Attachment 4 Site Plans and Floor Plans Livorno EMS.pdf
PDF 3 MB Posted
- Attached to
- Sources Sought Notice and Request for Information (RFI) for Total Maintenance Contract (TMC), Italy
- Solicitation number
- DODEAHQ-SS-001
- Issued by
-
Department of Defense Education Activity
About this file
This is a Department of Defense Education Activity (DoDEA) Facility Utilization Survey for Livorno Elementary/Middle School located at Camp Darby, Italy, dated January 2020 with a submittal date of May 1, 2020. The survey documents the facility's spatial configuration and room-by-room utilization across multiple buildings (200, 201, X201A, and X201B) comprising approximately 21,788 square meters (5.38 acres) of total area.
The facility includes two main buildings: Building 201 (Main Building constructed in 1954) containing approximately 1,954 gross square feet across the first floor, and Building 200 (Storage facility constructed in 2002) with 96 gross square feet. The survey provides detailed floor plans, room schedules, and area calculations for all spaces including educational facilities (general purpose classrooms, science labs, computer labs, art rooms, modular technology labs), administrative areas (principal's office, reception, conference rooms, teacher workrooms), support spaces (storage, mechanical rooms, janitor closets), and student amenities (kindergarten classrooms with associated facilities, gymnasium with stage, nursing area, bus office). Approximately three percent of Building 201 is identified as partial-use space occupied by Child and Youth Services (CYS). The document includes symbol legends, key plans, and GSF calculations based on Army RPI DoA Pamphlet 415-28, with comprehensive documentation suitable for facility planning and management purposes.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
LIVORNO EMS
Survey Date:
Sheet Name:
DoDAAC Number:
Sheet Seq:
NORTH
SITE:
INSTALLATION:
COUNTRY:
REGION-DISTRICT:
DEPARTMENT OF DEFENSE EDUCATION ACTIVITY
FACILITY UTILIZATION SURVEY
NOT TO SCALE
100% Submittal Date:
LIVORNO
ELEMENTARY / MIDDLE SCHOOL
HE5408 JANUARY 2020
CAMP DARBY
ITALY
DODEA EUROPE SOUTH
US ARMY GARRISON ITALY
01 MAY 2020
LIVORNO_BASE MAP 1 of 9
"identification only"
AutoCAD SHX Text
BASE MAP TO BE PROVIDED BY DODEA
AutoCAD SHX Text
SQUIRES STREET
AutoCAD SHX Text
OLSON STREET
AutoCAD SHX Text
KESSLER AVENUE
AutoCAD SHX Text
KESSLER AVENUE
AutoCAD SHX Text
CRAIG STREET
AutoCAD SHX Text
HARMON AVENUE
AutoCAD SHX Text
HARMON AVENUE
AutoCAD SHX Text
VIA CAPANNE BRUCIATE
AutoCAD SHX Text
VIA LIVARNESE
200(1)
201(1)
X201A
X201B
Survey Date:
Sheet Name:
DEPARTMENT OF DEFENSE EDUCATION ACTIVITY
FACILITY UTILIZATION SURVEY
DoDAAC Number:
Sheet Seq:
FLAG POLE
MONUMENT
MAIN ENTRY
STADIUM LIGHT
SIGN
FOOTBALL GOAL
SYMBOL LEGENDSYMBOL LEGEND
BASEBALL BACKSTOP
AREA LIGHT
SOCCER GOAL
BASKETBALL GOAL
PARKING AREA
FLAT ROOF
SLOPING ROOF
FENCE LINE
PROPERTY LINE
PLAYGROUND
CONCRETE
COVERED WALKWAY
KEY PLAN
NTS
Updated By:
FIRE HYDRANTSLOPE
PLAYGROUND SURFACING
WC - WOOD CHIPS PR - POURED RUBBER M - MULCH
SRT - SHREDDED RUBBER TIRES S - SAND
PG - PEA GRAVEL RT - RUBBER TILES
100% Submittal Date:FUS Review:
SITE:
INSTALLATION:
COUNTRY:
REGION-DISTRICT:
BUILDING LABEL BLDG #_(# OF FLOORS)
LEGEND
LIVORNO
ELEMENTARY / MIDDLE SCHOOL
HE5408 JANUARY 2020
SPF 01 MAY 2020MRS
CAMP DARBY
ITALY
DODEA EUROPE SOUTH
US ARMY GARRISON ITALY
(APPROX. 21,788 SM)
(APPROX. 5.38 AC)
NORTH
LIVORNO EMS_OVERALL 2 of 9
32 640 16 FT
"identification only"
AutoCAD SHX Text
SQUIRES STREET
AutoCAD SHX Text
AutoCAD SHX Text
SOCCER
AutoCAD SHX Text
FIELD
AutoCAD SHX Text
RT
AutoCAD SHX Text
KESSLER AVENUE
AutoCAD SHX Text
HARMON AVENUE
AutoCAD SHX Text
BASKETBALL
AutoCAD SHX Text
COURT
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
RT
AutoCAD SHX Text
RT
AutoCAD SHX Text
ACCESS CONTROL GATE
AutoCAD SHX Text
ACCESS CONTROL GATE
AutoCAD SHX Text
RT
AutoCAD SHX Text
RT
AutoCAD SHX Text
PR
AutoCAD SHX Text
BASKETBALL
AutoCAD SHX Text
COURT
AutoCAD SHX Text
GRASS
AutoCAD SHX Text
NOT DODDS
AutoCAD SHX Text
TURF
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
ARTIFICAL
AutoCAD SHX Text
ASPHALT
AutoCAD SHX Text
SUN SHADE
AutoCAD SHX Text
SUN SHADE
AutoCAD SHX Text
CHILLER
AutoCAD SHX Text
FUEL
AutoCAD SHX Text
STORAGE
AutoCAD SHX Text
TANK
AutoCAD SHX Text
GRAVEL
AutoCAD SHX Text
PAVERS
AutoCAD SHX Text
UNDER
CONSTRUCTION
K02A
WORKROOM
7 SM
75 SF
J101
JANITOR
4 SM
38 SF
T03
TOILET
16 SM
163 SF
T04
TOILET
14 SM
147 SF
C06
ACADEMIC SUPPORT
137 SM
1471 SF
C05
GPC
68 SM
722 SF
C04
SCIENCE LAB
70 SM
748 SF
C03
GPC
67 SM
721 SF
C02
GPC
68 SM
726 SF
C13
MOD. TECH. LAB
36 SM
377 SF
C12
ART
89 SM
957 SF
C11
STORAGE
60 SM
642 SF
C10
GPC
87 SM
936 SF
C09
GPC
88 SM
943 SF
C16
ASSESSMENT
63 SM
677 SF
M102
MECH.
9 SM
89 SF
K02
KG
101 SM
1079 SF
K02B
TOILET
3 SM
22 SF
K01C
KITCHEN
20 SM
211 SF
K01B
TOILET
3 SM
25 SF
K01
KG
102 SM
1089 SF
K01A
WORKROOM
7 SM
68 SF
M103
MECH.
8 SM
81 SF
S05
STORAGE
9 SM
88 SF
S04
STORAGE
4 SM
40 SF
S03
STORAGE
9 SM
87 SF
S02
STORAGE
7 SM
75 SF
S01
STORAGE
6 SM
58 SF
C15
COMPUTER LAB
63 SM
673 SF
C14
INFO CENTER
239 SM
2562 SF
A04
PRINCIPAL
45 SM
480 SF
T109
TOILET
4 SM
36 SF
A03
RECEPTION
27 SM
284 SF
A03A
RECORDS
5 SM
47 SF
T05
TOILET
4 SM
40 SF
S08
LAN
9 SM
93 SF
S06
JANITOR
6 SM
64 SF
S07
LAN
16 SM
172 SF
A02A
STORAGE
4 SM
43 SF
A02
CONFERENCE
39 SM
410 SF
A01
TSC
21 SM
219 SF
C08A
TOILET
6 SM
64 SF
A01A
STORAGE
4 SM
35 SF
C08
CENTRAL WORKROOM
54 SM
577 SF
C105
CORRIDOR
166 SM
1777 SF
M101
MECH.
52 SM
555 SF
A05A
CENT. SUPPLY
52 SM
559 SF
A05
STORAGE
20 SM
207 SF
C102
CORRIDOR
12 SM
123 SF
M03
GYM
463 SM
4983 SF
M03A
STAGE
74 SM
787 SF
C103
CORRIDOR
7 SM
74 SF
ST1
STORAGE
9 SM
93 SF
T02
TOILET
23 SM
241 SF
T01
TOILET
23 SM
242 SF
M04
CAFETERIA
285 SM
3064 SF
A06
BUS OFFICE
27 SM
284 SF
T108
TOILET
5 SM
50 SF
A06A
STAFF
3 SM
30 SF
NURSE
13 SM
132 SF
100A
REST AREA
11 SM
111 SF
100B
TOILET
6 SM
64 SF
C01
STAFF
68 SM
725 SF
C101
CORRIDOR
23 SM
238 SF
KT1
DISHWASH
28 SM
295 SF
KT2
KITCHEN
83 SM
887 SF
KT2A
DRY STORAGE
22 SM
229 SF
T06
JANITOR
10 SM
102 SF
C14A
ADMIN./WORK
8 SM
78 SF
Livorno EMS
Building 201
Main Building - Floor 1
C11A
KILN
27 SM
280 SF
C13A
MOD. TECH. LAB
33 SM
351 SF
STORAGE
8 SM
79 SF
Livorno EMS
Building 200
Main Building - Floor 1
UP
UP
UP
UP
T01B
TOILET
4 SM
41 SF
T02B
TOILET
4 SM
41 SF
T01A
SHOWER
1 SM
10 SF
T02A
SHOWER
1 SM
10 SF
C14
INFO CENTER
238 SM
2562 SF
MAINTENANCE
13 SM
139 SF
MAINTENANCE
13 SM
139 SF
UTILIZED BY:
CYS
AIR SPACE
AIR SPACE
AIR SPACE
118A
STORAGE
16 SM
168 SF
118B
STORAGE
16 SM
168 SF
Livorno EMS
Building 201
Main Building - Floor 2
AIR SPACE
UP
UP
Survey Date:Floor:
Sheet Name:
KEY PLAN
NTS
DEPARTMENT OF DEFENSE EDUCATION ACTIVITY
FACILITY UTILIZATION SURVEY
SYMBOL LEGEND
DoDAAC Number:
Sheet Seq:
Updated By:
SITE:
INSTALLATION:
COUNTRY:
DRINKING FOUNTAIN
LAVATORY
TOILET
URINAL
LOCKER
LAN DISTRIBUTION
SINK
VENT HOOD
DOOR
STACK OR FOLDING
SLIDING DOOR
WINDOW/GLAZING
HIGH WINDOW
SKYLIGHT
STOOP/STEP UP
STAIR
RAMP
WALL SHELVING
UPPER CABINET
TEACHER CABINET
BASE CABINET
ACCESS LADDER
FRAME
PARTITION
PARTITION
ACCORDION
COLD STORAGE
AREA CALCULATED
@ 50 %
100% Submittal Date:FUS Review:
REGION-DISTRICT:
MATCHLINE
TITLEBLOCK LEGEND
SHEET NAME: BLDG #_FLOOR # (# IN SERIES)
SLOPING ROOF FLAT ROOF
LIVORNO
ELEMENTARY / MIDDLE SCHOOL
CAMP DARBY
ITALY
DODEA EUROPE SOUTH
HE5408 JANUARY 2020
SPF
US ARMY GARRISON ITALY
01 MAY 2020MRS
NORTH
BUILDING NUMBER: 200, 201, X201A, X201B
GSF_1 (1)
LEVEL 1
BUILDING 201 - FIRST FLOOR
BUILDING 201 - MEZZININE
NOT TO SCALE
BUILDING 200
(STORAGE)
- FIRST FLOOR
- 96 GSF
GSF CALCULATIONS
BUILDING X201A - FIRST FLOOR
BUILDING X201B - FIRST FLOOR
X201A
X201B
Building 200
Floor 1 96
Total Area (SF) 96
50% Area (SF) 0
Gross Area (SF) 96
Building 201
Floor 1 38,242
Mezzinine 367
Total Area (SF) 38,609
50% Area (SF) 4,777
Gross Area (SF) 43,386
BUILDING 201 - MEZZININE
NOTE 2: GSF CALCULATIONS BASED ON ARMY
RPI DoA PAMPHLET 415-28.
NOTE 1: APPROXIMATELY 3% OF BUILDING
201 IS IDENTIFIED AS PARTIAL- USE, CCUPIED
BY CHILD AND YOUTH SERVICES (CYS).
"identification only"
AutoCAD SHX Text
POCKET DOOR
TRAY SLOT
Survey Date:Floor:
Sheet Name:
KEY PLAN
NTS
DEPARTMENT OF DEFENSE EDUCATION ACTIVITY
FACILITY UTILIZATION SURVEY
SYMBOL LEGEND
DoDAAC Number:
Sheet Seq:
Updated By:
SITE:
INSTALLATION:
COUNTRY:
DRINKING FOUNTAIN
LAVATORY
TOILET
URINAL
LOCKER
LAN DISTRIBUTION
SINK
VENT HOOD
DOOR
STACK OR FOLDING
SLIDING DOOR
WINDOW/GLAZING
HIGH WINDOW
SKYLIGHT
STOOP/STEP UP
STAIR
RAMP
WALL SHELVING
UPPER CABINET
TEACHER CABINET
BASE CABINET
ACCESS LADDER
FRAME
PARTITION
PARTITION
ACCORDION
COLD STORAGE
AREA CALCULATED
@ 50 %
100% Submittal Date:FUS Review:
REGION-DISTRICT:
MATCHLINE
TITLEBLOCK LEGEND
SHEET NAME: BLDG #_FLOOR # (# IN SERIES)
SLOPING ROOF FLAT ROOF
LIVORNO
ELEMENTARY / MIDDLE SCHOOL
CAMP DARBY
ITALY
DODEA EUROPE SOUTH
HE5408 JANUARY 2020
SPF
US ARMY GARRISON ITALY
01 MAY 2020MRS
NORTH
BUILDING NUMBER: 200, 201, X201A, X201B
SCHEDULES (1)
LEVEL 1
NOT TO SCALE
X201A
X201B
Floor Room Current Capacity Area (SF) Area (SM)
1 101 STORAGE OTHER 79 SF 8 SM
Floor Room Current Capacity Area (SF) Area (SM)
1 100 NURSE OTHER 132 SF 13 SM
1 100A REST AREA OTHER 111 SF 11 SM
1 100B TOILET OTHER 64 SF 6 SM
1 A01 TSC OTHER 219 SF 21 SM
1 A01A STORAGE OTHER 35 SF 4 SM
1 A02 CONFERENCE OTHER 410 SF 39 SM
1 A02A STORAGE OTHER 43 SF 4 SM
1 A03 RECEPTION OTHER 284 SF 27 SM
1 A03A RECORDS OTHER 47 SF 5 SM
1 A04 PRINCIPAL OTHER 480 SF 45 SM
1 A05 STORAGE STUDENT - HALF 207 SF 20 SM
1 A05A CENT. SUPPLY OTHER 559 SF 52 SM
1 A06 BUS OFFICE OTHER 284 SF 27 SM
1 A06A STAFF OTHER 30 SF 3 SM
1 C01 STAFF OTHER 725 SF 68 SM
1 C02 GPC STUDENT - FULL 726 SF 68 SM
1 C03 GPC STUDENT - FULL 721 SF 67 SM
1 C04 SCIENCE LAB STUDENT - FULL 748 SF 70 SM
1 C05 GPC STUDENT - FULL 722 SF 68 SM
1 C06 MUSIC STUDENT - FULL 1,471 SF 137 SM
1 C08 CENTRAL WORKROOM OTHER 577 SF 54 SM
1 C08A TOILET NET - GENERAL 64 SF 6 SM
1 C09 GPC STUDENT - FULL 943 SF 88 SM
1 C10 GPC STUDENT - FULL 936 SF 87 SM
1 C11 STORAGE OTHER 642 SF 60 SM
1 C11A KILN OTHER 280 SF 27 SM
1 C13 MOD. TECH. LAB STUDENT - HALF 377 SF 36 SM
1 C13A MOD. TECH. LAB STUDENT - HALF 351 SF 33 SM
1 C14 INFO CENTER OTHER 2,562 SF 239 SM
1 C14A ADMIN./WORK OTHER 78 SF 8 SM
1 C15 COMPUTER LAB STUDENT - FULL 673 SF 63 SM
1 C16 ASSESSMENT OTHER 677 SF 63 SM
1 C101 CORRIDOR NET - GENERAL 238 SF 23 SM
1 C102 CORRIDOR NET - GENERAL 123 SF 12 SM
1 C103 CORRIDOR NET - GENERAL 74 SF 7 SM
1 C105 CORRIDOR NET - GENERAL 1,777 SF 166 SM
1 J101 JANITOR NET - GENERAL 38 SF 4 SM
1 K01 KG STUDENT - FULL 1,089 SF 102 SM
1 K01A WORKROOM OTHER 68 SF 7 SM
1 K01B TOILET NET - GENERAL 25 SF 3 SM
1 K01C KITCHEN OTHER 211 SF 20 SM
1 K02 KG STUDENT - FULL 1,079 SF 101 SM
1 K02A WORKROOM OTHER 75 SF 7 SM
1 K02B TOILET NET - GENERAL 22 SF 3 SM
1 KT1 DISHWASH OTHER 295 SF 28 SM
1 KT2 KITCHEN OTHER 887 SF 83 SM
1 KT2A DRY STORAGE OTHER 229 SF 22 SM
1 M03 GYM STUDENT - FULL 4,983 SF 463 SM
1 M03A STAGE OTHER 787 SF 74 SM
1 M04 CAFETERIA OTHER 3,064 SF 285 SM
1 M101 MECH. NET - MECH 555 SF 52 SM
1 M102 MECH. NET - MECH 89 SF 9 SM
1 M103 MECH. NET - MECH 81 SF 8 SM
1 S01 STORAGE OTHER 58 SF 6 SM
1 S02 STORAGE OTHER 75 SF 7 SM
1 S03 STORAGE OTHER 87 SF 9 SM
1 S04 STORAGE OTHER 40 SF 4 SM
1 S05 STORAGE OTHER 88 SF 9 SM
1 S06 JANITOR NET - GENERAL 64 SF 6 SM
1 S07 LAN NET - MECH 172 SF 16 SM
1 S08 LAN NET - MECH 93 SF 9 SM
1 ST1 STORAGE STUDENT - HALF 93 SF 9 SM
1 T01 TOILET NET - GENERAL 242 SF 23 SM
1 T01A SHOWER OTHER 10 SF 1 SM
1 T01B TOILET NET - GENERAL 41 SF 4 SM
1 T02 TOILET NET - GENERAL 241 SF 23 SM
1 T02A SHOWER OTHER 10 SF 1 SM
1 T02B TOILET NET - GENERAL 41 SF 4 SM
1 T03 TOILET NET - GENERAL 163 SF 16 SM
1 T04 TOILET NET - GENERAL 147 SF 14 SM
1 T05 TOILET NET - GENERAL 40 SF 4 SM
1 T06 JANITOR NET - GENERAL 102 SF 10 SM
1 T108 TOILET NET - GENERAL 50 SF 5 SM
1 T109 TOILET NET - GENERAL 36 SF 4 SM
2 118A STORAGE OTHER 168 SF 16 SM
2 118B STORAGE OTHER 168 SF 16 SM
"identification only"
201_1 (1)
201_1 (2)
201_1 (3)
201_1 (4)
201_1 (4)
200_1 (1)
X201A
X201B
Survey Date:Floor:
Sheet Name:
KEY PLAN
NTS
DEPARTMENT OF DEFENSE EDUCATION ACTIVITY
FACILITY UTILIZATION SURVEY
SYMBOL LEGEND
DoDAAC Number:
Sheet Seq:
Updated By:
SITE:
INSTALLATION:
COUNTRY:
DRINKING FOUNTAIN
LAVATORY
TOILET
URINAL
LOCKER
LAN DISTRIBUTION
SINK
VENT HOOD
DOOR
STACK OR FOLDING
SLIDING DOOR
WINDOW/GLAZING
HIGH WINDOW
SKYLIGHT
STOOP/STEP UP
STAIR
RAMP
WALL SHELVING
UPPER CABINET
TEACHER CABINET
BASE CABINET
ACCESS LADDER
FRAME
PARTITION
PARTITION
ACCORDION
COLD STORAGE
AREA CALCULATED
@ 50 %
100% Submittal Date:FUS Review:
REGION-DISTRICT:
MATCHLINE
TITLEBLOCK LEGEND
SHEET NAME: BLDG #_FLOOR # (# IN SERIES)
SLOPING ROOF FLAT ROOF
LIVORNO
ELEMENTARY / MIDDLE SCHOOL
CAMP DARBY
ITALY
DODEA EUROPE SOUTH
HE5408 JANUARY 2020
SPF
US ARMY GARRISON ITALY
01 MAY 2020MRS
NORTH
BUILDING NUMBER: 200, 201, X201A, X201B
KEY PLAN
LEVEL 1
X201A
X201B
NOT TO SCALE
M
AT
C H
LI
N
E M
AT
C
H
LI
N E
A05A
CENT. SUPPLY
52 SM
559 SF
A05
STORAGE
20 SM
207 SF
C102
CORRIDOR
12 SM
123 SF
M03
GYM
463 SM
4983 SF
M03A
STAGE
74 SM
787 SF
C103
CORRIDOR
7 SM
74 SF
ST1
STORAGE
9 SM
93 SF
T02
TOILET
23 SM
241 SF
T01
TOILET
23 SM
242 SF
M04
CAFETERIA
285 SM
3064 SF
A06
BUS OFFICE
27 SM
284 SF
T108
TOILET
5 SM
50 SF
A06A
STAFF
3 SM
30 SF
NURSE
13 SM
132 SF
100A
REST AREA
11 SM
111 SF
100B
TOILET
6 SM
64 SF
C01
STAFF
68 SM
725 SF
C101
CORRIDOR
23 SM
238 SF
KT1
DISHWASH
28 SM
295 SF
KT2
KITCHEN
83 SM
887 SF
KT2A
DRY STORAGE
22 SM
229 SF
T06
JANITOR
10 SM
102 SF
UP
UP
UP
UP
T01B
TOILET
4 SM
41 SF
T02B
TOILET
4 SM
41 SF
T01A
SHOWER
1 SM
10 SF
T02A
SHOWER
1 SM
10 SF
Survey Date:Floor:
Sheet Name:
KEY PLAN
NTS
DEPARTMENT OF DEFENSE EDUCATION ACTIVITY
FACILITY UTILIZATION SURVEY
SYMBOL LEGEND
DoDAAC Number:
Sheet Seq:
Updated By:
SITE:
INSTALLATION:
COUNTRY:
DRINKING FOUNTAIN
LAVATORY
TOILET
URINAL
LOCKER
LAN DISTRIBUTION
SINK
VENT HOOD
DOOR
STACK OR FOLDING
SLIDING DOOR
WINDOW/GLAZING
HIGH WINDOW
SKYLIGHT
STOOP/STEP UP
STAIR
RAMP
WALL SHELVING
UPPER CABINET
TEACHER CABINET
BASE CABINET
ACCESS LADDER
FRAME
PARTITION
PARTITION
ACCORDION
COLD STORAGE
AREA CALCULATED
@ 50 %
100% Submittal Date:FUS Review:
REGION-DISTRICT:
MATCHLINE
TITLEBLOCK LEGEND
SHEET NAME: BLDG #_FLOOR # (# IN SERIES)
SLOPING ROOF FLAT ROOF
LIVORNO
ELEMENTARY / MIDDLE SCHOOL
CAMP DARBY
ITALY
DODEA EUROPE SOUTH
HE5408 JANUARY 2020
SPF
US ARMY GARRISON ITALY
01 MAY 2020MRS
NORTH
BUILDING NUMBER: 201
201_1 (1)
LEVEL 1
4 8 1620 FT
X201A
X201B
"identification only"
AutoCAD SHX Text
POCKET DOOR
TRAY SLOT
MATCHLINE
M
AT
C H
LI
N
E M
AT
C
H
LI
N E
M
AT
C H
LI
N
E
M
AT
C H
LI
N
E
J101
JANITOR
4 SM
38 SF
T03
TOILET
16 SM
163 SF
T04
TOILET
14 SM
147 SF
C02
GPC
68 SM
726 SF
C10
GPC
87 SM
936 SF
C09
GPC
88 SM
943 SF
S01
STORAGE
6 SM
58 SF
C14
INFO CENTER
239 SM
2562 SF
A04
PRINCIPAL
45 SM
480 SF
T109
TOILET
4 SM
36 SF
A03
RECEPTION
27 SM
284 SF
A03A
RECORDS
5 SM
47 SF
T05
TOILET
4 SM
40 SF
S08
LAN
9 SM
93 SF
S06
JANITOR
6 SM
64 SF
S07
LAN
16 SM
172 SF
A02A
STORAGE
4 SM
43 SF
A02
CONFERENCE
39 SM
410 SF
A01
TSC
21 SM
219 SF
C08A
TOILET
6 SM
64 SF
A01A
STORAGE
4 SM
35 SF
C08
CENTRAL WORKROOM
54 SM
577 SF
C105
CORRIDOR
166 SM
1777 SF
M101
MECH.
52 SM
555 SF
NURSE
13 SM
132 SF
C14A
ADMIN./WORK
8 SM
78 SF
C14
INFO CENTER
238 SM
2562 SF
Survey Date:Floor:
Sheet Name:
KEY PLAN
NTS
DEPARTMENT OF DEFENSE EDUCATION ACTIVITY
FACILITY UTILIZATION SURVEY
SYMBOL LEGEND
DoDAAC Number:
Sheet Seq:
Updated By:
SITE:
INSTALLATION:
COUNTRY:
DRINKING FOUNTAIN
LAVATORY
TOILET
URINAL
LOCKER
LAN DISTRIBUTION
SINK
VENT HOOD
DOOR
STACK OR FOLDING
SLIDING DOOR
WINDOW/GLAZING
HIGH WINDOW
SKYLIGHT
STOOP/STEP UP
STAIR
RAMP
WALL SHELVING
UPPER CABINET
TEACHER CABINET
BASE CABINET
ACCESS LADDER
FRAME
PARTITION
PARTITION
ACCORDION
COLD STORAGE
AREA CALCULATED
@ 50 %
100% Submittal Date:FUS Review:
REGION-DISTRICT:
MATCHLINE
TITLEBLOCK LEGEND
SHEET NAME: BLDG #_FLOOR # (# IN SERIES)
SLOPING ROOF FLAT ROOF
LIVORNO
ELEMENTARY / MIDDLE SCHOOL
CAMP DARBY
ITALY
DODEA EUROPE SOUTH
HE5408 JANUARY 2020
SPF
US ARMY GARRISON ITALY
01 MAY 2020MRS
NORTH
BUILDING NUMBER: 201
201_1 (2)
LEVEL 1
4 8 1620 FT
X201A
X201B
M
AT
C H
LI
N
E
M
AT
C H
LI
N
E K02A
WORKROOM
7 SM
75 SF
C16
ASSESSMENT
63 SM
677 SF
M102
MECH.
9 SM
89 SF
K02
KG
101 SM
1079 SF
K02B
TOILET
3 SM
22 SF
K01C
KITCHEN
20 SM
211 SF
K01B
TOILET
3 SM
25 SF
K01
KG
102 SM
1089 SF
K01A
WORKROOM
7 SM
68 SF
M103
MECH.
8 SM
81 SF
S05
STORAGE
9 SM
88 SF
S04
STORAGE
4 SM
40 SF
S03
STORAGE
9 SM
87 SF
S02
STORAGE
7 SM
75 SF
S01
STORAGE
6 SM
58 SF
C15
COMPUTER LAB
63 SM
673 SF
C14A
ADMIN./WORK
8 SM
78 SF
STORAGE
8 SM
79 SF
C14
INFO CENTER
238 SM
2562 SF
Survey Date:Floor:
Sheet Name:
KEY PLAN
NTS
DEPARTMENT OF DEFENSE EDUCATION ACTIVITY
FACILITY UTILIZATION SURVEY
SYMBOL LEGEND
DoDAAC Number:
Sheet Seq:
Updated By:
SITE:
INSTALLATION:
COUNTRY:
DRINKING FOUNTAIN
LAVATORY
TOILET
URINAL
LOCKER
LAN DISTRIBUTION
SINK
VENT HOOD
DOOR
STACK OR FOLDING
SLIDING DOOR
WINDOW/GLAZING
HIGH WINDOW
SKYLIGHT
STOOP/STEP UP
STAIR
RAMP
WALL SHELVING
UPPER CABINET
TEACHER CABINET
BASE CABINET
ACCESS LADDER
FRAME
PARTITION
PARTITION
ACCORDION
COLD STORAGE
AREA CALCULATED
@ 50 %
100% Submittal Date:FUS Review:
REGION-DISTRICT:
MATCHLINE
TITLEBLOCK LEGEND
SHEET NAME: BLDG #_FLOOR # (# IN SERIES)
SLOPING ROOF FLAT ROOF
LIVORNO
ELEMENTARY / MIDDLE SCHOOL
CAMP DARBY
ITALY
DODEA EUROPE SOUTH
HE5408 JANUARY 2020
SPF
US ARMY GARRISON ITALY
01 MAY 2020MRS
NORTH
BUILDING NUMBER: 200, 201
201_1 (3)
LEVEL 1
4 8 1620 FT
BUILDING 201 - FIRST FLOOR
BUILDING 200 - FIRST FLOOR
X201A
X201B
C06
ACADEMIC SUPPORT
137 SM
1471 SF
C05
GPC
68 SM
722 SF
C04
SCIENCE LAB
70 SM
748 SF
C03
GPC
67 SM
721 SF
C13
MOD. TECH. LAB
36 SM
377 SF
C12
ART
89 SM
957 SF
C11
STORAGE
60 SM
642 SF
C11A
KILN
27 SM
280 SF
C13A
MOD. TECH. LAB
33 SM
351 SF
UTILIZED BY:
CYS
AIR SPACE
AIR SPACE
AIR SPACE
118A
STORAGE
16 SM
168 SF
118B
STORAGE
16 SM
168 SF
UP
UP
MAINTENANCE
13 SM
139 SF
MAINTENANCE
13 SM
139 SF
Survey Date:Floor:
Sheet Name:
KEY PLAN
NTS
DEPARTMENT OF DEFENSE EDUCATION ACTIVITY
FACILITY UTILIZATION SURVEY
SYMBOL LEGEND
DoDAAC Number:
Sheet Seq:
Updated By:
SITE:
INSTALLATION:
COUNTRY:
DRINKING FOUNTAIN
LAVATORY
TOILET
URINAL
LOCKER
LAN DISTRIBUTION
SINK
VENT HOOD
DOOR
STACK OR FOLDING
SLIDING DOOR
WINDOW/GLAZING
HIGH WINDOW
SKYLIGHT
STOOP/STEP UP
STAIR
RAMP
WALL SHELVING
UPPER CABINET
TEACHER CABINET
BASE CABINET
ACCESS LADDER
FRAME
PARTITION
PARTITION
ACCORDION
COLD STORAGE
AREA CALCULATED
@ 50 %
100% Submittal Date:FUS Review:
REGION-DISTRICT:
MATCHLINE
TITLEBLOCK LEGEND
SHEET NAME: BLDG #_FLOOR # (# IN SERIES)
SLOPING ROOF FLAT ROOF
LIVORNO
ELEMENTARY / MIDDLE SCHOOL
CAMP DARBY
ITALY
DODEA EUROPE SOUTH
HE5408 JANUARY 2020
SPF
US ARMY GARRISON ITALY
01 MAY 2020MRS
NORTH
BUILDING NUMBER: 201, X201A, X201B
201_1 (4)
LEVEL 1
4 8 1620 FT
BUILDING 201 - MEZZININE
BUILDING 201 - FIRST FLOOR
X201A
X201B
BUILDING X201A - FIRST FLOOR
BUILDING X201B - FIRST FLOOR "identification only"
| Sheets and Views |
| HE5408_CVR-LIVORNO_BASE MAP |
| HE5408_S-LIVORNO EMS_OVERALL |
| HE5408-GSF_1 (1) |
| HE5408-SCHEDULES (1) |
| HE5408-KEY PLAN |
| HE5408-201_1 (1) |
| HE5408-201_1 (2) |
| HE5408-201_1 (3) |
| HE5408-201_1 (4) |
File details come from the government source that posted it. Updated .