEMPORARY
ENVIRONMENTAL
CONTROLS 1.4 A.1
A written and/or graphic Environmental Protection Plan including, but not limited to, the following. Environmental Plans
A.1.a Name(s) of person(s) within the Contractor's organization responsible for ensuring adherence to the Environmental Protection Plan Qualifications
A.1.b Name(s) and qualifications of person(s) responsible for manifesting hazardous waste to be removed from the site. Qualifications
A.1.c Name(s) and qualifications of person(s) responsible for training the Contractor's environmental protection personnel. Qualifications
A.1.d Description of the Contractor's environmental protection personnel training program. Training Plans
A.1.e
A list of Federal, State, and local laws, regulations, and permits concerning environmental protection, pollution control, noise control, and abatement that are applicable to the Contractor's proposed operations and the requirements imposed by those laws, regulations, and permits. Environmental Plans
A.1.f
Methods for protection of features to be preserved within authorized work areas including trees, shrubs, vines, grasses, ground cover, landscape features, air and water quality, fish and wildlife, soil, historical, and archeological and cultural resources. Environmental Plans
A.1.g
Procedures to provide the environmental protection that comply with the applicable laws and regulations. Describe the procedures to correct pollution of the environment due to accident, natural causes, or failure to follow the procedures as described in the Environmental Protection Plan. Environmental Plans
A.1.h Permits, licenses, and the location of the solid waste disposal area. Environmental Plans
Contractor: Schedule Dates
Su bm itt al n o.
Sp ec ifi ca tio n
Spec Title
Pa ra gr ap h no
It em n
o. Description of Submittal Type of Submittal
Contractor Action
Government Action
Submit Needed By
Approval Needed By
Material Needed By
VA Received Date
VA Returned Date
Contractor: Schedule Dates
Su bm itt al n o.
Sp ec ifi ca tio n
Spec Title
Pa ra gr ap h no
It em n
o. Description of Submittal Type of Submittal
A.1.i
Drawings showing locations of any proposed temporary excavations or embankments for haul roads, stream crossings, material storage areas, structures, sanitary facilities, and stockpiles of excess or spoil materials.
Include as part of an Erosion Control Plan approved by the District Office of the U.S. Soil Conservation Service and the Department of Veterans Affairs. Environmental Plans
A.1.j Environmental Monitoring Plans for the job site including land, water, air, and noise. Environmental Plans
A.1.k
Work Area Plan showing the proposed activity in each portion of the area and identifying the areas of limited use or nonuse. Plan should include measures for marking the limits of use areas. This plan may be incorporated within the Erosion Control Plan. Environmental Plans
01 74 19 CONSTRUCTION WASTE
MANAGEMENT 1.5 B Demolition debris management plan: Waste Management Plans
B.1 Procedures to be used for debris management. Waste Management Plans B.2 Techniques to be used to minimize waste generation. Waste Management Plans
B.3 Analysis of the estimated job site waste to be generated (salvaged, reused, recycled, landfilled). Waste Management Plans
B.4 Detailed description of the Means/Methods to be used for material handling [see details in spec]. Waste Management Plans
C
Designated Manager responsible for instructing personnel, supervising, documenting, and administrating over meetings relevant to the Waste Management Plan. Qualifications
D
Monthly summary of construction and demolition debris diversion and disposal, quantifying all materials generated at the work site and disposed of or diverted from disposal through recycling. Waste Management Plans
02 82 13.19 ASBESTOS FLOOR TILE AND
MASTIC ABATEMENT
2.5.1 A
Submit detailed work schedule for the entire project reflecting contract documents and the phasing/schedule requirements from the CPM chart. Work Schedule
B Submit staff organization chart showing all personnel who will be working on the project and their capacity/function [including all details listed in spec].
Organization chart / Qualifications
C
Submit Asbestos Hazard Abatement Plan developed specifically for this project, incorporating the requirements of the specifications, prepared, signed and dated by the CPIH/CIH.
Asbestos Hazard Abatement Plan
D Submit specifics of the materials and equipment to be used for this project [including all details listed in spec]. Manuf. Lit. & Data
E
Submit name, location, and phone number of the approved landfill;
proof/verification the landfill is approved for ACM disposal [including all details listed in spec]. Certifications
Contractor Action
Government Action
Submit Needed By
Approval Needed By
Material Needed By
VA Received Date
VA Returned Date
Contractor: Schedule Dates
Su bm itt al n o.
Sp ec ifi ca tio n
Spec Title
Pa ra gr ap h no
It em n
o. Description of Submittal Type of Submittal
F
Submit required notifications and arrangements made with regulatory agencies having regulatory jurisdiction and the specific contingency/emergency arrangements made with local health, fire, ambulance, hospital authorities and any other notifications/arrangements. Certifications
G
Submit the name, location and verification of the laboratory and/or personnel to be used for analysis of air and/or bulk samples [including all details listed in spec]. Certifications
H
Submit the following evidence of asbestos abatement company's qualifications. Make sure that all references are current and verifiable by providing current phone numbers and documentation. Qualifications
I
Submit information on personnel: Provide a resume; address each item completely; copies of certificates, accreditations, and licenses. Submit an affidavit signed by the CPIH/CIH stating that all personnel submitted below have medical records in accordance with OSHA... [Include all details listed in spec]. Qualifications
J
Submit copies of State license for asbestos abatement; copy of insurance policy, including exclusions with a letter from agent stating details of coverage provided [including all details listed in spec].
Qualifications / Certifications
L Submit, before the start of work, the manufacturer's technical data for all types of encapsulants, all MSDS, and application instructions. Manuf. Lit. & Data
2.5.2 A
During abatement: A daily log submitted to the VPIH/CIH documenting dates and times [including all details listed in spec]. Daily Logs / Reports
B
During abatement: The CPIH/CIH shall document and maintain the inspection and approval of the regulated area preparation daily, prior to and during work [including all items listed in spec]. Daily Logs / Reports
2.5.3 -
Submittal at completion of abatement: A project report consisting of the daily log book requirements and documentation of events during the abatement project [including all details listed in spec]. Daily Logs / Reports
03 30 53 (SHORT FORM) CAST IN
PLACE CONCRETE 1.4 B.1 Large scale drawings of reinforcing steel Submittal Drawings
C.1 Concrete Mix Design Manuf. Lit. & Data C.2 Certify products comply with specifications: Air-entraining admixture, Manuf. Lit. & Data C.3 Indicate manufacturer's recommendation for each application Manuf. Lit. & Data
D.a Certify products comply with specifications: Each ready-mix concrete batch delivered to site Certificates
06 10 00 ROUGH CARPENTRY
1.3 B
Shop Drawings showing framing connection details, fasteners, connections and dimensions. Shop Drawings
C.1 Data for lumber, panels, hardware and adhesives [see spec]. Manuf. Lit. & Data C.2 Data for wood-preservative treatment [see spec]. Manuf. Lit. & Data C.3 Data for fire retardant treatment [see spec]. Manuf. Lit. & Data
Contractor Action
Government Action
Submit Needed By
Approval Needed By
Material Needed By
VA Received Date
VA Returned Date
Contractor: Schedule Dates
Su bm itt al n o.
Sp ec ifi ca tio n
Spec Title
Pa ra gr ap h no
It em n
o. Description of Submittal Type of Submittal
C.4
For products receiving a waterborne treatment, submit statement that moisture content of treated materials was reduced to levels specified before shipment to project site. Manuf. Lit. & Data
D Manufacturer’s certificate for unmarked lumber. Certificates
06 20 00 FINISH CARPENTRY
1.4 B
Show size, configuration, and fabrication and installation details [including all details listed in spec]. Submittal Drawings
C.1 Description of each product: Finish hardware, Sinks with fittings, Electrical components. Manuf. Lit. & Data
C.2 List of acceptable sealers for fire retardant materials. Manuf. Lit. & Data C.3 Installation instructions. Manuf. Lit. & Data
D
Plastic Laminate Finished Plywood and Particleboard: 150 mm by 300 mm (6 by 12 inches) long, each type and color. Submit quantity required to show full color and texture range. Samples
E.1 Certify products comply with specifications: Moisture content of materials. Certificates
F.1 Substantiate qualifications comply with specifications: Fabricator with project experience list. Qualifications
F.2 Substantiate qualifications comply with specifications: Installer with project experience list. Qualifications
07 21 13 THERMAL INSULATION
1.4 B
Submittal Drawings showing insulation type, thickness, and R-value for each location. Submittal Drawings
C.1 Description of each product. Manuf. Lit. & Data
C.2 Adhesive indicating manufacturer recommendation for each application. Manuf. Lit. & Data
07 84 00 FIRESTOPPING 1.3 B Installer qualifications. Qualifications C Inspector qualifications. Qualifications
D Manufacturers literature, data, and installation instructions for types of firestopping and smoke stopping used. Manuf. Lit. & Data
E List of FM, UL, or WH classification number of systems installed. Product Info
F Certified laboratory test reports for ASTM E814 tests for systems not listed by FM, UL, or WH proposed for use. Test Reports
G Certificates from manufacturer attesting that firestopping materials comply with the specified requirements. Certificates
07 92 00 JOINT SEALANTS 1.5 B Installer qualifications. Qualifications C Contractor certification. Certifications D Manufacturer's installation instructions for each product used. Manuf. Instructions E Cured samples of exposed sealants for each color. Samples
F.1 Primers. Manuf. Lit. & Data
F.2 Sealing compounds, each type, including compatibility when different sealants are in contact with each other. Manuf. Lit. & Data
G Manufacturer warranty. Warranty
Contractor Action
Government Action
Submit Needed By
Approval Needed By
Material Needed By
VA Received Date
VA Returned Date
Contractor: Schedule Dates
Su bm itt al n o.
Sp ec ifi ca tio n
Spec Title
Pa ra gr ap h no
It em n
o. Description of Submittal Type of Submittal
08 11 13 HOLLOW METAL DOORS
AND FRAMES 1.4 B.1 Show size, configuration, and fabrication and installation details. Submittal Drawings
C.1 Description of each product. Manuf. Lit. & Data
C.2 Include schedule showing each door and frame requirements fire label and smoke control label for openings. Manuf. Lit. & Data
C.3 Installation instructions. Manuf. Instructions D Certify each product complies with specifications: Sound rated door. Test Reports
E.1 Substantiate manufacturer's qualifications comply with specifications. Qualifications
08 14 00 INTERIOR WOOD DOORS 1.4 B.1 Show size, configuration, and fabrication and installation details. Submittal Drawings B.2 Include details of glazing. Submittal Drawings
B.3 Indicate project specific requirements not included in Manufacturer's Literature and Data submittal. Submittal Drawings
C Description of each product: Fire rated doors showing conformance with NFPA 80. Manuf. Lit. & Data
D.1
Sample: Corner section of flush veneered door 300 mm (12 inches) square, showing details of construction, labeled to show grade and type number and conformance to specified standard. Samples
D.2
Veneer sample 200 mm by 275 mm (8 inch by 11 inch) showing specified wood species sanded to receive a transparent finish. Factory finish veneer sample where the prefinished option is accepted. Samples
E.1 Screw Holding Capacity Test. Test Reports E.2 Cycle-Slam Test. Test Reports E.3 Hinge-Loading Test. Test Reports F.1 Care instructions for each exposed finish product. O&M Data
08 31 13 ACCESS DOORS AND
FRAMES 1.4 B.1 Show size, configuration, and fabrication and installation details. Submittal Drawings
C.1 Description of each product. Manuf. Lit. & Data C.2 Installation instructions. Manuf. Lit. & Data
08 41 13 ALUMINUM-FRAMED
ENTRANCES AND
STOREFRONTS 1.5 B.1 Show size, configuration, and fabrication and installation details. Submittal Drawings
B.2 Show anchorage and reinforcement. Submittal Drawings
B.3 Show interface and relationship to adjacent work, including thermal, air, and water barrier continuity. Submittal Drawings
C.1 Description of each product. Manuf. Lit. & Data C.2 Doors, each type. Manuf. Lit. & Data C.3 Entrance and Storefront construction. Manuf. Lit. & Data C.4 Installation instructions. Manuf. Lit. & Data C.5 Warranty. Warranty
Contractor Action
Government Action
Submit Needed By
Approval Needed By
Material Needed By
VA Received Date
VA Returned Date
Contractor: Schedule Dates
Su bm itt al n o.
Sp ec ifi ca tio n
Spec Title
Pa ra gr ap h no
It em n
o. Description of Submittal Type of Submittal
C.6 Aluminum Anodized Finish: Sample extrusions minimum 150 mm (6 inches) long for each specified color in sets of three showing maximum color range. Samples
D.1 Recycled Content: Identify post-consumer and pre-consumer recycled content percentage by weight. Sustainable Construction
E Certify each product complies with specifications. Test Reports F.1 Certify anodized finish thickness. Certificates G.1 Qualifications for manufacturer with project experience list Qualifications G.2 Qualifications for installer with project experience list Qualifications G.3 Qualifications for welders and welding procedures Qualifications
H
Delegated Design Drawings and Calculations: Signed and sealed by responsible design professional. Show location and magnitude of loads applied to building structural frame. Identify deviations from details shown on drawings. Submittal Drawings
I Care instructions for each exposed finish product. O&M Data
08 71 00 DOOR HARDWARE
1.6 B
Submit 6 copies of the schedule per Section 01 33 23. Submit 2 final copies of the final approved schedules to VAMC Locksmith as record copies (VISN Locksmith if the VAMC does not have a locksmith). Submittal Instructions Hardware schedule in the format shown in spec. Design Data
C.1
All hardware items (proposed for the project) that have not been previously approved by Builders Hardware Manufacturers Association shall be submitted for approval. Tag and mark all items with manufacturer's name, catalog number and project number. Manuf. Lit. & Data
D
Certificate of Compliance and Test Reports: Submit certificates that hardware conforms to the requirements specified herein. Certificates shall be accompanied by copies of reports as referenced. The testing shall have been conducted either in the manufacturer's plant and certified by an independent testing laboratory or conducted in an independent laboratory, within four years of submittal of reports for approval. Certificates
08 71 13.11 LOW ENERGY POWER
ASSIST DOOR OPERATORS
1.5 B Show size, configuration, and fabrication and installation details. Submittal Drawings C.1 Description of each product. Manuf. Lit. & Data C.2 Maintenance manuals. Manuf. Lit. & Data C.3 Installation instructions. Manuf. Lit. & Data C.4 Warranty. Warranties D.1 Door Operator: Full sized, complete assembly. Samples E Show door operator is UL Listed for specified application. Certificates
F.1 Care instructions for each exposed finish product. Manuf. Lit. & Data
Contractor Action
Government Action
Submit Needed By
Approval Needed By
Material Needed By
VA Received Date
VA Returned Date
Contractor: Schedule Dates
Su bm itt al n o.
Sp ec ifi ca tio n
Spec Title
Pa ra gr ap h no
It em n
o. Description of Submittal Type of Submittal
F.2 Start-up, maintenance, troubleshooting, emergency, and shut-down instructions for each operational product. Manuf. Lit. & Data
08 80 00 GLAZING
1.5 B
Manufacturer's certificate stating that fire-protection-rated glazing units meet code requirements for fire-resistance-rated assembly and applicable safety glazing requirements. Certificates
C Manufacturer warranty. Warranties D.1 Glass, each kind required. Manuf. Lit. & Data D.2 Elastic compound for metal sash glazing. Manuf. Lit. & Data D.3 Glazing cushion. Manuf. Lit. & Data D.4 Sealing compound. Manuf. Lit. & Data
09 05 16 SUBSURFACE PREPARATION
FOR FLOOR FINISHES
1.3 B
Written approval confirming product compatibility with subfloor material manufacturer and the flooring manufacturer. Approvals
C.1 Moisture remediation system Product Data C.2 Underlayment Primer Product Data C.3 Cementitious Self-Leveling Underlayment Product Data
C.4 Cementitious Trowel-Applied Underlayment (Not suitable for resinous floor finishes) Product Data
D.1
Moisture test and pH results performed by a qualified independent testing agency or warranty holding manufacturer’s technical representative. Test Data
09 22 16 NON-STRUCTURAL METAL
FRAMING 1.4 B.1 Studs, runners and accessories. Manuf. Lit. & Data
B.2 Hanger inserts. Manuf. Lit. & Data B.3 Channels (Rolled steel). Manuf. Lit. & Data B.4 Furring channels. Manuf. Lit. & Data B.5 Screws, clips and other fasteners. Manuf. Lit. & Data C.1 Typical ceiling suspension system. Shop Drawings
C.2 Typical metal stud and furring construction system including details around openings and corner details. Shop Drawings
C.3 Typical fire rated assembly and column fireproofing showing details of construction same as that used in fire rating test. Shop Drawings
D Fire rating test designation, each fire rating required for each assembly. Test Data
09 29 00 GYPSUM BOARD 1.4 B.1 Cornerbead and edge trim. Manuf. Lit. & Data B.2 Finishing materials. Manuf. Lit. & Data B.3 Laminating adhesive. Manuf. Lit. & Data B.4 Gypsum board, each type. Manuf. Lit. & Data
C.1 Typical gypsum board installation, showing corner details, edge trim details and the like. Shop Drawings
Contractor Action
Government Action
Submit Needed By
Approval Needed By
Material Needed By
VA Received Date
VA Returned Date
Contractor: Schedule Dates
Su bm itt al n o.
Sp ec ifi ca tio n
Spec Title
Pa ra gr ap h no
It em n
o. Description of Submittal Type of Submittal
C.2 Typical sound rated assembly, showing treatment at perimeter of partitions and penetrations at gypsum board. Shop Drawings
C.4 Typical fire rated assembly and column fireproofing, indicating details of construction same as that used in fire rating test. Shop Drawings
D.1 Fire rating test, each fire rating required for each assembly. Test Data D.2 Sound rating test. Test Data
E Certify that gypsum board types, gypsum backing board types, cementitious backer units, and joint treating materials do not contain asbestos material. Certificates
09 30 13 CERAMIC/PORCELAIN
TILING 1.3 B.1 Base tile, each type, each color, each size. Samples
B.2 Glass Mosaic tile panels, 228 by 228 mm (9 by 9 inches), each type, color, size and pattern. Samples
B.3 Porcelain tile, each type, color, patterns and size. Samples
C.1 Glass and porcelain tile, marked to show each type, size, and shape required. Product Data C.2 Cementitious backer unit. Product Data C.3 Divider strip. Product Data C.4 Elastomeric membrane and bond coat. Product Data C.5 Reinforcing tape. Product Data C.6 Leveling compound. Product Data C.7 Latex-portland cement mortar and grout. Product Data C.8 Commercial portland cement grout. Product Data C.9 Waterproofing isolation membrane. Product Data
C.10 Fasteners. Product Data D.1 Master grade certificate, ANSI A137.1. Certificates
D.2 Manufacturer's certificates indicating that the materials comply with specification requirements [for all materials listed in spec]. Certificates
E.1 Submit letter stating installer’s experience. Qualifications
09 51 00 ACOUSTICAL CEILINGS
1.5 B.1
Submittal Drawings: Show size, configuration, and fabrication and installation details. Submittal Drawings
C.1 Description of each product. Manuf. Lit. & Data
C.2 Ceiling suspension system indicating manufacturer recommendation for each application. Manuf. Lit. & Data
C.3 Installation instructions. Manuf. Lit. & Data C.4 Warranty. Warranty D.1 Acoustical units, 150 mm (6 inches) in size, each type Samples D.2 Suspension system, trim and molding, 300 mm (12 inches) long Samples D.3 Colored markers for access service. Samples
E.1 Certify each type of acoustical unit product complies with specifications. Certifications
F.1 Substantiate manufacturer's qualifications comply with specifications. Qualifications
Contractor Action
Government Action
Submit Needed By
Approval Needed By
Material Needed By
VA Received Date
VA Returned Date
Contractor: Schedule Dates
Su bm itt al n o.
Sp ec ifi ca tio n
Spec Title
Pa ra gr ap h no
It em n
o. Description of Submittal Type of Submittal
G.1 Care instructions for each exposed finish product. O&M Data
09 65 13 RESILIENT BASE AND
ACCESSORIES 1.4 B.1 Description of each product. Manuf. Lit. & Data
B.2 Adhesives and primers indicating manufacturer's recommendation for each application. Manuf. Lit. & Data
B.3 Installation instructions. Manuf. Lit. & Data C.1 Resilient Base: 150 mm (6 inches) long, each type and color. Samples D.1 Care instructions for each exposed finish product. O&M Data
09 65 16 RESILIENT SHEET FLOORING
1.4 A Show size, configuration, and fabrication and installation details. Submittal Instructions
B.1 Description of each product. Manuf. Lit. & Data B.2 Application, installation instructions Manuf. Lit. & Data B.3 Warranty Warranty
C Sheet material, 38 mm by 300 mm (1-1/2 inch by 12 inch), of each color and pattern. Samples
C.1 Layout of joints showing patterns where joints are expressed, and type and location of obscure type joints. Indicate orientation of directional patterns. Shop Drawings
C.2 Quality Control Certificate Submittals and lists specified in paragraph, QUALIFICATIONS Certificates
D Certify products comply with specifications. Certificates E.1 Certify manufacturer qualifications comply with specifications Qualifications E.2 Certify installer qualifications comply with specifications Qualifications
09 65 19 RESILIENT TILE FLOORING 1.3 B.1 Description of each product. Manuf. Lit. & Data
B.2 Resilient material manufacturer’s recommendations for adhesives, underlayment, primers, and polish. Manuf. Lit. & Data
B.3 Application, installation and maintenance instructions. Manuf. Lit. & Data C.1 Tile: Each type, color, thickness and finish. Samples D.1 Layout of patterns as shown on the construction documents. Shop Drawings
E.1
Abrasion resistance: Depth of wear for each tile type and color and volume loss of tile, certified by independent laboratory. Tested per ASTM F510/F510M. Test Reports
E.2 Moisture and pH test results as per Section 09 05 16, SUBSURFACE PREPARATION FOR FLOOR FINISHES. Test Reports
09 67 23.20 RESINOUS (EPOXY BASE)
WITH VINYL CHIP
BROADCAST (RES-1) 1.3 B.1 Description of each product to be provided. Manuf. Lit. & Data
B.2 Application and installation instructions. Manuf. Lit. & Data
B.3 Maintenance Instructions: Submit manufacturer’s written instructions for recommended maintenance practices. Manuf. Lit. & Data
C Qualification Data: For Installer. Qualifications
Contractor Action
Government Action
Submit Needed By
Approval Needed By
Material Needed By
VA Received Date
VA Returned Date
Contractor: Schedule Dates
Su bm itt al n o.
Sp ec ifi ca tio n
Spec Title
Pa ra gr ap h no
It em n
o. Description of Submittal Type of Submittal
D.1 Each color and texture specified on drawings. Samples
D.2
Samples for verification: For each (color and texture) resinous flooring system required, 6 inches (152 mm) square, applied to a rigid backing by installer for this project. Samples
D.3
Sample showing construction from substrate to finish surface in thickness specified and color and texture of finished surfaces. Finished flooring must match the approved samples in color and texture. Samples
E Shop Drawings: Include plans, sections, component details, and attachment to other trades. Indicate layout of the following: Shop Drawings
E.1 Patterns. Shop Drawings E.2 Edge configurations. Shop Drawings
F.1 Manufacturer's certification of material and substrate compliance with specification. Certifications
F.2 Manufacturer's approval of installers. Approvals
F.3 Contractor's certificate of compliance with Quality Assurance requirements. Certificates G Warranty: As specified in this section. Warranty
09 91 00 PAINTING 1.3 B Painter qualifications. Qualifications
C.1
Before work is started, or sample panels are prepared, submit manufacturer's literature and technical data per the current Master Painters Institute (MPI) "Approved Product List" indicating brand label, product name and product code... [see details in spec]. Manuf. Lit. & Data
D.1 After painters' materials have been approved and before work is started, submit sample panels showing each type of finish and color specified. Samples
D.2 Panels to Show Color: Composition board, 100 x 250 mm (4 x 10 inch). Samples
D.3
Panel to Show Transparent Finishes: Wood of same species and grain pattern as wood approved for use, 100 x 250 mm (4 x 10 inch face) minimum, and where both flat and edge grain will be exposed, 250 mm (10 inches) long by sufficient size, 50 x 50 mm (2 x 2 inch) minimum or actual wood member to show complete finish. Samples
D.4 Labels attached to panel stating items listed in spec. Samples
D.5 Strips showing not less than 50 mm (2 inch) wide strips of undercoats and 100 mm (4 inch) wide strip of finish coat. Samples
E Sample of identity markers if used. Samples
F.1 Certificate that manufacturer's paint substituted for Federal Specification paints meets or exceeds performance of paint specified. Certificates
F.2 Intumescent clear coating or fire retardant paint. Certificates
10 14 00 SIGNAGE
1.4 B
Interior Sign Samples: Sign panels and frames, with letters and symbols, for each sign type. Samples
B.1 Sign Panel, 203 x 254 mm (8 x 10 inches), with letters. Samples
Contractor Action
Government Action
Submit Needed By
Approval Needed By
Material Needed By
VA Received Date
VA Returned Date
Contractor: Schedule Dates
Su bm itt al n o.
Sp ec ifi ca tio n
Spec Title
Pa ra gr ap h no
It em n
o. Description of Submittal Type of Submittal
B.2 Color samples of each color, 152 x 152 mm (6 x 6 inches). Show anticipated range of color and texture. Samples
B.3 Sample of typeface, arrow and symbols in a typical full size layout. Samples
C.1 Manufacturer's literature showing the methods and procedures proposed for the anchorage of the signage system to each surface type. Manuf. Lit. & Data
C.2 Manufacturer’s printed specifications and maintenance instructions. Manuf. Lit. & Data
D Sign Location Plan, showing location, type and total number of signs required. Submittal Drawings
E
Shop Drawings: Scaled for manufacture and fabrication of sign types. Identify materials, show joints, welds, anchorage, accessory items, mounting and finishes. Shop Drawings
F Full size layout patterns for dimensional letters. Design Data G Manufacturer's qualifications. Qualifications H Installer's qualifications. Qualifications
10 21 23 CUBICLE CURTAIN TRACKS
1.3 B.1
305 mm (12 inch) long piece of cubicle curtain track with carrier access and end stop. Samples
B.2 Clip anchor for fastening track to grid system of acoustical ceilings. Samples B.4 Curtain carrier for attaching curtain to track. Samples C Showing layout of tracks and method of anchorage. Shop Drawings D Cubicle curtain track. Manuf. Lit. & Data
10 26 00 WALL AND DOOR
PROTECTION 1.4 B Shop Drawings: Show design and installation details. Shop Drawings
C.1 Handrail/Wall Guard Combinations. Manuf. Lit. & Data C.2 Wall Guards. Manuf. Lit. & Data C.3 Corner Guards. Manuf. Lit. & Data C.4 Door/Door Frame Protectors. Manuf. Lit. & Data
D Test report showing that resilient material complies with specified fire and safety code requirements. Test Report
E Manufacturer's qualifications. Qualifications F Installer's qualifications. Qualifications G Manufacturer's warranty. Warranty
10 28 00 TOILET, BATH, AND
LAUNDRY ACCESSORIES 1.3 B.1
Submittal Drawings: Show size, configuration, and fabrication, anchorage and installation details. Submittal Drawings
B.2 Submittal Drawings: Show mounting locations and heights. Submittal Drawings C.1 Description of each product. Manuf. Lit. & Data C.2 Installation instructions for each product. Manuf. Lit. & Data D.1 Full sized, complete assembly of each product specified. Samples
E.1 Certify soap dispensers are fabricated of material that will not be affected by liquid soap, aseptic detergents, and hexachlorophene solutions. Certificates
F.1 Certify manufacturer qualifications comply with specifications. Qualifications
Contractor Action
Government Action
Submit Needed By
Approval Needed By
Material Needed By
VA Received Date
VA Returned Date
Contractor: Schedule Dates
Su bm itt al n o.
Sp ec ifi ca tio n
Spec Title
Pa ra gr ap h no
It em n
o. Description of Submittal Type of Submittal
G.1 Care instructions for each exposed finish product. O&M Data
10 51 13 METAL LOCKERS
1.3 A.1
Include construction details, material descriptions, dimensions of individual components and profiles, and finishes for each type of metal locker. Product Data
B.1 Include plans, elevations, sections, details, and attachments to other work. Shop Drawings B.2 Show locker trim and accessories. Shop Drawings B.3 Include locker identification system and numbering sequence. Shop Drawings C Samples for each color specified, in manufacturer's standard size. Samples D Product schedule for lockers. Schedule
1.4 A Qualification Data: For Installer Qualifications
B Sample Warranty: For special warranty. Warranty
1.5 A
Maintenance data for adjusting, repairing, and replacing locker doors and latching mechanisms to include in maintenance manuals. O&M Data
1.6 A
Furnish extra materials that match products installed and that are packaged with protective covering for storage and identified [including all details listed in spec]
Maintenance Material Submittals
10 56 13 METAL STORAGE SHELVING
1.3 A Product Data: For each type of product. Manuf. Lit. & Data
B
Shop Drawings: For metal storage shelving. (1) Include plans, elevations, sections, and attachment details. (2) Include installation details of connectors, lateral bracing, and special bracing. Shop Drawings
12 24 00 WINDOW SHADES
1.4 B.1
Shade cloth, each type, 610 mm (24 inch) square, including cord and ring, showing color, finish and texture. Samples
B.2 Venetian blind slats, 305 mm (12 inches) long, including cord and tape, showing color and finish. Samples
C Details of construction and hardware for: Cloth and window shades, Vertical blinds Manuf. Lit. & Data
D Fabrication and installation details for cloth shades, including shade cloth materials, their orientation to rollers, and their seam and batten locations. Shop Drawings
E Submit report of flame spread and smoke developed during product material tests by independent testing laboratory. Test Reports
F Manufacturer’s warranty. Warranty
12 36 00 COUNTERTOPS 1.3 B.1 Show dimensions of section and method of assembly. Shop Drawings B.2 Show details of construction at a scale of ½ inch to a foot. Shop Drawings C.1 150 mm (6 inch) square samples each top. Samples
C.2 Front edge, back splash, end splash and core with surface material and booking. Samples
Contractor Action
Government Action
Submit Needed By
Approval Needed By
Material Needed By
VA Received Date
VA Returned Date
Contractor: Schedule Dates
Su bm itt al n o.
Sp ec ifi ca tio n
Spec Title
Pa ra gr ap h no
It em n
o. Description of Submittal Type of Submittal
13 05 41 SEISMIC RESTRAINT
REQUIREMENTS FOR NON-
STRUCTURAL COMPONENTS
1.4 A
Submit a coordinated set of equipment anchorage drawings prior to installation [including all details listed in spec]. Submittal Drawings
B
Submit prior to installation, a coordinated set of bracing drawings for seismic protection of piping, with data identifying the various support-to-structure connections and seismic bracing structural connections [including all details listed in spec]. Submittal Drawings
C
Submit prior to installation, bracing drawings for seismic protection of suspended ductwork and suspended electrical and communication cables [including all details listed in spec]. Submittal Drawings
D Submit design calculations prepared and sealed by the registered structural engineer specified in paragraph 1.3A. Calculations
E
Submit for concrete anchors, the appropriate ICBC evaluation reports, OSHPD pre-approvals, or lab test reports verifying compliance with OSHPD Interpretation of Regulations 28-6. Test Reports
21 13 13 WET-PIPE SPRINKLER
SYSTEMS
1.4 A
Prepare detailed working drawings that are signed by a Level IV Sprinkler Technician or stamped by a Registered Professional Engineer licensed in the field of Fire Protection Engineering. [Hard copies and PDF files as indicated in spec]. Submittal Drawings
A.1.a Provide a copy of the installing contractors fire sprinkler and state contractor’s license. Qualifications
A.1.b
Provide a copy of the NICET certification for the Level IV Sprinkler Technician who prepared and signed the detailed working drawings unless the drawings are stamped by a Registered Professional Engineer licensed in the field of Fire Protection Engineering. Qualifications
A.1.c
Provide documentation showing that the installer has been actively and successfully engaged in the installation of commercial automatic sprinkler systems for the past ten years. Qualifications
A.2
Drawings: Submit detailed 1:100 (1/8 inch) scale (minimum) working drawings conforming to the Plans and Calculations chapter of NFPA
13. Drawings shall include graphical scales that allow the user to determine lengths when the drawings are reduced in size. Submittal Drawings
A.3
Manufacturer’s Data Sheets: Provide data sheets for all materials and equipment proposed for use on the system. Include listing information and installation instructions in data sheets. Where data sheets describe items in addition to those proposed to be used for the system, clearly identify the proposed items on the sheet. Manuf. Lit. & Data
A.4 Submit calculations of loads for sizing of sway bracing in accordance with NFPA 13. Calculations
Contractor Action
Government Action
Submit Needed By
Approval Needed By
Material Needed By
VA Received Date
VA Returned Date
Contractor: Schedule Dates
Su bm itt al n o.
Sp ec ifi ca tio n
Spec Title
Pa ra gr ap h no
It em n
o. Description of Submittal Type of Submittal
A.5.a Provide a complete set of as-built drawings, testing and maintenance instructions in the formats as specified in the spec. Submittal Drawings
A.5.b
Material and Testing Certificate: Upon completion of the sprinkler system installation or any partial section of the system, including testing and flushing, provide a copy of a completed Material and Testing Certificate as indicated in NFPA 13. Certificates shall be provided to document all parts of the installation. Certificates
A.5.c
Operations and Maintenance Manuals that include step-by-step procedures required for system startup, operation, shutdown, and routine maintenance and testing. [Include details listed in spec.] O&M Data
A.5.d Paper and PDF copies of the Material and Testing Certificates and the Operations and Maintenance Manuals. Certificates, O&M Data
A.5.e
Provide one additional copy of the Operations and Maintenance Manual covering the system in a flexible protective cover and mount in an accessible location adjacent to the riser or as directed by the COR. O&M Data
22 05 11 COMMON WORK RESULTS
FOR PLUMBING
1.4 C
Contractor shall make all necessary field measurements and investigations to assure that the equipment and assemblies will meet contract requirements and will fit the space available. Test Reports
D If equipment is submitted which differs in arrangement from that shown, provide drawings that show the rearrangement of all associated systems. Submittal Drawings
E
Prior to submitting shop drawings for approval, contractor shall certify in writing that manufacturers of all major items of equipment have each reviewed drawings and specifications, and have jointly coordinated and properly integrated their equipment and controls to provide a complete and efficient installation. Approvals
F
Installing Contractor shall provide lists of previous installations for selected items of equipment. Contact persons who will serve as references, with telephone numbers and e-mail addresses shall be submitted with the references. References
G Manufacturer’s literature shall be submitted under the pertinent Division 22 sections rather than under this section. [including all details listed in spec] Manuf. Lit. & Data
H
Submittals and shop drawings for interdependent items, containing applicable descriptive information, shall be furnished together and complete in a group. Coordinate and properly integrate materials and equipment in each group to provide a completely compatible and efficient installation. Shop Drawings
Contractor Action
Government Action
Submit Needed By
Approval Needed By
Material Needed By
VA Received Date
VA Returned Date
Contractor: Schedule Dates
Su bm itt al n o.
Sp ec ifi ca tio n
Spec Title
Pa ra gr ap h no
It em n
o. Description of Submittal Type of Submittal
K
Completed System Readiness Checklist provided by the Commissioning Agent and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 22 08 00 COMMISSIONING OF PLUMBING SYSTEMS. System Readiness Checklist
L
Submit training plans, trainer qualifications and instructor qualifications in accordance with the requirements of Section 22 08 00 COMMISSIONING OF
PLUMBING SYSTEMS.
Training Plans;
Qualifications
22 05 23 GENERAL-DUTY VALVES FOR
PLUMBING PIPING
1.4 C
Full item description and optional features and accessories. Include dimensions, weights, materials, applications, standard compliance, model numbers, size, and capacity. Manuf. Lit. & Data
C.1 Ball valves. Manuf. Lit. & Data C.2 Butterfly valves. Manuf. Lit. & Data C.3 Balancing valves. Manuf. Lit. & Data C.4 Thermostatic mixing valves. Manuf. Lit. & Data D Test and Balance reports for balancing valves. Test Reports
E
Complete operating and maintenance manuals including wiring diagrams, technical data sheets and information for ordering replaceable parts [including all details listed in spec]. O&M Data
F
Completed System Readiness Checklist provided by the Commissioning Agent and completed by the Contractor, signed by a qualified technician and dated on the date of completion System Readiness Checklist
G Submit training plans and instructor qualifications Training Plans;
Qualifications
22 07 11 PLUMBING INSULATION
1.4 C
Manufacturer's Literature and Data including: Full item description and optional features and accessories. Include dimensions, weights, materials, applications, standard compliance, model numbers, size, and capacity. Manuf. Lit. & Data
D
Shop Drawings: All information, clearly presented, shall be included to determine compliance with drawings and specifications and ASTM Designation, Federal and Military specifications. [Include all information listed in spec]. Shop Drawings
D.1.a Insulation materials: Specify each type used and state surface burning characteristics. Shop Drawings
D.1.b Insulation facings and jackets: Each type used and state surface burning characteristics. Shop Drawings
D.1.c Insulation accessory materials: Each type used. Shop Drawings
F
Completed System Readiness Checklist provided by the CxA and completed by the contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS. System Readiness Checklist
Contractor Action
Government Action
Submit Needed By
Approval Needed By
Material Needed By
VA Received Date
VA Returned Date
Contractor: Schedule Dates
Su bm itt al n o.
Sp ec ifi ca tio n
Spec Title
Pa ra gr ap h no
It em n
o. Description of Submittal Type of Submittal
22 08 00 COMMISSIONING OF
PLUMBING SYSTEMS
1.6 A
The commissioning process requires review of selected Submittals. The Commissioning Agent will provide a list of submittals that will be reviewed by the Commissioning Agent. This list will be reviewed and approved by the VA prior to forwarding to the Contractor. Refer to Section 01 33 23 SHOP DRAWINGS, PRODUCT DATA, and SAMPLES for further details. Commissioning
B The commissioning process requires Submittal review simultaneously with engineering review. Commissioning
22 11 00 FACILITY WATER
DISTRIBUTION
1.4 C.1
Manufacturer's Literature and Data for all items listed in Part 2 - Products of this spec, including full item description and optional features and accessories. Include dimensions, weights, materials, applications, standard compliance, model numbers, size, and capacity. Manuf. Lit. & Data
D
Complete operating and maintenance manuals including wiring diagrams, technical data sheets and information for ordering replacement parts [include all details listed in spec]. O&M Data
E
Completed System Readiness Checklist provided by the CxA and completed by the Contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS. System Readiness Checklist
F Submit training plans and instructor qualifications in accordance with the requirements of Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS.
Training Plans;
Qualifications
22 13 00 FACILITY SANITARY AND
VENT PIPING
1.4 C
Manufacturer's Literature and Data for the following items including: Full item description and optional features and accessories. Include dimensions, weights, materials, applications, standard compliance, model numbers, size, and capacity. Manuf. Lit. & Data
C.1 Piping. Manuf. Lit. & Data C.2 Floor drains. Manuf. Lit. & Data C.4 Cleanouts. Manuf. Lit. & Data C.5 Trap seal protection. Manuf. Lit. & Data C.6 Penetration Sleeves. Manuf. Lit. & Data C.7 Pipe Fittings. Manuf. Lit. & Data C.8 Traps. Manuf. Lit. & Data C.9 Exposed Piping and Fittings. Manuf. Lit. & Data
D Detailed shop drawing of clamping device and extensions when required in connection with the waterproofing membrane or the floor drain. Shop Drawings
Contractor Action
Government Action
Submit Needed By
Approval Needed By
Material Needed By
VA Received Date
VA Returned Date
Contractor: Schedule Dates
Su bm itt al n o.
Sp ec ifi ca tio n
Spec Title
Pa ra gr ap h no
It em n
o. Description of Submittal Type of Submittal
22 40 00 PLUMBING FIXTURES
1.4 C
Manufacturer's Literature and Data including: Full item description and optional features and accessories. Include dimensions, weights, materials, applications, standard compliance, model numbers, size, and capacity. Manuf. Lit. & Data
D Operating Instructions: Comply with requirements in Section 01 00 00, GENERAL REQUIREMENTS. O&M Data
E
Completed System Readiness Checklist provided by the CxA and completed by the Contractor, signed by a qualified technician and dated on the date of completion, in accordance with the requirements of Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS. System Readiness Checklist
F Submit training plans and instructor qualifications in accordance with the requirements of Section 22 08 00, COMMISSIONING OF PLUMBING SYSTEMS.
Training Plans;
Qualifications
23 05 11 COMMON WORK RESULTS
FOR HVAC
1.4 C
Contractor shall make all necessary field measurements and investigations to assure that the equipment and assemblies will meet VA specs and contract requirements, and all equipment that requires regular maintenance, calibration, etc are accessable from the floor or permanent work platform. Test Reports
D
If equipment is submitted which differs in arrangement from that shown, provide documentation proving equivalent performance, design standards and drawings that show the rearrangement of all associated systems.
Manuf. Lit. & Data, Submittal Drawings
E
Prior to submitting shop drawings for approval, Contractor shall certify in writing that manufacturers of all major items of equipment have each reviewed contract documents, and have jointly coordinated and properly integrated their equipment and controls to provide a complete and efficient installation. Certifications
F
Submittals and shop drawings for interdependent items, containing applicable descriptive information, shall be furnished together.
Coordinate and properly integrate materials and equipment to provide a completely compatible and efficient…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .