Drawings 26 50_Part5.pdf

PDF 24 MB Posted

Attached to
Y1DZ--Correct FCA Deficiencies Building 1| Federal contract opportunity
Solicitation number
36C24222B0031_1
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This document provides details on a federal solicitation to correct deficiencies in Building 1 at the VA New Jersey Healthcare System located in Lyons, New Jersey. The solicitation is for a construction project requiring the contractor to prepare the site for building operations including demolition and removal of existing structures. The contractor will furnish all labor, materials, and services to perform the work defined in the project drawings and specifications. This is a set-aside procurement only for Service-Disabled Veteran Owned Small Businesses. The work must be completed within 365 days of the notice to proceed date. The pre-bid walkthrough is scheduled for June 2, 2022 and interested parties should review the attached solicitation for additional requirement details such as the scope of work, procurement terms, and evaluation factors. The estimated value of the construction is between $1,000,000 to $5,000,000.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DZ--Correct FCA Deficiencies Building 1|, newest first.
File Type Posted
36C24222B0031 0003 Amendment.docx DOCX document
Responses to Requests for Information for Solicitation 36C24222B0031.docx DOCX document
36C24222B0031 0002.docx DOCX document
36C24222B0031 0001.docx DOCX document
Drawings 26 50_Part7.pdf PDF
36C24222B0031_1.docx DOCX document
Drawings 1 25.pdf PDF
Drawings 26 50_Part2.pdf PDF
Drawings 26 50_Part9.pdf PDF
Drawings 26 50_Part10.pdf PDF
561A4 15 102 Specifications_Part3.pdf PDF
561A4 15 102 Specifications_Part4.pdf PDF
561A4 15 102 Specifications_Part7.pdf PDF
561A4 15 102 Specifications_Part8.pdf PDF
561A4 15 102 Specifications_Part9.pdf PDF
561A4 15 102 Specifications_Part5.pdf PDF
Drawings 26 50_Part1.pdf PDF
Drawings 26 50_Part4.pdf PDF
Drawings 26 50_Part11.pdf PDF
561A4 15 102 Specifications_Part1.pdf PDF
561A4 15 102 Specifications_Part2.pdf PDF
Drawings 26 50_Part3.pdf PDF
Drawings 26 50_Part6.pdf PDF
Drawings 26 50_Part8.pdf PDF
561A4 15 102 Specifications_Part6.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1-FD101

REMOVE AND REPLACE

EXISTING 6" FIRE SERVICE

PIPE TO EXISTING POST

INDICATOR VALVE, SEE

SHEET 1-AS101.

REMOVE AND REPLACE

EXISTING 6" SPRINKLER

PIPE TO AND INCLUDING

WET PIPE VALVE AND TRIM

REMOVE AND REPLACE

EXISTING 6" SPRINKLER

PIPE TO AND INCLUDING

DRY PIPE VALVE AND TRIM

A

VIEWPOINT

FOR

PICTURE

GROUND FLOOR

294' - 0"

BASEMENT

283' - 0"

REMOVE AND REPLACE EXISTING 6" FIRE

SERVICE PIPE TO EXISTING POST

INDICATOR VALVE, SEE SHEET 1-AS101.

REMOVE AND REPLACE

EXISTING DOUBLE ELBOW AT

BASE OF RISER

REMOVE AND REPLACE EXISTING

DRAIN VALVE AND DRAIN SPOUT

REMOVE AND REPLACE EXISTING 6" SPRINKLER

PIPE, WET AND DRY PIPE OS&Y GATE VALVES

AND ASSOCIATED TAMPER SWITCHES

REMOVE AND REPLACE ALL EXISTING

SPRINKLER PIPE, FITTINGS, FLANGES,

ELBOWS, VALVES AND CONTROLS

FROM INCOMING SERVICE

CONNECTION TO DESIGNATED

TERMINATION/CONNECTION POINTS

REMOVE AND REPLACE EXISTING 6"

SPRINKLER PIPE UP TO AND INCLUDING

WET PIPE VALVE, TRIM, AND ASSOCIATED

FLOW SWITCH

REMOVE AND REPLACE EXISTING 6"

SPRINKLER PIPE UP TO AND INCLUDING

DRY PIPE VALVE, TRIM, AND ASSOCIATED

LOW/HIGH AIR PRESSURE MONITOR

REMOVE AND REPLACE EXISTING 6"

OS&Y GATE VALVE AND ASSOCIATED

TAMPER SWITCH

REMOVE AND REPLACE EXISTING

CONCRETE FLOOR SUPPORTS

REMOVE AND REPLACE

EXISTING SPRINKLER PIPE

TO AND INCLUDING DOUBLE

ELBOW AT BASE OF RISER REMOVE AND REPLACE ALL EXISTING

SPRINKLER PIPE, FITTINGS, FLANGES,

ELBOWS, VALVES AND CONTROLS

FROM INCOMING SERVICE

CONNECTION TO DESIGNATED

TERMINATION/CONNECTION POINTS

REMOVE AND REPLACE EXISTING 6"

OS&Y GATE VALVE AND ASSOCIATED

TAMPER SWITCH

REMOVE AND REPLACE EXISTING 6"

SPRINKLER PIPE UP TO AND INCLUDING

DRY PIPE VALVE, TRIM, AND ASSOCIATED

LOW/HIGH AIR PRESSURE MONITOR

REMOVE AND REPLACE EXISTING 6"

SPRINKLER PIPE UP TO AND INCLUDING

WET PIPE VALVE, TRIM, AND ASSOCIATED

FLOW SWITCH

REMOVE AND REPLACE EXISTING 6" FIRE

SERVICE PIPE TO EXISTING POST

INDICATOR VALVE, SEE SHEET 1-AS101.

REMOVE AND REPLACE EXISTING 6" FIRE

SERVICE PIPE TO SERVICE CONNECTION

APPROX. 15' OUTSIDE EXTERIOR WALL.

CONTRACTOR SHALL VERFY EXACT

LOCATION WITH ENGINEER AND COR.

REMOVE AND REPLACE EXISTING

SPRINKLER PIPE TO AND INCLUDING

DOUBLE ELBOW AT BASE OF RISER

REMOVE AND REPLACE EXISTING 6" SPRINKLER

PIPE UP TO AND INCLUDING DRY PIPE VALVE,

TRIM, AND ASSOCIATED LOW/HIGH AIR

PRESSURE MONITOR

REMOVE AND REPLACE EXISTING SPRINKLER PIPE

UP TO AND INCLUDING WET PIPE VALVE, TRIM, AND

ASSOCIATED FLOW SWITCH

REMOVE AND REPLACE EXISTING

DRAIN VALVE AND DRAIN SPOUT

REMOVE AND REPLACE EXISTING

6" SPRINKLER PIPE, WET AND DRY

PIPE OS&Y GATE VALVES AND

ASSOCIATED TAMPER SWITCHES

REMOVE AND REPLACE ALL EXISTING SPRINKLER PIPE,

FITTINGS, FLANGES, ELBOWS, VALVES AND CONTROLS

FROM INCOMING SERVICE CONNECTION TO

DESIGNATED TERMINATION/CONNECTION POINTS

REMOVE AND REPLACE EXISTING 6"

OS&Y GATE VALVE AND ASSOCIATED

TAMPER SWITCH

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

U.S. Department of Veterans Affairs

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

C U s e rs \b p e re ir a

\D o c u m e n ts

\2 -U

S D

V A

-0 P

L U

M B

IN

G b p e re ir a

N M

M N

.r v t

/2 /2

:4

:0

P M

1-FD101

BASEMENT FIRE PROTECTION PLAN

ACELA

561A4-15-102CORRECT FCA F RATED

DEFICIENCIES BUILDING 1

1/4" = 1'-0"1

ENLARGED PARTIAL BASEMENT FIRE PROTECTION - DEMOLITION / NEW WORK

1/4" = 1'-0"2

FIRE SERVICE RISER SECTION VIEW - DEMOLITION / NEW WORK

NOTES:

1. NEW AND EXISTING SPRINKLER PIPING IN MECHANICAL ROOM TO BE PAINTED RED AND PROVIDED WITH A NEW HYDRAULIC

NAMEPLATE AT BASE OF RISER.

2. REMOVE AND REPLACE EXISTING CONCRETE PIPING FLOOR SUPPORTS AND PAINT YELLOW.

3. SEAL FOUNDATION CRACKS AND OPENINGS FROM EXTERIOR AROUND THE SPRINKLER PIPES AFTER EXCAVATION OCCURS

TO REPLACE THE 15 FEET OF PIPING.

4. PROVIDE GRAY EPOXY FLOOR PAINT BELOW AND 6 FEET IN FRONT OF NEW SPRINKLER PIPING.

5. REMOVE AND REPLACE EXISTING FIRE ALARM SPRINKLER TAMPER / SUPERVISORY SWITCHES AND FLOW SWITCHES

ASSOCIATED WITH SPRINKLER RISER.

6. REMOVE AND REPLACE EXISTING LOW/HIGH AIR PRESSURE MONITOR MODULES ASSOCIATED WITH THE DRY-PIPE SYSTEM.

7. REPLACE ALL DRAIN PIPING ASSOCIATED WITH THE SPRINKLER RISER.

FIRE SERVICE RISER ISOMETRIC

1/4" = 1'-0"A

FIRE SERVICE RISER PICTURE

Revisions: Date:

10/18/2021 DTB

100% FINAL DOCUMENTS

File details come from the government source that posted it. Updated .