About this file
This is a Facility Condition Assessment Report (FCAR) for Naples Campus DoDEA schools, documenting the physical condition of three buildings (2057, 2058, and 2059) as of April 28, 2020. The assessment was conducted using the BUILDER Engineered Management System (EMS) Version 3, a standardized DoD process for facility condition evaluations that generates Condition Index (CI) metrics at component, system, building, and site levels.
The Naples Elementary School Building 2057 and Naples Middle School/High School Buildings 2058 and 2059 are all rated Q-2, indicating significant facility conditions requiring attention. Major deficiencies identified include: exterior enclosure systems at end of expected service life with deteriorated stucco and modified bitumen roofing (installed 1996); rooftop air handling units with corrosion and fin damage; chillers with severe corrosion; compromised plumbing infrastructure with calcium buildup and corroded piping; failed interior partitions due to water damage; damaged acoustical ceilings and suspension systems; nonfunctional exterior door coordinators creating security vulnerabilities; and broken radiators throughout Building 2058 inadequate for heating. The assessment inventories building systems across structural/exterior, mechanical, electrical, plumbing, fire protection, and interior finishes using UNIFORMAT classification. Work items spanning 2015-2020 are detailed with quantities, material descriptions, and repair/replacement activities, though costs are listed as $0.00 pending detailed engineering and budget development. The report includes site plans, system summaries by building, remaining service life details for components, and direct condition ratings for all component-sections inspected.
View the file
Other files
Show all 19
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
"identification only"
II. SCHOOL PHYSICAL DESCRIPTION
The summary below provides a physical description of the campus. When multiple systems or materials are present, the predominant system or material observed during the facility condition assessment is shown.
a. STRUCTURAL/EXTERIOR ENCLOSURE: The building exterior is stucco. Roof coverings are modified bitumen. Exterior doors are pre-finished aluminum with glazing. Window systems are pre-finished aluminum with double-glazing.
b. INTERIORS: Floor finishes used include ceramic tile and carpet. Walls are painted hard surfaces. Ceilings are acoustical lay-in tiles.
c. MECHANICAL: Campus facilities have heating, which is provided by boilers and package units. Most campus facilities have air conditioning, which is provided by chilled water. The campus has two elevators.
d. ELECTRICAL: Some electrical upgrades have been completed at Building 2057 to support the computer network, but most wiring appears to be original. There were no electrical upgrades completed at the remaining facilities. Lighting is typically lay-in fixtures with fluorescent lamps. Ground-fault circuit interrupter
(GFCI) receptacles appear to be present in required locations. The campus has two intercom systems.
There are security systems, and security cameras are present.
e. PLUMBING: Plumbing fixtures have been partially upgraded, but piping appears to be original. Domestic hot water is provided by indirect water heaters and gas-fired storage water heaters.
f. SITE: The campus has parking for approximately 166 privately owned vehicles. In addition, Naples
Elementary School has four playgrounds.
g. LIFE SAFETY: Fire safety inspection reports were not available for review.
III. OBSERVATIONS
The following observations were made: Exterior door security was not reported to be a problem. However, assessment findings noted most sample tested double-leaf door coordinators were nonfunctional, specifically the door coordinators do not close consecutively as intended if the inactive door is opened before the active door resulting in unsecured doors. This malfunction is possibly caused by misalignment of the field maintenance repairs to locksets, missing hardware components, and closers in need of manual set adjustment. Overall the exterior enclosures systems at the main Naples Campus are at the end of their expected service life but are of good quality with various levels of deterioration.
In Building 2057, Art Room and Information Center, there are some isolated areas of ceramic flooring that are in poor condition which are deficient because of major cracking and upheaving files. In both Buildings 2057 and 2058, acoustical ceiling tiles and the suspension system around the newly installed cabinetry have been damaged. In Building 2057 the cabinetry and countertops in the Kitchenette Room 111C, which is shared between Rooms 111 and 113, are in particularly poor condition. The staff reported the next phase of cabinetry replacement has been scheduled. In Building 2058 is was observed and reported in Room 109, the partition (plaster) has failed due to a domestic piping leak from the adjacent restroom. The wall covering is significantly deteriorated with both water surface damage and failed paint finish.
Overall the mechanical, electrical, and plumbing systems were observed in fair condition with some maintenance updates noted since the last facility condition assessment throughout the campus. It appears outside air is being introduced into the HVAC system at the main campus. At Building 2057, the rooftop air handling units are corroded, have major fin damage, and corrosion on the vents. The chillers are operational but have severe fin damage and corrosion to the units as well as the piping. In Building 2059, Room M102, the piping of the hot and chilled water distribution pumps had calcium build-up and were corroded. Several radiators throughout Building 2058 are broken and/or reported by staff to not generate enough heat for a comfortable work environment. Additionally, in Building 2058, the ductwork over the Gym has extensive damage with holes, missing screws, and a large piece of protruding metal. In Buildings 2058 and 2057, new toilets, urinals, and sinks in the common areas were observed and reported. The transformer in Building 2057, Room M104, has excess noise and signs of a previous failure were observed during the assessment.
The Facility Utilization Survey (FUS) drawings have been updated to reflect the assessment findings, including room-use and room number changes observed throughout the campus. No buildings were added or removed from the site since the time of the previous assessment. It was observed at Naples ES Building 2057, Room 3 (967 SF), is being used by the Naples Community Superintendent's Office. Naples MS/HS Bldg 2059 is shared equally between Naples Elementary School and Naples Middle School/High School.
Finally, the assessment team observed some damage to the site work surrounding the campus; the new epoxy/gravel coating on sidewalks appears to be too thin and is failing prematurely.
Building 2057 remained a Q-2.
Building 2058 remained a Q-2.
Building 2059 remained a Q-2.
Appendix A
Site Plan
Appendix B
Overview of Sustainment Management System (SMS) and
BUILDER™ Engineered Management System (EMS)
Overview of Sustainment Management System (SMS) and BUILDER™ Engineered Management System (EMS)
Sustainment Management System (SMS)
The Sustainment Management System (SMS) is a suite of web-based software applications developed by the
United States Army Corps of Engineers - Engineer Research Development Center - Construction Engineering
Research Laboratory (USACE-ERDC-CERL) to help facility engineers, technicians, and managers decide when, where, and how to best maintain the built environment. The SMS modules include BUILDER™ and
ROOFER™ for assessing building conditions, PAVER™ for pavements, and RAILER™ for railroad infrastructure.
Because real property assets are so vast and diverse, a "knowledge-based" philosophy drives the SMS process. The process starts with the automated download of real property data, and then more detailed system inventory is modeled and/or collected which identifies components and their key life cycle attributes such as the age and material.
From this inventory, Condition Index (CI) measures for each component are predicted based on its expected stage in the life cycle. Objective and repeatable inspections can then be performed on various components to verify their condition with respect to the expected life cycle deterioration. The level of detail and frequency of these inspections are not fixed like other processes; they are dependent on knowledge of component criticality, the expected and measured condition and rate of deterioration, and remaining maintenance and service life. This "knowledge-based" inspection focuses attention to the most critical components at the time.
In addition to these condition assessments, functionality assessments can be performed to evaluate user requirement changes, compliance and obsolescence issues. This provides a comprehensive picture of the overall performance of real property assets and their key components.
BUILDER Engineered Management System (EMS)
In September 2013, the Under Secretary of Defense, Frank Kendall, issued a memo indicating the Department of Defense requires a standardized process for facility condition assessments to ensure consistent and reliable data necessary for sound strategic investment decisions in managing the Department's built environment.
Establishing a DoD-wide facility condition assessment process will contribute to a more credible DoD asset management program and will support better buying power by allowing Department leadership to better target fiscal resources to those facilities most in need of investment. Further, adopting a standard process will help ensure that condition data will be audit-ready in accordance with the Under Secretary of Defense (Comptroller)'s "Financial Improvement and Readiness Guidance" issued in March 2013.
The facility condition assessment process used to generate this report is based on BUILDER Engineered Management System (EMS) Version 3. BUILDER EMS was developed by the Engineer Research and Development Center.
The facility condition assessment process addresses the requirements necessary for routine building facility management activities, including long range budgeting and sustainment/restoration/modernization (SRM) planning. This assessment approach provides an objective and generalized framework to help to identify problem areas that will require more investigation through detailed or specialized assessments. There may be times when detailed engineering assessments may be required to diagnose specific problems.
BUILDER is a software application for building asset life cycle management. The primary focus of BUILDER is work plan development. BUILDER stores real property building information and more detailed system inventory is modeled and/or collected which identifies building components and their key life cycle attributes such as the age, material and capacity. Inspections are then performed on the various components to determine an objective and repeatable Condition Index (CI) measure, which relates the general physical health of the asset.
With information about condition and remaining service life, BUILDER guides the development of short- and long-range work plans based on sound investment strategies, prioritization criteria, and budget constraints.
BUILDER consolidates a variety of building-related management issues into a single decision-support package.
The system gives functional managers and decision-makers instant access to building inventory, current building condition indices, and probabilities condition prediction models. It also employs a patented knowledge-based inspection scheduling process. BUILDER improves the allocation process and return of building life cycle investments by directing resources to the most condition critical components to avoid costly repair penalty costs, as well as, the most mission critical components to manage risks of failure.
BUILDER Facility Condition Assessment Process
Facility Condition Assessment (FCA) is one of the primary processes of a facility life cycle asset management program. The FCA process results in a better understanding of the physical condition and readiness of an organization's buildings along with the reliability of its systems and components. It also facilitates the identification of work candidates for facility SRM repair projects. It is a critical aspect of the shift towards a proactive versus reactive facility management strategy. Instead of keeping facilities operational by relying primarily on corrective repairs (after a system or component has failed due to significant loss of function), it focuses on condition-based repairs which can be planned prior to failure. A condition-based approach can result in higher performing facilities at lower life cycle costs.
Prior to an assessment, knowledge of the building systems and components present is necessary, since assessments are done against these components, not against the building as a whole. This information about the systems and components that make up a building is called the BUILDER Inventory. BUILDER has a vast library of predefined components which an assessor will select from, and the inventory collection process involves identifying the type, quantity, and year installed for all pertinent components. These components are also organized into systems and sub-systems according to the UNIFORMAT classification hierarchy. When a specific instance of a component is recorded, this is called a component-section in BUILDER, and represents a single component assembly or collection of like components to be managed as a single unit. The BUILDER facility condition assessment process directly supports the computation of a condition index for building component-sections, known as the Component-Section Condition Index (CSCI), which is the fundamental metric used in BUILDER. The CSCI is aggregated to compute a condition index metric at the system (SCI), building (BCI), and site/organizational levels.
A condition-based facility repair strategy requires condition information be collected at a component level, and that this condition information relate to loss of component function. Every component of a building has a primary function that it performs. This function is the reason that the component was constructed or installed in the building. It may also serve a number of secondary or tertiary functions. For example, for a door component, the primary function is to provide safe entry/egress of authorized movements while limiting unwanted movements of people (security), or other objects (water or moisture). The secondary functions would relate to aesthetics and thermal and air control, among others.
The condition assessment process in BUILDER uses the Direct Rating method.
1. The Direct Rating method uses a single qualitative rating for each component based on condition observations. This also results in a condition index metric, which relates to the level of deterioration and the loss of function. This abbreviated Direct Rating approach is often better suited to initial baseline assessments where the components are inventoried, and data is initially loaded into BUILDER.
BUILDER Report Overview
Outlined below is a summary and description of the reports that are included.
Appendix C - Facility Summary Report – Provides a summation of FCA results. A Building Summary Report is included for each building that is considered permanent or semi-permanent construction and receives a Q-Rating. The purpose of this report is to provide a general overview of the building including key performance indicators. This report was generated using DoDEA's calculated Replacement Cost overwriting the data populated from real property records. This provides a more accurate Replacement Cost due to the inconsistencies with real property reconciliation between DoDEA and the Services. The DoD Facility Pricing Guide and DoDEA measurements for building square footage were used to calculate the Replacement Cost.
Appendix D - System Summary Report – Provides an overview of inspected systems and their condition index rating. A Building System Condition Index (SCI) By System Report is included for each building that is considered permanent or semi-permanent construction and receives a Q-Rating.
Appendix E - Work Items By Building – Provides a list of work items requiring repair or replacement of system/components, including budgets, for project planning purposes. A Work Plan Detail by Year Report is included for each building that is considered permanent or semi-permanent construction and receives a Q- Rating.
Appendix F - Remaining Service Life (RSL) Detail Report – Provides a detailed overview of systems/components, including descriptions, and their respective age, remaining service life and remaining paint life.
Appendix G - Direct Condition Rating Inspection By Section Report – Provides a summary of direct condition ratings for each component-section collected within each facility.
Appendix H - System Inventory Report – Provides a list of details for each component-section collected within each facility.
Appendix I - Fire Inspection Safety Report – This appendix is only applicable when a Fire Inspection Safety Report is provided at the time of the assessment for inclusion in the Facility Condition Assessment Report.
The report provides a summary of the recent Fire Inspection to include any deficiencies.
Note: All reports are generated from the DoDEA BUILDER database. In the event line items within a report are compressed and difficult to read, this is a result of how BUILDER generates the report. It is our understanding that CERL is working to update the report format.
Appendix C
Facility Summary Report
Appendix D
System Summary Report
Appendix E
Work Items By Building
B20 EXTERIOR ENCLOSURE2015
1996 B201004 PARAPETS General
1,738 (LF) Replace 0.00B2010 EXTERIOR WALLS
-- Replace B2010 EXTERIOR WALLS 1996 B201004 PARAPETS General
2004 B B201004 PARAPETS General
325 (LF) Replace 0.00B2010 EXTERIOR WALLS
-- Replace B2010 EXTERIOR WALLS 2004b B201004 PARAPETS General
B30 ROOFING2015
1996 B301002 LOW SLOPE ROOF SYSTEMS Modified Bitumen
60,131 (SF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301002 LOW SLOPE ROOF SYSTEMS Modified Bitumen
1996 B301003 ROOF INSULATION & FILL General
60,131 (SF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301003 ROOF INSULATION & FILL Unknown
1996 B301004 FLASHINGS & TRIM Flashings - Base
3,655 (LF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301004 FLASHINGS & TRIM Flashings - Base
1996 B301004 FLASHINGS & TRIM Flashings - Cap
3,371 (LF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301004 FLASHINGS & TRIM Flashings - Cap
1996 B301004 FLASHINGS & TRIM Flashings - Flashing Penetrations
76 (EA) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301004 FLASHINGS & TRIM Flashings - Flashing Penetrations
1996 A B301004 FLASHINGS & TRIM Flashings - Apron
248 (LF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301004 FLASHINGS & TRIM Flashings - Apron
Support Site
Year System
Completion Date
Qty (UM) CostActivity
Section Description
Component Status
-- Description
ScoreProject
Naples ES (HE5549)2057 - Naples ES Bldg 2057
Cost Book: Reference
Work Items by Building Report
Page 1 of 28April 28, 2020
1996 A B301004 FLASHINGS & TRIM General
749 (LF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301004 FLASHINGS & TRIM General
2004 B301004 FLASHINGS & TRIM Flashings - Cap
506 (LF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 2004 B301004 FLASHINGS & TRIM Flashings - Cap
2004 B301090 OTHER ROOFING Walkway Protection
222 (SF) Repair 0.00B3010 ROOF COVERINGS
-- Repair B3010 ROOF COVERINGS 2004 B301090 OTHER ROOFING Walkway Protection
2004 A B301004 FLASHINGS & TRIM Flashings - Flashing Penetrations
19 (EA) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 2004a B301004 FLASHINGS & TRIM Flashings - Flashing Penetrations
2004 B B301002 LOW SLOPE ROOF SYSTEMS Modified Bitumen
6,640 (SF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 2004b B301002 LOW SLOPE ROOF SYSTEMS Modified Bitumen
2004 B B301004 FLASHINGS & TRIM Flashings - Base
326 (LF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 2004b B301004 FLASHINGS & TRIM Flashings - Base
C10 INTERIOR CONSTRUCTION2015
2004 C101001 FIXED PARTITIONS Wall - Plaster w/Stud Framing
15,474 (SF) Paint 0.00C1010 PARTITIONS
-- Paint C1010 PARTITIONS 2004 C101001 FIXED PARTITIONS General
C30 INTERIOR FINISHES2015
1996 C302005 CARPETING General
17,701 (SF) Replace 0.00C3020 FLOOR FINISHES
-- Replace C3020 FLOOR FINISHES 1996 C302005 CARPETING General
Support Site
Year System
Completion Date
Qty (UM) CostActivity
Section Description
Component Status
-- Description
ScoreProject
Naples ES (HE5549)2057 - Naples ES Bldg 2057
Cost Book: Reference
Work Items by Building Report
Page 2 of 28April 28, 2020
1996 C303001 ACOUSTICAL CEILING TILES & PANELS General
88,900 (SF) Replace 0.00C3030 CEILING FINISHES
-- Replace C3030 CEILING FINISHES 1996 C303001 ACOUSTICAL CEILING TILES & PANELS General
1996 C303005 SUSPENSION SYSTEMS General
90,176 (SF) Replace 0.00C3030 CEILING FINISHES
-- Replace C3030 CEILING FINISHES 1996 C303005 SUSPENSION SYSTEMS General
D20 PLUMBING2015
1996 D201006 DRINKING FOUNTAINS AND COOLERS Drinking Fountain
8 (EA) Repair 0.00D2010 PLUMBING FIXTURES
-- Repair D2010 PLUMBING FIXTURES D201006 DRINKING FOUNTAINS AND COOLERS General
1996 D203002 VENT PIPE & FITTINGS General
1,340 (EA) Replace 0.00D2030 SANITARY WASTE
-- Replace D2030 SANITARY WASTE D203002 VENT PIPE & FITTINGS General
1996 D204002 ROOF DRAINS Other
67 (EA) Replace 0.00D2040 RAIN WATER DRAINAGE
-- Replace D2040 RAIN WATER DRAINAGE 1996 3 inch D204002 ROOF DRAINS Other
D30 HVAC2015
1996 D304003 HOT WATER DISTRIBUTION SYSTEMS General
1,000 (MBH) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS D304003 HOT WATER DISTRIBUTION SYSTEMS General
1996 D304006 CHILLED WATER DISTRIBUTION SYSTEMS General
200 (TON) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS D304006 CHILLED WATER DISTRIBUTION SYSTEMS General
1996 AHU-055 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS AHU-055 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
Support Site
Year System
Completion Date
Qty (UM) CostActivity
Section Description
Component Status
-- Description
ScoreProject
Naples ES (HE5549)2057 - Naples ES Bldg 2057
Cost Book: Reference
Work Items by Building Report
Page 3 of 28April 28, 2020
1996 AHU-061 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS AHU-061 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1996 AHU-1 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS AHU-1 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1996 AHU-2 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS AHU-2 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1996 AHU-3 D304008 AIR HANDLING UNITS Rooftop - 10000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS AHU-3 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1996 AHU-4 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS AHU-4 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1996 D306002 ELECTRONIC CONTROLS General
128 (EA) Replace 0.00D3060 CONTROLS & INSTRUMENTATION
-- Replace D3060 CONTROLS & INSTRUMENTATION D306001 HVAC CONTROLS General
D40 FIRE PROTECTION2015
1996 D401001 FIRE ALARM DISTRIBUTION Other
108,693 (SF) Replace 0.00D4010 FIRE ALARM AND DETECTION SYSTEMS
-- Replace D4010 FIRE ALARM AND DETECTION SYSTEMS D401001 FIRE ALARM DISTRIBUTION General
B20 EXTERIOR ENCLOSURE2016
1996 B201004 PARAPETS General
1,738 (LF) Replace 0.00B2010 EXTERIOR WALLS
-- Replace B2010 EXTERIOR WALLS 1996 B201004 PARAPETS General
Support Site
Year System
Completion Date
Qty (UM) CostActivity
Section Description
Component Status
-- Description
ScoreProject
Naples ES (HE5549)2057 - Naples ES Bldg 2057
Cost Book: Reference
Work Items by Building Report
Page 4 of 28April 28, 2020
2004 B B201004 PARAPETS General
325 (LF) Replace 0.00B2010 EXTERIOR WALLS
-- Replace B2010 EXTERIOR WALLS 2004b B201004 PARAPETS General
B30 ROOFING2016
1996 B301002 LOW SLOPE ROOF SYSTEMS Modified Bitumen
60,131 (SF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301002 LOW SLOPE ROOF SYSTEMS Modified Bitumen
1996 B301003 ROOF INSULATION & FILL General
60,131 (SF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301003 ROOF INSULATION & FILL Unknown
1996 B301004 FLASHINGS & TRIM Flashings - Base
3,655 (LF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301004 FLASHINGS & TRIM Flashings - Base
1996 B301004 FLASHINGS & TRIM Flashings - Cap
3,371 (LF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301004 FLASHINGS & TRIM Flashings - Cap
1996 B301004 FLASHINGS & TRIM Flashings - Flashing Penetrations
76 (EA) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301004 FLASHINGS & TRIM Flashings - Flashing Penetrations
1996 A B301004 FLASHINGS & TRIM Flashings - Apron
248 (LF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301004 FLASHINGS & TRIM Flashings - Apron
1996 A B301004 FLASHINGS & TRIM General
749 (LF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301004 FLASHINGS & TRIM General
Support Site
Year System
Completion Date
Qty (UM) CostActivity
Section Description
Component Status
-- Description
ScoreProject
Naples ES (HE5549)2057 - Naples ES Bldg 2057
Cost Book: Reference
Work Items by Building Report
Page 5 of 28April 28, 2020
2004 B301004 FLASHINGS & TRIM Flashings - Cap
506 (LF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 2004 B301004 FLASHINGS & TRIM Flashings - Cap
2004 A B301004 FLASHINGS & TRIM Flashings - Flashing Penetrations
19 (EA) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 2004a B301004 FLASHINGS & TRIM Flashings - Flashing Penetrations
2004 B B301002 LOW SLOPE ROOF SYSTEMS Modified Bitumen
6,640 (SF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 2004b B301002 LOW SLOPE ROOF SYSTEMS Modified Bitumen
2004 B B301004 FLASHINGS & TRIM Flashings - Base
326 (LF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 2004b B301004 FLASHINGS & TRIM Flashings - Base
C10 INTERIOR CONSTRUCTION2016
2004 C101001 FIXED PARTITIONS Wall - Plaster w/Stud Framing
15,474 (SF) Paint 0.00C1010 PARTITIONS
-- Paint C1010 PARTITIONS 2004 C101001 FIXED PARTITIONS General
C30 INTERIOR FINISHES2016
1996 C302005 CARPETING General
17,701 (SF) Replace 0.00C3020 FLOOR FINISHES
-- Replace C3020 FLOOR FINISHES 1996 C302005 CARPETING General
1996 C303001 ACOUSTICAL CEILING TILES & PANELS General
88,900 (SF) Replace 0.00C3030 CEILING FINISHES
-- Replace C3030 CEILING FINISHES 1996 C303001 ACOUSTICAL CEILING TILES & PANELS General
1996 C303005 SUSPENSION SYSTEMS General
90,176 (SF) Replace 0.00C3030 CEILING FINISHES
-- Replace C3030 CEILING FINISHES 1996 C303005 SUSPENSION SYSTEMS General
Support Site
Year System
Completion Date
Qty (UM) CostActivity
Section Description
Component Status
-- Description
ScoreProject
Naples ES (HE5549)2057 - Naples ES Bldg 2057
Cost Book: Reference
Work Items by Building Report
Page 6 of 28April 28, 2020
D20 PLUMBING2016
1996 D203002 VENT PIPE & FITTINGS General
1,340 (EA) Replace 0.00D2030 SANITARY WASTE
-- Replace D2030 SANITARY WASTE D203002 VENT PIPE & FITTINGS General
1996 D204002 ROOF DRAINS Other
67 (EA) Replace 0.00D2040 RAIN WATER DRAINAGE
-- Replace D2040 RAIN WATER DRAINAGE 1996 3 inch D204002 ROOF DRAINS Other
D30 HVAC2016
1996 D304003 HOT WATER DISTRIBUTION SYSTEMS General
1,000 (MBH) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS D304003 HOT WATER DISTRIBUTION SYSTEMS General
1996 D304006 CHILLED WATER DISTRIBUTION SYSTEMS General
200 (TON) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS D304006 CHILLED WATER DISTRIBUTION SYSTEMS General
1996 AHU-055 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS AHU-055 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1996 AHU-061 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS AHU-061 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1996 AHU-1 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS AHU-1 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1996 AHU-2 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS AHU-2 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
Support Site
Year System
Completion Date
Qty (UM) CostActivity
Section Description
Component Status
-- Description
ScoreProject
Naples ES (HE5549)2057 - Naples ES Bldg 2057
Cost Book: Reference
Work Items by Building Report
Page 7 of 28April 28, 2020
1996 AHU-3 D304008 AIR HANDLING UNITS Rooftop - 10000 CFM
-- Replace D3040 DISTRIBUTION SYSTEMS AHU-3 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1996 AHU-4 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS AHU-4 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1996 D305003 FAN COIL UNITS Cab Mount, Two Pipe - 2 ton
57 (EA) Repair 0.00D3050 TERMINAL & PACKAGE UNITS
-- Repair D3050 TERMINAL & PACKAGE UNITS Duct mount units D305003 FAN COIL UNITS Cab Mount, Two Pipe - 2 ton
1996 D306002 ELECTRONIC CONTROLS General
128 (EA) Replace 0.00D3060 CONTROLS & INSTRUMENTATION
-- Replace D3060 CONTROLS & INSTRUMENTATION D306001 HVAC CONTROLS General
D40 FIRE PROTECTION2016
1996 D401001 FIRE ALARM DISTRIBUTION Other
108,693 (SF) Replace 0.00D4010 FIRE ALARM AND DETECTION SYSTEMS
-- Replace D4010 FIRE ALARM AND DETECTION SYSTEMS D401001 FIRE ALARM DISTRIBUTION General
2004 D401001 FIRE ALARM DISTRIBUTION Other
11,612 (SF) Repair 0.00D4010 FIRE ALARM AND DETECTION SYSTEMS
-- Repair D4010 FIRE ALARM AND DETECTION SYSTEMS 2004 D401001 FIRE ALARM DISTRIBUTION General
B20 EXTERIOR ENCLOSURE2017
1996 B201001 EXTERIOR CLOSURE Stucco
21,900 (SF) Paint 0.00B2010 EXTERIOR WALLS
-- Paint B2010 EXTERIOR WALLS 1996 B201001 EXTERIOR CLOSURE Stucco
1996 B201004 PARAPETS General
1,738 (LF) Replace 0.00B2010 EXTERIOR WALLS
-- Replace B2010 EXTERIOR WALLS 1996 B201004 PARAPETS General
Support Site
Year System
Completion Date
Qty (UM) CostActivity
Section Description
Component Status
-- Description
ScoreProject
Naples ES (HE5549)2057 - Naples ES Bldg 2057
Cost Book: Reference
Work Items by Building Report
Page 8 of 28April 28, 2020
1996 B201006 BALCONY WALLS & HANDRAILS Handrailing
174 (LF) Paint 0.00B2010 EXTERIOR WALLS
-- Paint B2010 EXTERIOR WALLS 1996 B201006 BALCONY WALLS & HANDRAILS Handrailing
2004 B201001 EXTERIOR CLOSURE Stucco
6,136 (SF) Paint 0.00B2010 EXTERIOR WALLS
-- Paint B2010 EXTERIOR WALLS 2004 B201001 EXTERIOR CLOSURE Stucco
2004 B201006 BALCONY WALLS & HANDRAILS Handrailing
75 (LF) Paint 0.00B2010 EXTERIOR WALLS
-- Paint B2010 EXTERIOR WALLS 2004 B201006 BALCONY WALLS & HANDRAILS Handrailing
2004 B201007 EXTERIOR SOFFITS General
774 (SF) Paint 0.00B2010 EXTERIOR WALLS
-- Paint B2010 EXTERIOR WALLS 2004 B201007 EXTERIOR SOFFITS General
2004 B B201004 PARAPETS General
325 (LF) Replace 0.00B2010 EXTERIOR WALLS
-- Replace B2010 EXTERIOR WALLS 2004b B201004 PARAPETS General
2013 B201001 EXTERIOR CLOSURE Stucco
6,765 (SF) Paint 0.00B2010 EXTERIOR WALLS
-- Paint B2010 EXTERIOR WALLS 2013 B201001 EXTERIOR CLOSURE Stucco
2013 B201005 EXTERIOR LOUVERS & SCREENS General
1 (SF) Paint 0.00B2010 EXTERIOR WALLS
-- Paint B2010 EXTERIOR WALLS 2013 B201005 EXTERIOR LOUVERS & SCREENS General
2013 B201006 BALCONY WALLS & HANDRAILS Handrailing
51 (LF) Paint 0.00B2010 EXTERIOR WALLS
-- Paint B2010 EXTERIOR WALLS 2013 B201006 BALCONY WALLS & HANDRAILS Handrailing
2013 B201007 EXTERIOR SOFFITS General
607 (SF) Paint 0.00B2010 EXTERIOR WALLS
-- Paint B2010 EXTERIOR WALLS 2013 B201007 EXTERIOR SOFFITS General
Support Site
Year System
Completion Date
Qty (UM) CostActivity
Section Description
Component Status
-- Description
ScoreProject
Naples ES (HE5549)2057 - Naples ES Bldg 2057
Cost Book: Reference
Work Items by Building Report
Page 9 of 28April 28, 2020
1996 B203090 OTHER EXTERIOR SPECIALTY DOORS Emergency Egress Door
35 (EA) Replace 0.00B2030 EXTERIOR DOORS
-- Replace B2030 EXTERIOR DOORS 1996 B203002 GLAZED DOORS General
B30 ROOFING2017
1996 B301002 LOW SLOPE ROOF SYSTEMS Modified Bitumen
60,131 (SF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301002 LOW SLOPE ROOF SYSTEMS Modified Bitumen
1996 B301003 ROOF INSULATION & FILL General
60,131 (SF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301003 ROOF INSULATION & FILL Unknown
1996 B301004 FLASHINGS & TRIM Flashings - Base
3,655 (LF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301004 FLASHINGS & TRIM Flashings - Base
1996 B301004 FLASHINGS & TRIM Flashings - Cap
3,371 (LF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301004 FLASHINGS & TRIM Flashings - Cap
1996 B301004 FLASHINGS & TRIM Flashings - Flashing Penetrations
76 (EA) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301004 FLASHINGS & TRIM Flashings - Flashing Penetrations
1996 B301090 OTHER ROOFING Walkway Protection
552 (SF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301090 OTHER ROOFING Walkway Protection
1996 A B301004 FLASHINGS & TRIM Flashings - Apron
248 (LF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301004 FLASHINGS & TRIM Flashings - Apron
Support Site
Year System
Completion Date
Qty (UM) CostActivity
Section Description
Component Status
-- Description
ScoreProject
Naples ES (HE5549)2057 - Naples ES Bldg 2057
Cost Book: Reference
Work Items by Building Report
Page 10 of 28April 28, 2020
1996 A B301004 FLASHINGS & TRIM General
749 (LF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301004 FLASHINGS & TRIM General
1996 B B301004 FLASHINGS & TRIM General
746 (LF) Paint 0.00B3010 ROOF COVERINGS
-- Paint B3010 ROOF COVERINGS 1996 Stucco Fascia B301004 FLASHINGS & TRIM Other
2004 B301004 FLASHINGS & TRIM Flashings - Cap
506 (LF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 2004 B301004 FLASHINGS & TRIM Flashings - Cap
2004 B301004 FLASHINGS & TRIM General
170 (LF) Paint 0.00B3010 ROOF COVERINGS
-- Paint B3010 ROOF COVERINGS 2004 Stucco Fascia B301004 FLASHINGS & TRIM Other
2004 B301005 GUTTERS & DOWNSPOUTS Downspouts
159 (LF) Paint 0.00B3010 ROOF COVERINGS
-- Paint B3010 ROOF COVERINGS 2004 B301005 GUTTERS & DOWNSPOUTS Downspouts
2004 B301090 OTHER ROOFING Walkway Protection
222 (SF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 2004 B301090 OTHER ROOFING Walkway Protection
2004 A B301004 FLASHINGS & TRIM Flashings - Flashing Penetrations
19 (EA) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 2004a B301004 FLASHINGS & TRIM Flashings - Flashing Penetrations
2004 B B301002 LOW SLOPE ROOF SYSTEMS Modified Bitumen
6,640 (SF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 2004b B301002 LOW SLOPE ROOF SYSTEMS Modified Bitumen
2004 B B301004 FLASHINGS & TRIM Flashings - Base
326 (LF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 2004b B301004 FLASHINGS & TRIM Flashings - Base
Support Site
Year System
Completion Date
Qty (UM) CostActivity
Section Description
Component Status
-- Description
ScoreProject
Naples ES (HE5549)2057 - Naples ES Bldg 2057
Cost Book: Reference
Work Items by Building Report
Page 11 of 28April 28, 2020
2013 B B301004 FLASHINGS & TRIM General
121 (LF) Paint 0.00B3010 ROOF COVERINGS
-- Paint B3010 ROOF COVERINGS 2013 Stucco Fascia B301004 FLASHINGS & TRIM Other
C10 INTERIOR CONSTRUCTION2017
1996 C101001 FIXED PARTITIONS Wall - Plaster w/Stud Framing
109,077 (SF) Paint 0.00C1010 PARTITIONS
-- Paint C1010 PARTITIONS 1996 C101001 FIXED PARTITIONS General
2004 C101001 FIXED PARTITIONS Wall - Plaster w/Stud Framing
15,474 (SF) Paint 0.00C1010 PARTITIONS
-- Paint C1010 PARTITIONS 2004 C101001 FIXED PARTITIONS General
1996 C103001 COMPARTMENTS, CUBICLES & TOILET PARTITIONS Toilet Partitions
52 (EA) Replace 0.00C1030 SPECIALTIES
-- Replace C1030 SPECIALTIES 1996 C103001 COMPARTMENTS, CUBICLES & TOILET PARTITIONS Toilet Partitions
1996 C103005 LOCKERS General
882 (EA) Replace 0.00C1030 SPECIALTIES
-- Replace C1030 SPECIALTIES 1996 C103005 LOCKERS General
1996 C103008 COUNTERS Laminated Plastic
327 (LF) Replace 0.00C1030 SPECIALTIES
-- Replace C1030 SPECIALTIES 1996 C103008 COUNTERS General
C20 STAIRS2017
1996 C201090 STAIR HANDRAILS, GUARDRAILS AND ACCESSORIES General
227 (LF) Paint 0.00C2010 STAIR CONSTRUCTION
-- Paint C2010 STAIR CONSTRUCTION 1996 C201090 STAIR HANDRAILS, GUARDRAILS AND ACCESSORIES General
2004 C201090 STAIR HANDRAILS, GUARDRAILS AND ACCESSORIES General
115 (LF) Paint 0.00C2010 STAIR CONSTRUCTION
-- Paint C2010 STAIR CONSTRUCTION 2004 C201090 STAIR HANDRAILS, GUARDRAILS AND ACCESSORIES General
Support Site
Year System
Completion Date
Qty (UM) CostActivity
Section Description
Component Status
-- Description
ScoreProject
Naples ES (HE5549)2057 - Naples ES Bldg 2057
Cost Book: Reference
Work Items by Building Report
Page 12 of 28April 28, 2020
C30 INTERIOR FINISHES2017
1996 C302005 CARPETING General
17,701 (SF) Replace 0.00C3020 FLOOR FINISHES
-- Replace C3020 FLOOR FINISHES 1996 C302005 CARPETING General
1996 C303001 ACOUSTICAL CEILING TILES & PANELS General
88,900 (SF) Replace 0.00C3030 CEILING FINISHES
-- Replace C3030 CEILING FINISHES 1996 C303001 ACOUSTICAL CEILING TILES & PANELS General
1996 C303005 SUSPENSION SYSTEMS General
90,176 (SF) Replace 0.00C3030 CEILING FINISHES
-- Replace C3030 CEILING FINISHES 1996 C303005 SUSPENSION SYSTEMS General
D20 PLUMBING2017
1996 D201006 DRINKING FOUNTAINS AND COOLERS Drinking Fountain
8 (EA) Replace 0.00D2010 PLUMBING FIXTURES
-- Replace D2010 PLUMBING FIXTURES D201006 DRINKING FOUNTAINS AND COOLERS General
1996 A D201001 WATERCLOSETS General
73 (EA) Replace 0.00D2010 PLUMBING FIXTURES
-- Replace D2010 PLUMBING FIXTURES D201001 WATERCLOSETS General
1996 D203002 VENT PIPE & FITTINGS General
1,340 (EA) Replace 0.00D2030 SANITARY WASTE
-- Replace D2030 SANITARY WASTE D203002 VENT PIPE & FITTINGS General
1996 D204002 ROOF DRAINS Other
67 (EA) Replace 0.00D2040 RAIN WATER DRAINAGE
-- Replace D2040 RAIN WATER DRAINAGE 1996 3 inch D204002 ROOF DRAINS Other
D30 HVAC2017
Support Site
Year System
Completion Date
Qty (UM) CostActivity
Section Description
Component Status
-- Description
ScoreProject
Naples ES (HE5549)2057 - Naples ES Bldg 2057
Cost Book: Reference
Work Items by Building Report
Page 13 of 28April 28, 2020
1996 D304003 HOT WATER DISTRIBUTION SYSTEMS General
1,000 (MBH) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS D304003 HOT WATER DISTRIBUTION SYSTEMS General
1996 D304006 CHILLED WATER DISTRIBUTION SYSTEMS General
200 (TON) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS D304006 CHILLED WATER DISTRIBUTION SYSTEMS General
1996 AHU-055 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS AHU-055 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1996 AHU-061 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS AHU-061 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1996 AHU-1 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS AHU-1 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1996 AHU-2 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS AHU-2 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1996 AHU-3 D304008 AIR HANDLING UNITS Rooftop - 10000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS AHU-3 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1996 AHU-4 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS AHU-4 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1996 D305003 FAN COIL UNITS Cab Mount, Two Pipe - 1 ton
24 (EA) Replace 0.00D3050 TERMINAL & PACKAGE UNITS
-- Replace D3050 TERMINAL & PACKAGE UNITS Hallway wall units D305003 FAN COIL UNITS Cab Mount, Two Pipe - 1 ton
Support Site
Year System
Completion Date
Qty (UM) CostActivity
Section Description
Component Status
-- Description
ScoreProject
Naples ES (HE5549)2057 - Naples ES Bldg 2057
Cost Book: Reference
Work Items by Building Report
Page 14 of 28April 28, 2020
2004 D305003 FAN COIL UNITS Duct Mount, 2 Pipe - 1 ton
8 (EA) Repair 0.00D3050 TERMINAL & PACKAGE UNITS
-- Repair D3050 TERMINAL & PACKAGE UNITS 2004 Duct mount units D305003 FAN COIL UNITS General
1996 D306002 ELECTRONIC CONTROLS General
128 (EA) Replace 0.00D3060 CONTROLS & INSTRUMENTATION
-- Replace D3060 CONTROLS & INSTRUMENTATION D306001 HVAC CONTROLS General
D40 FIRE PROTECTION2017
1996 D401001 FIRE ALARM DISTRIBUTION Other
108,693 (SF) Replace 0.00D4010 FIRE ALARM AND DETECTION SYSTEMS
-- Replace D4010 FIRE ALARM AND DETECTION SYSTEMS D401001 FIRE ALARM DISTRIBUTION General
2004 D401001 FIRE ALARM DISTRIBUTION Other
11,612 (SF) Repair 0.00D4010 FIRE ALARM AND DETECTION SYSTEMS
-- Repair D4010 FIRE ALARM AND DETECTION SYSTEMS 2004 D401001 FIRE ALARM DISTRIBUTION General
D50 ELECTRICAL2017
2004 D503003 INTERCOMMUNICATIONS SYSTEMS 6 stations
1 (EA) Repair 0.00D5030 COMMUNICATIONS & SECURITY
-- Repair D5030 COMMUNICATIONS & SECURITY 2004 D503003 INTERCOMMUNICATIONS SYSTEMS 6 stations
2004 D509002 EMERGENCY LIGHTING & POWER Uninterruptible Power Supply - 1.0 kVA
1 (EA) Repair 0.00D5090 OTHER ELECTRICAL SERVICES
-- Repair D5090 OTHER ELECTRICAL SERVICES 2004 D509002 EMERGENCY LIGHTING & POWER Uninteruptible Power Supply
B20 EXTERIOR ENCLOSURE2018
2004 B201006 BALCONY WALLS & HANDRAILS Handrailing
75 (LF) Paint 0.00B2010 EXTERIOR WALLS
-- Paint B2010 EXTERIOR WALLS 2004 B201006 BALCONY WALLS & HANDRAILS Handrailing
Support Site
Year System
Completion Date
Qty (UM) CostActivity
Section Description
Component Status
-- Description
ScoreProject
Naples ES (HE5549)2057 - Naples ES Bldg 2057
Cost Book: Reference
Work Items by Building Report
Page 15 of 28April 28, 2020
2004 B201007 EXTERIOR SOFFITS General
774 (SF) Paint 0.00B2010 EXTERIOR WALLS
-- Paint B2010 EXTERIOR WALLS 2004 B201007 EXTERIOR SOFFITS General
2013 B201006 BALCONY WALLS & HANDRAILS Handrailing
51 (LF) Paint 0.00B2010 EXTERIOR WALLS
-- Paint B2010 EXTERIOR WALLS 2013 B201006 BALCONY WALLS & HANDRAILS Handrailing
2013 B201007 EXTERIOR SOFFITS General
607 (SF) Paint 0.00B2010 EXTERIOR WALLS
-- Paint B2010 EXTERIOR WALLS 2013 B201007 EXTERIOR SOFFITS General
1996 B203090 OTHER EXTERIOR SPECIALTY DOORS Emergency Egress Door
34 (EA) Replace 0.00B2030 EXTERIOR DOORS
-- Replace B2030 EXTERIOR DOORS 1996 B203090 OTHER EXTERIOR SPECIALTY DOORS Emergency Egress Door
B30 ROOFING2018
1996 B301003 ROOF INSULATION & FILL General
60,664 (SF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301003 ROOF INSULATION & FILL General
1996 B301006 ROOF OPENINGS AND SUPPORTS Skylights
180 (SF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301006 ROOF OPENINGS AND SUPPORTS Skylights
1996 B301090 OTHER ROOFING Walkway Protection
552 (SF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301090 OTHER ROOFING Walkway Protection
C10 INTERIOR CONSTRUCTION2018
1996 C103001 COMPARTMENTS, CUBICLES & TOILET PARTITIONS Toilet Partitions
52 (EA) Replace 0.00C1030 SPECIALTIES
-- Replace C1030 SPECIALTIES 1996 C103001 COMPARTMENTS, CUBICLES & TOILET PARTITIONS Toilet Partitions
Support Site
Year System
Completion Date
Qty (UM) CostActivity
Section Description
Component Status
-- Description
ScoreProject
Naples ES (HE5549)2057 - Naples ES Bldg 2057
Cost Book: Reference
Work Items by Building Report
Page 16 of 28April 28, 2020
1996 C103005 LOCKERS General
882 (EA) Replace 0.00C1030 SPECIALTIES
-- Replace C1030 SPECIALTIES 1996 C103005 LOCKERS General
1996 C103008 COUNTERS Laminated Plastic
327 (LF) Replace 0.00C1030 SPECIALTIES
-- Replace C1030 SPECIALTIES 1996 C103008 COUNTERS Laminated Plastic
C30 INTERIOR FINISHES2018
1996 C302005 CARPETING General
17,701 (SF) Replace 0.00C3020 FLOOR FINISHES
-- Replace C3020 FLOOR FINISHES 1996 C302005 CARPETING Carpet Tile
1996 C303001 ACOUSTICAL CEILING TILES & PANELS General
88,843 (SF) Replace 0.00C3030 CEILING FINISHES
-- Replace C3030 CEILING FINISHES 1996 C303001 ACOUSTICAL CEILING TILES & PANELS General
1996 C303005 SUSPENSION SYSTEMS General
90,176 (SF) Replace 0.00C3030 CEILING FINISHES
-- Replace C3030 CEILING FINISHES 1996 C303005 SUSPENSION SYSTEMS General
1996 C303006 METAL STRIP CEILINGS General
1,333 (SF) Replace 0.00C3030 CEILING FINISHES
-- Replace C3030 CEILING FINISHES 1996 C303006 METAL STRIP CEILINGS General
D20 PLUMBING2018
1996 D201004 SINKS Service Sink
3 (EA) Repair 0.00D2010 PLUMBING FIXTURES
-- Repair D2010 PLUMBING FIXTURES 1996 D201004 SINKS Service Sink
1996 D203002 VENT PIPE & FITTINGS General
3,861 (EA) Replace 0.00D2030 SANITARY WASTE
-- Replace D2030 SANITARY WASTE 1996 D203002 VENT PIPE & FITTINGS General
Support Site
Year System
Completion Date
Qty (UM) CostActivity
Section Description
Component Status
-- Description
ScoreProject
Naples ES (HE5549)2057 - Naples ES Bldg 2057
Cost Book: Reference
Work Items by Building Report
Page 17 of 28April 28, 2020
1996 D204001 PIPE & FITTINGS General
1,005 (LF) Replace 0.00D2040 RAIN WATER DRAINAGE
-- Replace D2040 RAIN WATER DRAINAGE 1996 D204001 PIPE & FITTINGS General
1996 D204002 ROOF DRAINS Other
67 (EA) Replace 0.00D2040 RAIN WATER DRAINAGE
-- Replace D2040 RAIN WATER DRAINAGE 1996 D204002 ROOF DRAINS Other
2004 D204001 PIPE & FITTINGS General
135 (LF) Replace 0.00D2040 RAIN WATER DRAINAGE
-- Replace D2040 RAIN WATER DRAINAGE 2004 D204001 PIPE & FITTINGS General
D30 HVAC2018
1996 D304003 HOT WATER DISTRIBUTION SYSTEMS General
4,382 (MBH) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS 1996 D304003 HOT WATER DISTRIBUTION SYSTEMS General
1996 D304006 CHILLED WATER DISTRIBUTION SYSTEMS General
438 (TON) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS 1996 D304006 CHILLED WATER DISTRIBUTION SYSTEMS General
1996 AHU-055 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS 1996 C D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1996 AHU-061 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS 1996 D D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1996 AHU-1 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS 1996 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
Support Site
Year System
Completion Date
Qty (UM) CostActivity
Section Description
Component Status
-- Description
ScoreProject
Naples ES (HE5549)2057 - Naples ES Bldg 2057
Cost Book: Reference
Work Items by Building Report
Page 18 of 28April 28, 2020
1996 AHU-2 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
-- Replace D3040 DISTRIBUTION SYSTEMS 1996 B D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1996 AHU-3 D304008 AIR HANDLING UNITS Rooftop - 10000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS 1996 D304008 AIR HANDLING UNITS Rooftop - 10000 CFM
1996 AHU-4 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS 1996 A D304008 AIR HANDLING UNITS Rooftop - 5000 CFM
1996 ROOFTOP D304007 EXHAUST SYSTEMS Fan System, Roof Exhaust - 1500 CFM
2 (EA) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS 1996 D304007 EXHAUST SYSTEMS Fan System, Roof Exhaust - 1500 CFM
2013 D304003 HOT WATER DISTRIBUTION SYSTEMS General
37 (MBH) Replace 0.00D3040 DISTRIBUTION SYSTEMS
-- Replace D3040 DISTRIBUTION SYSTEMS 2013 D304003 HOT WATER DISTRIBUTION SYSTEMS General
1996 D306002 ELECTRONIC CONTROLS General
6 (EA) Replace 0.00D3060 CONTROLS & INSTRUMENTATION
-- Replace D3060 CONTROLS & INSTRUMENTATION 1996 D306002 ELECTRONIC CONTROLS General
D40 FIRE PROTECTION2018
1996 D401001 FIRE ALARM DISTRIBUTION Other
108,693 (SF) Replace 0.00D4010 FIRE ALARM AND DETECTION SYSTEMS
-- Replace D4010 FIRE ALARM AND DETECTION SYSTEMS 1996 D401001 FIRE ALARM DISTRIBUTION Other
D50 ELECTRICAL2018
1996 D501004 PANELBOARDS Main lugs, 50 amp
8 (EA) Repair 0.00D5010 ELECTRICAL SERVICE & DISTRIBUTION
-- Repair D5010 ELECTRICAL SERVICE & DISTRIBUTION 1996 D501004 PANELBOARDS Main lugs, 50 amp
Support Site
Year System
Completion Date
Qty (UM) CostActivity
Section Description
Component Status
-- Description
ScoreProject
Naples ES (HE5549)2057 - Naples ES Bldg 2057
Cost Book: Reference
Work Items by Building Report
Page 19 of 28April 28, 2020
1996 D501004 PANELBOARDS Main lugs, 125 amp
4 (EA) Repair 0.00D5010 ELECTRICAL SERVICE & DISTRIBUTION
-- Repair D5010 ELECTRICAL SERVICE & DISTRIBUTION 1996 D501004 PANELBOARDS Main lugs, 125 amp
1996 ROOM 117 D501004 PANELBOARDS Main lugs, 200 amp
1 (EA) Repair 0.00D5010 ELECTRICAL SERVICE & DISTRIBUTION
-- Repair D5010 ELECTRICAL SERVICE & DISTRIBUTION 1996 D501004 PANELBOARDS Main lugs, 200 amp
1996 D503001 TELECOMMUNICATIONS SYSTEMS General
1 (EA) Replace 0.00D5030 COMMUNICATIONS & SECURITY
-- Replace D5030 COMMUNICATIONS & SECURITY 1996 D503001 TELECOMMUNICATIONS SYSTEMS General
1996 D503002 PUBLIC ADDRESS SYSTEMS 100 outlets
1 (EA) Replace 0.00D5030 COMMUNICATIONS & SECURITY
-- Replace D5030 COMMUNICATIONS & SECURITY 1996 D503002 PUBLIC ADDRESS SYSTEMS 100 outlets
1996 D503003 INTERCOMMUNICATIONS SYSTEMS 100 stations
1 (EA) Replace 0.00D5030 COMMUNICATIONS & SECURITY
-- Replace D5030 COMMUNICATIONS & SECURITY 1996 D503003 INTERCOMMUNICATIONS SYSTEMS 100 stations
B20 EXTERIOR ENCLOSURE2019
1996 B203090 OTHER EXTERIOR SPECIALTY DOORS Emergency Egress Door
34 (EA) Replace 0.00B2030 EXTERIOR DOORS
-- Replace B2030 EXTERIOR DOORS 1996 B203090 OTHER EXTERIOR SPECIALTY DOORS Emergency Egress Door
B30 ROOFING2019
1996 B301003 ROOF INSULATION & FILL General
60,664 (SF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301003 ROOF INSULATION & FILL General
1996 B301006 ROOF OPENINGS AND SUPPORTS Skylights
180 (SF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301006 ROOF OPENINGS AND SUPPORTS Skylights
Support Site
Year System
Completion Date
Qty (UM) CostActivity
Section Description
Component Status
-- Description
ScoreProject
Naples ES (HE5549)2057 - Naples ES Bldg 2057
Cost Book: Reference
Work Items by Building Report
Page 20 of 28April 28, 2020
1996 B301090 OTHER ROOFING Walkway Protection
552 (SF) Replace 0.00B3010 ROOF COVERINGS
-- Replace B3010 ROOF COVERINGS 1996 B301090 OTHER ROOFING Walkway Protection
C10 INTERIOR CONSTRUCTION2019
1996 C103001 COMPARTMENTS, CUBICLES & TOILET PARTITIONS Toilet Partitions
52 (EA) Replace 0.00C1030 SPECIALTIES
-- Replace C1030 SPECIALTIES 1996 C103001 COMPARTMENTS, CUBICLES & TOILET PARTITIONS Toilet Partitions
1996 C103005 LOCKERS General
882 (EA) Replace 0.00C1030 SPECIALTIES
-- Replace C1030 SPECIALTIES 1996 C103005 LOCKERS General
1996 C103008 COUNTERS Laminated Plastic
327 (LF) Replace 0.00C1030 SPECIALTIES
-- Replace C1030 SPECIALTIES 1996 C103008 COUNTERS Laminated Plastic
C30 INTERIOR FINISHES2019
1996 C302005 CARPETING General
17,701…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .