DRAFT_B2_09.8_NTP_Submittal_Checklist.pdf

PDF 508 KB Posted

Attached to
SLAC Design-Build B057, Room 1026, Modular Cleanroom project
Solicitation number
329772
Issued by

View the file

Other files

File Type Posted
DRAFT_B2_04.0_RFP_Section_C_Cover.pdf PDF
DRAFT_B2_11.1_Section_L_B057_Modular_Cleanroom_Bid_Breakdown.xlsx XLSX spreadsheet
DRAFT_B2_09.5_Work Classification_329772.pdf PDF
DRAFT_B2_02_RFP_Section_A_(Subcontract_Award)_05.23.22_(B2).pdf PDF
DRAFT_B2_10.1_Section_K_Reps_and_Certs-Rider-Feb_2018.pdf PDF
DRAFT_B2_12.0_Section_M_Evaluation_Criteria.pdf PDF
DRAFT_B2_06.0_Section_G_(General_Terms_and_Conditions).pdf PDF
DRAFT_B2_09.9_Final_Inspection_Report.docx DOCX document
DRAFT_B2_09.4_Section_J_Kobe.pdf PDF
DRAFT_B2_09.2_Section_J _ISEMS.pdf PDF
DRAFT_B2_06.1_FP_Construction_(Sept_2020).pdf PDF
DRAFT_B2_03_Section_B_(Supplies or Services).pdf PDF
DRAFT_B2_09.10_Final_Release.docx DOCX document
DRAFT_B2_00_RFP_Cover_Letter_329772_B057_Modular_Cleanroom_Project.pdf PDF
DRAFT_B2_08_Section_I_(Specific Subcontract Clauses).pdf PDF
DRAFT_B2_09.0_Section_J_(List_of_Attachments).pdf PDF
DRAFT_B2_01_Attachment_A_Request_for_Clarifications.docx DOCX document
DRAFT_B2_09.7_SubcontractorFormSQF.pdf PDF
DRAFT_B2_11.0_Section_L_Instructions_to_Offerors.pdf PDF
DRAFT_B2_07_Section_H_(Special_Terms_and_Conditions).pdf PDF
DRAFT_B2_09.6_Section_J_SF1413-13g.pdf PDF
DRAFT_B2_09.3_Section_J_Subcontractor_Form_IIPP_052121.pdf PDF
DRAFT_B2_04.1_B057_Room_1026_Modular_Cleanroom_Design-Build_Requirements_053122.pdf PDF
DRAFT_B2_05_Sec_F_Deliveries_Performance.pdf PDF
DRAFT_B2_09.1_DBA_WD_CA20220018_060322_Mod_7.pdf PDF
DRAFT_B2_10.0_RFP_Section_K_Reps_and_Certs_Cover.pdf PDF
DRAFT_B2_06.2_COVID-19 Rider for Onsite_Contractors_(Nov_2021).pdf PDF
Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPLY CHAIN MANAGEMENT

NOTICE TO PROCEED SUBMITTALS

Project:

PO#:

Subcontractor:

SLAC PM:

SLAC FCM:

NOTICE TO PROCEED REQUIRED

Performance & Payment Bonds. Penal sum of Bonds must be equal to the FFP Award.

Approved insurance certificates

Subcontracts of $25,000 and over requiring design by Subcontractor: Professional Errors and Omissions Insurance in the amount not less than $1,000,000 per claim.

Subcontracts of $50,000 and over: Subcontractor shall purchase and maintain at its cost Builder’s All Risk Insurance covering physical damage to the work being performed under this Subcontract in a form acceptable to the University and to the full value of the work at the time of loss or damage.

"Statement and Acknowledgment” Standard Form (SF1413-13) for all known Sub-Subcontractors.

A copy of the Subcontractor’s licenses and permits, and copies of all known Sub-Subcontractors licenses or permits, if needed, in performance of the Subcontract.

Issue for Construction Set (IFC) Drawings and Specifications.

Project schedule in the specified format as required by the SLAC PM

Notes:

June 2022

Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Text19:
Text20:
Text21:
Text22:
Text23:
Text24: