This document includes a federal solicitation for construction services and architectural drawings related to correcting deficiencies in Building 1 at the VA New Jersey Healthcare System located in Lyons, New Jersey. The solicitation is for a contractor to perform demolition and new construction work defined in the drawings and specifications, including disconnecting and removing existing steam piping from designated points and replacing it with new insulated piping of the same type and size. The procurement is set aside for Service-Disabled Veteran Owned Small Businesses with a NAICS code of 236220 and size standard of $39.5 million. The construction magnitude is between $1-5 million and the completion time is 365 days from notice to proceed. A pre-bid site walkthrough is scheduled for June 2, 2022.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
4" STM
4" STM
4" STM
4" STM4" STM4" STM
4" STM
4" STM
1-M102
1-M102
1-M103
1-M103
6" STM
8" STM
8" STM
8" STM 8" STM
8" STM
8" STM
8" STM
8" STM
8" STM
8" STM
8" STM
8" STM
4" STM
8" STM
4" STM
4" STM
2-1/2" STM
SEE ENLARGED
PLAN
SEE ENLARGED
PLAN
SEE ENLARGED
PLAN
SEE ENLARGED
PLAN
2-1/2" STM
2-1/2" STM
1 2 3 4 5
C
D
E
F
G
H
1.5 2.4 2.8 3.4 3.8 4.4 4.6
18' - 2" 19' - 10" 13' - 1 1/2" 9' - 0" 13' - 1 1/2" 15' - 7" 15' - 7" 14' - 7" 15' - 1 1/2" 9' - 0" 15' - 1 1/2"
/2
/2
38' - 0" 35' - 3" 45' - 9" 39' - 3"
EX. FLOW
METER TO REMAIN
C
D
E
F
2"Ø
2"Ø1 1/2"Ø1 1/2"Ø
3 1/2"Ø
3 1/2"Ø
3 1/2"Ø
2"Ø1 1/2"Ø1 1/2"Ø
LPR
LPS
LPS
LPR
3 3
87.5
C
D
E
F
3 3
3 3
87.5
MECHANICAL DEMOLITION AND NEW WORK NOTES
DISCONNECT AND REMOVE EXISTING 1" STEAM SUPPLY AND 3/4" RETURN PIPING FROM DESIGNATED DEMOLITION POINT AT MAINS IN BASEMENT UP TO GROUND FLOOR. REPLACE IN KIND (TYPE/SIZE) WITH NEW 1" STEAM SUPPLY AND 3/4" RETURN PIPING UP TO GROUND FLOOR. INSULATE NEW PIPING AS SPECIFIED. REFER TO GROUND FLOOR PIPING PLAN FOR CONTINUATION. PROVIDE ABATEMENT OF ALL ASBESTOS MATERIALS AS
SPECIFIED AND REQUIRED BY VA ABATEMENT GUIDELINES.
DISCONNECT AND REMOVE EXISTING 1" STEAM SUPPLY AND 3/4" RETURN PIPING FROM BASEMENT TO END OF RUN ON GROUND FLOOR. REPLACE IN KIND (TYPE/SIZE) WITH NEW 1" STEAM SUPPLY AND 3/4" RETURN PIPING FROM BASEMENT TO END OF RUN ON GROUND FLOOR. INSULATE NEW PIPING AS SPECIFIED. REFER TO BASEMENT PIPING PLAN FOR CONTINUATION. PROVIDE ABATEMENT OF ALL ASBESTOS MATERIALS AS
SPECIFIED AND REQUIRED BY VA ABATEMENT GUIDELINES.
EXISTING 1" STEAM SUPPLY AND 3/4" RETURN PIPING FROM BASEMENT UP TO GROUND FLOOR.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C
U s e rs
\t b o rg e r\
D o c u m e n ts
\2 -U
S D
V A
-0 S
T E
A M tb o rg e r3
K H
Y N
.r v t
/1
/2
:2
:0
A
M
1-M101
STEAM PIPING DEMOLITION AND NEW WORK PLANS
BASEMENT AND GROUND FLOOR
10/18/2021 TMB
561A4-15-102CORRECT FCA F RATED DEFICIENCIES
BUILDING 1
100% Final Documents
3/16" = 1'-0"1
BASEMENT PARTIAL STEAM PIPING PLAN
1/8" = 1'-0"2
BASEMENT PARTIAL PIPING PLAN
1/8" = 1'-0"3
GROUND FLOOR PARTIAL PIPING PLAN