SUPPLY CHAIN MANAGEMENT
NOTICE TO PROCEED SUBMITTALS
Project:
PO#:
Subcontractor:
SLAC PM:
SLAC FCM:
NOTICE TO PROCEED REQUIRED
Performance & Payment Bonds. Penal sum of Bonds must be equal to the FFP Award.
Approved insurance certificates
Subcontracts of $25,000 and over requiring design by Subcontractor: Professional Errors and Omissions Insurance in the amount not less than $1,000,000 per claim.
Subcontracts of $50,000 and over: Subcontractor shall purchase and maintain at its cost Builder’s All Risk Insurance covering physical damage to the work being performed under this Subcontract in a form acceptable to the University and to the full value of the work at the time of loss or damage.
"Statement and Acknowledgment” Standard Form (SF1413-13) for all known Sub-Subcontractors.
A copy of the Subcontractor’s licenses and permits, and copies of all known Sub-Subcontractors licenses or permits, if needed, in performance of the Subcontract.
Issue for Construction Set (IFC) Drawings and Specifications.
Project schedule in the specified format as required by the SLAC PM
Notes:
June 2022
| Check Box1: Off |
| Check Box2: Off |
| Check Box3: Off |
| Check Box4: Off |
| Check Box5: Off |
| Check Box6: Off |
| Check Box7: Off |
| Check Box8: Off |
| Text19: |
| Text20: |
| Text21: |
| Text22: |
| Text23: |
| Text24: |
File details come from the government source that posted it. Updated .