Drawings 1 25.pdf

PDF 6 MB Posted

Attached to
Y1DZ--Correct FCA Deficiencies Building 1| Federal contract opportunity
Solicitation number
36C24222B0031_1
Issued by
Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 2

About this file

This solicitation package includes drawings and specifications for a construction project to correct FCA deficiencies in Building 1 at the VA New Jersey Healthcare System located in Lyons, New Jersey. The contractor shall perform demolition and removal of existing structures, and furnish labor and materials to complete the work defined in the attached Architecture and Engineering drawings and specifications. This is a Service-Disabled Veteran Owned Small Business set-aside procurement with a NAICS code of 236220 and business size limit of $39.5 million. The magnitude of construction is between $1-5 million and work must be completed within 365 days of the notice to proceed date. A pre-bid walkthrough is scheduled for June 2, 2022 at 9 AM eastern time. The solicitation provides additional details and the work will be awarded by the Department of Veterans Affairs Veterans Health Administration VISN 2.

View the file

Other files for this federal contract opportunity

Other files attached to Y1DZ--Correct FCA Deficiencies Building 1|, newest first.
File Type Posted
36C24222B0031 0003 Amendment.docx DOCX document
Responses to Requests for Information for Solicitation 36C24222B0031.docx DOCX document
36C24222B0031 0002.docx DOCX document
36C24222B0031 0001.docx DOCX document
Drawings 26 50_Part1.pdf PDF
Drawings 26 50_Part4.pdf PDF
Drawings 26 50_Part11.pdf PDF
561A4 15 102 Specifications_Part1.pdf PDF
561A4 15 102 Specifications_Part2.pdf PDF
Drawings 26 50_Part7.pdf PDF
36C24222B0031_1.docx DOCX document
Drawings 26 50_Part2.pdf PDF
Drawings 26 50_Part5.pdf PDF
Drawings 26 50_Part9.pdf PDF
Drawings 26 50_Part10.pdf PDF
561A4 15 102 Specifications_Part3.pdf PDF
561A4 15 102 Specifications_Part4.pdf PDF
561A4 15 102 Specifications_Part7.pdf PDF
561A4 15 102 Specifications_Part8.pdf PDF
561A4 15 102 Specifications_Part9.pdf PDF
561A4 15 102 Specifications_Part5.pdf PDF
Drawings 26 50_Part3.pdf PDF
Drawings 26 50_Part6.pdf PDF
Drawings 26 50_Part8.pdf PDF
561A4 15 102 Specifications_Part6.pdf PDF
Show all 25

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

FULLY SPRINKLERED

Office of Construction and Facilities Management

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-GI101

COVER SHEET

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED

DEFICIENCIES BUILDING 1

100% FINAL DOCUMENTS

Gary Boehner, 2.boehner@va.gov 909-647-0180 X4265 Cell:

732-979-1786

Michael J. Giaquinto, michael.giaquinto2@va.gov 718-584-9000 X4355 Tel:

203-295-4294

Revisions: Date: Page 1 of 50

Project Number

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-GI102

GENERAL INFORMATION

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

100% FINAL DOCUMENTS

Revisions: Date: Page 2 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-GC101

SITE PLAN - CONTRACTOR STAGING AREA

10/18/2021 JLH BS

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: Page 3 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-GC201

BASEMENT & GROUND FLOOR SCOPE OF WORK &

PHASING PLANS

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: Page 4 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-GC202

LEVEL 1 & LEVEL 2 SCOPE OF WORK & PHASING PLANS

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: Page 5 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-GC203

LEVEL 3 SCOPE OF WORK & PHASING PLAN

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: Page 6 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-GC301

DOOR SCHEDULE AND DETAILS

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: Page 7 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-GC302

STEAM PIPE WORK, DEMO AND NEW DOORS

10/18/2021

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: JLH ACELA Page 8 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-HA100

ABATEMENT NOTES & DETAILS

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: Page 9 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-HA101

BASEMENT ASBESTOS ABATEMENT / LEAD REMOVAL

PLAN

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: Page 10 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-HA102

GROUND FLOOR ASBESTOS ABATEMENT / LEAD

REMOVAL PLAN

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: Page 11 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-HA103

LEVEL 1 ASBESTOS ABATEMENT / LEAD REMOVAL

PLAN

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: Page 12 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-HA104

LEVEL 2 ASBESTOS ABATEMENT / LEAD REMOVAL

PLAN

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: Page 13 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-HA105

LEVEL 3 ASBESTOS ABATEMENT / LEAD REMOVAL

PLAN

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: Page 14 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-AD101

STAIR HALL DEMOLITION PLANS

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: Page 15 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-AD102

STAIR HALL REFLECTED CEILING DEMOLITION PLANS

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: Page 16 of 50

10/18/2021 CMGJMS

Building Number

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

A

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

Phase

321 4 5 6 7 8 9 10

CALL 811 OR

1-800-272-1000

New Jersey

SCALE: 1"=10'

20'10'0'

100% FINAL DOCUMENTS

EXISTING CONDITION NOTES

1. THIS EXISTING FEATURES INFORMATION SHOWN IS BASED ON AERIAL MAPPING. NO TOPOGRAPHIC SURVEY WAS PERFORMED.

2. WHERE AN EXISTING UTILITY IS FOUND TO CONFLICT WITH THE PROPOSED WORK, OR EXISTING CONDITIONS DIFFER FROM THOSE SHOWN SUCH THAT THE WORK CANNOT BE COMPLETED AS INTENDED, THE LOCATION, ELEVATION, AND SIZE OF THE UTILITY SHALL BE ACCURATELY DETERMINED WITHOUT DELAY BY THE CONTRACTOR AND THE INFORMATION SHALL BE FURNISHED IN WRITING BY THE CONTRACTOR TO THE ENGINEER, CONTRACTING OFFICER, AND CONTRACTING OFFICER'S REPRESENTATIVE FOR THE RESOLUTION OF THE CONFLICT. THE CONTRACTORS FAILURE TO NOTIFY PRIOR TO PERFORMING ADDITIONAL WORK RELEASES OWNER FROM OBLIGATIONS FOR ADDITIONAL PAYMENTS WHICH OTHERWISE MAY BE WARRANTED TO

RESOLVE THE CONFLICT.

RESTORATION - OPEN AREAS1 NTS

MINIMUM 6" OF TOPSOIL

VA

RI

ES

SEEDED

AREA

C

OF

PIPE

L

FOR REQUIREMENTS OF SEED MIXTURE

AND APPLICATION SEE SPECIFICATIONS.

PIPE BEDDING

PIPE

SEE NOTE 3

VARIES

LIM

IT

S

OF

B

AC

KF

ILL

VARIES

NOTES:

1. THIS RESTORATION WILL BE REQUIRED ON ALL DISTURBED AREAS THAT WILL NOT BE

COVERED WITH SOD OR OTHER SURFACING.

2. ROCKS LARGER THAN 2" CANNOT BE PLACED WITHIN TOPSOIL.

3. BACKFILL ABOVE BEDDING MATERIAL SHALL BE COMPACTED PER SPECIFICATIONS.

SOURCE: 19-USDVA-07

Revisions: Date:

EXISTING FEATURES & DEMOLITION VIEW4 SCALE: 1"=10'

PROPOSED VIEW3 SCALE: 1"=10'

4" THICK, 5,000 PSI CONCRETE

6" AGGREGATE BASE COURSE (A.B.C.)

COMPACTED TO 95% OF ASTM D698 MAXIMUM

DENSITY UNLESS OTHERWISE NOTED

EXISTING GROUND OR REINFORCED

FILL COMPACTED TO 95 PERCENT

OF ASTM D698 MAXIMUM DENSITY

UNLESS OTHERWISE NOTED

xx

GALVANIZED 6X6-W1.4XW1.4

WELDED WIRE FABRIC

AT MID DEPTH ON CHAIRS

x

MATCH EXISTING SIDEWALK

FINISH

NOTES:

1. WHEN REPAIRING/REPLACING PORTIONS OF SIDEWALK, MATCH JOINT LOCATION & SPACING WITH

EXISTING JOINTS.

2. APPLY WATER REPELLANT PER SPECIFICATION SECTION 32 05 23.

3. ALL AGGREGATE DEPTHS SHOWN ARE AFTER BEING FULLY COMPACTED.

4. SOILS DEEMED UNSUITABLE BY THE COR SHALL BE OVEREXCAVATED BY A MINIMUM DEPTH OF 12 INCHES

AND REPLACED WITH MATERIAL AS DIRECTED BY THE ENGINEER AND APPROVED BY THE COR.

5. THE CONTRACTOR SHALL NOT PLACE THE STEEL ON THE GROUND AND LIFT AFTER THE CONCRETE HAS

BEEN PLACED. THE WWF MUST BE ON CHAIRS AS NOTED IN THE DETAIL.

6. ALL NEW SIDEWALK CONCRETE SHALL BE 5,000 PSI, MINIMUM 4" THICK, WITH GALVANIZED 6X6-W1.4XW1.4

WWF, AND EXPANSION JOINTS EVERY 20' ON CENTER FOR SIDEWALK CONSTRUCTION. ALLOWABLE SLUMP WILL BE 4" MAXIMUM, WATER-CEMENT RATIO OF 0.55, AIR ENTRAINMENT SHALL BE 6% +/- 1.5%.

3" [76mm]

3" [76mm]

STOP REINF.

AT JOINT

MIRAFI HP270 GEOTEXTILE

SEPARATION FABRIC OR

APPROVED EQUAL

CONCRETE DETAIL (SIDEWALK)2 NTS

SOURCE: AAE DETAIL

1-AS101

EXISTING FEATURES, DEMOLITION & LAYOUT PLANARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

Management and Facilities Construction

Office of of Veterans U.S. Department

Affairs Page 17 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-AE104

WEST STAIR HALL PLANS & ELEVATIONS

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: Page 18 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-AE105

WEST STAIR HALL ELEVATIONS

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: Page 19 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-AE106

CENTER STAIR HALL PLANS & ELEVATIONS

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: Page 20 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-AE107

CENTER STAIR HALL ELEVATIONS

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: Page 21 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-AE108

EAST STAIR HALL PLANS & ELEVATIONS

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: Page 22 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-AE109

STAIR HALL REFLECTED CEILING PLANS - NEW WORK

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: Page 23 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-AE110

CENTER STAIR WALL REPAIRS

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: Page 24 of 50

Drawing Number

Project Title

Location

Issue Date Checked Drawn

Drawing Title

Approved:

VA FORM 08 - 6231

A

Office of Construction and Facilities Management

B

C

D

E

F

A

B

C

D

E

F

21 4 5 6 7 8 9 10

PhaseARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS

321 4 5 6 7 8 9 10

1-AE111

EXTERIOR ELEVATIONS - DEMO AND NEW WORK

10/18/2021 JLH ACELA

561A4-15-102CORRECT FCA F RATED DEFICIENCIES

BUILDING 1

Revisions: Date: Page 25 of 50