Drawings 26 50_Part6.pdf
PDF 2 MB Posted
- Attached to
- Y1DZ--Correct FCA Deficiencies Building 1| Federal contract opportunity
- Solicitation number
- 36C24222B0031_1
About this file
This solicitation is for a Service-Disabled Veteran Owned Small Business (SDVOSB) set-aside contract to correct FCA deficiencies in Building 1 at the VA New Jersey Healthcare System located in Lyons, NJ. The contractor shall demolish existing structures, prepare the site for construction, and perform work defined in the attached architecture and engineering drawings and specifications for VA Project #561A4-15-102. The work includes a magnitude of construction between $1-5 million and must be completed within 365 days of the notice to proceed. A pre-bid site walkthrough is scheduled for June 2, 2022 at 9:00 AM Eastern. The solicitation is issued by the Department of Veterans Affairs Veterans Health Administration VISN 2.
View the file
Other files for this federal contract opportunity
Show all 25
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PLUMBING GENERAL NOTES
SCOPE OF WORK:
1. REPLACE EXISTING GALVANIZED DOMESTIC WATER RISER PIPING WITH NEW COPPER TYPE 'L' OR 'K'. RECONNECT EXISTING BRANCH PIPING ON EACH FLOOR. PROVIDE NEW SHUT-OFF VALVES WHERE NECESSARY TO ISOLATE SYSTEM ON EACH FLOOR.
2. REPLACE EXISTING ROOF DRAIN DOWN SPOUT PIPING WITH NEW CAST IRON PIPING.
3. REMOVE DOMESTIC WATER AND ROOF DRAIN DOWN SPOUT PIPING, FROM RISER #5, CURRENTLY OVER ELECTRICAL EQUIPMENT ROOM IN BASEMENT. REPLACE WITH NEW OFFSET TO RISER #6 AT SECOND LEVEL. INCREASE NEW RISER #6 PIPE TO SIZES INDICATED.
4. THE CONTRACTOR SHALL REPAIR/PATCH AND PAINT WALLS AND CEILING AT REPLACED RISERS TO MATCH EXISTING ADJACENT SURFACES.
GENERAL:
1. THE CONTRACTOR SHALL VERIFY ALL DIMENSIONS, ELEVATIONS, INVERTS, PIPE SIZES AND MATERIALS, FLUID FLOW DIRECTION(S) AND CONDITIONS AT THE SITE AND REPORT ANY DISCREPANCIES TO THE ENGINEER PRIOR TO BEGINNING INSTALLATION OR FABRICATION
WORK. (DO NOT SCALE DRAWINGS).
2. THE CONTRACTOR IS RESPONSIBLE FOR ANY DAMAGE TO EXISTING UTILITIES EVEN IF THE UTILITIES ARE NOT SHOWN ON THE DRAWINGS.
THE CONTRACTOR SHALL REPAIR ALL DAMAGES AT THEIR OWN EXPENSE AND WILL BE RESPONSIBLE FOR ANY ADDITIONAL DAMAGES
CAUSED BY A SYSTEM BEING OUT OF SERVICE.
3. THIS INSTALLATION WILL CONFORM TO ALL CODES AND THE REQUIREMENTS OF FEDERAL, STATE, AND LOCAL REGULATORY AGENCIES
HAVING JURISDICTION.
4. INSTALL ALL PRODUCTS IN ACCORDANCE WITH THE MANUFACTURERS RECOMMENDATIONS, CONTRACT DOCUMENTS AND THE
APPLICABLE CODES, STANDARDS AND REGULATIONS.
5. THE CONTRACTOR WILL BE RESPONSIBLE FOR ENSURING THAT ALL RULES AND REGULATIONS ARE BEING OBSERVED, PARTICULARLY WORKPLACE SAFETY AND THE CONDUCT OF ALL THOSE EMPLOYED DIRECTLY AND INDIRECTLY ON THE PREMISES, AND WHO MAY BE IMPACTED OR AFFECTED BY CONSTRUCTION ACTIVITIES. THE CONTRACTOR WILL INSTALL SIGNAGE, TEMPORARY FENCES, BARRIERS, AND OTHER MEANS TO PROVIDE WARNING AND PERSONNEL SAFETY. PLACEMENT OF THESE ITEMS WILL BE COORDINATED WITH THE COR AND ONGOING OPERATIONS AND WILL PROMPTLY BE RESTORED WHEN WORK IN A PARTICULAR AREA HAS BEEN COMPLETED.
6. ALL WORK WILL BE LAWFULLY EXECUTED IN A NEAT AND WORKMANLIKE MANNER AND WILL BE DONE IN ACCORDANCE WITH THE GOVERNING CODES, INDUSTRY STANDARDS AND IN CONFORMANCE WITH THE MANUFACTURERS RECOMMENDATIONS AND
REQUIREMENTS.
7. WORK UNDER THIS CONTRACT SHALL CONSIST OF THE CONTRACTOR PROVIDING LABOR, MATERIALS, AND SERVICES, INCLUDING WORK NOT SPECIFICALLY SHOWN BUT REASONABLY IMPLIED TO PROVIDE A COMPLETE AND OPERATIONAL SYSTEM.
8. WORK ALL DRAWINGS WITH THE PROJECT SPECIFICATIONS.
9. PIPING SHOWN ON RESPECTIVE PLANS OCCURS ABOVE THAT FLOOR OR AT THE CEILING OF THAT FLOOR SERVING THE FLOOR ABOVE
UNLESS OTHERWISE NOTED.
10. PIPING RISING WITHIN A STORY IS DESIGNATED AS "RISE". PIPING RISING TO ANOTHER STORY IS NOTED AS "UP". PIPING DROPPING WITHIN
A STORY IS NOTED AS "DROP". PIPING DROPPING TO ANOTHER STORY IS NOTED AS "DN".
PLUMBING NOTES:
1. ALL PIPING MATERIALS AND COMPONENTS INCLUDING FITTINGS, PIPE, FLANGES, VALVES, ETC. SHALL BE DESIGNATED, FABRICATED AND INSTALLED PER THE APPROPRIATE SECTIONS OF THE LATEST CODES, VETERAN'S AFFAIRS PLUMBING STANDARDS AND PROJECT
CONTRACT DOCUMENTS.
2. ALL CLEANOUTS INSTALLED IN THE STORM WATER SYSTEM SHALL BE SIZED AS FOLLOWS:
PIPE SIZE SIZE OF CLEANOUT
2" 2" 2 1/2" 2 1/2" 3" 3" 4"-6" 4"
3. CLEANOUTS INSTALLED IN HORIZONTAL PIPING SHALL BE SPACED AT INTERVALS NOT EXCEEDING 100'.
4. THE MAXIMUM VERTICAL DISTANCE FROM THE FIXTURE OUTLET (LAVATORY, FLOOR DRAIN, ETC.) TO THE TRAP WEIR SHALL BE 24".
5. SURFACES TO BE SOLDERED SHALL BE CLEANED BRIGHT. THE JOINTS SHALL BE PROPERLY FLUXED AND MADE WITH APPROVED SOLDER.
SOLDER JOINTS FOR POTABLE WATER SHALL BE MADE WITH A SOLDER CONTAINING NOT MORE THAN 0.2 PERCENT LEAD. NOTE: NO HOT
WORK IS TO BE PERFORMED WITHIN THE CONSTRUCTION AREA; BRAZED JOINTS MAY ONLY BE UTILIZED IN ASSEMBLIES FABRICATED OFF
SITE.
6. UNIONS SHALL BE INSTALLED AT ALL EQUIPMENT. THE USE OF DIELECTRIC UNIONS AND FLANGES MUST BE INSTALLED IN AREAS WHERE JOINING OF DISSIMILAR METALS (I.E. CARBON STEEL TO COPPER OR BRONZE, ETC.). THIS IS TO FACILITATE PIPING REMOVAL AND
REASSEMBLY FOR FUTURE MAINTENANCE WORK AND/OR PREVENT GALVANIC CORROSION.
7. PIPE SUPPORT SPACING SHALL BE IN ACCORDANCE WITH MSS SP-58. ALL PIPE SUPPORTS FOR NEW WORK SHALL BE NEW, RE-USE OF
EXISTING PIPE SUPPORTS IS PROHIBITED.
8. ALL POTABLE WATER BRANCHES SHALL BE INSTALLED WITH ISOLATION VALVES CLOSE TO MAIN.
9. CONTRACTOR SHALL PROVIDE WALL ACCESS COVERS TO ALL CLEANOUTS AND VALVES LOCATED WITHIN WALLS.
10. ALL PIPES OR TUBING WHICH PASS THROUGH RATED AND NON-RATED WALLS, FLOORS, AND FOUNDATION WALLS, SHALL PASS THROUGH A SCHEDULE 40 CARBON STEEL PIPE SLEEVE. SLEEVES WHICH PASS THROUGH MASONRY SHALL BE GALVANIZED COATED. ALL SLEEVES
SHALL BE INSTALLED FLUSH ON BOTH SIDES OF WALL PENETRATION.
NON-RATED WALLS: THE SLEEVE SHALL BE SIZED TO ALLOW FREE PASSAGE OF INSULATED AND NON-INSULATED PIPES AND
TUBING.
RATED WALLS: PIPES WHICH PASS THROUGH FIRE-RATED WALLS & FLOORS SHALL USE THE APPROPRIATE DETAILED INSTALLATION
METHOD OF SEALING WHILE MAINTAINING THE INTEGRITY OF THE WALL'S FIRE RATING(S).
EXTENSION WALLS & FOUNDATION: PIPES WHICH PASS THROUGH EXTENSION WALLS OR FOUNDATION WALLS SHALL BE SEALED
AND MADE WEATHER-TIGHT.
11. INSULATE COLD AND HOT WATER PIPING PER THE PROJECT DOCUMENTS WITH FIRE RETARDANT VAPOR BARRIER JACKET. PIPE
INSULATION SHALL BE SEALED WITH A FIRE RESISTIVE ADHESIVE.
12. CONTRACTOR IS RESPONSIBLE FOR ALL TESTING COORDINATION OF INSPECTIONS OF THE ENTIRE POTABLE WATER, SANITARY SEWER AND VENT SYSTEMS. TESTING SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS AND THE INTERNATIONAL PLUMBING CODE.
13. ALL PIPING AND VALVES SHALL BE PROPERLY IDENTIFIED, LABELED AND TAGGED. CONTRACTOR SHALL SUBMIT VALVE TAG LIST PER
SPECIFICATIONS.
14. CONTRACTOR SHALL FLUSH AND DISINFECT THE ENTIRE POTABLE WATER SYSTEM. FLUSHING AND DISINFECTION OF THE POTABLE WATER SYSTEM SHALL BE IN ACCORDANCE WITH THE SPECIFICATIONS AND THE INTERNATIONAL PLUMBING CODE.
15. PROVIDE THREE (3) ELBOW SWING JOINTS FOR ALL DOMESTIC HOT WATER CONNECTIONS TO THE MAIN.
16. CONTRACTOR SHALL PROVIDE AND INSTALL THERMAL EXPANSION/CONTRACTION COMPENSATION IN THE DOMESTIC HOT WATER AND RECIRCULATION SYSTEMS, LIMITING THE MAXIMUM MOVEMENT TO 1 1/2" OR LESS. ANCHORS & RESTRAINTS SHALL BE INSTALLED WHERE NECESSARY. ALL PIPES SHALL BE PROPERLY GUIDED INTO THE THERMAL EXPANSION LOOPS OR COMPENSATORS.
A/E
AD
AFF
AFG
AG
AP
AS
ASD
ASD
ASHRAE
ASME
ASPE
ASR
AV
AW
BFP
BHP
BSP
BT
BTU
BTUH
C
CA
CGA
CFM
CI
CO
CS
CV
DCW
DFU
DHW
DHWR
DHWS
DI
DN
DOE
DS
DW
DWG
DWH
DWR
DWS
DWV
EL
EMCS
EPA
EPACT
ESC
ESH
ET
EWH
EWS
EWS/SH
EX
F
FCO
FCW
FD
FDC
FM
FOP
FOR
FOS
FOV
FS
FS
FU
GAL
GCO
GPD
GPH
GPM
GPR
GRS
GT
GVTR
GWH
H&CW
HB
HD
HEX
HP
HS
HST
HWB
HWCP
HWP
HYD
ID
IE
ICW
IHW
INV
IPC
IRW
IW
IWH
IWR
IWS
KW
KWH
ARCHITECT / ENGINEER
AREA DRAIN/ACCESS DOOR
ABOVE FINISH FLOOR
ABOVE FINISH GRADE
AIR GAP
ACCESS PANEL
AUTOMATIC SPRINKLER
ADJUSTABLE SPEED DRIVES
AUTOMATIC SPRINKLER DRAIN
AMERICAN SOCIETY OF HEATING, REFRIGERATION,
AIR CONDITIONING ENGINEERS
AMERICAN SOCIETY OF MECHANICAL ENGINEERS
AMERICAN SOCIETY OF PLUMBING ENGINEERS
AUTOMATIC SPRINKLER RISER
ACID VENT
ACID WASTE
REDUCED PRESSURE BACKFLOW PREVENTER
BREAK HORSEPOWER
BLACK STEEL PIPE
BATHTUB
BRITISH THERMAL UNIT
BRITISH THERMAL UNIT PER HOUR
CELSIUS
COMPRESSED AIR
COMPRESSED GAS ASSOCIATION
CUBIC FEET PER MINUTE
CAST IRON
CLEANOUT
CLINICAL SINK
CONTROL VALVE
DOMESTIC COLD WATER
DRAINAGE FIXTURE UNITS
DOMESTIC HOT WATER
DOMESTIC HOT WATER RETURN
DOMESTIC HOT WATER SUPPLY
DEIONIZED WATER
DOWN
DEPARTMENT OF ENERGY
DOWNSPOUT
DISHWASHER
DRAWING
DOMESTIC WATER HEATER
DRINKING WATER RETURN
DRINKING WATER SUPPLY
DRAIN WASTE VENT
ELEVATION
ENERGY MONOSERRAT AND CENTRAL SYSTEM
ENVIRONMENTAL PROTECTION AGENCY
ENERGY POLICY ACT
ESCUTCHEON
EMERGENCY SHOWER
EXPANSION TANK
ELECTRIC WATER HEATER
EYE WASH STATION
EYEWASH/DRENCH SHOWER
EXISTING
FAHRENHEIT
FLOOR CLEANOUT
FILTERED COLD WATER
FLOOR DRAIN
FIRE DEPARTMENT (HOSE) CONNECTION
FLOW METER
FUEL OIL PUMP
FUEL OIL RETURN
FUEL OIL SUPPLY
FUEL OIL VENT
FLOOR SINK
FLOW SWITCH
FIXTURE UNITS
GALLON
GRADE CLEANOUTS
GALLONS PER DAY
GALLONS PER HOUR
GALLONS PER MINUTE
GAS PRESSURE REGULATOR
GAS REGULATOR STATION
GREASE TRAP
GAS VENT THROUGH ROOF
GAS FIRED WATER HEATER
HOT AND COLD WATER
HOSE BIBB
HUB DRAIN
HEAT EXCHANGER
HORSEPOWER
HAND SINK
HOT WATER STORAGE TANK (DOMESTIC)
HOT WATER BOILER
HOT WATER CIRCULATING PUMP
HOT WATER PUMP
HYDRANT
INSIDE DIAMETER
INVERT ELEVATION
INDUSTRIAL COLD WATER
INDUSTRIAL HOT WATER
INVERT
INTERNATIONAL PLUMBING CODE
IRRIGATION WATER
INDIRECT WASTE
INSTANTANEOUS WATER HEATER
INDUSTRIAL WATER RETURN
INDUSTRIAL WATER SUPPLY
KILOWATT
KILOWATT-HOUR
PLUMBING ABBREVIATIONS
L/S
LA
LAV
LBS/HR
LCW
LHW
LNG
LOX
LV
LW
M
MA
MAV
MBH
MED
MER
MH
MOU
MSB
MV
N2 N2O
NC
NG
NIC
NO
NOM.
NPW
NTS
O2
OC
OD
OFD
OR
OVFL
PA
PD
PDI
PG
PP
PPM
PRS
PRV
PSI
PSIA
PSIG
PTRV
PW
RD
RDL
RL
RP
RO
RWL
SAN
SMACNA
SCFM
SCW
SDMH
SMH
SP
SPR
SQFT/SF
SS
ST
SW
TCV
TD
TD
TDH
TEMP
TMV
TP
TSTAT
TWR
TWS
TYP
V
VAC
VB
VCO
VP
VS
VSD
VTR
W
WC
WCO
WG
WH
WH
WHA
WL
WM
WPD
WS
WSFU
YCO
YH
LITER PER SECOND
LABORATORY AIR
LAVATORY
POUNDS PER HOUR
LABORATORY COLD WATER
LABORATORY HOT WATER
LIQUID NATURAL GAS
LIQUID OXYGEN
LABORATORY VACUUM
LOW WATER
METER
MEDICAL AIR
MANUAL AIR VENT
1000 BTUH
MEDICAL
MECHANICAL EQUIPMENT ROOM
MANHOLE
MEMORANDUM OF UNDERSTANDING
MOP SERVICE BASIN
MEDICAL VACUUM
NITROGEN
NITROUS OXIDE
NORMALLY CLOSED
NATURAL GAS
NOT IN CONTRACT
NORMALLY OPEN
NOMINAL
NON POTABLE WATER
NOT TO SCALE
OXYGEN
ON CENTER
OUTSIDE DIAMETER
OVERFLOW DRAIN
OPERATING ROOM
OVERFLOW
PASCAL
PRESSURE DROP OR DIFFERENCE
PLUMBING AND DRAINAGE INSTITUTE
PRESSURE GAGE
PLUMBING PUMP
PARTS PER MILLION
PRESSURE REDUCING STATION
PRESSURE REDUCING VALVE
POUNDS PER SQUARE INCH
POUNDS PER SQUARE INCH ATMOSPHERE
POUNDS PER SQUARE INCH GAGE
PRESSURE TEMPERATURE RELIEF VALVE
POTABLE WATER
ROOF DRAIN
ROOF DRAIN LEADER
ROOF LEADER
RECIRCULATION PUMP
REVERSE OSMOSIS WATER
RAIN WATER LEADER
SANITARY SEWER
SHEET METER AND AIR CONDITIONING
CONTRACTORS NATIONAL ASSOCIATION
STANDARD CUBIC FOOT/MINUTE
SOFTENED COLD WATER
STORM DRAIN MANHOLE
SANITARY MANHOLE
SUMP PUMP
SPRINKLER LINE
SQUARE FEET
STAINLESS STEEL
STORAGE TANK
STORM WATER
TEMPERATURE CONTROL VALVE
TEMPERATURE DIFFERENCE
TRENCH DRAIN
TOTAL DYNAMIC HEAD
TEMPERATURE
THERMOSTATIC MIXING VALVE
TRAP PRIMER
THERMOSTAT
TEMPERED WATER RETURN
TEMPERED WATER SUPPLY
TYPICAL
VENT
VACUUM
VACUUM BREAKER
VACUUM CLEANER OUTLET
VACUUM PUMP
VENT STACK
VARIABLE SPEED DRIVE
VENT THROUGH ROOF
WASTE
WATER CLOSET
WALL CLEANOUT
WATER GAGE
WALL HYDRANT
WATER HEATER
WATER HAMMER ARRESTER
WATER LINE
WATER METER
WATER PRESSURE DROP
WASTE STACK
WATER SUPPLY FIXTURE UNITS
YARD CLEANOUT
YARD HYDRANT
PLUMBING PIPING SYMBOLS
DOMESTIC HOT WATER, HOT WATER
DOMESTIC COLD WATER, COLD WATER
ORAL EVACUATION
LABORATORY VACUUM
LABORATORY AIR
MEDICAL VACUUM
MEDICAL AIR
DOMESTIC HOW WATER RETURN, HOT WATER RETURN
STORM WATER, BELOW GRADE
STORM WATER
SANITARY SEWER, BELOW GRADE
DRAIN
DRINKING WATER SUPPLY
DRINKING WATER RETURN
NITROUS OXIDE
TEMPERED WATER RETURN
TEMPERED WATER SUPPLY
INDUSTRIAL AIR
MA MA MA
MV MV MV
LA LA LA
LV LV LV
OA OA OA
IA IA IA
D D D
SAN SAN SAN
SD SD SD
SD SD SD
TWR TWR TWR
DWS DWS DWS
DWR DWR DWR
TWS TWS TWS
SOIL, WASTE, OR SANITARY SEWERSS SS SS
SOFTEN COLD WATERSCW SCW SCW
FILTERED COLD WATERFCW FCW FCW
N20 N20 N20
OXYGEN 0 0 0
NITROGEN N2 N2 N2
NATURAL GAS, BELOW GRADE
NATURAL GAS
NG NG NG
NG NG NG
FUEL OIL DISCHARGEFOD FOD FOD
FUEL OIL SUPPLYFOS FOS FOS
FUEL OIL RETURN
FUEL OIL VENT
FOR FOR FOR
FOV FOV FOV
VENT (SANITARY)
PLUMBING VALVE SYMBOLS
BALL VALVE
GATE VALVE WITH 3/4 " HOSE ADAPTER
CHECK VALVE
ANGLE GLOBE VALVE
BUTTERFLY VALVE
MODULATING CONTROL VALVE
TWO POSITION CONTROL VALVE
THREE-WAY MODULATING CONTROL VALVE
AUTOMATIC FLOW CONTROL VALVE
PRESSURE RELIEF VALVE
GATE VALVE
MANUAL AIR VENT
TEST PLUG (PRESSURE/TEMPERATURE)
GLOBE VALVE
PRESSURE REGULATING VALVE
THREE-WAY TWO POSITION CONTROL VALVE
AUTOMATIC AIR VENT
AV
NOTE:
1. APPLICABLE TO PENETRATIONS OF ALL FIRE
RATED MEMBRANES, IN ACCORDANCE WITH
NFPA 101. REFER TO SPECIFICATIONS
SECTION 07 84 00, FIRE STOPPING SYSTEMS.
INSULATED PIPE
OR DUCT
FLOOR
FIRESTOP MATERIAL
3/4" [19mm] APPROVED
FIRESTOP INSULATION
WITH VAPOR BARRIER
PIPE SLEEVE WHERE
SPECIFIED
1/4" [6.4mm]∅ ANCHOR ROD
FOR NEW CONSTRUCTION
WELD
[2 m m
[1 m m
[1 m m
FLOOR OR DECK PENETRATION
PARTITION OR CHASE PENETRATION
[150mm] [150mm]
MASONRY PARTITION
PARTITION SUPPORT
FIRESTOP
MATERIAL
[150mm] [150mm]
3/4" [19mm] APPROVED FIRESTOP
INSULATION WITH VAPOR
BARRIER
DRYWALL PARTITION
INSULATED
PIPE OR
DUCT
1"1
6" 6"
6" 6"
DRAWING SYMBOLS
26-P 3
DETAIL NUMBER
DRAWING NUMBER WHERE SHOWN
SECTION LETTER
TYPICAL UNIT NO.
BUILDING NO. WHERE EQUIPMENT IS LOCATED.
PUMP NO.3 IN BUILDING NO.26
EQUIPMENT ABBREVIATION (PUMP)
DRAWING NUMBER WHERE DRAWN
PL105
A
PL105
PIPE RISE UP
PLUMBING SYMBOL LIST
PIPE DOWN
PIPE BRANCH RISE UP
EX. DOMESTIC COLD WATER SUPPLY TO REMAIN
EX. DOMESTIC HOT WATER RETURN TO REMAIN
EX. DOMESTIC HOT WATER SUPPLY TO REMAIN
EX. PIPING TO BE DEMOLISHED
NEW HORZONTAL PIPING
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs \b p e re ir a
\D o c u m e n ts
\2 -U
S D
V A
-0 P
L U
M B
IN
G b p e re ir a
N M
M N
.r v t
/2 /2
:4
:0
P M
1-P001
PLUMBING ABBREVIATIONS, LEGENDS AND NOTES
ACELA
561A4-15-102CORRECT FCA F RATED
DEFICIENCIES BUILDING 1
1/2" = 1'-0"1
PIPE/DUCT PENETRATION OF SMOKE/FIRE BARRIERS
Revisions: Date:
10/18/2021 DTB
100% FINAL DOCUMENTS
UP
UP
DN
UP
RISER #6: DEMO AND REPLACE
4" D.S.
3/4" C.W.
3/4" H.W.
1/2" H.W.R.C.
SERVES SECOND FLOOR
RISER #5: DEMO
4" D.S. (DEMO COMPLETELY)
2" C.W. (DEMO COMPLETELY)
1" H.W. (DEMO COMPLETELY)
1/2" H.W.R.C. (DEMO COMPLETELY)
SERVES SECOND FLOOR
RISER #7: DEMO AND REPLACE
3/4" C.W.
3/4" H.W.
1/2" H.W.R.C.
SERVES SECOND FLOOR
RISER #3: DEMO AND REPLACE
2" C.W.
1" H.W.
1/2" H.W.R.C.
3/4" H.W.
1/2" H.W.R.C.
SERVES FIRST, SECOND, AND THIRD FLOOR.
(H.W. AND H.W.R.C. STOPS AT SECOND FLOOR)
RISER #4: DEMO AND REPLACE
2" C.W.
1-1/4" H.W.
1/2" H.W.R.C.
3/4" H.W.
1/2" H.W.R.C.
SERVES FIRST, SECOND, AND THIRD FLOOR.
RISER #1: DEMO AND REPLACE
4" D.S.
3/4" C.W.
1" H.W.
1/2" H.W.R.C.
SERVES THIRD FLOOR
RISER #2: DEMO AND REPLACE
1-1/2" C.W.
1-1/4" H.W.
1/2" H.W.R.C.
SERVES FIRST, SECOND AND THIRD FLOOR
RISER #13: DEMO AND REPLACE
2" C.W.
1" H.W.
1/2" H.W.R.C.
SERVES FIRST, SECOND AND THIRD FLOOR
RISER #12: DEMO AND REPLACE
1-1/2" C.W.
1-1/4" H.W.
1/2" H.W.R.C.
SERVES FIRST, SECOND AND
THIRD FLOOR
RISER #11: DEMO
3/4" H.W. (DEMO COMPLETELY)
1/2" H.W.R.C. (DEMO COPLETELY)
SERVES SECOND FLOOR
RISER #8: DEMO AND REPLACE
1-1/4" C.W.
1" H.W.
1/2" H.W.R.C.
1/2" H.W.
1/2" H.W.R.C.
SERVES SECOND AND THIRD FLOOR
RISER #9: DEMO AND REPLACE
4" D.S.
1" C.W.
1" H.W.
1/2" H.W.R.C.
SERVES FIRST AND SECOND FLOOR
RISER #10: DEMO AND REPLACE
4" D.S.
2" C.W.
1" H.W.
1/2" H.W.R.C.
SERVES FIRST AND SECOND FLOOR
NEW RISER #6 PIPING
SHALL BE:
4" D.S.
2" C.W.
1" H.W.
1/2" H.W.R.C.
DEMO EXISTING C.W., H.W., AND
H.W.R.C. TO MAIN AND CAP.
EXISTING MAINS TO REMAIN (C.W., H.W., H.W.R.C.)
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
WEST
STAIRWELL
CENTER
STAIRWELL
DEMO EXISTING H.W. AND
H.W.R.C. TO MAIN AND CAP
EXISTING MAINS TO REMAIN (C.W., H.W., H.W.R.C.)
EXISTING MAINS TO REMAIN (C.W., H.W., H.W.R.C.)
NEW RISER #12 PIPING
SHALL BE:
1-1/2" C.W.
1-1/2" H.W.
1/2" H.W.R.C.
DEMO EXISTING CW, HW, AND
HWRC TO MAIN AND REPLACE
WITH NEW TO MATCH SIZE OF
NEW RISER PIPES.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs \b p e re ir a
\D o c u m e n ts
\2 -U
S D
V A
-0 P
L U
M B
IN
G b p e re ir a
N M
M N
.r v t
/2 /2
:4
:0
P M
1-P101
BASEMENT DEMOLITION/NEW WORK PLAN - PLUMBING
ACELA
561A4-15-102CORRECT FCA F RATED
DEFICIENCIES BUILDING 1
1/8" = 1'-0"1
BASEMENT PLUMBING - DEMOLITION/NEW WORK
Revisions: Date:
10/18/2021 DTB
DN
UPUP
DN
CENTRAL PHONE
EXCHANGE
WAITING
OFFICE, ASST.
PATHOLOGIST
X-RAY #3
X-RAY #2
RADIOLOGY
FILM
STORAGE
ASSISTANT
CHIEF
RADIOLOGY
SECRETARY
X-RAY #1
LABORATORY
SPECIAL CHEMISTRY
POLICE TRAINING
TOILET
CENTRAL DISPATCH
STORAGE
DETECTIVE OFFICE
RISER #6: DEMO AND REPLACE
4" D.S.
3/4" C.W.
3/4" H.W.
1/2" H.W.R.C.
SERVES SECOND FLOOR
RISER #5: DEMO
4" D.S. (DEMO COMPLETELY)
2" C.W. (DEMO COMPLETELY)
1" H.W. (DEMO COMPLETELY)
1/2" H.W.R.C. (DEMO COMPLETELY)
SERVES SECOND FLOOR
RISER #7: DEMO AND REPLACE
3/4" C.W.
3/4" H.W.
1/2" H.W.R.C.
SERVES SECOND FLOOR
RISER #3: DEMO AND REPLACE
2" C.W.
1" H.W.
1/2" H.W.R.C.
3/4" H.W.
1/2" H.W.R.C.
SERVES FIRST, SECOND, AND THIRD FLOOR.
(H.W. AND H.W.R.C. STOPS AT SECOND FLOOR)
RISER #4: DEMO AND REPLACE
2" C.W.
1-1/4" H.W.
1/2" H.W.R.C.
3/4" H.W.
1/2" H.W.R.C.
SERVES FIRST, SECOND, AND THIRD FLOOR.
RISER #1: DEMO AND REPLACE
4" D.S.
3/4" C.W.
1" H.W.
1/2" H.W.R.C.
SERVES THIRD FLOOR
RISER #2: DEMO AND REPLACE
1-1/2" C.W.
1-1/4" H.W.
1/2" H.W.R.C.
SERVES FIRST, SECOND AND THIRD FLOOR
RISER #13: DEMO AND REPLACE
2" C.W.
1" H.W.
1/2" H.W.R.C.
SERVES FIRST, SECOND AND THIRD FLOOR
RISER #11: DEMO
3/4" H.W. (DEMO COMPLETELY)
1/2" H.W.R.C. (DEMO COMPLETELY)
SERVES SECOND FLOOR
RISER #8: DEMO AND REPLACE
1-1/4" C.W.
1" H.W.
1/2" H.W.R.C.
1/2" H.W.
1/2" H.W.R.C.
SERVES SECOND AND THIRD FLOOR
RISER #9: DEMO AND REPLACE
4" D.S.
1" C.W.
1" H.W.
1/2" H.W.R.C.
SERVES FIRST AND SECOND FLOOR
RISER #10: DEMO AND REPLACE
4" D.S.
2" C.W.
1" H.W.
1/2" H.W.R.C.
SERVES FIRST AND SECOND FLOOR
NEW RISER #6 PIPING
SHALL BE:
4" D.S.
2" C.W.
1" H.W.
1/2" H.W.R.C.
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
WEST STAIRWELL
CENTER
STAIRWELL
EAST
STAIRWELL
RISER #12: DEMO AND REPLACE
1-1/2" C.W.
1-1/4" H.W.
1/2" H.W.R.C.
SERVES FIRST, SECOND AND
THIRD FLOOR
NEW RISER #12 PIPING
SHALL BE:
1-1/2" C.W.
1-1/2" H.W.
1/2" H.W.R.C.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs \b p e re ir a
\D o c u m e n ts
\2 -U
S D
V A
-0 P
L U
M B
IN
G b p e re ir a
N M
M N
.r v t
/2 /2
:4
:0
P M
1-P102
GROUND FLOOR DEMOLITION/NEW WORK PLAN -
PLUMBING
ACELA
561A4-15-102CORRECT FCA F RATED
DEFICIENCIES BUILDING 1
1/8" = 1'-0"1
GROUND FLOOR PLUMBING - DEMOLITION/NEW WORK
Revisions: Date:
10/18/2021 DTB
DN
DOCUMENTATION ROOMPREPARATION AND
STERILIZATION
RECEPTION AREA
TOILET
RISER #6: DEMO AND REPLACE
4" D.S.
3/4" C.W.
3/4" H.W.
1/2" H.W.R.C.
RISER #5: DEMO
4" D.S. (DEMO COMPLETELY)
2" C.W. (DEMO COMPLETELY)
1" H.W. (DEMO COMPLETELY)
1/2" H.W.R.C. (DEMO COMPLETELY)
RISER #7: DEMO AND REPLACE
3/4" C.W.
3/4" H.W.
1/2" H.W.R.C.
RISER #3: DEMO AND REPLACE
2" C.W.
1" H.W.
1/2" H.W.R.C.
3/4" H.W.
1/2" H.W.R.C.
RISER #4: DEMO AND REPLACE
2" C.W.
1-1/4" H.W.
1/2" H.W.R.C.
3/4" H.W.
1/2" H.W.R.C.
RISER #1: DEMO AND REPLACE
4" D.S.
3/4" C.W.
1" H.W.
1/2" H.W.R.C.
RISER #2: DEMO AND REPLACE
1-1/2" C.W.
1-1/4" H.W.
1/2" H.W.R.C.
RISER #13: DEMO AND REPLACE
2" C.W.
1" H.W.
1/2" H.W.R.C.
RISER #12: DEMO AND REPLACE
1-1/2" C.W.
1-1/4" H.W.
1/2" H.W.R.C.
RISER #11: DEMO
3/4" H.W. (DEMO COMPLETELY)
1/2" H.W.R.C. (DEMO COMPLETELY)
RISER #8: DEMO AND REPLACE
1-1/4" C.W.
1" H.W.
1/2" H.W.R.C.
1/2" H.W.
1/2" H.W.R.C.
RISER #9: DEMO AND REPLACE
4" D.S.
1" C.W.
1" H.W.
1/2" H.W.R.C.
RISER #10: DEMO AND REPLACE
4" D.S.
2" C.W.
1" H.W.
1/2" H.W.R.C.
NEW RISER #6 PIPING
SHALL BE:
4" D.S.
2" C.W.
1" H.W.
1/2" H.W.R.C.
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
WEST STAIRWELL
CENTER
STAIRWELL
EAST
STAIRWELL
NEW RISER #12 PIPING
SHALL BE:
1-1/2" C.W.
1-1/2" H.W.
1/2" H.W.R.C.
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs \b p e re ir a
\D o c u m e n ts
\2 -U
S D
V A
-0 P
L U
M B
IN
G b p e re ir a
N M
M N
.r v t
/2 /2
:4
:1
P M
1-P103
LEVEL 1 DEMOLITION/NEW WORK PLAN - PLUMBING
ACELA
561A4-15-102CORRECT FCA F RATED
DEFICIENCIES BUILDING 1
1/8" = 1'-0"1
LEVEL 1 PLUMBING - DEMOLITION/NEW WORK
Revisions: Date:
10/18/2021 DTB
DNDN
RISER #6: DEMO AND REPLACE
4" D.S.
3/4" C.W.
3/4" H.W.
1/2" H.W.R.C.
RISER #5: DEMO
4" D.S. (DEMO COMPLETELY)
2" C.W. (DEMO COMPLETELY)
1" H.W. (DEMO COMPLETELY)
1/2" H.W.R.C. (DEMO COMPLETELY)
RISER #7: DEMO AND REPLACE
3/4" C.W.
3/4" H.W.
1/2" H.W.R.C.
RISER #3: DEMO AND REPLACE
1-1/2" C.W.
3/4" H.W.
1/2" H.W.R.C.
3/4" H.W.
1/2" H.W.R.C.
RISER #4: DEMO AND REPLACE
1-1/2" C.W.
1-1/4" H.W.
1/2" H.W.R.C.
3/4" H.W.
1/2" H.W.R.C.
RISER #1: DEMO AND REPLACE
4" D.S.
3/4" C.W.
1" H.W.
1/2" H.W.R.C.
RISER #2: DEMO AND REPLACE
1-1/2" C.W.
1-1/4" H.W.
1/2" H.W.R.C.
RISER #13: DEMO AND REPLACE
2" C.W.
1" H.W.
1/2" H.W.R.C.
RISER #12: DEMO AND REPLACE
1-1/2" C.W.
1-1/4" H.W.
1/2" H.W.R.C.
RISER #11: DEMO
3/4" H.W. (DEMO COMPLETELY)
1/2" H.W.R.C. (DEMO COMPLETELY)
RISER #8: DEMO AND REPLACE
1-1/4" C.W.
1" H.W.
1/2" H.W.R.C.
1/2" H.W.
1/2" H.W.R.C.
RISER #9: DEMO AND REPLACE
4" D.S.
3/4" C.W.
3/4" H.W.
1/2" H.W.R.C.
RISER #10: DEMO AND REPLACE
4" D.S.
2" C.W.
1" H.W.
1/2" H.W.R.C.
ROUTE NEW PIPING
IN CEILING TO
TOILET ROOM 219NEW RISER #6 PIPING
SHALL BE:
4" D.S.
2" C.W.
1" H.W.
1/2" H.W.R.C.
(N) 2" C.W.
(N) 1" H.W.
(N) 1/2" H.W.R.C (N) 4" D.S.
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
REROUTE NEW 4" D.S. FROM RISER #5 AND
CONNECT INTO RISER #6
WEST
STAIRWELL
CENTER
STAIRWELL
EAST
STAIRWELL
DEMO EX. 3/4" H.W. AND 1/2" H.W.R.C.
PENETRATING INTO WEST STAIRWELL
NEW RISER #12 PIPING
SHALL BE:
1-1/2" C.W.
1-1/2" H.W.
1/2" H.W.R.C.
CONNECT NEW 3/4" H.W. AND 1/2" H.W.R.C.
FROM RISER #12 TO EXISTING SYSTEM
SERVED BY RISER #11 ABOVE SOILED
UTILITY ROOM 203
SOILED UTILITY
TOILET ROOM
1-P104
1-P104
DS
TOILET ROOM
DEMO EXISTING C.W. PIPING
DEMO EXISTING C.W.,
H.W., AND H.W.R.C. PIPING
RISER #5 TO BE
DEMOLISHED
COMPLETELY DS
CONNECT TO (E)
4" DS ABOVE
CEILING
DS
(N) 1" H.W.
(N) 2" C.W.
(N) 4" D.S.
(N) 1/2" H.W.R.C.
(N) 1-1/2" C.W.
TOILET ROOM
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs \b p e re ir a
\D o c u m e n ts
\2 -U
S D
V A
-0 P
L U
M B
IN
G b p e re ir a
N M
M N
.r v t
/2 /2
:4
:1
P M
1-P104
LEVEL 2 DEMOLITION/NEW WORK PLAN - PLUMBING
ACELA
561A4-15-102CORRECT FCA F RATED
DEFICIENCIES BUILDING 1
1/8" = 1'-0"1
LEVEL 2 PLUMBING - DEMOLITION / NEW WORK
1/4" = 1'-0"2
ENLARGED TOILET ROOM DEMOLITION
1/4" = 1'-0"3
ENLARGED TOILET ROOM NEW WORK
Revisions: Date:
10/18/2021 DTB
RISER #3: DEMO AND REPLACE
3/4" C.W.
3/4" H.W.
1/2" H.W.R.C.
RISER #4: DEMO AND REPLACE
1-1/2" C.W.
1" H.W.
1/2" H.W.R.C.
3/4" H.W.
1/2" H.W.R.C.
RISER #1: DEMO AND REPLACE
4" D.S.
3/4" C.W.
1" H.W.
1/2" H.W.R.C.
RISER #2: DEMO AND REPLACE
1-1/2" C.W.
1" H.W.
1/2" H.W.R.C.
RISER #13: DEMO AND REPLACE
1-1/2" C.W.
3/4" H.W.
1/2" H.W.R.C.
RISER #12: DEMO AND REPLACE
1-1/2" C.W.
1" H.W.
1/2" H.W.R.C.
RISER #8: DEMO AND REPLACE
1" C.W.
1" H.W.
1/2" H.W.R.C.
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
DEMO AND REPLACE
4" D.S. RISER
WEST
STAIRWELL
CENTER
STAIRWELL
EAST
STAIRWELL
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C U s e rs \b p e re ir a
\D o c u m e n ts
\2 -U
S D
V A
-0 P
L U
M B
IN
G b p e re ir a
N M
M N
.r v t
/2 /2
:4
:1
P M
1-P105
LEVEL 3 DEMOLITION/NEW WORK PLAN - PLUMBING
ACELA
561A4-15-102CORRECT FCA F RATED
DEFICIENCIES BUILDING 1
1/8" = 1'-0"1
LEVEL 3 PLUMBING - DEMOLITION/NEW WORK
Revisions: Date:
10/18/2021 DTB
TURNING VANES
CEILING UNLESS NOTED OTHERWISE)
DUCTWORK EXISTING (ABOVE
MECHANICAL ABBREVIATIONS AIR MOVING DEVICES AND COMPONENTS
DUCTWORK - NEW WORK
DUCTWORK - DEMOLITION
SUPPLY DUCT RISER
DUCT ELBOW WITH
TRANSITION
TYPICAL ASSEMBLY
CHANGE OF ELEVATION
RISE (R) DROP (D)
ACCESS DOORS, VERTICAL
OR HORIZONTAL
DUCT SECTION, NEGATIVE PRESSURE
15x820x10
AD
R
SYMBOL DESCRIPTION
CHILLED WATER SUPPLYCHWS
SMOKE DETECTOR FOR LOCATION ONLY.
SEE ELECTRICAL DWGS.
HUMIDITY SPACE SENSOR
DUCT HEATER
(PROVIDE ACCESS DOOR)
FIRE DAMPER IN VERTICAL DUCT
FIRE DAMPER
SYMBOL
REVISION CLOUD
SPACE THERMOSTAT
REVISION TAG
TYPICAL ANNOTATIONS
DESCRIPTION
SD
AD
FD
VOLUME DAMPER
SMOKE DAMPER
MANUAL DUCT SPLITTER
AD
COMBINATION FIRE &
SMOKE DAMPER
MOTOR OPERATED DAMPER
M
BDD
BACK DRAFT DAMPER
DUCT SMOKE DETECTOR
DUCT ACCESS DOOR
TYPE (A) SUPPLY DIFFUSER/GRILL - 100 CFM
EQUIPMENT TAG NO. 1
GENERAL HVAC NOTES
KEYED NEW WORK NOTE
KEYED DEMOLITION NOTE
PIPING LEGEND
SYMBOL DESCRIPTION
CHILLED WATER RETURNCHWR
CONDENSATE DRAINCD
HEATING WATER SUPPLYHWS
HEATING WATER RETURNHWR
REFRIGERANT LIQUIDRL
REFRIGERANT SUCTIONRS
AD
10x10
EQUIPMENT NO. 1
EQUIPMENT TAG LEGEND
SYMBOL DESCRIPTION
RETURN DUCT RISER
EXHAUST DUCT RISER
1. COORDINATE WORK WITH THE WORK OF ALL OTHER TRADES. COORDINATE THE LOCATION OF ALL EQUIPMENT, LOUVERS, WALL OPENINGS WITH OTHER TRADES, ARCHITECTURAL FLOOR PLANS, ELEVATIONS, SECTIONS, DETAILS AND STRUCTURAL SUPPORTS.
2. PRIOR TO SUBMITTING SHOP DRAWINGS, CHECK AND VERIFY AIR TERMINAL CONTROL DEVICES AND COORDINATE INSTALLATION REQUIREMENTS WITH THE ROOM FINISH SCHEDULES PROVIDED IN GENERAL
CONSTRUCTION DOCUMENTS.
3. DISCONNECT AND REMOVE ALL EXISTING EQUIPMENT AND ASSOCIATED APPURTENANCES NO LONGER
REQUIRED, UNLESS OTHERWISE NOTED. SEE SPECIFICATIONS.
4. ALL EQUIPMENT PADS INDICATED ON THE HVAC DRAWINGS SHALL BE PROVIDED BY THIS CONTRACTOR, UNLESS OTHERWISE NOTED.
5. COORDINATE PARTITION AND BUILDING ENVELOPE OPENINGS REQUIRED FOR THE INSTALLATION OF HIS
CONTRACT WORK WITH THE WORK OF OTHER CONTRACTORS.
6. ALL PIPING, CONDUIT, DUCTWORK AND OTHER PENETRATIONS REQUIRED THROUGH THE BUILDING PARTITIONS OR THE BUILDING ENVELOPE SHALL BE SEALED IN A WEATHERPROOF AND WATERTIGHT MANNER, UNLESS
OTHERWISE NOTED.
7. REVIEW THE GENERAL CONSTRUCTION DOCUMENTS TO COORDINATE THE TYPE OF SEAL REQUIRED RELATIVE TO THE PARTITION CONSTRUCTION, I.E.: FIRE-RATED PARTITION, SMOKE-RATED PARTITIONS, COMBINATION
THEREOF OR NON-RATED PARTITION.
8. SEALS THROUGH SMOKE-RATED PARTITIONS SHALL PREVENT SMOKE PASSAGE. ALL PARTITIONS NOTED AS SMOKE-BARRIERS OR ONE-HOUR WALLS. THE WALLS MUST COMPLY WITH THE REQUIREMENTS FOR SMOKE- BARRIER WALLS AS DESCRIBED IN THE LIFE SAFETY CODE, NFPA 1O1 AND, IN ADDITION, BE ONE-HOUR FIRE-
RATED.
9. DUCT ACCESS DOORS SHALL BE PROVIDED AT ALL DAMPER, COIL, HUMIDIFIER, FILTER OR BARRED SECURITY
GRATE LOCATIONS.
10. DUCT ACCESS PANELS SHALL BE NOMINALLY TWO INCHES SMALLER THAN THE OUTSIDE EDGE OF THE DUCT
DIMENSION TO FACILITATE REMOVAL OF DEVICE IN THE DUCTWORK.
11. COORDINATE ROUGH OPENINGS AND FRAMING REQUIREMENTS FOR ACCESS PANELS AS REQUIRED OR SHOWN ON ARCHITECTURAL DRAWINGS. ACCESS DOORS SHALL BE PROVIDED IN THESE PARTITIONS OR
CEILINGS WHEREVER VALVES, DUCT ACCESS DOORS, DAMPERS, TERMINAL
UNITS OR EQUIPMENT RFEQUIRING SERVICING OR ADJUSTMENT ARE CONCEALED BEHIND PARTITIONS OR CEILINGS OR PROVIDED ON THE ARCHITECTURAL DRAWINGS. COORDINATE LOCATIONS OF ALL ACCESS
DOORS AND KEYING SYSTEMS.
12. ALL DUCTWORK IN AREAS WITHOUT CEILINGS SHALL BE INSTALLED AS HIGH AS POSSIBLE, UNLESS OTHERWISE
NOTED.
13. ALL DIMENSIONS AND NEW CONDITIONS SHALL BE CHECKED AND VERIFIED AT THE SITE BY THE CONTRACTOR.
14. REFERENCE INDICATED DIMENSIONS. DO NOT SCALE DRAWINGS. RESOLVE ANY DISCREPANCIES WITH THE
PROFESSIONAL BEFORE BEGINNING WORK.
15. VERIFY ALL DIMENSIONS AND INSPECT CONDITIONS OF PRIOR WORK BY ALL TRADES BEFORE PROCEEDING WITH ANY WORK. UNACCEPTABLE OR INCORRECT PRIOR WORK SHALL BE REPAIRED OR REPLACED BEFORE STARTING WORK. PROCEEDING WITH THE WORK SHALL CONSTITUTE ACCEPTANCE OF PRIOR WORK.
16. THERMOSTATS AND ALL OTHER WALL MOUNTED MECHANICAL ACCESSORIES SHALL BE ALIGNED VERTICALLY OR HORIZONTALLY WITH ALL ELECTRICAL OUTLETS, COMPUTER AND TELEPHONE OUTLETS/ JACKS, SWITCHES, PULL STATIONS, EXIT LIGHTS, WHEN IN CLOSE PROXIMITY. COORDINATION OF THIS ALIGNMENT SHALL BE THE RESPONSIBILITY OF THE CONSTRUCTION MANAGER AND ALL CONTRACTORS, AND LOCATIONS SHALL BE
APPROVED BY THE ARCHITECT.
17. COORDINATE THE EXACT LOCATION OF ALL CEILING DIFFUSERS, GRILLES, CEILING MOUNTED FANS AND HEATERS WITH ARCHITECTURAL REFLECTED CEILING PLANS, LIGHT FIXTURES, SPRINKLERS, ETC.
18. DUCTWORK SHALL NOT BE FABRICATED OR INSTALLED UNLESS FIRST COORDINATED WITH OTHER TRADES AND CONDITIONS, AND CONFLICTS HAVE BEEN RESOLVED, COORDINATED AND INDICATED ON DUCT SHOP DRAWINGS. CHANGES REQUIRED FROM FAILURE TO DO SO, SHALL BE AT THE CONTRACTOR'S EXPENSE.
19. ALL DUCT SIZES INDICATED ARE NET FREE AREA. ADD 2" CLEARANCE FOR EXTERIOR INSULATION ON
INSULATED DUCTS WHEN COORDINATING SPACE REQUIREMENTS.
20. CONFIRM EXACT STRUCTURAL REQUIREMENTS FOR THE MOUNTING AND SUPPORT OF ALL ACTUAL EQUIPMENT, PIPING AND DUCTWORK SUBMITTED AND APPROVED TO BE INSTALLED, WITH STRUCTURAL ENGINEER. ALL MOUNTING DETAILS INDICATED ON MECHANICAL DRAWINGS ARE INTENDED TO CONVEY A
GENERAL MEANS OF SUPPORT.
21. THE DRAWINGS ARE DIAGRAMMATIC AND DO NOT INDICATE ALL OFFSETS, BENDS, ACCESS PANELS AND SIMILAR PARTS, WHICH MAY BE REQUIRED, THE CONTRACTOR SHALL INVESTIGATE STRUCTURAL AND FINISH CONDITIONS AND CEILING HEIGHTS AFFECTING HIS WORK AND PROVIDE ALL NECESSARY OFFSETS, FITTINGS, ACCESS PANELS AND SIMILAR ACCESSORIES THAT MAY BE REQUIRED TO PROVIDE A COMPLETE AND O
OPERATING INSTALLATION AT NO ADDITIONAL COSTS TO THE OWNER.
22. PROVIDE FIRE STOPS FOR ALL HIS PIPING AND DUCTWORK PENETRATIONS USING U.L. RATED ASSEMBLIES.
23. PROVIDE FIRE DAMPERS AND DUCT ACCESS DOORS AT ALL 2 HOUR FIRE RATED WALL PENETRATIONS. REFER
TO ARCHITECTURAL DRAWINGS INDICATING ALL FIRE WALL ASSEMBLIES.
24. FURNISH AND INSTALL ALL MECHANICAL SYSTEMS IN ACCORDANCE WITH VA STANDARDS AND GUIDELINES, AND MANUFACTURER'S RECOMMENDED INSTALLATION RECOMMENDATIONS.
25. REUSE EXISTING PIPE HANGER RODS TO EXTENT POSSIBLE. PROVIDE NEW PIPE HANGERS AND SADDLES AS
REQUIRED TO SUPPORT NEW PIPING AND INSULATION.
AD
10"∅ x
(A) 100 CFM
EQ
ID INSIDE DIAMETER
IN INCHES
KVA KILOVOLT AMPERE
KW KILOWATTS
L LENGTH AND/OR LOUVER
LAT LEAVING AIR TEMPERATURE
LB POUNDS
LP LIQUID PROPANE
LWT LEAVING WATER TEMPERATURE
MAX MAXIMUM
MBH THOUSAND BTU/HOUR
MIN MINIMUM
MU MAKEUP WATER
NEG NEGATIVE
NG NATURAL GAS
NO. NUMBER
NTS NOT TO SCALE
OA OUTSIDE AIR
OBD OPPOSED BLADE DAMPER
P PUMP
PH PHASE
PNL PANEL
POS POSITIVE
PRESS PRESSURE
PRV PRESSURE REDUCING/RELIEF VALVE
PSI POUNDS PER SQUARE INCH
PSIA POUNDS PER SQUARE INCH ABSOLUTE
PSIG POUNDS PER SQUARE INCH GUAGE
R RISE
RCP RADIANT CEILING PANEL
REC RECEIVER
RECIP RECIPROCATING
REFR REFRIGERANT
RH RELATIVE HUMIDITY
RPM REVOLUTIONS PER MINUTE
RR REGISTER RETURN
RL REFRIGERANT LIQUID
RS REFRIGERANT SUCTION
S SWITCH, SENSOR AND/OR SMOKE DETECTOR
SAN SANITARY WASTE
SD SMOKE DAMPER
SENS SENSIBLE
SF SUPPLY FAN
SG SPECIFIC GRAVITY
SP STATIC PRESSURE
T THERMOSTAT
TEMP TEMPERATURE
TONS TONS OF REFRIGERATION
TOT TOTAL
TSP TOTAL STATIC PRESSURE
UH UNIT HEATER
V VOLTS
VAV VARIABLE AIR VOLUME
VP VELOCITY PRESSURE
W WIDTH
WB° WET BULB
WG WATER GAUGE
WT WEIGHT
A AREA
AD ACCESS DOOR
AF AIR FILTER
AFF ABOVE FINISH FLOOR
AHU AIR HANDLING UNIT
AMPS AMPERES
APD AIR PRESSURE DROP
B BOILER
BB BASEBOARD
BDD BACK DRAFT DAMPER
BHP BRAKE HORSEPOWER
BOD BOTTOM OF DUCT
BTU BRITISH THERMAL UNIT
BTUH BRITISH THERMAL UNIT/HR
CC COOLING COIL
CD CONDENSATE DRAIN
CENTRIF CENTRIFUGAL
CFM CUBIC FEET PER MINUTE
CR CONDENSER WATER RETURN
CS CONDENSER WATER SUPPLY
CHWR CHILLED WATER RETURN
CHWS CHILLED WATER SUPPLY
CT COOLING TOWER
CU CONDENSING UNIT
CUH CABINET UNIT HEATER
CW CITY WATER
D DEPTH AND/OR DROP
DB DRY BULB
DW DOMESTIC WATER
DIA DIAMETER
DN DOWN
DP DEW POINT
DX DIRECT EXPANSION
EAT ENTERING AIR TEMPERATURE
EBB ELECTRIC BASEBOARD
EF EXHAUST FAN
ER EXHAUST REGISTER
ESP EXTERNAL STATIC PRESSURE
EUH ELECTRIC UNIT HEATER
EVAP EVAPORATOR
EWT ENTERING WATER TEMPERATURE
EXH EXHAUST
EXP EXPANSION
°F DEGREES FAHRENHEIT
F&T FLOAT & THERMOSTATIC TRAP
FCU FAN COIL UNIT
FD DAMPER FIRE
FL FUSIBLE LINK
FOR FUEL OIL RETURN
FOS FUEL OIL SUPPLY
FOV FUEL OIL VENT
FP FIRE PROTECTION
FPM FEET PER MINUTE
FPS FEET PER SECOND
FS FLOW SWITCH
FSD FIRE/SMOKE DAMPER
FT FEET
FV FACE VELOCITY
GA GAUGE
GPM GALLONS PER MINUTE
H2O WATER
HC HEATING COIL
HD HEAD
HP HORSEPOWER
HT HEIGHT
H HUMIDISTAT
HWR HOT WATER RETURN
HWS HOT WATER SUPPLY
HX HEAT EXCHANGER TYPE (B) SUPPLY DIFFUSER/GRILL - 100 CFM(B) 100 CFM
TYPE (C) SUPPLY DIFFUSER/GRILL - 100 CFM(C) 100 CFM
TYPE (D) EXHAUST/RETURN REGISTER/GRILL - 100 CFM(D) 100 CFM
TYPE (E) EXHAUST/RETURN REGISTER/GRILL - 100 CFM(E) 100 CFM
TYPE (F) EXHAUST/RETURN REGISTER/GRILL - 100 CFM(F) 100 CFM
FSD
FD
S
T
H
S
Project Number
Building Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
Drawing Title
Approved:
VA FORM 08 - 6231
A
Office of Construction and Facilities Management
U.S. Department of Veterans Affairs
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9 10
Phase
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANTS
321 4 5 6 7 8 9 10
C
U s e rs
\t b o rg e r\
D o c u m e n ts
\2 -U
S D
V A
-0 S
T E
A M tb o rg e r3
K H
Y N
.r v t
/1
/2
:1
:4
A
M
1-M001
LEGENDS, NOTES AND ABBREVIATIONS
10/18/2021 TMB
561A4-15-102CORRECT FCA F RATED DEFICIENCIES
BUILDING 1
100% Final Documents
Revisions: Date:
DTB