This document is a Facility Condition Assessment Report for Vicenza Campus, a Department of Defense Education Activity (DoDEA) facility located at U.S. Army Garrison Italy.

The assessment, dated January 13, 2020, evaluates Building 700 (Vicenza ES/MS 700), a 267,825 gross square foot permanent structure built in 2011 that serves as a shared facility for Vicenza Elementary School, Vicenza Middle School, and the DoDEA Europe South DSO. The building received a Q-1 (well-maintained/good condition) facility rating with a Facility Condition Index (FCI) of 100. Primary structural components include exterior insulation and finish systems (E.I.F.S) over rigid foam, clay tile roofing, aluminum windows and doors, ceramic tile and resilient flooring, acoustical ceiling tiles, and central heating/cooling systems supplied by base facilities. Critical deficiencies identified include numerous leaks in the clay tile roofing system with evidence of water intrusion throughout the building, consistently damaged and deteriorated synthetic stucco exterior wall trim with exposed metal lath showing rust and corrosion, and malfunctioning motion sensors controlling lighting. The assessment identifies work items requiring repair or replacement, including roofing repairs (6,000 SF), interior finish replacements (flooring and carpeting totaling approximately 16,000 SF across multiple years from 2015-2019), and intercom system replacement. No fire safety inspection report was available for review at the time of assessment. The facility utilization was updated to reflect shared occupancy, with Vicenza Elementary and Middle Schools utilizing approximately 98 percent of the building.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

"identification only"

II. SCHOOL PHYSICAL DESCRIPTION

The summary below provides a physical description of the campus. When multiple systems or materials are present, the predominant system or material observed during the facility condition assessment is shown.

a. STRUCTURAL/EXTERIOR ENCLOSURE: The building exterior is an exterior insulation and finish system (E.I.F.S). Roof coverings are clay tile. Exterior doors are pre-finished aluminum with glazing. Window systems are pre-finished aluminum with double-glazing.

b. INTERIORS: Floor finishes used include ceramic tile and resilient sheeting. Walls are painted hard surfaces. Ceilings are acoustical lay-in tiles.

c. MECHANICAL: Building 700 has heating, which is provided by a central plant. The facility has air conditioning, which is provided by a central plant. Building 700 has two elevators.

d. ELECTRICAL: No electrical upgrades have been completed, and most wiring appears to be original.

Lighting is typically lay-in fixtures with fluorescent lamps. Ground-fault circuit interrupter (GFCI) receptacles appear to be present in required locations. Building 700 has an intercom system. There is no security system, and security cameras are present.

e. PLUMBING: Plumbing fixtu es and piping are original. Domestic hot water is provided by point of use (tankless) water heaters.

f. SITE: The campus has parking fo approximately 158 privately owned vehicles. In addition, Vicenza Elementary School has six playgrounds

g. LIFE SAFETY: A fire safety inspection report was not available for review.

III. OBSERVATIONS

The following observations were made: Exterior door security was not observed or reported to be a problem.

The clay tile roofing system on Building 700 was reported to have several leaks throughout the facility.

Evidence of water intrusion was observed in various areas throughout the building. Additionally, the exterior enclosure wall trim of Building 700, which is composed of synthetic stucco over rigid foam, was observed to be consistently damaged and deteriorated throughout; as well as the wall base finish with exposed metal lathe which is beginning to show indicators of rust and corrosion. The interior finishes were generally in good condition with no major issues observed.

It appears that outside air is being introduced into the HVAC system. Hot and chilled water at Building 700 is supplied by the base. The air handling units throughout the building were observed to be in good condition.

There is an HVAC duct above the ceiling in Room 1222, in Building 700 that has standing water inside due to an apparent water leak, source unknown. Additionally, the motion sensors that control the lights throughout Building 700 do not always function.

The Facility Utilization Survey (FUS) drawings to include the site plan have been updated to reflect the following: X-Building (X700G) was renamed as “WALK-IN COOLER 1”. Room-use changes were observed throughout the building. Further, Building 700 was identified as a shared facility between Vicenza Elementary School, Vicenza Middle School, and the DoDEA Europe South DSO. Additionally, the Maintenance contractor, SKE, occupies space in the building. Vicenza Elementary School and Vicenza Middle School share Building 700 equally, and utilize approximately 98% of Building 700 (266,617 SF), the DoDEA Europe South DSO utilizes approximately <1% of Building 700 (741 SF), and SKE utilizes approximately <1% of Building 700, specifically Rooms E0129, E0122, and E0123 (467 SF) for a GSF total of 267,825 SF.

Building 700 remained a Q-1.

Appendix A

Site Plan

Appendix B

Overview of Sustainment Management System (SMS) and BUILDER™ Engineered Management System (EMS)

Overview of Sustainment Management System (SMS) and BUILDER™ Engineered Management System (EMS)

Sustainment Management System (SMS)

The Sustainment Management System (SMS) is a suite of web-based software applications developed by the United States Army Corps of Engineers - Engineer Research Development Center - Construction Engineering Research Laboratory (USACE-ERDC-CERL) to help facility engineers, technicians, and managers decide when, where, and how to best maintain the built environment. The SMS modules include BUILDER™ and ROOFER™ for assessing building conditions, PAVER™ for pavements, and RAILER™ for railroad infrastructure.

Because real property assets are so vast and diverse, a "knowledge-based" philosophy drives the SMS process. The process starts with the automated download of real property data, and then more detailed system inventory is modeled and/or collected which identifies components and their key life cycle attributes such as the age and material.

From this inventory, Condition Index (CI) measures for each component are predicted based on its expected stage in the life cycle. Objective and repeatable inspections can then be performed on various components to verify their condition with respect to he expected life cycle deterioration. The level of detail and frequency of these inspections are not fixed like other processes; they are dependent on knowledge of component criticality, the expected and measured condition and rate of deterioration, and remaining maintenance and service life. This "knowledge-based" inspect on focuses attention to the most critical components at the time.

In addition to these condition assessments, functionality assessments can be performed to evaluate user requirement changes, compliance and obsolesce ce issues. This provides a comprehensive picture of the overall performance of real property assets and their key components.

BUILDER Engineered Management System (EMS)

In September 2013, the Under Secretary of Defense, Frank Kendall, issued a memo indicating the Department of Defense requires a standardized process for facility condition assessments to ensure consistent and reliable data necessary for sound strategic investment decisions in managing the Department's built environment.

Establishing a DoD-wide facility condition assessment process will contribute to a more credible DoD asset management program and will support better buying power by allowing Department leadership to better target fiscal resources to those facilities most in need of investment. Further, adopting a standard process will help ensure that condition data will be audit-ready in accordance with the Under Secretary of Defense (Comptroller)'s "Financial Improvement and Readiness Guidance" issued in March 2013.

The facility condition assessment process used to generate this report is based on BUILDER Engineered Management System (EMS) Version 3. BUILDER EMS was developed by the Engineer Research and Development Center.

The facility condition assessment process addresses the requirements necessary for routine building facility management activities, including long range budgeting and sustainment/restoration/modernization (SRM) planning. This assessment approach provides an objective and generalized framework to help to identify problem areas that will require more investigation through detailed or specialized assessments. There may be times when detailed engineering assessments may be required to diagnose specific problems.

BUILDER is a software application for building asset life cycle management. The primary focus of BUILDER is work plan development. BUILDER stores real property building information and more detailed system inventory is modeled and/or collected which identifies building components and their key life cycle attributes such as the age, material and capacity. Inspections are then performed on the various components to determine an objective and repeatable Condition Index (CI) measure, which relates the general physical health of the asset.

With information about condition and remaining service life, BUILDER guides the development of short- and long-range work plans based on sound investment strategies, prioritization criteria, and budget constraints.

BUILDER consolidates a variety of building-related management issues into a single decision-support package.

The system gives functional managers and decision-makers instant access to building inventory, current building condition indices, and probabilities condition prediction models. It also employs a patented knowledge-based inspection scheduling process. BUILDER improves the allocation process and return of building life cycle investments by directing resources to the most condition critical components to avoid costly repair penalty costs, as well as, the most mission critical components to manage risks of failure.

BUILDER Facility Condition Assessment Process

Facility Condition Assessment (FCA) is one of the primary processes of a facility life cycle asset management program. The FCA process results in a better understanding of the physical condition and readiness of an organization's buildings along with the reliability of its systems and components. It also facilitates the identification of work candidates for facility SRM repair projects. It is a critical aspect of the shift towards a proactive versus reactive facility management strategy. Instead of keeping facilities operational by relying primarily on corrective repairs (after a system or component has failed due to significant loss of function), it focuses on condition-based repairs which can be planned prior to failure. A condition-based approach can result in higher performing facilities at lower life cycle costs.

Prior to an assessment, knowledge of the building systems and components present is necessary, since assessments are done against these components, not against the building as a whole. This information about the systems and components that make up a building is called the BUILDER Inventory. BUILDER has a vast library of predefined components which an as essor will select from, and the inventory collection process involves identifying the type, quantity, and year installed for all pertinent components. These components are also organized into systems and sub-systems according to the UNIFORMAT classification hierarchy. When a specific instance of a component is recorded, this is called a component-section in BUILDER, and represents a single component assembly or colle tion of like components to be managed as a single unit. The BUILDER facility condition assessment process directly supports the computation of a condition index for building component-sections, known as the Component-Section Condition Index (CSCI), which is the fundamental metric used in BUILDER. The CSCI is aggregated to compute a condition index metric at the system (SCI), building (BCI), and site/organizational levels.

A condition-based facility repair strategy requires condition information be collected at a component level, and that this condition information relate to loss of component function. Every component of a building has a primary function that it performs. This function is the reason that the component was constructed or installed in the building. It may also serve a number of secondary or tertiary functions. For example, for a door component, the primary function is to provide safe entry/egress of authorized movements while limiting unwanted movements of people (security), or other objects (water or moisture). The secondary functions would relate to aesthetics and thermal and air control, among others.

The condition assessment process in BUILDER uses the Direct Rating method.

1. The Direct Rating method uses a single qualitative rating for each component based on condition observations. This also results in a condition index metric, which relates to the level of deterioration and the loss of function. This abbreviated Direct Rating approach is often better suited to initial baseline assessments where the components are inventoried, and data is initially loaded into BUILDER.

BUILDER Report Overview

Outlined below is a summary and description of the reports that are included.

Appendix C - Facility Summary Report – Provides a summation of FCA results. A Building Summary Report is included for each building that is considered permanent or semi-permanent construction and receives a Q-Rating. The purpose of this report is to provide a general overview of the building including key performance indicators. This report was generated using DoDEA's calculated Replacement Cost overwriting the data populated from real property records. This provides a more accurate Replacement Cost due to the inconsistencies with real property reconciliation between DoDEA and the Services. The DoD Facility Pricing Guide and DoDEA measurements for building square footage were used to calculate the Replacement Cost.

Appendix D - System Summary Report – Provides an overview of inspected systems and their condition index rating. A Building System Condition Index (SCI) By System Report is included for each building that is considered permanent or semi-permanent construction and receives a Q-Rating.

Appendix E - Work Items By Building – Provides a list of work items requiring repair or replacement of system/components, including budgets, for project planning purposes. A Work Plan Detail by Year Report is included for each building that is considered permanent or semi-permanent construction and receives a Q- Rating.

Appendix F - Remaining Service Life (RSL) Detail Report – Provides a detailed overview of systems/components, including descr ptions, and their respective age, remaining service life and remaining paint life.

Appendix G - Direct Condition Rating Inspection By Section Report – Provides a summary of direct condition ratings for each component-section collected within each facility.

Appendix H - System Inventory Report – Prov des a list of details for each component-section collected within each facility.

Appendix I - Fire Inspection Safety Report – This appendix is only applicable when a Fire Inspection Safety Report is provided at the time of the assessment for inclusion in the Facility Condition Assessment Report.

The report provides a summary of the recent Fire Inspection to include any deficiencies.

Note: All reports are generated from the DoDEA BUILDER database. n the event line items within a report are compressed and difficult to read, this is a result of how BUILDER generates the report. It is our understanding that CERL is working to update the report format.

Appendix C

Facility Summary Report

Appendix D

System Summary Report

Appendix E

Work Items By Building

C30 INTERIOR FINISHES2015

2011 C302005 CARPETING General 5,663 (SF) Replace 0.00C3020 FLOOR FINISHES

-- Replace C3020 FLOOR FINISHES 2011 C302005 CARPETING General

2011 C302005 CARPETING General 5,663 (SF) Replace 0.00C3020 FLOOR FINISHES

-- Replace C3020 FLOOR FINISHES 2011 C302005 CARPETING General

B30 ROOFING2017

2011 B301002 LOW SLOPE ROOF SYSTEMS Built-Up 6,000 (SF) Repair 0.00B3010 ROOF COVERINGS

-- Repair B3010 ROOF COVERINGS 2011 B301002 LOW SLOPE ROOF SYSTEMS Bui t-Up

C30 INTERIOR FINISHES2017

2011 C302005 CARPETING General 5,663 (SF) Replace 0.00C3020 FLOOR FINISHES

-- Replace C3020 FLOOR FINISHES 2011 C302005 CARPETING General

D50 ELECTRICAL2018

2011 A D503003 INTERCOMMUNICATIONS SYSTEMS 100 stations 1 (EA) Replace 0.00D5030 COMMUNICATIONS & SECURITY

-- Replace D5030 COMMUNICATIONS & SECURITY 2011 A D503003 INTERCOMMUNICATIONS SYSTEMS 100 stations

C30 INTERIOR FINISHES2019

2011 C302005 CARPETING General 5,800 (SF) Replace 0.00C3020 FLOOR FINISHES

-- Replace C3020 FLOOR FINISHES 2011 C302005 CARPETING General

Vicenza FAM HSG

Year System

Completion Date Qty (UM) CostActivity

Section Description Component Status

-- Description

ScoreProject

Unassigned700 - Vicenza Bldg ES/MS 700

Cost Book: Reference

Work Items by Building Report

Page 1 of 2April 30, 2020

D50 ELECTRICAL2019

2011 A D503003 INTERCOMMUNICATIONS SYSTEMS 100 tations 1 (EA) Replace 0.00D5030 COMMUNICATIONS & SECURITY

-- Replace D5030 COMMUNICATIONS & SECURITY 2011 A D503003 INTERCOMMUNICATIONS SYSTEMS 100 stations

Vicenza FAM HSG

Year System

Completion Date Qty (UM) CostActivity

Section Description Component Status

-- Description

ScoreProject

Unassigned700 - Vicenza Bldg ES/MS 700

Cost Book: Reference

Work Items by Building Report

Page 2 of 2April 30, 2020

Appendix F

Remaining Service Life (RSL) Detail Report

B20 EXTERIOR ENCLOSURE B2010 EXTERIOR WALLS 2011 B201001 EXTERIOR CLOSURE E.I.F.S. 9 15

B2010 EXTERIOR WALLS 2011 B201004 PARAPETS General 9 8

B2010 EXTERIOR WALLS 2011 B201005 EXTERIOR LOUVERS & SCREENS General 9 10

B2010 EXTERIOR WALLS 2011 B201006 BALCONY WALLS & HANDRAILS Ladder 9 8

B2010 EXTERIOR WALLS 2011 B201007 EXTERIOR SOFFITS General 9 8

B2010 EXTERIOR WALLS 2011 B201010 EXTERIOR JOINT SEALANT General 9 8

B2020 EXTERIOR WINDOWS 011 B202001 WINDOWS Aluminum Windows 9 39

B2020 EXTERIOR WINDOWS 2011 B202002 STOREFRONTS General 9 10

B2020 EXTERIOR WINDOWS 2011 B202003 CURTAIN WALLS General 9 39

B2030 EXTERIOR DOORS 2011 B203001 SOLID DOORS Aluminum 9 10

B2030 EXTERIOR DOORS 2011 B203002 GLAZED DOORS General 9 21

B2030 EXTERIOR DOORS 2011 B203007 GATES General 9 10 Unknown

B2030 EXTERIOR DOORS 2011 B203090 OTHER EXTERIOR SPECIALTY DOORS Emergency Egress D

9 10

B30 ROOFING B3010 ROOF COVERINGS 2011 B301001 STEEP SLOPE ROOF SYSTEMS Clay Tile 9 7

B3010 ROOF COVERINGS 2011 B301002 LOW SLOPE ROOF SYSTEMS Built-Up 9 4

B3010 ROOF COVERINGS 2011 B301003 ROOF INSULATION & FILL General 9 11

B3010 ROOF COVERINGS 2011 B301004 FLASHINGS & TRIM Flashings - Base 9 10

B3010 ROOF COVERINGS 2011 B301004 FLASHINGS & TRIM Flashings - Valley 9 10

B3010 ROOF COVERINGS 2011 B301005 GUTTERS & DOWNSPOUTS Downspouts 9 10

B3010 ROOF COVERINGS 2011 B301005 GUTTERS & DOWNSPOUTS Gutte s 9 10

B3010 ROOF COVERINGS 2011 B301006 ROOF OPENINGS AND SUPPORTS Gravity Ventilator - 48" x 60" 9 10

B3010 ROOF COVERINGS 2011 B301006 ROOF OPENINGS AND SUPPORTS Gravity Ventilator - 6" Di t

9 10

B3010 ROOF COVERINGS 2011 A B301004 FLASHINGS & TRIM Flashings - Cap 9 10

B3010 ROOF COVERINGS 2011 B B301004 FLASHINGS & TRIM Flashings - Cap 9 10

C10 INTERIOR

CONSTRUCTION

C1010 PARTITIONS 2011 C101001 FIXED PARTITIONS Wall - Drywall w/Stud Framing 9 26 27

C1010 PARTITIONS 2011 C101005 INTERIOR WINDOWS Interior Windows 9 26

C1020 INTERIOR DOORS 2011 C102001 STANDARD INTERIOR DOORS Wood Door/Wood Frame 9 16

C1020 INTERIOR DOORS 2011 C102002 GLAZED INTERIOR DOORS General 9 12

C1030 SPECIALTIES 2011 C103001 COMPARTMENTS, CUBICLES & TOILET PARTITIONS Shower C t t

9 8

C1030 SPECIALTIES 2011 C103001 COMPARTMENTS, CUBICLES & TOILET PARTITIONS Toilet Partitions

9 10

Unassigned700 - Vicenza Bldg ES/MS 700

Section Description Age (yrs) RSL (yrs) RPL (yrs)ComponentSystem

Vicenza FAM HSG

Remaining Service Life (RSL) Detail Report

C1030 SPECIALTIES 2011 C103001 COMPARTMENTS, CUBICLES & TOILET PARTITIONS Urinal S

9 10

Page 1 of 5April 30, 2020

C1030 SPECIALTIES 2011 C103002 TOILET & BATH ACCESSORIES General 9 8

C1030 SPECIALTIES 2011 C103003 MARKER BOARDS & TACK BOARDS General 9 8

C1030 SPECIALTIES 2011 C103005 LOCKERS General 9 12

C1030 SPECIALTIES 2011 C103008 COUNTERS Laminated Plastic 9 12

C1030 SPECIALTIES 2011 C103009 CABINETS Other 9 8

C20 STAIRS C2010 STAIR CONSTRUCTION 2011 C201001 INTERIOR AND EXTERIOR STAIRS Interior Stairs 9 41

C2010 STAIR CONSTRUCTION 20 1 C201001 INTERIOR AND EXTERIOR STAIRS Interior Steps 9 10 Unknown

C2010 STAIR CONSTRUCTION 2011 C201090 STAIR HANDRAILS, GUARDRAILS AND ACCESSORIES General 9 10

C30 INTERIOR FINISHES C3010 WALL FINISHES 2011 C3010 4 TILE & TERRAZZO WALL FINISHES Tile 9 39

C3020 FLOOR FINISHES 2011 C302001 TILE FLOOR FINISHES Ceramic Tile 9 39

C3020 FLOOR FINISHES 2011 C302003 WOOD FLOORING General 9 16

C3020 FLOOR FINISHES 2011 C302004 RESILIENT FLOOR FINISHES Composition Sheet 9 7

C3020 FLOOR FINISHES 2011 C302005 CARPETING General 9 2

C3030 CEILING FINISHES 2011 C303001 ACOUSTICAL CEILING TILES & PANELS General 9 29

C3030 CEILING FINISHES 2011 C303003 PLASTER CEILING FINISHES General 9 65 Unknown

C3030 CEILING FINISHES 2011 C303005 SUSPENSION SYSTEMS General 9 8

D10 CONVEYING D1010 ELEVATORS AND LIFTS 2011 D101002 PASSENGER ELEVATORS Hydraulic Elevators - 2000 lb, 2 floors 9 13

D20 PLUMBING D2010 PLUMBING FIXTURES 2011 D201001 WATERCLOSETS General 9 10

D2010 PLUMBING FIXTURES 2011 D201002 URINALS General 9 10

D2010 PLUMBING FIXTURES 2011 D201004 SINKS General 9 10

D2010 PLUMBING FIXTURES 2011 D201004 SINKS Kitchen Sink 9 18

D2010 PLUMBING FIXTURES 2011 D201004 SINKS Service Sink 9 10

D2010 PLUMBING FIXTURES 2011 D201005 SHOWERS/TUBS Shower 9 10

D2010 PLUMBING FIXTURES 2011 D201006 DRINKING FOUNTAINS AND COOLERS Drinking Fountain 9 10

D2010 PLUMBING FIXTURES 2011 D201090 OTHER PLUMBING FIXTURES Emergency Eye Wash 9 13

D2010 PLUMBING FIXTURES 2011 D201090 OTHER PLUMBING FIXTURES Emergency Shower 9 13

D2020 DOMESTIC WATER

DISTRIBUTION

2011 D202001 PIPES & FITTINGS General 9 41

D2020 DOMESTIC WATER

DISTRIBUTION

2011 D202003 DOMESTIC WATER EQUIPMENT Storage Tank - Galvanized t l 400 ll 36" i t 100" L O

4 15

D2020 DOMESTIC WATER

DISTRIBUTION

2011 D202003 DOMESTIC WATER EQUIPMENT Water Heaters, Residential, Electric

9 10

Unassigned700 - Vicenza Bldg ES/MS 700

Section Description Age (yrs) RSL (yrs) RPL (yrs)ComponentSystem

Vicenza FAM HSG

Remaining Service Life (RSL) Detail Report

D2020 DOMESTIC WATER

DISTRIBUTION

2011 M0302 D202003 DOMESTIC WATER EQUIPMENT Water Heaters, C i l El t i 80 l 36 W 1 7 GPH

9 4

Page 2 of 5April 30, 2020

D2020 DOMESTIC WATER

DISTRIBUTION

2011 M3010 D202003 DOMESTIC WATER EQUIPMENT Booster Pump - 1 HP 9 10

D2020 DOMESTIC WATER

DISTRIBUTION

2011 M3010 D202003 DOMESTIC WATER EQUIPMENT Water Heaters, Commercial Electric 80 gal 12 KW 49 GPH

9 5

D2020 DOMESTIC WATER

DISTRIBUTION

2011 M3020 D202003 DOMESTIC WATER EQUIPMENT Booster Pump - 1 HP 9 8

D2030 SANITARY WASTE 2011 D203001 WASTE PIPE & FITTINGS General 9 41

D2030 SANITARY WASTE 2011 D203002 VENT PIPE & FITTINGS General 9 11

D2030 SANITARY WASTE 2011 D203003 FLOOR DRAINS General 9 10

D30 HVAC D3020 HEAT GENERATING SYSTEMS 20 1 D302004 AUXILIARY EQUIPMENT Expansion Tank - 15 gal 9 15

D3020 HEAT GENERATING SYSTEMS 2011 D302004 AUXILIARY EQUIPMENT Expansion Tank - 80 gal 4 15

D3020 HEAT GENERATING SYSTEMS 2011 D302005 EQUIPMENT THERMAL INSULATION General 9 10

D3040 DISTRIBUTION SYSTEMS 2011 D304001 AIR DISTRIBUTION, HEATING & COOLING Ductwork 9 31

D3040 DISTRIBUTION SYSTEMS 2011 D304001 AIR DISTRIBUTION, HEATING & COOLING Smoke Vents 9 10

D3040 DISTRIBUTION SYSTEMS 2011 D304003 HOT WATER DISTRIBUTION SYSTEMS Circulating Pump, End S ti 2 1/2" i 3 HP t 150 GPM

9 10

D3040 DISTRIBUTION SYSTEMS 2011 D304003 HOT WATER DISTRIBUTION SYSTEMS General 9 11

D3040 DISTRIBUTION SYSTEMS 2011 D304006 CHILLED WATER DISTRIBUTION SYSTEMS Circulating Pump, E S ti 5" i 1 HP t 000 GPM

9 10

D3040 DISTRIBUTION SYSTEMS 2011 D304006 CHILLED WATER DISTRIBUTION SYSTEMS General 9 11

D3040 DISTRIBUTION SYSTEMS 2011 D304007 EXHAUST SYSTEMS Fume Hood Exhaust System - 6', 5000

CFM

9 5

D3040 DISTRIBUTION SYSTEMS 2011 D304007 EXHAUST SYSTEMS Kitchen Exhaust/Make-Up Air - 5000 CFM 9 10

D3040 DISTRIBUTION SYSTEMS 2011 M0301 AHU/2E D304008 AIR HANDLING UNITS Central Station - 30000

CFM V V

9 18

D3040 DISTRIBUTION SYSTEMS 2011 M0301 AHU/3E D304008 AIR HANDLING UNITS Central Station - 30000

CFM VAV

9 18

D3040 DISTRIBUTION SYSTEMS 2011 M0301 EF/10E D304007 EXHAUST SYSTEMS Fan System, Wall Exhaust 9 5

D3040 DISTRIBUTION SYSTEMS 2011 M0301 EF/11E D304007 EXHAUST SYSTEMS Fan System, Wall Exhaust 9 5

D3040 DISTRIBUTION SYSTEMS 2011 M0301 EF/13E D304007 EXHAUST SYSTEMS an Sy tem, Wall Exhaust 9 5

D3040 DISTRIBUTION SYSTEMS 2011 M0301 EF/14E D304007 EXHAUST SYSTEMS Fan System, Wall Exhaust 9 5

D3040 DISTRIBUTION SYSTEMS 2011 M0301 EF/15E D304007 EXHAUST SYSTEMS Fan System, Wall Exhaust 9 5

D3040 DISTRIBUTION SYSTEMS 2011 M0301 EF/9E D304007 EXHAUST SYSTEMS Fan System, Wall Exhaust 9 5

D3040 DISTRIBUTION SYSTEMS 2011 M0301 ERU/2E D304008 AIR HANDLING UNITS Central Station - 10000

CFM V V

9 8

D3040 DISTRIBUTION SYSTEMS 2011 M0302 AHU/4E D304008 AIR HANDLING UNITS Central Station - 20000

CFM VAV

9 8

D3040 DISTRIBUTION SYSTEMS 2011 M0302 AHU/5E D304008 AIR HANDLING UNITS Central Station - 30000

CFM V V

9 14

D3040 DISTRIBUTION SYSTEMS 2011 M0302 EF/12E D304008 AIR HANDLING UNITS Central Station - 30000

CFM VAV

9 18

D3040 DISTRIBUTION SYSTEMS 2011 M0302 EF/5E D304008 AIR HANDLING UNITS Central Station - 30000

CFM V V

9 18

D3040 DISTRIBUTION SYSTEMS 2011 M0302 ERU/3E D304008 AIR HANDLING UNITS Central Station - 30000

CFM VAV

9 18

Unassigned700 - Vicenza Bldg ES/MS 700

Section Description Age (yrs) RSL (yrs) RPL (yrs)ComponentSystem

Vicenza FAM HSG

Remaining Service Life (RSL) Detail Report

D3040 DISTRIBUTION SYSTEMS 2011 M0302 ERU/4E D304008 AIR HANDLING UNITS Central Station - 30000

CFM V V

9 18

Page 3 of 5April 30, 2020

D3040 DISTRIBUTION SYSTEMS 2011 M1090 AHU/1E D304008 AIR HANDLING UNITS Central Station - 30000

CFM VAV

9 18

D3040 DISTRIBUTION SYSTEMS 2011 M1090 AHU/7E D304008 AIR HANDLING UNITS Central Station - 30000

CFM VAV

9 18

D3040 DISTRIBUTION SYSTEMS 2011 M1090 EF/3E D304007 EXHAUST SYSTEMS Fan System, Wall Exhaust 9 5

D3040 DISTRIBUTION SYSTEMS 2011 M1090 EF/4E D304007 EXHAUST SYSTEMS Fan System, Wall Exhaust 9 5

D3040 DISTRIBUTION SYSTEMS 2011 M1090 ERU/1E D304008 AIR HANDLING UNITS Central Station - 30000

CFM V V

9 14

D3040 DISTRIBUTION SYSTEMS 2011 M1255 AHU/6E D304008 AIR HANDLING UNITS Central Station - 30000

CFM VAV

9 18

D3050 TERMINAL & PACKAGE UNITS 011 D305001 UNIT VENTILATORS Air Curtain 9 10

D3050 TERMINAL & PACKAGE UNITS 2011 D305002 UNIT HEATERS Hydronic - 200 MBH 9 15

D3050 TERMINAL & PACKAGE UNITS 2011 D305003 FAN COIL UNITS Cab Mount, Two Pipe - 1 ton 9 8

D40 FIRE PROTECTION D4010 FIRE ALARM AND DETECTION

SYSTEMS

2011 D401001 FIRE ALARM DISTRIBUTION Other 9 11

D4020 FIRE SUPP WATER SUPPLY /

EQUIP

2011 D402001 FIRE PROTECTION WATER PIPING AND EQUIPMENT Backflow Preventer 8"

9 21

D4030 STANDPIPE SYSTEMS 2011 D403001 STANDPIPE EQUIPMENT & PIPING Riser - 4" diam 9 10

D4040 SPRINKLERS 2011 D404001 SPRINKLERS AND RELEASING DEVICES Wet Pipe Systems 9 66

D4090 OTHER FIRE PROTECTION

SYSTEMS

2011 D409004 HOOD & DUCT FIRE PROTECTION General 9 13

D50 ELECTRICAL D5010 ELECTRICAL SERVICE &

DISTRIBUTION

2011 D501004 PANELBOARDS Main lugs, 120/208 V, 100 amp, NQOD 9 15

D5010 ELECTRICAL SERVICE &

DISTRIBUTION

2011 D501004 PANELBOARDS Main ugs, 120/208 V, 225 amp, NQOD 9 15

D5010 ELECTRICAL SERVICE &

DISTRIBUTION

2011 D501004 PANELBOARDS Switchgear - 2000 Amp 9 26

D5010 ELECTRICAL SERVICE &

DISTRIBUTION

2011 D501004 PANELBOARDS Switchg ar - 00 Amp 9 26

D5010 ELECTRICAL SERVICE &

DISTRIBUTION

2011 D501004 PANELBOARDS Switchgear - 800 Amp 9 26

D5010 ELECTRICAL SERVICE &

DISTRIBUTION

2011 D501005 ENCLOSED CIRCUIT BREAKERS Main circuit breaker, 120/208 V 100 amp NQOD

9 26

D5010 ELECTRICAL SERVICE &

DISTRIBUTION

2011 D501006 MOTOR CONTROL CENTERS Motor Control Center - Size 3, 50 HP 24" hi h

9 21

D5010 ELECTRICAL SERVICE &

DISTRIBUTION

2011 D501006 MOTOR CONTROL CENTERS Motor Control Center - Size 4, 100 HP 30" high

9 21

D5020 LIGHTING & BRANCH WIRING 2011 D502001 BRANCH WIRING General 9 51

D5020 LIGHTING & BRANCH WIRING 2011 D502002 LIGHTING EQUIPMENT Exit Lighting 9 10

D5020 LIGHTING & BRANCH WIRING 2011 D502002 LIGHTING EQUIPMENT General 9 10

D5030 COMMUNICATIONS &

SECURITY

2011 D503005 SECURITY SYSTEMS General 9 10

D5030 COMMUNICATIONS &

SECURITY

2011 D503007 CLOCK & PROGRAM SYSTEMS General 9 10

D5030 COMMUNICATIONS &

SECURITY

2011 A D503002 PUBLIC ADDRESS SYSTEMS 100 outlets 9 10

D5030 COMMUNICATIONS &

SECURITY

2011 A D503003 INTERCOMMUNICATIONS SYSTEMS 100 stations 9 8

D5030 COMMUNICATIONS &

SECURITY

2011 B D503002 PUBLIC ADDRESS SYSTEMS 100 outlets 9 10

Unassigned700 - Vicenza Bldg ES/MS 700

Section Description Age (yrs) RSL (yrs) RPL (yrs)ComponentSystem

Vicenza FAM HSG

Remaining Service Life (RSL) Detail Report

D5030 COMMUNICATIONS &

SECURITY

2011 B D503003 INTERCOMMUNICATIONS SYSTEMS 100 stations 9 8

Page 4 of 5April 30, 2020

D5090 OTHER ELECTRICAL

SERVICES

2011 D509002 EMERGENCY LIGHTING & POWER General 9 10

D5090 OTHER ELECTRICAL

SERVICES

2011 D509003 GROUNDING SYSTEMS General 9 41

D5090 OTHER ELECTRICAL

SERVICES

2011 D509004 LIGHTNING PROTECTION Unknown 9 26

D5090 OTHER ELECTRICAL

SERVICES

2011 D509006 ENERGY MANAGEMENT CONTROL SYSTEM General 9 10

E10 EQUIPMENT E1090 OTHER EQUIPMENT *DEEP FRYER E109002 FOOD SERVICE EQUIPMENT General 9 13

E1090 OTHER EQUIPMENT *DISH MACHINE E109002 FOOD SERVICE EQUIPMENT General 9 13

E1090 OTHER EQUIPMENT *FIRE SUPPRESSION SYSTEM E109002 FOOD SERVICE EQUIPMENT

eneral

9 13

E1090 OTHER EQUIPMENT FREEZER REACH IN 2 DR E109002 FOOD SERVICE EQUIPMENT General 9 13

E1090 OTHER EQUIPMENT *HOT CABINET REACH IN 1 DR A E109002 FOOD SERVICE EQUIPMENT Gen ral

9 13

E1090 OTHER EQUIPMENT *HOT CAB NET REACH IN 1 DR B E109002 FOOD SERVICE EQUIPMENT G l

9 13

E1090 OTHER EQUIPMENT *HOT CABINET REACH IN 1 DR C E109002 FOOD SERVICE EQUIPMENT General

9 13

E1090 OTHER EQUIPMENT *HOT CABINET REACH IN 1 DR D E109002 FOOD SERVICE EQUIPMENT G l

9 13

E1090 OTHER EQUIPMENT *ICE MACHINE E 09002 FOOD SERVICE EQUIPMENT General 9 13

E1090 OTHER EQUIPMENT *REFRIGERATOR PASS THRU 4 DR A E109002 FOOD SERVICE EQUIPMENT G l

9 13

E1090 OTHER EQUIPMENT *REFRIGERATOR PASS THRU 4 DR B E109002 FOOD SERVICE EQUIPMENT General

9 13

E1090 OTHER EQUIPMENT *REFRIGERATOR PASS THRU 4 DR C E109002 FOOD SERVICE EQUIPMENT G l

9 13

E1090 OTHER EQUIPMENT *REFRIGERATOR PASS THRU 4 DR D E109002 FOOD SERVICE EQUIPMENT General

9 13

E1090 OTHER EQUIPMENT *REFRIGERATOR PASS THRU 4 DR E E109002 FOOD SERVICE EQUIPMENT G l

9 13

E1090 OTHER EQUIPMENT *REFRIGERATOR REACH IN 2 DR A E109002 FOOD SERVICE EQUIPMENT General

9 13

E1090 OTHER EQUIPMENT *REFRIGERATOR REACH IN 2 DR B E109002 FOOD SERVICE EQUIPMENT G l

9 13

E1090 OTHER EQUIPMENT *REFRIGERATOR REACH IN 2 DR C E109002 FOOD SERVICE EQUIPMENT General

9 13

E1090 OTHER EQUIPMENT *REFRIGERATOR REACH IN 2 DR D E109002 FOOD SERVICE EQUIPMENT G l

9 13

E1090 OTHER EQUIPMENT *REFRIGERATOR REACH IN 2 DR E E109002 FOOD SERVICE EQUIPMENT General

9 13

E1090 OTHER EQUIPMENT *REFRIGERATOR REACH IN 2 DR F E109002 FOOD SERVICE EQUIPMENT G l

9 13

E1090 OTHER EQUIPMENT *REFRIGERATOR REACH IN 2 DR G E109002 FOOD SERVICE EQUIPMENT General

9 13

E1090 OTHER EQUIPMENT *STEAM COUNTER ELECTRIC MULTI BASIN A E109002 FOOD SERVICE

EQUIPMENT G l

9 13

E1090 OTHER EQUIPMENT *STEAM COUNTER ELECTRIC MULTI BASIN B E109002 FOOD SERVICE

EQUIPMENT General

9 13

E1090 OTHER EQUIPMENT *STEAMER 1 DOOR A E109002 FOOD SERVICE EQUIPMENT General 9 13

E1090 OTHER EQUIPMENT *TILT KETTLE E109002 FOOD SERVICE EQUIPMENT General 9 13

E1090 OTHER EQUIPMENT *WALK IN COOLER E109002 FOOD SERVICE EQUIPMENT General 9 13

E1090 OTHER EQUIPMENT *WALK IN FREEZER E109002 FOOD SERVICE EQUIPMENT General 9 13

Unassigned700 - Vicenza Bldg ES/MS 700

Section Description Age (yrs) RSL (yrs) RPL (yrs)ComponentSystem

Vicenza FAM HSG

Remaining Service Life (RSL) Detail Report

Page 5 of 5April 30, 2020

Appendix G

Direct Condition Rating Inspection By Section Report

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*DEEP FRYER E109002 FOOD SERVICE EQUIPMENT General

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*DISH MACHINE E109002 FOOD SERVICE EQUIPMENT

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*FIRE SUPPRESSION SYSTEM E109002 FOOD SERVICE

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*FREEZER REACH IN 2 DR E109002 FOOD SERVICE

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan- No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*HOT CABINET REACH IN 1 DR A E109002 FOOD SERVICE

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*HOT CABINET REACH IN 1 DR B E109002 FOOD SERVICE

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*HOT CABINET REACH IN 1 DR C E109002 FOOD SERVICE

700 - Vicenza Bldg ES/MS 700 Unassigned

Vicenza FAM HSG

ComponentSection Description Quantity (UM)System

Direct Condition Rating Inspection Report by Section

Page 1 of 24April 30, 2020

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*HOT CABINET REACH IN 1 DR D E109002 FOOD SERVICE

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*ICE MACHINE E109002 FOOD SERVICE EQUIPMENT General

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*REFRIGERATOR PASS THRU 4 DR A E109002 FOOD

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*REFRIGERATOR PASS THRU 4 DR B E109002 FOOD

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*REFRIGERATOR PASS THRU 4 DR C E109002 FOOD

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*REFRIGERATOR PASS THRU 4 DR D E109002 FOOD

700 - Vicenza Bldg ES/MS 700 Unassigned

Vicenza FAM HSG

ComponentSection Description Quantity (UM)System

Direct Condition Rating Inspection Report by Section

Page 2 of 24April 30, 2020

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*REFRIGERATOR PASS THRU 4 DR E E109002 FOOD

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*REFRIGERATOR REACH IN 2 DR A E109002 FOOD SERVICE

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*REFRIGERATOR REACH IN 2 DR B E109002 FOOD SERVICE

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*REFRIGERATOR REACH IN 2 DR C E109002 FOOD SERVICE

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*REFRIGERATOR REACH IN 2 DR D E109002 FOOD SERVICE

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*REFRIGERATOR REACH IN 2 DR E E109002 FOOD SERVICE

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*REFRIGERATOR REACH IN 2 DR F E109002 FOOD SERVICE

Vicenza FAM HSG

ComponentSection Description Quantity (UM)System

Direct Condition Rating Inspection Report by Section

Page 3 of 24April 30, 2020

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*REFRIGERATOR REACH IN 2 DR G E109002 FOOD SERVICE

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*STEAM COUNTER ELECTRIC MULTI BASIN A E109002 FOOD

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*STEAM COUNTER ELECTRIC MULTI BASIN B E109002 FOOD

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*STEAMER 1 DOOR A E109002 FOOD SERVICE EQUIPMENT

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*TILT KETTLE E109002 FOOD SERVICE EQUIPMENT General

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*WALK IN COOLER E109002 FOOD SERVICE EQUIPMENT

700 - Vicenza Bldg ES/MS 700 Unassigned

Vicenza FAM HSG

ComponentSection Description Quantity (UM)System

Direct Condition Rating Inspection Report by Section

Page 4 of 24April 30, 2020

13-Jan-2020 No Inspection Source:

G Inspection

Inspection Comments:

E1090 OTHER EQUIPMENT 1 (EA)E10 EQUIPMENT*WALK IN FREEZER E109002 FOOD SERVICE EQUIPMENT

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

A Inspection

The exterior wall trim composed of synthetic stucco over rigid foam was consistently damaged and deteriorated as was the wall base finish with exposed metal lath beginning to rust. Numerous hairline cracks were also observed.

Inspection Comments:

B2010 EXTERIOR WALLS 88,000 (SF)B20 EXTERIOR ENCLOSURE2011 B201001 EXTERIOR CLOSURE E.I.F.S.

Last Inspection Date: Condit on Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

A+ Inspection

Inspection Comments:

B2010 EXTERIOR WALLS 196 (LF)B20 EXTERIOR ENCLOSURE2011 B201004 PARAPETS General

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

B2010 EXTERIOR WALLS 5,822 (SF)B20 EXTERIOR ENCLOSURE2011 B201005 EXTERIOR LOUVERS & SCREENS General

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

B2010 EXTERIOR WALLS 57 (LF)B20 EXTERIOR ENCLOSURE2011 B201006 BALCONY WALLS & HANDRAILS Ladder

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

A+ Inspection

B2010 EXTERIOR WALLS 7,167 (SF)B20 EXTERIOR ENCLOSURE2011 B201007 EXTERIOR SOFFITS General

B2010 EXTERIOR WALLS 7,310 (LF)B20 EXTERIOR ENCLOSURE2011 B201010 EXTERIOR JOINT SEALANT General

Vicenza FAM HSG

ComponentSection Description Quantity (UM)System

Direct Condition Rating Inspection Report by Section

Page 5 of 24April 30, 2020

13-Jan-2020 No Inspection Source:

A+ Inspection

Inspection Comments:

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

B2020 EXTERIOR WINDOWS 384 (EA)B20 EXTERIOR ENCLOSURE2011 B202001 WINDOWS Aluminum Windows

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

B2020 EXTERIOR WINDOWS 612 (SF)B20 EXTERIOR ENCLOSURE2011 B202002 STOREFRONTS General

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

B2020 EXTERIOR WINDOWS 1,339 (SF)B20 EXTERIOR ENCLOSURE2011 B202003 CURTAIN WALLS General

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

B2030 EXTERIOR DOORS 10 (EA)B20 EXTERIOR ENCLOSURE2011 B203001 SOLID DOORS Aluminum

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

B2030 EXTERIOR DOORS 11 (EA)B20 EXTERIOR ENCLOSURE2011 B203002 GLAZED DOORS General

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- G- InspectionPaint Rating:

Inspection Comments:

B2030 EXTERIOR DOORS 147 (SF)B20 EXTERIOR ENCLOSURE2011 B203007 GATES General

700 - Vicenza Bldg ES/MS 700 Unassigned

Vicenza FAM HSG

ComponentSection Description Quantity (UM)System

Direct Condition Rating Inspection Report by Section

Page 6 of 24April 30, 2020

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

B2030 EXTERIOR DOORS 57 (EA)B20 EXTERIOR ENCLOSURE2011 B203090 OTHER EXTERIOR SPECIALTY DOORS

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

R+ Inspection

The clay tile roofing system was reported to have numerous leaks throughout the school. A detailed report based on crane lift investigations was provided. Assessor observations above eiling tiles confirmed evidence of the known water leaks.

Inspection Comments:

B3010 ROOF COVERINGS 148,000 (SF)B30 ROOFING2011 B301001 STEEP SLOPE ROOF SYSTEMS Clay Tile

Last Inspection Date: Condit on Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

A+ Inspection

Inspection Comments:

B3010 ROOF COVERINGS 6,000 (SF)B30 ROOF NG2011 B301002 LOW SLOPE ROOF SYSTEMS Built-Up

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

01-Jan-2011 No Inspection Source:

G+ InstallDate

Original InspectionInspection Comments:

B3010 ROOF COVERINGS 154,000 (SF)B30 ROOFING2011 B301003 ROOF INSULATION & FILL General

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

A+ Inspection

Inspection Comments:

B3010 ROOF COVERINGS 7,629 (LF)B30 ROOFING2011 B301004 FLASHINGS & TRIM Flashings - Base

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

A+ Inspection

B3010 ROOF COVERINGS 325 (LF)B30 ROOFING2011 B301004 FLASHINGS & TRIM Flashings - Valley

B3010 ROOF COVERINGS 2,640 (LF)B30 ROOFING2011 B301005 GUTTERS & DOWNSPOUTS Downspouts

Vicenza FAM HSG

ComponentSection Description Quantity (UM)System

Direct Condition Rating Inspection Report by Section

Page 7 of 24April 30, 2020

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

B3010 ROOF COVERINGS 4,336 (LF)B30 ROOFING2011 B301005 GUTTERS & DOWNSPOUTS Gutters

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

B3010 ROOF COVERINGS 7 (EA)B30 ROOFING2011 B301006 ROOF OPENINGS AND SUPPORTS Gravity

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

B3010 ROOF COVERINGS 46 (EA)B30 ROOFING2011 B301006 ROOF OPENINGS AND SUPPORTS Gravity

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- A+ InspectionPaint Rating:

Inspection Comments:

C1010 PARTITIONS 260,000 (SF)C10 INTERIOR CONSTRUCTION2011 C101001 FIXED PARTITIONS Wall - Drywall w/Stud

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

C1010 PARTITIONS 60 (EA)C10 INTERIOR CONSTRUCTION2011 C101005 INTERIOR WINDOWS Interior Windows

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

A+ Inspection

Inspection Comments:

C1020 INTERIOR DOORS 192 (EA)C10 INTERIOR CONSTRUCTION2011 C102001 STANDARD INTERIOR DOORS Wood

700 - Vicenza Bldg ES/MS 700 Unassigned

Vicenza FAM HSG

ComponentSection Description Quantity (UM)System

Direct Condition Rating Inspection Report by Section

Page 8 of 24April 30, 2020

13-Jan-2020 No Inspection Source:

A Inspection

Inspection Comments:

C1020 INTERIOR DOORS 291 (EA)C10 INTERIOR CONSTRUCTION2011 C102002 GLAZED INTERIOR DOORS General

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

A+ Inspection

Inspection Comments:

C1030 SPECIALTIES 6 (EA)C10 INTERIOR CONSTRUCTION2011 C103001 COMPARTMENTS, CUBICLES & TOILET

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

C1030 SPECIALTIES 95 (EA)C10 INTERIOR CONSTRUCTION2011 C103001 COMPARTMENTS, CUBICLES & TOILET

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

C1030 SPECIALTIES 29 (EA)C10 INTERIOR CONSTRUCTION2011 C103001 COMPARTMENTS, CUBICLES & TOILET

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

A+ Inspection

Inspection Comments:

C1030 SPECIALTIES 345 (EA)C10 INTERIOR CONSTRUCTION2011 C103002 TOILET & BATH ACCESSORIES General

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

A+ Inspection

C1030 SPECIALTIES 250 (EA)C10 INTERIOR CONSTRUCTION2011 C103003 MARKER BOARDS & TACK BOARDS General

C1030 SPECIALTIES 300 (EA)C10 INTERIOR CONSTRUCTION2011 C103005 LOCKERS General

Vicenza FAM HSG

ComponentSection Description Quantity (UM)System

Direct Condition Rating Inspection Report by Section

Page 9 of 24April 30, 2020

13-Jan-2020 No Inspection Source:

A+ Inspection

Inspection Comments:

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

A+ Inspection

Inspection Comments:

C1030 SPECIALTIES 1,500 (LF)C10 INTERIOR CONSTRUCTION2011 C103008 COUNTERS Laminated Plastic

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

A+ Inspection

Inspection Comments:

C1030 SPECIALTIES 3,500 (LF)C10 INTERIOR CONSTRUCTION2011 C103009 CABINETS Other

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

A+ Inspection

Inspection Comments:

C2010 STAIR CONSTRUCTION 8 (EA)C20 STAIRS2011 C201001 INTERIOR AND EXTERIOR STAIRS Interior

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- A+ InspectionPaint Rating:

Inspection Comments:

C2010 STAIR CONSTRUCTION 6 (EA)C20 STAIRS2011 C201001 INTERIOR AND EXTERIOR STAIRS Interior

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

C2010 STAIR CONSTRUCTION 1,099 (LF)C20 STAIRS2011 C201090 STAIR HANDRAILS, GUARDRAILS AND

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

C3010 WALL FINISHES 51,000 (SF)C30 INTERIOR FINISHES2011 C301004 TILE & TERRAZZO WALL FINISHES Tile

700 - Vicenza Bldg ES/MS 700 Unassigned

Vicenza FAM HSG

ComponentSection Description Quantity (UM)System

Direct Condition Rating Inspection Report by Section

Page 10 of 24April 30, 2020

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

C3020 FLOOR FINISHES 165,000 (SF)C30 INTERIOR FINISHES2011 C302001 TILE FLOOR FINISHES Ceramic Tile

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

A+ Inspection

Inspection Comments:

C3020 FLOOR FINISHES 13,000 (SF)C30 INTERIOR FINISHES2011 C302003 WOOD FLOORING General

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

A+ Inspection

Inspection Comments:

C3020 FLOOR FINISHES 26,000 (SF)C30 INTERIOR FINISHES2011 C302004 RESILIENT FLOOR FINISHES Composition

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

A Inspection

Inspection Comments:

C3020 FLOOR FINISHES 5,800 (SF)C30 INTERIOR FINISHES2011 C302005 CARPETING General

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

A+ Inspection

Inspection Comments:

C3030 CEILING FINISHES 174,000 (SF)C30 INTERIOR FINISHES2011 C303001 ACOUSTICAL CEILING TILES & PANELS

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- G InspectionPaint Rating:

C3030 CEILING FINISHES 23,000 (SF)C30 INTERIOR FINISHES2011 C303003 PLASTER CEILING FINISHES General

C3030 CEILING FINISHES 174,000 (SF)C30 INTERIOR FINISHES2011 C303005 SUSPENSION SYSTEMS General

Vicenza FAM HSG

ComponentSection Description Quantity (UM)System

Direct Condition Rating Inspection Report by Section

Page 11 of 24April 30, 2020

13-Jan-2020 No Inspection Source:

A+ Inspection

Inspection Comments:

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

D1010 ELEVATORS AND LIFTS 2 (EA)D10 CONVEYING2011 D101002 PASSENGER ELEVATORS Hydraulic Elevators -

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

D2010 PLUMBING FIXTURES 126 (EA)D20 PLUMBING2011 D201001 WATERCLOSETS General

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

D2010 PLUMBING FIXTURES 37 (EA)D20 PLUMBING2011 D201002 URINALS General

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

D2010 PLUMBING FIXTURES 289 (EA)D20 PLUMBING2011 D201004 SINKS General

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

D2010 PLUMBING FIXTURES 4 (EA)D20 PLUMBING2011 D201004 SINKS Kitchen Sink

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

D2010 PLUMBING FIXTURES 12 (EA)D20 PLUMBING2011 D201004 SINKS Service Sink

700 - Vicenza Bldg ES/MS 700 Unassigned

Vicenza FAM HSG

ComponentSection Description Quantity (UM)System

Direct Condition Rating Inspection Report by Section

Page 12 of 24April 30, 2020

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

D2010 PLUMBING FIXTURES 7 (EA)D20 PLUMBING2011 D201005 SHOWERS/TUBS Shower

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan-2020 No Inspection Source:

G- Inspection

Inspection Comments:

D2010 PLUMBING FIXTURES 34 (EA)D20 PLUMBING2011 D201006 DRINKING FOUNTAINS AND COOLERS Drinking

Last Inspection Date: Condition Rating: Used Sampling?

Inspector:

13-Jan- No Inspection Source:

G- Inspection

Inspection Comments:

D2010 PLUMBING FIXTURES 3 (EA)D20 PLUMBING2011 D201090 OTHER PLUMBING FIXTURES Emergency Eye

Last Inspection Date: Condition Rating: Used Sampling?

Inspecto…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .