CINCINNATI
Job Corps Center Cincinnati, OH
Facility Planning Report Volume II
Supporting Data
Preliminary October 2016
Department of Labor/ Office of Job Corps
CINCINNATI
Job Corps Center Cincinnati, OH
Facility Planning Report Volume II
Supporting Data
Preliminary October 2016
Carpentry/Warehouse Building 4 and boiler stack
VOLUME II - SUPPORTING DATA
EXECUTIVE SUMMARY
1.0 SITE LAYOUT AND PLANS
• Location Map
• Exisiting Site Plan
2.0 DESCRIPTIONS
• Buildings and Structures
• Space Utilization By Function
• NSF by Building
• Environmental Management Report
• Asbestos Report
• Radon Report
• Site Descriptions
• Building Descriptions
3.0 DEFICIENCIES
APPENDICES - CORRESPONDENCE AND REPORTS
Appendix A.
• Survey Brief
• Student Questionnaire
Appendix B.
• Life Safety Defi ciencies and List
Appendix C.
• O&M Defi ciencies List
Appendix D.
• Active Warranty List
Executive Summary
The Program Year 2015 facility survey for Cincinnati Job Corps Center was completed the week of 28 March 2016. The information presented in Volume II, Supporting Data, represents the current status of the campus.
The information includes the following:
Existing site layout Overall status of existing building and structures Space utilization by building and function compared to recommended standards Status of environmental elements of the Center’s operations Details on the site and buildings and structures based on architectural, electrical, and mechanical survey and supporting documentation Presentation of the status of historical deficiencies and compilation of deficiencies documented through this survey Supporting documentation, as presented in the appendices of the center review meeting; survey brief and student questionnaire; life safety IA/IIA transmittal; and active warranties
Section 1.0 of this volume addresses site layout and plans while Section 2.0 presents details on the buildings and structures. Section 3.0 presents deficiencies and their status as well as new ones identified in this survey. The appendices provide additional information as noted below:
Appendix A. Survey Brief Questionnaire Appendix B. Life Safety Deficiencies and List Appendix C. O&M Deficiencies List Appendix D. Active Warranty Report
EXECUTIVE SUMMARY
1.0 - Site Layout and Plans
CINCINNATI
JOB CORPS CENTER
CINCINNATI, OHIO
CINCINNATI JCC
10 MI50
2.0 - Descriptions
BUILDINGS AND STRUCTURES
00503 CINCINNATI 10/14/2016
1Page: of Date:
0001 - MAIN BUILDING
0003 - WELDING VOCATION
0004 - CARPENTRY VOC/WAREHOUSE
0005 - AUTO MECH/FACILITY MAINT
VOC
0010 - GAZEBO (Octagon, 5Ft Each Side, 12' Dia) 0011 - GAZEBO (Octagon, 5Ft Each Side, 12' Dia) 0012 - DECK (44Ft x 29Ft)
Name GSF
86,290 3,420 7,130 5,070
1,276
Active Active Active Active
Active
Active
Active
StatusType
Building Building Building Building
Structure
Structure
Structure
Use Group Built Flrs Const
A-2,A-3,R-2,B F-1 B,S-1 F-1,B
U
U
Assembly
Fair Fair
Good Good
Good
Good
Good
ConditionAsset Number
0050300002 0050300003 0050300004 0050300005
0050308066
0050308067
0050308068
4 101,910
3 1,496
7 103,406
Buildings
Structures
Total
GSF
GSF
GSF
Summary
10/14/2016
Space Utilization By Function 00503 Cincinnati Page: 1 of Date:
HOUSING
EDUCATION
FOOD SERVICE
SUGGESTED
NSF/
ENROLLEE
SUGGESTED
TOTAL
NSF
ACTUAL
TOTAL
NSF
TYPE OF SPACE
SUB TOTAL
SUB TOTAL
SUB TOTAL
Resident Men Resident Women Total Residents
Residents 153 Non Residents 49
202Total Students
(153)
(225)
(202)
DIFFERENCE
16,524
16,430
3,636
19,869
21,799
4,500
Lounge Other Shower/Toilet Sleeping excl. SPD(77 rooms; 186 beds) Storage
Academic (225) Non-Academic
15 -- ACT (Off-Ctr) 20 -- Automotive Mechanic + 40 -- Carpentry + 20 -- Culinary Arts + 24 -- Facilities Maint. and Const. + 25 -- Nursing Assistant (Off-Ctr) 30 -- Office Administration 24 -- Welding +
Vocational Theory (128)
Dining (2 Servings) Food Preparation Food Storage
1,240 2,585 1,820
12,950 1,274
3,919 4,250
1,962 2,848 2,180 1,880
1,050 2,654
1,056
2,014 1,746
1,530 1,224 1,836
11,016
2,250 2,250
1,500 3,000 1,200 1,800
1,350 1,800
1,280
1,616 1,212
-290 1,361
-16 1,934
1,669 2,000
-152
-300
-224
-68
Vocations
3,345
5,369
10/14/2016
Space Utilization By Function 00503 Cincinnati Page: 2 of Date:
RECREATION
MEDICAL/DENTAL
ADMINISTRATION
STORAGE/SUPPORT
SUGGESTED
NSF/
ENROLLEE
SUGGESTED
TOTAL
NSF
ACTUAL
TOTAL
NSF
TYPE OF SPACE
SUB TOTAL
SUB TOTAL
SUB TOTAL
SUB TOTAL
TOTAL 269.80 54,500 68,630
(202)
(202)
(202)
(202)
DIFFERENCE
101,910
0.67
TOTAL GSF
NET TO GROSS RATIO
8,385
1,445
4,040
4,040
9,640
1,680
4,504
6,638
Aerobics/Exercise Auditorium Canteen Gymnasium Recreation Hall Recreation Office Recreation Storage Theater Weight Room
Medical/Dental
Administration
Operations & Maintenance Warehouse
7.15
1,400 1,950
2,700 1,220
1,680
4,504
4,904 1,734
1,445
4,040
1,616 2,424
1,400 1,950
2,700 1,220
3,288 -690
RESIDENT
NON-RESIDENT
(153)
(49) 15
50 7,650
1,255
2,598
14,130
Net Square Footage By Building Date: 10/14/2016 Page: 1
Center: CINCINNATI (00503) of 3
HOUSING
EDUCATION
Sleeping excl. SPD
Lounge
Storage
Shower/Toilet
Other
Academic
Vocational Theory (128)
Carpentry
Culinary Arts
Welding
Facilities Maint. and Const.
Non-Academic
Automotive Mechanic
Office Administration
Function Suggested
NSF
12,950
1,240
1,274
1,820
2,585
1,141
1,225
2,848
2,180
2,654
1,880
2,386 1,170
1,962
1,050
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0003 - WELDING VOCATION
0005 - AUTO MECH/FACILITY MAINT VOC
0004 - CARPENTRY VOC/WAREHOUSE
0001 - MAIN BUILDING
0003 - WELDING VOCATION
0005 - AUTO MECH/FACILITY MAINT VOC
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0005 - AUTO MECH/FACILITY MAINT VOC
0001 - MAIN BUILDING
Bldg Name Actual NSF Difference
12,950
1,240
1,274
1,820
2,585
3,919
1,056
2,848
2,180
2,654
1,880
4,250
1,962
1,050
Sub Total:
Sub Total:
19,869
21,799
11,016
1,530
1,836
1,224
2,250
1,280
3,000
1,200
1,800
1,800
2,250
1,500
1,350
16,524
16,430
1,934
-290
-16
1,361
1,669
-224
-152
2,000
-300
3,345
5,369
77 rooms; 186 beds
Page: 2
Center: CINCINNATI (00503) of 3
FOOD SERVICE
RECREATION
MEDICAL/DENTAL
ADMINISTRATION
Dining (2 Servings)
Food Preparation
Food Storage
Recreation Hall
Gymnasium
Weight Room
Auditorium
Theater
Canteen
Aerobics/Exercise
Recreation Storage
Recreation Office
Medical/Dental
Administration
Function Suggested
NSF
2,014
1,746
1,220
2,700
1,950
1,400
1,680
4,336
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0001 - MAIN BUILDING
0004 - CARPENTRY VOC/WAREHOUSE
0001 - MAIN BUILDING
Bldg Name Actual NSF Difference
2,014
1,746
1,220
2,700
1,950
1,400
1,680
4,504
Sub Total:
Sub Total:
Sub Total:
Sub Total:
4,500
9,640
1,680
4,504
1,616
1,212
1,445
4,040
3,636
8,385
1,445
4,040
-68
1,255
Page: 3
Center: CINCINNATI (00503) of 3
STORAGE/SUPPORT
Warehouse
Operations & Maintenance
Function Suggested
NSF
1,734
3,330 1,574
0004 - CARPENTRY VOC/WAREHOUSE
0001 - MAIN BUILDING
0004 - CARPENTRY VOC/WAREHOUSE
Bldg Name Actual NSF Difference
1,734
4,904
Sub Total: 6,638
2,424
1,616
4,040
-690
3,288
( 202
2,598
Environmental Management Report Center: CINCINNATI (00503)
Page: 1 Date: 10/14/2016 of 1
SOLID & HAZARDOUS WASTE MANAGEMENT (RCRA)
Commercial Waste Service
HAZARDOUS MATERIALS STORAGE (EPCRA)
No Paint lockers
Propane gas cylinders, Oil-based paint Yes
PETROLEUM UNDERGROUND STORAGE TANKS (RCRA)
Compliance0
PETROLEUM ABOVEGROUND STORAGE TANKS (CWA)
ASBESTOS AND PCB MANAGEMENT (TSCA)
AIR POLLUTION CONTROL (CAA)
N/A None
Non-Attainment
Solid Waste Disposal :
Hazardous Waste Generator :
Hazardous Waste ID :
Generator Classification :
Hazadous Materials Storage :
Hazardous Materials ID :
HazMat Storage Area :
HazMat Spill Response Plan :
Number of Regulated USTs :
Number of Un-regulated USTs :
Local Hazardous Use Permit :
LEPC Notification :
EPA Generator ID Number :
Hazardous Waste Disposal :
RCRA Compliance
ID LocationFuel Type Capacity
Number of ASTs :
Asbestos Survey Date :
Asbestos Type :
Asbestos Coordinator :
Coordinator Training Date:
Custodial/Maintenance Training :
AHERA Regulated :
Management Plan Approval :
PCB Transformer Testing :
PCB Transformers :
PCB-Contaminated Transformers :
Transformers Labelled :
Regional Air Quality :
Permitted Air Pollution Source :
Source Description :
Bavarian Waste Management No N/A
N/A N/A N/A
No No
Overfill Leak Corrosion
SPCC Plan Required : SPCC Plan Completed :
No N/A
04/05/1990 Friable/Non-Friable Jack Pflanzer 12/03/1998 Yes No N/A Yes Yes
Ozone
ID Fuel Type Capacity Location Overfill
Prevention Secondary ContainmentTank Status
Tank Status Prevention/Detection
Asbestos-Containing Materials Inventory
Date: 10/14/2016Center : Cincinnati (00503) Page: 1 of 1
Floor Finishes Heating Floor Finishes Floor Finishes Floor Finishes Floor Finishes Floor Finishes Floor Finishes Floor Finishes Wall Finishes Wall Finishes Wall Finishes Wall Finishes Wall Finishes Wall Finishes Wall Finishes Wall Finishes Floor Finishes Heating Heating Heating Heating
Heating Heating
Bldg System
Bldg System
9x9 floor tile, grey/green 9x9 floor tile, burgundy 9x9 floor tile, grey/green 9x9 floor tile, beige/brown 9x9 floor tile, beige 9x9 floor tile, beige/green 9x9 floor tile, multi-colored 9x9 floor tile, multi-colored 9x9 floor tile, burgundy Wall/ceiling plaster Wall/ceiling plaster Wall/ceiling plaster Wall/ceiling plaster Wall/ceiling plaster Wall/ceiling plaster Wall/ceiling plaster Wall/ceiling plaster 9x9 floor tile, grey/black Pipe fitting insulation Pipe insulation, pre-cast Pipe fitting insulation Pipe insulation, pre-cast
Pipe fitting insulation Boiler gasket
Category Description
Category Description
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Sq. Ft.
Ea.
Lin. Ft.
Ea.
Lin. Ft.
Sq. Ft.
Ea.
Location
Location
Unit
Unit
Quantity
Quantity
Auditorium 1st fl., gym storage Grnd. fl., OEP Grnd. fl., WOW Grnd. fl., business Grnd. fl., math Grnd. fl., health Grnd. fl., reading Grnd. fl., GED Ground floor Stairwell, NW corner 1st floor 2nd floor 3rd floor Attic Stairwell, SW corner Stairwell, SE corner Auditorium storage Grnd. fl., ceiling Sub-basement Sub-basement Grnd. fl., ceiling
Boiler room Boiler room
40000
47500 38300 18500
Building :
Building :
0001 - MAIN BUILDING
0004 - CARPENTRY VOC/WAREHOUSE
Radon
Page: 1 of 1
0001 - MAIN BUILDING
0003 - WELDING VOCATION
0004 - CARPENTRY VOC/WAREHOUSE
0005 - AUTO MECH/FACILITY MAINT VOC
Bldg Name
05/09/1990
05/09/1990
05/09/1990
05/09/1990
Test Date
Yes
Yes
Yes
Yes
Radon Testing
< 4 pCi
< 4 pCi
< 4 pCi
< 4 pCi
Test Result
N/A
N/A
N/A
N/A
Mitigation Mitigation Date
RADON EXPLANATORY NOTES
The US Environmental Protection Agency (EPA) has established a radon action level of 4.0 picoCuries per liter (pCi/L). Occupied buildings with radon concentrations less than 4.0 pCi/L do not require radon mitigation; un-occupied buildings, or those buildings which are occupied only infrequently for brief periods of time, also do not require radon mitigation. Occupied buildings with radon concentrations greater than
4.0 pCi/L require radon mitigation and verification of radon reductions as soon as possible, with priority given to dormitories and student recreation buildings. Occupied buildings with radon concentrations greater than 20.0 pCi/L should be considered significant radon exposure hazards, and priority for mitigation should be given to buildings with these highly elevated radon concentrations.
Radon mitigation techniques include: (1) adjustment of the building HVAC system to create a positive pressure within the building; (2) sealing of foundation wall cracks, penetrations, or other openings;
(3) sealing crawlspace openings and sump pits; (4) installing an active subslab depressurization (ASD) system.
Site Description
Interior Court
Page: 1 Date: 10/14/2016 of 5
Paving Type for Roads & Parking Paving Type for Sidewalks
Asphalt/Concrete Concrete/Pavers
Comments:
Topography Buildings and Structures
Center is fully enclosed by fencing. The campus is enclosed by a masonry wall on the north boundary, a wrought iron fence on the west, and Buildings 1, 4, and 5 located on the periphery and forming part of the campus enclosure on the east, south and west.
ROADS, PARKING & SIDEWALKS
Water Source Water Authority Service Meter On-Site Treatment Plant
1. Water System
Treatment Type Storage Type Storage Capacity(Gallons)
NoIndividualGreater Cincinnati Water WorksPublic Water Authority
None 0None
Comments:
Fire Hydrants On-Site Water Supply Storage Capacity
(Gallons) Pressure Source FD Response Time (Minutes)
Yes 0 2None Municipal
The fire station, which is located at the corner of Liberty and Linn Streets, is located 1/2 mile from the center and the response time is 3 minutes.
Number of Deficiencies = 2
SITE FEATURES
UTILITIES
2. Fire Protection System
Buildings Structures4 3Flat
Surrounding
Outdoor Recreation
Light Industrial, Museum, Residential
Basketball, Volleyball Cover Grill Area, Pond
Dumpsters
Loading Dock
North and East Perimeter
Rear Gate (south Perimeter)
Metal
Decorative Fence
Stone
Stone/Decorative Fence
Location Type
Maintenance Responsibility System Capacity Adequate System Condition
Center Center Yes Good
Separate Loop
Yes
Ownership Maintenance Responsibility System Capacity Adequate System Condition
Utility Utility Yes Good
Ownership
Roads & Parking Adequate Roads & Parking Condition Sidewalks Adequate Sidewalk Condition Yes Good Yes Good
Fencing
Other Features
Page: 2 Date: 10/14/2016 of 5
Sewage Treatment Flow
Utility
Publicly Owned Treatment Works
Center
Gravity
Maintenance ResponsibilityOwnership
Duke Energy
Comments: The central steam heating plant is located in Building 4 and consists of one Weil-Mclain model 88, 2750 MBH steam boiler installed in 2015, and two Kewanee 70 HP steam boilers, which are aged, offline, and scheduled for replacement. The steam is distributed to Building 1 though a steam tunnel system. The central domestic hot water plant consists of a Raypak model H3-1468 boiler and four A.O. Smith model TJV 120M 000, 119 gallon, hot water storage tanks, and a circulating pump.
3. Sanitary Sewer System/ Sewage Treatment Plant
5. Fuel Distribution System
6. Central Plant
System Capacity Adequate System Condition
Yes Good
4. Storm Water System
Drain Type On-Site Storm Water Management
Underground N/A
Ownership Maintenance Responsibility System Capacity Adequate System Condition
Center Yes GoodCenter
Gas Company Metering
Master
Ownership Maintenance Responsibility System Capacity Adequate System Condition
Center Center Yes Good
Type Energy Source
Steam Natural Gas Buildings 1, 3, 4 and 5 Bldgs Served
Ownership Maintenance Responsibility Plant Capacity Adequate Plant Condition
Center Center No Fair
Page: 3 Date: 10/14/2016 of 5
Comments:
Electric Company PCB Trans.
Transformer Mounting Transformer Ownership
Systems Ownership Maintenance Responsibility
Duke Energy
Three primary overhead services are brought to the center from power poles along Kenner Street and Denman Avenue. The first service, from a power pole on Kenner Street at the center rear gate, changes to underground before entering the center and terminates in a 500 kVA pad-mounted transformer which provides the 120/208V, 3-phase, 4 wire secondary service to Building 1 via a 2000A switchboard located in the basement. A meter is provided at this location. The second and third services are derrived from 75 kVA and 50 kVA pole-mounted transformers located at the corner of Kenner Street and Denman Avenue. The secondary overhead lines from these transformers enter Building 4 from service weather heads on Denman Avenue and terminate in 800A and 600A switchboards located in the boiler room. The 75 kVA transformer provides the 240V, 3-phase, 3 wire service and the 50 kVA transformer provides the 120/240V, 1-phase, 3 wire service. Each service has its own meter. Both services supply power to Buildings 3, 4 and 5. Building 1 has a 12 kW stand-by generator and an ATS in the basement which provides back-up power to the emergency lighting system in the building. A lightning protection system is installed on the roof of Buildings 3, 4 and 5.
Pole and Pad Utility
Utility Utility
No
4,160 Volt, 3-Phase, 3 Wire
120/208V, 3-P, 4 W, 120/240V, 1-P, 3 WOverhead & Underground
Overhead & UndergroundPrimary Service
Secondary Service
Distribution Characteristics
7. Electrical (Service)
Transformer Maint Resp
Utility
System Capacity Adequate System Condition
Yes Good
Generator
Natural Gas
8. Electrical (Site Lighting)
Roadways Parking Walkways Building Outdoor Sports
Mounting
Control
Pole Pole Pole and Building Building Pole
Photocell Photocell Photocell Photocell Time Clock
System Ownership Maintenance Responsibility System Capacity Adequate System Condition
Utility, Center Utility, Center Yes Good
Comments: The center primarily owns and maintains the site lighting system. Some pole-mounted lights are leased from the utility.
ATS MTS
Yes No
Metering Individual
Page: 4 Date: 10/14/2016 of 5
ACCESSIBILITY
Yes
Comments:
UnknownNoYes
Main Building 1 was constructed at least 10 years prior to 1897. The north and west wing additions were constructed in 1897, and the chapel was constructed in 1909.
Yes
Nationally Registered Site
Site Eligible for National Register
Located in Historic District
Archaeological Significance
Comments:
Telephone Company
On-site Line Owner
Analog telephone service is provided by Cincinnati Bell Telephone to a Merlin telephone switch maintained by the center. A portable 2 kVA UPS is provided for phone service. The digital communication VoIP service and data network with four T1 lines is provided by AT&T and managed by the Job Corps Data Center. The network is supported by a 2 kVA rack-mounted UPS. The main telephone switchboard and the main data equipment are located in a ground-floor room in Building 1. The security system site wide includes five CCTV cameras, strategically installed on the buildings exterior around the center, two black and white monitors located at the security station in Building 1 and an electric gate at the rear entrance which is remotely operated from the security station. The fire alarm system in Building 1 is controlled and monitored at the security station. The fire alarm system in Building 4, which also serves Buildings 3 and 5, is a stand alone system but is also monitored at the security station.
Cincinnati Bell Telephone
Maint. Responsibility
Utility Utility, Center
CCTV Cameras, Black & White Monitors, Electric Gate Operator
Accessible Parking: Accessible Slope:
Yes
Curb Cuts:
Yes
Ramps:
YesYes
Site Accessible Route:
HISTORIC PRESERVATION
9. Electrical (Communication/Alarm/Security)
No
Stand-Alone
VOIP
System Capacity Adequate System Condition
FairYes
STORAGE TANKS: None
Fire Alarm Security
Active Energy Use Reduction Program
Active Water Use Reduction Program
Approximate or Measured Waste Recycled
Use of School Dude or CMMS for Preventative Maintenance
Green Purchasing Policy Practiced
Site Stormwater Absorption Measures in Place
Center has Onsite Renewable Energy (PV or Wind)
Center has a Chartered Green Committee & Roster
Center Uses Green Cleaning Practices
SUSTAINABILITY
Comments: Center effectively uses a manual paper based preventive maintenance program.
NO
Yes
NO
NO
Yes
NO
Yes
Yes
45 %
Page: 5 Date: 10/14/2016 of 5
Earthquake Risk Low Low LowMedium LowIBC Low
LightningEarthquake Def. Authority Flooding Tornado Hurricane Forest
Fire
GENERAL SITE CONDITION
Rating X
Good Fair Poor
The small site limits outdoor recreation.
NATURAL HAZARDS
The site condition is not impacting the functional use of the facilities.
The site condition IS impacting the functional use of the facilities.
The site condition IS SIGNIFICANTLY impacting the functional use of the facilities.
Building Descriptions and Structures
BUILDING 1 - MAIN BUILDING
Building Descriptions
Page: 1 of 22
Building: 0001 - MAIN BUILDING
BUILDING ENVELOPE
Foundation RoofBuilding
Brick Loadbearing Masonry Wood (Heavy Timber)
The sub-basement has steel framing with a combination concrete and steel ceiling.
Brick Masonry CMU Masonry Concrete Concrete Siding Stone Masonry Vinyl Siding Wood Siding
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership#Floors A-2,A-3,R-2,B 86,290 54,754 6 Owned 1897 Listed
Comments: A ramp within the stairwell opposite the testing room on the basement level leads from grade level to academics. The current elevator does not meet accessible requirements.
REAL ESTATE
Access to Building
Ramps
Entrance
2nd Egress
Visual Alarm
Corridor/Aisle
Rooms
Stairs
Elevator
Restrooms
Drinking Fountain
Telephone
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
No
No
Yes
Yes
ACCESSIBILITY
Structural Systems1. Number of Deficiencies = 2
Exterior Walls2.
Material Drainage Year Life
Remaining Type Area Served
Slate
Asphalt Shingles
EPDM
Slate
Gutters and Downspouts
Gutters and Downspouts
Gutters and Downspouts
Gutters and Downspouts
Hip
Hip
Flat
Gable
Main Building
Vestibule
Near the Court Yard
Basketball Court
Number of Deficiencies = 23. Roof
Entire Building
Area Served
Comments:
Page: 2 of 22
Building: 0001 - MAIN BUILDING
Wall Roof None Batt
INTERIOR FINISH
Carpet Ceramic Tile Concrete Marble Painted Wood Tile Quarry Tile Rubber Vinyl Tile Wood
Brick Ceramic Tile Drywall Exposed Structure FRP Fencing Marble Plaster Plywood Wall Covering
Metal Grille - Aluminum Frame Metal Unit - Metal Frame
Wood Unit - Metal Frame Closet - Wood Frame
Wood Unit - Wood Frame
VERTICAL CIRCULATION
Concrete Stairs Elevator Metal Stairs Ramp Comments: Concrete steps lead to main entrance and secondary exits. A concrete ramp leads to the loading dock.
Metal Unit - Metal Frame Metal w/ Glass - Metal Frame Wood Unit - Metal Frame
Double Hung - Aluminum Frame; Double Glazing; Fixed - Aluminum Frame; Double Glazing;
Fixed - Aluminum Frame; Single Glazing; Fixed - Metal Frame; Single Glazing;
Fixed - Steel Frame; Single Glazing; Fixed - Wood Frame; Single Glazing;
Fixed - Wood Frame; Stain Glass Glazing; Single Hung - Wood Frame; Double Glazing;
Single Hung - Wood Frame; Single Glazing; Sliding - Steel Frame; Single Glazing;
Acoustical Tile Exposed Structure Gypsum Board Plaster
Number of Deficiencies = 1
Number of Deficiencies = 4
Insulation4.
Exterior Doors5. Number of Deficiencies = 1
Windows6. Number of Deficiencies = 2
Floors1. Asbestos: Yes Number of Deficiencies = 3
Interior Walls2. Asbestos: Yes
3.
Interior Doors4. Number of Deficiencies = 1
Ceilings
Page: 3 of 22
Building: 0001 - MAIN BUILDING
Mechanical
Mechanical
Mechanical
Mechanical
Toilet/Shower
Kitchen Hood
Dishwashing
Janitor's Closet
Ventilation Area ServedExhaust Ventilation
Number of Deficiencies = 3
Heat Source
Heat Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Some dorm rooms that have not been renovated are still served by cast iron steam radiators. Steam radiators are also located in corridors.
A steam coil air handler serves the laundry.
Renovated dorm rooms on the second floor are heated by steam coils in three Enviro-Tec air handlers.
Two are model H-16 and one is a model H-12.
The auditorium is provided with heat from a Carrier model 40RM-012-B611HC steam coil air handling unit.
Heating steam is supplied by boilers located in Building 4. Most offices and classrooms are also served by convectors.
Comments:
Comments:
Comments:
Comments:
Comments:
HVAC
Heat1. Asbestos: Yes
Gas-Fired Steam Boiler
Gas-Fired Steam Boiler
Gas-Fired Steam Boiler
Gas-Fired Steam Boiler
Gas-Fired Steam Boiler
Gas-Fired Steam Boiler
Radiator
Single Duct
Unit Heater
Single Duct
Single Duct
Convector
Two-Pipe
Two-Pipe
Two-Pipe
Two-Pipe
Two-Pipe
Two-Pipe
Hand Valves
Electric
Hand Valves
Electronic
Electronic
Thermostatic Valves
Natural
Natural
Natural
Natural
Mechanical
Natural
None
None
None
None
None
Classrooms and Offices
Laundry
Gymnasium
Dorm Rooms
Recreation Area
Dorm Rooms
Ventilation2. Number of Deficiencies = 3
Page: 4 of 22
Building: 0001 - MAIN BUILDING
The domestic hot water boiler and storage tanks are located in Building 4. An A.O. Smith model BTH 199 gas-fired water heater serves as the booster heater for the main kitchen dishwasher. Feedwater for the booster heater is treated by a water softener.
Comments:
Comments:
Cast Iron Outdoor None
Separate outdoor grease interceptors serve the main kitchen, dishwasher, and culinary arts.
Electric Water Cooler Hose Bibb Lavatory Mop Sink Portable Bottled Water Cooler Shower Sink Urinal Water Closet (Flush Valve) Water Closet (Tank)
Gas (Natural)
Comments:
Copper Copper Gas-Fired Water Softener No
Hot Water Cold Water Water Heater Water Treatment HW Storage Tank
Grease InterceptorWaste / Vent Interior Storm
Split Direct Expansion (Air
Source)
Split Direct Expansion (Air
Source)
Packaged Direct
Expansion (Air Source)
Split Direct Expansion (Air
Source)
Single Duct
Single Duct
Window Unit
Single Duct
Refrigerant
Refrigerant
None
Refrigerant
Electronic
Electronic
Electric
Electric
Natural
Mechanical
Natural
Natural
None
None
None
Dorm Rooms
Recreation Area
Dorm Rooms
Classrooms and Offices
PLUMBING
Renovated dorm rooms on the second floor are cooled by evaporator coils in three Enviro-Tec air handlers. The two model H-16s are matched to Bryant model 561G042 condensing units and the model H-12 is matched to a Bryant model 561G030 condensing unit.
The air handler for the auditorium is provided with evaporator coils matched to two Carrier model 38KC060570 condensing units.
All dorm rooms except the newly renovated rooms on the second floor are served by window units. The data room is also cooled by a window unit. The culinary arts dining room is cooled by two through-wall units.
This building has 26 Carrier split systems ranging from 1.5 to 5 tons. These systems also serve the recreation hall and auditorium.
Comments:
Comments:
Comments:
Comments:
System Type
Air Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Water Distribution1.
Sanitary Distribution2.
Fixtures3.
Fuel Distribution4.
3. Number of Deficiencies = 1Air Conditioning
Natural gas is used for cooking and for the dishwasher booster heater.
Page: 5 of 22
Building: 0001 - MAIN BUILDING
Wet None ABC Type Fire Extinguisher, K Type Fire Extinguisher, Wet Chemical
Comments: There are three UL-300 compliant kitchen hood fire extinguishing systems, two in the main kitchen and one in culinary arts. A wet pipe sprinkler system serves the gound, second and third floors. A dry pipe system serves the attic. There is no sprinkler system serving the first floor.
Comments: Service is brought from a 500 kVA pad-mounted transformer to a 2,000A, 120/208V, 3-phase, 4 wire switchboard located in the main electrical room in the basement. The service meter is installed in the main electrical room. A 1,200A switch subfeeder from the main switchboard feeds a 1,200A, 120/208V, 3-phase, 4 wire switchboard MS2 located in the adjacent smaller electrical room. A 12 kW gas engine generator with an ATS provides back-up power to the exit/emergency lighting in the building.
Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices
Comments: Recorded footcandle levels include natural light contribution. Most of fluorescent lighting fixtures in the basement, first and second floors are equipped with T8 lamps. The center is in the process of phasing out the remaining incandescent and T-12 lamps in the building. Corridors have time clock control.
High Intensity Discharge (HID) Comments: Exterior building-mounted and surrounding area pole-mounted light fixtures are controlled by photocells.
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T12 - Fluorescent
T12 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T12 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T12 - Fluorescent
T12 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
High Intensity Discharge (HID)
T8 - Fluorescent
Offices
Corridors & Stairs
Equipment Rooms (Elec/Mech)
Toilets
Dining/Lunch Rooms
Dishwashing
Food Preparation
Storage Rooms
Classrooms
Laundry Room
Housing Lounge
Shower
Sleeping Rooms
Medical/Dental
Wards (Patient)
Recreation
Recreation
Area Recommended Level
Recorded Level Light Type
Switchboard 120/208V, 3-Phase, 4 Wire Panelboard Receptacles, GFCI, Switches
Sprinkler System Stand Pipe System Fire Suppression
Number of Deficiencies = 3FIRE PROTECTION
ELECTRICAL SERVICES Number of Deficiencies = 7
Exterior Lighting1.
Interior Lighting2.
LIGHTING
Page: 6 of 22
Building: 0001 - MAIN BUILDING
FIRE ALARM
Comments: The fire alarm control/annunciator panel is a Silent Knight model 5207 located in the security station on the first floor.
Comments: Fourteen CCTV cameras are strategically installed on the building exteriors throughout the center.
Additionally, there is a CCTV camera installed in the laundry room in the basement. Two black and white monitors are located in the security station in this building which monitors all CCTV cameras on the center. The electric gate operator at the center rear entrance is also remotely controlled from this station. Ingress and egress in the dormitory on the second and third floor are monitored/controlled by door alarms at exit doors to stairwells. Pay phones are provided on the first floor near the security station and on the second and third floor corridors of the dormitories. A satellite dish is installed on the west wall of Building 1. A center PA system is acessed from the center director's office.
Audible Alarm Control/ Annunciator Panel Flow Switch Heat Detector Manual Pull Station Smoke Detector Tamper Switch Visual Alarm
Connected to Main System Closed Circuit TV/Door Alarm
Connected to Main System Satellite Dish Telephone Security Public Address Television
Comments: The exit/emergency lights in the building are additionally supported by a 12 kW gas engine generator located in the basement.
Battery and Generator Backup Battery and Generator Backup Emergency Exit
Number of Deficiencies = 1
GENERAL BUILDING CONDITION
Rating
X Good Fair Poor
Emergency /Exit Lighting3. Number of Deficiencies = 8
COMMUNICATION
The facility condition is not impacting the functional use of the facility.
The facility condition IS impacting the functional use of the facility.
The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.
Electric Water Gas Yes YesYes
BUILDING UTILITY METERING
Structure: Fair Exterior: Fair Interior: Fair Mechanical: Fair Electrical: Good
Type Location Battery Operated
Battery Operated
Battery Operated
Corridor
Electrical Room
Laundry Room
Carbon monoxide detectors are provided in the laundry room and electrical room in the basement and in the dormitory corridors on the second and third floors.
CARBON MONOXIDE DETECTION
Detection Required No
Number of Deficiencies = 1
IMPAIRMENT
Page: 7 of 22
Building: 0001 - MAIN BUILDING
IMPAIRMENT
Potentially Impaired
DOL Responded
DOL Determination
Potential Impaired Comments DOL Determination Discussion/Comments
BUILDING 3 - WELDING VOCATION
Page: 8 of 22
Building: 0003 - WELDING VOCATION
BUILDING ENVELOPE
Foundation RoofBuilding
Concrete Loadbearing Masonry Steel
Brick Masonry CMU Masonry
Wall Roof None Rigid
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership#Floors F-1 3,420 2,974 1 Owned 1897 Not Evaluated
Comments: The building's fire alarm system has adequate audio/visual alarm devices throughout except in the toilet.
REAL ESTATE
Access to Building
Ramps
Entrance
2nd Egress
Visual Alarm
Corridor/Aisle
Rooms
Stairs
Elevator
Restrooms
Drinking Fountain
Telephone
Yes
Yes
Yes
Yes
Yes
Yes
Yes
Yes
N/A
Yes
Yes
N/A
ACCESSIBILITY
Structural Systems1.
Exterior Walls2.
Insulation4.
Material Drainage Year Life
Remaining Type Area Served
EPDM
Metal
Gutters and Downspouts
Gutters and Downspouts
Flat
Gable
Original Building
Classrooms
3. Roof
Entire Building
Page: 9 of 22
Building: 0003 - WELDING VOCATION
INTERIOR FINISH
Ceramic Tile Concrete Vinyl Tile
Brick CMU Ceramic Tile Drywall Plywood
Metal Unit - Metal Frame
VERTICAL CIRCULATION
Ramp Comments: There is a concrete stair and ramp leading to the entry.
Metal Overhead - Metal Frame Metal Unit - Metal Frame
Awning Units - Wood Frame; Single Glazing; Fixed - Aluminum Frame; Double Glazing;
Fixed - Wood Frame; Single Glazing; Sliding - Aluminum Frame; Single Glazing;
Acoustical Tile Exposed Structure Plaster
Exterior Doors5.
Windows6. Number of Deficiencies = 1
Floors1.
Interior Walls2.
3.
Interior Doors4.
Heat Source
Heat Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Conditioned air is from an air handler with steam coils located in the warehouse area of Building 4.
Heating steam is supplied by boilers located in Building 4. The shop area is served by a rooftop air handler with steam coils.
Comments:
Comments:
HVAC
Heat1.
Gas-Fired Steam Boiler
Gas-Fired Steam Boiler
Gas-Fired Steam Boiler
Radiator
Single Duct
Makeup Air Unit
Two-Pipe
Two-Pipe
Two-Pipe
Hand Valves
None
Electric
Natural
Natural
Mechanical
None
None
None
Shop Area
Classrooms and Offices
Shop Area
Page: 10 of 22
Building: 0003 - WELDING VOCATION
Mechanical
Welding Fume Exhaust
Mechanical
Restroom
Welding Booths
Shop Area
The domestic hot water boiler and storage tanks are located in Building 4. The water meter is located in Building 4.
Comments:
Cast Iron None None
Electric Water Cooler Hose Bibb Lavatory Sink Urinal Water Closet (Flush Valve)
Gas (Natural)
Comments:
Wet None ABC Type Fire Extinguisher
Comments: The storage area has sprinkler heads connected to the sprinkler system in Building 4.
Ventilation Area Served
Copper Copper None None No
Hot Water Cold Water Water Heater Water Treatment HW Storage Tank
Grease InterceptorWaste / Vent Interior Storm
Split Direct Expansion (Air
Source)
Single Duct Refrigerant Electric Natural None Classrooms and Offices
Sprinkler System Stand Pipe System Fire Suppression
PLUMBING
Exhaust Ventilation
Conditioned air is from an air handler with refrigerant expansion coils located in the warehouse area of Building 4.
Comments:
Ventilation2.
System Type
Air Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Water Distribution1.
Sanitary Distribution2.
Fixtures3.
Fuel Distribution4.
FIRE PROTECTION
3. Air Conditioning
The gas meter is located in Building 4.
Page: 11 of 22
Building: 0003 - WELDING VOCATION
Comments: Service is brought to this building from the 120/240V, 3 wire switchboards located in Building 4 boiler room.
FIRE ALARM
Comments: The fire alarm devices in this building are connected to the fire alarm control/annunciator panel located in Building 4.
Comments: A CCTV camera is installed at the northwest corner of the building which is monitored from the security station in Building 1.
Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices
Audible Alarm Heat Detector Manual Pull Station Smoke Detector Visual Alarm
Connected to Main System Closed Circuit TV None None Telephone Security Public Address Television
Comments: Recorded footcandle levels include natural lighting contribution.
LED
Comments: Exterior building-mounted light fixtures are controlled by photocells.
T12 - Fluorescent
T12 - Fluorescent
T8 - Fluorescent
T8 - Fluorescent
T12 - Fluorescent
Offices
Storage Rooms
Classrooms
Vocational
Locker Room
Area Recommended Level
Recorded Level Light Type
Battery Backup Battery Backup
Main Disconnect Switch 120/208V, 3-Phase, 4 Wire Panelboard Receptacles, GFCI, Switches
Emergency Exit
ELECTRICAL SERVICES Number of Deficiencies = 3
Exterior Lighting1.
Interior Lighting2.
Emergency /Exit Lighting3.
COMMUNICATION
Type Location N/A N/A
There are no installed fuel sources available that can generate carbon monoxide in the building.
CARBON MONOXIDE DETECTION
LIGHTING
Detection Required No
Number of Deficiencies = 0
Page: 12 of 22
Building: 0003 - WELDING VOCATION
GENERAL BUILDING CONDITION
Rating
X Good Fair Poor
The facility condition is not impacting the functional use of the facility.
The facility condition IS impacting the functional use of the facility.
The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.
Electric Water Gas Zone ZoneNo
BUILDING UTILITY METERING
Structure: Good Exterior: Fair Interior: Fair Mechanical: Good Electrical: Good
IMPAIRMENT
Potentially Impaired
DOL Responded
BUILDING 4 - CARPENTRY VOC/WAREHOUSE
Page: 13 of 22
Building: 0004 - CARPENTRY VOC/WAREHOUSE
BUILDING ENVELOPE
Foundation RoofBuilding
Concrete Structural Steel Steel
Concrete and CMU are also part of the structural system.
Concrete Metal Siding
Wall Roof Batt Batt
Metal Overhead - Metal Frame Metal Unit - Metal Frame
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership#Floors B,S-1 7,130 6,324 1 Owned 1981 Not Evaluated
Comments: There are lockers located in the toilets that block the accessible entrance.
REAL ESTATE
Access to Building
Ramps
Entrance
2nd Egress
Visual Alarm
Corridor/Aisle
Rooms
Stairs
Elevator
Restrooms
Drinking Fountain
Telephone
Yes
N/A
Yes
Yes
Yes
Yes
Yes
Yes
N/A
Yes
Yes
N/A
ACCESSIBILITY
Structural Systems1.
Exterior Walls2.
Insulation4.
Exterior Doors5. Number of Deficiencies = 2
Material Drainage Year Life
Remaining Type Area Served
Metal Gutters and Downspouts 1981 5 Gable Entire Building
3. Roof
Entire Building
Comments:
Page: 14 of 22
Building: 0004 - CARPENTRY VOC/WAREHOUSE
INTERIOR FINISH
Carpet Concrete Plywood Vinyl Tile
CMU Drywall Exposed Structure Wood Paneling plywood
Metal Unit - Metal Frame Wood Unit - Metal Frame
VERTICAL CIRCULATION
Concrete Stairs Metal Stairs Wood Stairs Comments: Metal stairs lead to the sub-basement boiler room. Wood stairs lead to the storage mezzanine and concrete stairs lead to the street level.
Awning Units - Steel Frame; Single Glazing; Fixed - Aluminum Frame; Double Glazing;
Fixed - Steel Frame; Single Glazing; Fixed - Wood Frame; Double Glazing;
Sliding - Aluminum Frame; Double Glazing;
Acoustical Tile Exposed Structure
Windows6.
Floors1.
Interior Walls2.
3.
Interior Doors4.
Heat Source
Heat Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
The central steam heating plant consists of three Kewanee 70 HP steam boilers and the condensate return tank. Make up water is treated with an automatic chemical system. The steam air handling unit located in the warehouse provides conditioned air to the warehouse, the carpentry vocation office, the warehouse, purchasing and placement offices, and the welding vocation classroom and office in Building 3. The carpentry vocation shop has a steam air handling unit.
Comments:
HVAC
Heat1. Asbestos: Yes Number of Deficiencies = 1
Electric Resistance
Gas-Fired Steam Boiler
Gas-Fired Steam Boiler
Unit Ventilator
Single Duct
Unit Heater
None
Two-Pipe
Two-Pipe
Electric
Electric
Electric
Natural
Natural
Natural
None
None
None
Rest Rooms
Classrooms and Offices
Shop Area
Page: 15 of 22
Building: 0004 - CARPENTRY VOC/WAREHOUSE
Mechanical
Mechanical
Dust Collection
Mechanical
Shop Area
Restroom
Shop Area
Steam Tunnel
Comments: The carpentry shop is equipped with a portable dust collection system.
The central domestic hot water plant consists of a Raypak model H3-1468 boiler and four A.O. Smith model TJV 120 M000 hot water storage tanks and circulating pumps. The water meter for Buildings 3, 4, and 5 is located in this building.
Comments:
Cast Iron None None
Electric Water Cooler Fixed Emergency Eyewash Hose Bibb Lavatory Urinal Water Closet (Flush Valve)
Gas (Natural)
Comments:
Ventilation Area Served
Copper Copper Gas-Fired None Yes
Hot Water Cold Water Water Heater Water Treatment HW Storage Tank
Grease InterceptorWaste / Vent Interior Storm
Packaged Direct
Expansion (Air Source)
Split Direct Expansion (Air
Source)
Window Unit
Fan Coil
None
Refrigerant
Electric
Electric
Natural
Natural
None
None
Shop Area
Classrooms and Offices
PLUMBING
Exhaust Ventilation
The carpentry shop mezzanine level is cooled by six window air conditioners.
The DX coil air handling unit located in the warehouse provides conditioned air to the warehouse, the carpentry vocation office, purchasing and placement offices, and the welding vocation classroom and office in Building 3.
Comments:
Comments:
Number of Deficiencies = 1
Ventilation2.
System Type
Number of Deficiencies = 1
Air Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Water Distribution1.
Sanitary Distribution2.
Fixtures3.
Fuel Distribution4.
The gas meter for Buildings 3, 4, and 5 is located in this building.
Page: 16 of 22
Building: 0004 - CARPENTRY VOC/WAREHOUSE
Wet None ABC Type Fire Extinguisher
Comments: Two services are bought to this building from a 75 kVA and a 50 kVA pole-mounted transformer. Services terminate in an 800A, 2o8V, 3-phase, 4 wire and a 600A, 120/240V, 3-phase, 3 wire switchboard located in the boiler room. Each service has its own meter. The two switchboards also serve Buildings 2, 3 and 5.
FIRE ALARM
Comments: The fire alarm control/annunciator panel is a Silent Knight model 5207 located in the main lobby. The fire alarm devices in Buildings 3 and 5 are also connected to this panel. The fire alarm system in this building is a stand alone system but is monitored from the security station in Building 1.
Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices
Audible Alarm Control/Annunciator Panel Flow Switch Heat Detector Manual Pull Station Smoke Detector Tamper Switch Visual Alarm
Comments: Recorded footcandle levels include natural lighting contribution. Some fluorescent lighting fixtures are equipped with T8 lamps.
LED
Comments: Exterior building-mounted light fixtures are controlled by photocells.
T12 - Fluorescent
T12 - Fluorescent
T12 - Fluorescent
T12 - Fluorescent
T12 - Fluorescent
T8 - Fluorescent
T12 - Fluorescent
Offices
Equipment Rooms (Elec/Mech)
Toilets
Storage Rooms
Classrooms
Vocational
Storage/Warehouse-Active
Area Recommended Level
Recorded Level Light Type
Battery Backup Battery Backup
Switchboard 120/240V, 1-Phase, 3 Wire Panelboard Receptacles, GFCI, Switches
Sprinkler System Stand Pipe System Fire Suppression
Emergency Exit
Number of Deficiencies = 1FIRE PROTECTION
ELECTRICAL SERVICES Number of Deficiencies = 1
Exterior Lighting1.
Interior Lighting2.
Emergency /Exit Lighting3.
LIGHTING
Page: 17 of 22
Building: 0004 - CARPENTRY VOC/WAREHOUSE
Connected to Main System None None TV with VCR
Telephone Security Public Address Television
GENERAL BUILDING CONDITION
Rating
Comments:
X Good Fair Poor
One of the three steam heating boilers has been shut down due to a tube sheet leak.
COMMUNICATION
The facility condition is not impacting the functional use of the facility.
The facility condition IS impacting the functional use of the facility.
The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.
Electric Water Gas Zone ZoneNo
BUILDING UTILITY METERING
Structure: Good Exterior: Good Interior: Good Mechanical: Fair Electrical: Good
Type Location 120V w/Battery Backup Boiler Room
A carbon monoxide detector is installed in the boiler room.
CARBON MONOXIDE DETECTION
Detection Required No
Number of Deficiencies = 0
IMPAIRMENT
Potentially Impaired
DOL Responded
BUILDING 5 - AUTO MECH/FACILITY MAINT VOC
Page: 18 of 22
Building: 0005 - AUTO MECH/FACILITY MAINT VOC
BUILDING ENVELOPE
Foundation RoofBuilding
Concrete Structural Steel Steel
CMU Masonry Concrete Metal Siding
Wall Roof Batt Batt
Metal Overhead - Metal Frame Metal Unit - Metal Frame
AccessibilityFeature
GSF NSF Year Built Use Group Historic Ownership#Floors F-1,B 5,070 4,578 1 Owned 1972 Not Evaluated
Comments: The building's fire alarm system has adequate audio/visual alarm devices throughout except in toilets.
REAL ESTATE
Access to Building
Ramps
Entrance
2nd Egress
Visual Alarm
Corridor/Aisle
Rooms
Stairs
Elevator
Restrooms
Drinking Fountain
Telephone
Yes
N/A
Yes
Yes
Yes
Yes
Yes
Yes
No
No
No
N/A
ACCESSIBILITY
Structural Systems1.
Exterior Walls2.
Insulation4.
Exterior Doors5.
Material
The roof was repaired and re-coated in 2008 and has 5 years of warranty left.
Drainage Year Life
Remaining Type Area Served
Metal Gutters and Downspouts 1972 10 Gable Entire Building
Comments:
3. Roof
Entire Building
Page: 19 of 22
Building: 0005 - AUTO MECH/FACILITY MAINT VOC
INTERIOR FINISH
Concrete Vinyl Tile Wood
CMU Drywall Wood Paneling
Metal Unit - Metal Frame Metal Unit - Wood Frame
Wood Unit - Wood Frame
VERTICAL CIRCULATION
Concrete Stairs Wood Stairs Comments: There are wood stairs to the mezzanine floor and concrete stairs to the street level.
Fixed - Aluminum Frame; Double Glazing; Fixed - Wood Frame; Single Glazing;
Single Hung - Aluminum Frame; Double Glazing; Sliding - Aluminum Frame; Double Glazing;
Acoustical Tile Exposed Structure Gypsum Board
Windows6.
Floors1.
Interior Walls2.
3.
Interior Doors4.
Heat Source
Heat Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Heating steam is supplied by boilers located in Building 4.
The makeup air unit is a roof-mounted Reznor model ADF500-2.
Comments:
Comments:
HVAC
Heat1.
Gas-Fired Steam Boiler
Gas-Fired Indirect
Unit Heater
Makeup Air Unit
Two-Pipe
Two-Pipe
Electric
Electric
Natural
Mechanical
None
None
Shop Area
Classrooms and Offices
Page: 20 of 22
Building: 0005 - AUTO MECH/FACILITY MAINT VOC
Mechanical
Mechanical
Restroom
Shop Area
The domestic hot water boiler and storage tanks are located in Building 4. The water meter is located in Building 4.
Comments:
Comments:
Cast Iron Outdoor None
The automotive mechanics vocation shop is provided with an indoor oil separator.
Electric Water Cooler Fixed Emergency Eyewash Hose Bibb Sink Water Closet (Tank)
Gas (Natural)
Comments:
None None ABC Type Fire Extinguisher
Ventilation Area Served
Copper Copper None None No
Hot Water Cold Water Water Heater Water Treatment HW Storage Tank
Grease InterceptorWaste / Vent Interior Storm
Packaged Direct
Expansion (Air Source)
Window Unit None Electric Natural None Classrooms and Offices
Sprinkler System Stand Pipe System Fire Suppression
PLUMBING
Exhaust Ventilation
Ventilation2.
System Type
Number of Deficiencies = 1
Air Distribution
Piping System
Control System
Fresh Air Intake
Energy Conservation
Measure
Area Served
Water Distribution1.
Sanitary Distribution2.
Fixtures3.
Fuel Distribution4.
Number of Deficiencies = 1FIRE PROTECTION
The gas meter is located in Building 4.
Page: 21 of 22
Building: 0005 - AUTO MECH/FACILITY MAINT VOC
Comments: Service is brought to this building from the 120/240V, 3 wire switchboards located in Building 4 boiler room.
FIRE ALARM
Comments: The fire alarm devices in this building are connected to the fire alarm control/annunciator panel located in Building 4.
Comments: A CCTV camera is installed at the southeast corner of the building which is monitored from the security station in Building 1.
Service Entrance Electrical Characteristics Distribution Equipment Wiring Devices
Audible Alarm Control/Annunciator Panel Heat Detector Manual Pull Station Smoke Detector Visual Alarm
Connected to Main System Closed Circuit TV None TV with VCR
Telephone Security Public Address Television
Comments: Recorded footcandle levels include natural lighting contribution.
LED
Comments: Exterior building-mounted light fixtures are controlled by photocells.
T8 - Fluorescent
T12 - Fluorescent
T12 - Fluorescent
T8 - Fluorescent
T12 - Fluorescent
Offices
Toilets
Storage Rooms
Classrooms
Vocational
Area Recommended Level
Recorded Level Light Type
Battery Backup Battery Backup
Main Disconnect Switch 120/208V, 3-Phase, 4 Wire Panelboard Receptacles, Switches
Emergency Exit
ELECTRICAL SERVICES
Exterior Lighting1.
Interior Lighting2.
Emergency /Exit Lighting3. Number of Deficiencies = 1
COMMUNICATION
Type Location None None
There are no CO detectors in this building. It is required by DOL Directive Information Notice 12-27 and
NFPA 720, 2012.
CARBON MONOXIDE DETECTION
LIGHTING
Detection Required No
Number of Deficiencies = 0
Page: 22 of 22
Building: 0005 - AUTO MECH/FACILITY MAINT VOC
GENERAL BUILDING CONDITION
Rating X Good
Fair Poor
The facility condition is not impacting the functional use of the facility.
The facility condition IS impacting the functional use of the facility.
The facility condition IS SIGNIFICANTLY impacting the functional use of the facility.
Electric Water Gas Zone ZoneNo
BUILDING UTILITY METERING
Structure: Good Exterior: Good Interior: Good Mechanical: Good Electrical: Good
IMPAIRMENT
Potentially Impaired
DOL Responded
STRUCTURE 10 - GAZEBO (OCTAGON, 5FT EACH SIDE, 12' DIA)
STRUCTURE 11 - GAZEBO (OCTAGON, 5FT EACH SIDE, 12' DIA)
STRUCTURE 12 - DECK (44FT X 29FT)
3.0 - Defi ciencies
Deficiency Text
Cincinnati (00503) 10/14/2016Date :Center :
Page : 1 of 42
Deficiency
ID
Class Resp.
Office
Findings / Recommendations Cost (Status)
IIIB
IIIB
The Center reported that at three locations of the front wall, moisture is penetrating into the ground floor. The team observed possible sources of moisture including the condensate drains that continuously drip water onto the concrete slab adjacent to the front wall.
The historic stained glass windows in the recreation area, although protected by wire cages, are damaged and cracked. They create a hazard for participants in the gym due to falling glass particles.
Redirect the excess water source by extending the condensate drain away from the building.
Provide waterproof caulking at the joint between the concrete slab and the building exterior wall.
Repair/replace the stained glass as required to maintain the historic character of the windows.
For costing, assume the repair of approximately 25 SF of stained glass windows.
As of the March 2016 Facility Survey, this deficiency, identified in 2006, was still valid.
As of the March 2016 Facility Survey, this deficiency, identified in 2009, had not been corrected. It was determined stained glass windows are protected and this deficiency is no longer needed.
O
R
62748
72001
ID
Year
$11,838
0001 - MAIN BUILDING
Excess moisture presence at the front wall
Stained glass windows are damaged and cracked
Findings :
Findings :
Recommendations :
Recommendations :
Notes :
Notes :
18.0.0 - OTHER
08.2.0 - WINDOWS
CATEGORY :
CATEGORY :
O & M
Funded Year:
Page : 2 of 42
Deficiency
ID
Class Resp.
Office
Findings / Recommendations Cost (Status)
IIIB
IIIB
The plaster ceiling was damaged by roof leaks during hurricanes Ike and Gustav.
Main entry doors and frames are deteriorated.
Completely remove damaged plaster areas. Install new plaster ceiling to match the adjacent existing installation. Coordinate with existing structure, appurtenances, and finishes. Finish ceiling to match existing undamaged areas. Finished ceiling heights vary from 35 to 40 feet above finished floor.
For costing, assume a plaster replacement area of 200 SF. Note that the existing plaster contains asbestos fibers and will need to be abated and disposed of as hazardous materials.
Remove existing metal doors and frames, install new commercial grade 2- 36 FT x 70 FT galvanized metal double leaf doors and install new metal frames including mullion and sidelites with ¼'' temper glass.