This is a Facility Condition Assessment Report (FCAR) for Aviano Campus, dated January 21, 2020, documenting the physical condition and inspection findings of DoDEA school facilities in Italy.

The report provides a comprehensive physical description of Aviano Elementary School campus infrastructure, including exterior insulation and finish systems (E.I.F.S) with clay tile roofing, aluminum window and door systems, ceramic tile and carpet flooring, and acoustical ceiling tiles. Mechanical systems include boiler-based heating and chilled water air conditioning with two elevators. Electrical infrastructure comprises lay-in fluorescent lighting fixtures, GFCI receptacles, intercom systems, and security cameras, though most wiring remains original with no recent upgrades. The facility contains four playgrounds with no dedicated parking for privately owned vehicles.

The assessment identifies multiple deficiencies requiring attention: deteriorating low-slope modified bitumen and single-ply roofing systems approaching end-of-life with sections already replaced; aging carpet in moderately deteriorated condition; paint finishes in Building 151 showing moderate deterioration; failing exterior window hold-open mechanisms; non-functioning dual leaf exterior door coordinators; and compromised exterior door security at stairways. Mechanical systems show weather damage to chiller coils (possibly hail-related), deteriorated rooftop package units above the gymnasium, and severely deteriorated hydronic piping on roofs. The intercom system was non-functional during assessment. Building 151 (274,442 SF) is shared by Aviano Elementary School, Aviano Middle/High School, DoDEA Europe South DSO, and maintenance contractor SKE. A fire safety inspection dated August 5, 2019, identified multiple additional deficiencies documented in the assessment appendix.

View the file

Other files

Show all 19

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

“identification only”

"Identification Only"

II. SCHOOL PHYSICAL DESCRIPTION

The summary below provides a physical description of the campus. When multiple systems or materials are present, the predominant system or material observed during the facility condition assessment is shown.

a. STRUCTURAL/EXTERIOR ENCLOSURE: The building exterior is an exterior insulation and finish system (E.I.F.S). Roof coverings are clay tile. Exterior doors are pre-finished aluminum with glazing. Window systems are pre-finished aluminum with double-glazing.

b. INTERIORS: Floor finishes used include ceramic tile and carpet. Walls are painted hard surfaces. Ceilings are acoustical lay-in tiles.

c. MECHANICAL: Campus facilities have heating, which is provided by boilers. All campus facilities have air conditioning, which is provided by chilled water. The campus has two elevators.

d. ELECTRICAL: No electrical upgrades have been completed, and most wiring appears to be original.

Lighting is typically lay-in fixtures with fluorescent lamps. Ground-fault circuit interrupter (GFCI) receptacles appear to be present, but are not properly labeled. The campus has an intercom system. There is a security system, and security cameras are present.

e. PLUMBING: Plumbing fixtures and piping are original. Domestic hot water is provided by indirect water heaters.

f. SITE: The campus has no dedicated parking for privately owned vehicles. In addition, Aviano Elementary School has four playgrounds.

g. LIFE SAFETY: A fire safety inspection report, dated 5 August 2019, was provided for inclusion in this report. The inspection was conducted by the 31st Civil Engineer Squadron Fire Department. Multiple deficiencies were noted, and the inspection report is included in Appendix I.

III. OBSERVATIONS

The following observations were made: Exterior door security was observed or reported to be a problem at exterior stairways where locks are difficult to operate. Additionally, many dual leaf exterior door coordinators are not functioning properly, preventing closure if the leaves are closed in the wrong order. Exterior window awning style hold-open mechanisms are failing, causing the windows to fall while in the open position. The low slope modified bitumen and single-ply roofing systems are approaching the end of their statistical lives and are deteriorated due to age. The low slope modified bitumen roofs have deteriorated requiring areas at the Elementary School's Gym to be replaced several years ago. The areas over the Music and Storage rooms were being replaced during the assessment. The interior finishes are aging as intended; however, the carpet was observed to be in moderately deteriorated condition due to age. Additionally, the paint finishes in Building 151 appear moderately deteriorated and multicolored.

It appears that outside air is being introduced into the HVAC system. The air handlers, chillers, and exhaust fans located on the roof of Building 151 appear to be weathered and discolored. Additionally, the chiller coils appeared to be damaged due to weather elements, possibly hail. A roof-top package unit above the Gym, Room E99 is severely deteriorated. Also, there were sections of hydronic piping located on the roof that were severely deteriorated and beginning to fail. The air handlers, exhaust fans, boilers, and pumps inside the buildings were generally observed to be in good condition.

The Facility Utilization Survey (FUS) drawings to include the site plan have been updated to reflect the following: newly added X-Building X151B and X-Building X151C. Room-use changes were observed throughout the campus. Building 151 was identified as a shared facility between Aviano Elementary School, Aviano Middle/High School, and the DoDEA Europe South DSO. Additionally, the Maintenance contractor, SKE, occupies space in the building. Aviano Elementary School and Aviano Middle/High School utilize approximately 99% of Building 151 (274,442 SF), the DoDEA Europe South DSO utilizes approximately <1% of Building 151 (529 SF), and SKE utilizes approximately <1% of Building 151, specifically Rooms E99F and E99G (883 SF) for a GSF total of 275,854 SF. Finally, the assessment team observed some damage to the site work surrounding the campus; the pavers in a few areas around Building 151 are beginning to sink, this is a potential tripping hazard.

Building 114 remained a Q-1.

Building 151 remained a Q-1.

Building 153 remained a Q-1.

Appendix A

Site Plan

Appendix B

Overview of Sustainment Management System (SMS) and BUILDER™ Engineered Management System (EMS)

Overview of Sustainment Management System (SMS) and BUILDER™ Engineered Management System (EMS)

Sustainment Management System (SMS)

The Sustainment Management System (SMS) is a suite of web-based software applications developed by the United States Army Corps of Engineers - Engineer Research Development Center - Construction Engineering Research Laboratory (USACE-ERDC-CERL) to help facility engineers, technicians, and managers decide when, where, and how to best maintain the built environment. The SMS modules include BUILDER™ and ROOFER™ for assessing building conditions, PAVER™ for pavements, and RAILER™ for railroad infrastructure.

Because real property assets are so vast and diverse, a "knowledge-based" philosophy drives the SMS process. The process starts with the automated download of real property data, and then more detailed system inventory is modeled and/or collected which identifies components and their key life cycle attributes such as the age and material.

From this inventory, Condition Index (CI) measures for each component are predicted based on its expected stage in the life cycle. Objective and repeatable inspections can then be performed on various components to verify their condition with respect to the expected life cycle deterioration. The level of detail and frequency of these inspections are not fixed like other processes; they are dependent on knowledge of component criticality, the expected and measured condition and rate of deterioration, and remaining maintenance and service life. This "knowledge-based" inspection focuses attention to the most critical components at the time.

In addition to these condition assessments, functionality assessments can be performed to evaluate user requirement changes, compliance and obsolescence issues. This provides a comprehensive picture of the overall performance of real property assets and their key components.

BUILDER Engineered Management System (EMS)

In September 2013, the Under Secretary of Defense, Frank Kendall, issued a memo indicating the Department of Defense requires a standardized process for facility condition assessments to ensure consistent and reliable data necessary for sound strategic investment decisions in managing the Department's built environment.

Establishing a DoD-wide facility condition assessment process will contribute to a more credible DoD asset management program and will support better buying power by allowing Department leadership to better target fiscal resources to those facilities most in need of investment. Further, adopting a standard process will help ensure that condition data will be audit-ready in accordance with the Under Secretary of Defense (Comptroller)'s "Financial Improvement and Readiness Guidance" issued in March 2013.

The facility condition assessment process used to generate this report is based on BUILDER Engineered Management System (EMS) Version 3. BUILDER EMS was developed by the Engineer Research and Development Center.

The facility condition assessment process addresses the requirements necessary for routine building facility management activities, including long range budgeting and sustainment/restoration/modernization (SRM) planning. This assessment approach provides an objective and generalized framework to help to identify problem areas that will require more investigation through detailed or specialized assessments. There may be times when detailed engineering assessments may be required to diagnose specific problems.

BUILDER is a software application for building asset life cycle management. The primary focus of BUILDER is work plan development. BUILDER stores real property building information and more detailed system inventory is modeled and/or collected which identifies building components and their key life cycle attributes such as the age, material and capacity. Inspections are then performed on the various components to determine an objective and repeatable Condition Index (CI) measure, which relates the general physical health of the asset.

With information about condition and remaining service life, BUILDER guides the development of short- and long-range work plans based on sound investment strategies, prioritization criteria, and budget constraints.

BUILDER consolidates a variety of building-related management issues into a single decision-support package.

The system gives functional managers and decision-makers instant access to building inventory, current building condition indices, and probabilities condition prediction models. It also employs a patented knowledge-based inspection scheduling process. BUILDER improves the allocation process and return of building life cycle investments by directing resources to the most condition critical components to avoid costly repair penalty costs, as well as, the most mission critical components to manage risks of failure.

BUILDER Facility Condition Assessment Process

Facility Condition Assessment (FCA) is one of the primary processes of a facility life cycle asset management program. The FCA process results in a better understanding of the physical condition and readiness of an organization's buildings along with the reliability of its systems and components. It also facilitates the identification of work candidates for facility SRM repair projects. It is a critical aspect of the shift towards a proactive versus reactive facility management strategy. Instead of keeping facilities operational by relying primarily on corrective repairs (after a system or component has failed due to significant loss of function), it focuses on condition-based repairs which can be planned prior to failure. A condition-based approach can result in higher performing facilities at lower life cycle costs.

Prior to an assessment, knowledge of the building systems and components present is necessary, since assessments are done against these components, not against the building as a whole. This information about the systems and components that make up a building is called the BUILDER Inventory. BUILDER has a vast library of predefined components which an assessor will select from, and the inventory collection process involves identifying the type, quantity, and year installed for all pertinent components. These components are also organized into systems and sub-systems according to the UNIFORMAT classification hierarchy. When a specific instance of a component is recorded, this is called a component-section in BUILDER, and represents a single component assembly or collection of like components to be managed as a single unit. The BUILDER facility condition assessment process directly supports the computation of a condition index for building component-sections, known as the Component-Section Condition Index (CSCI), which is the fundamental metric used in BUILDER. The CSCI is aggregated to compute a condition index metric at the system (SCI), building (BCI), and site/organizational levels.

A condition-based facility repair strategy requires condition information be collected at a component level, and that this condition information relate to loss of component function. Every component of a building has a primary function that it performs. This function is the reason that the component was constructed or installed in the building. It may also serve a number of secondary or tertiary functions. For example, for a door component, the primary function is to provide safe entry/egress of authorized movements while limiting unwanted movements of people (security), or other objects (water or moisture). The secondary functions would relate to aesthetics and thermal and air control, among others.

The condition assessment process in BUILDER uses the Direct Rating method.

1. The Direct Rating method uses a single qualitative rating for each component based on condition observations. This also results in a condition index metric, which relates to the level of deterioration and the loss of function. This abbreviated Direct Rating approach is often better suited to initial baseline assessments where the components are inventoried, and data is initially loaded into BUILDER.

BUILDER Report Overview

Outlined below is a summary and description of the reports that are included.

Appendix C - Facility Summary Report – Provides a summation of FCA results. A Building Summary Report is included for each building that is considered permanent or semi-permanent construction and receives a Q-Rating. The purpose of this report is to provide a general overview of the building including key performance indicators. This report was generated using DoDEA's calculated Replacement Cost overwriting the data populated from real property records. This provides a more accurate Replacement Cost due to the inconsistencies with real property reconciliation between DoDEA and the Services. The DoD Facility Pricing Guide and DoDEA measurements for building square footage were used to calculate the Replacement Cost.

Appendix D - System Summary Report – Provides an overview of inspected systems and their condition index rating. A Building System Condition Index (SCI) By System Report is included for each building that is considered permanent or semi-permanent construction and receives a Q-Rating.

Appendix E - Work Items By Building – Provides a list of work items requiring repair or replacement of system/components, including budgets, for project planning purposes. A Work Plan Detail by Year Report is included for each building that is considered permanent or semi-permanent construction and receives a Q- Rating.

Appendix F - Remaining Service Life (RSL) Detail Report – Provides a detailed overview of systems/components, including descriptions, and their respective age, remaining service life and remaining paint life.

Appendix G - Direct Condition Rating Inspection By Section Report – Provides a summary of direct condition ratings for each component-section collected within each facility.

Appendix H - System Inventory Report – Provides a list of details for each component-section collected within each facility.

Appendix I - Fire Inspection Safety Report – This appendix is only applicable when a Fire Inspection Safety Report is provided at the time of the assessment for inclusion in the Facility Condition Assessment Report.

The report provides a summary of the recent Fire Inspection to include any deficiencies.

Note: All reports are generated from the DoDEA BUILDER database. In the event line items within a report are compressed and difficult to read, this is a result of how BUILDER generates the report. It is our understanding that CERL is working to update the report format.

Appendix C

Facility Summary Report

Appendix D

System Summary Report

Appendix E

Work Items By Building

B20 EXTERIOR ENCLOSURE2015

2002 B201001 EXTERIOR CLOSURE E.I.F.S.

132,580 (SF) ReplaceB2010 EXTERIOR WALLS

-- Replace B2010 EXTERIOR WALLS 2002 B201001 EXTERIOR CLOSURE Stucco

C30 INTERIOR FINISHES2015

2002 C302005 CARPETING General 85,091 (SF) ReplaceC3020 FLOOR FINISHES

-- Replace C3020 FLOOR FINISHES 2002 C302005 CARPETING General

D30 HVAC2015

2002 A D303001 CHILLED WATER SYSTEMS Chiller, Rotary Screw - 160 TN, Air Cooled Screw Liquid Chiller 1 (EA) RepairD3030 COOLING GENERATING SYSTEMS

-- Repair D3030 COOLING GENERATING SYSTEMS Chiller1 D303001 CHILLED WATER SYSTEMS Chiller, Rotary Screw - 160 TN, Air Cooled Screw Liquid Chiller

2002 C D303001 CHILLED WATER SYSTEMS Chiller, Rotary Screw - 270 TN, Air Cooled Screw Liquid Chiller 1 (EA) RepairD3030 COOLING GENERATING SYSTEMS

-- Repair D3030 COOLING GENERATING SYSTEMS Chiller3 D303001 CHILLED WATER SYSTEMS Chiller, Rotary Screw - 160 TN, Air Cooled Screw Liquid Chiller

D40 FIRE PROTECTION2015

2002 D401001 FIRE ALARM DISTRIBUTION Other 278,700 (SF) RepairD4010 FIRE ALARM AND DETECTION SYSTEMS

-- Repair D4010 FIRE ALARM AND DETECTION SYSTEMS D401001 FIRE ALARM DISTRIBUTION General

B20 EXTERIOR ENCLOSURE2016

2002 B201001 EXTERIOR CLOSURE E.I.F.S.

132,580 (SF) ReplaceB2010 EXTERIOR WALLS

-- Replace B2010 EXTERIOR WALLS 2002 B201001 EXTERIOR CLOSURE Stucco

Aviano Hospital-School Annex

Year System

Completion Date Qty (UM) CostActivity

Section Description Component Status

-- Description

ScoreProject

Unassigned151 - Aviano Bldg MS/HS 151

Cost Book: Reference

Work Items by Building Report

Page 1 of 7April 29, 2020

C30 INTERIOR FINISHES2016

2002 C302005 CARPETING General 85,091 (SF) ReplaceC3020 FLOOR FINISHES

-- Replace C3020 FLOOR FINISHES 2002 C302005 CARPETING General

D30 HVAC2016

2002 A D303001 CHILLED WATER SYSTEMS Chiller, Rotary Screw - 160 TN, Air Cooled Screw Liquid Chiller 1 (EA) RepairD3030 COOLING GENERATING SYSTEMS

-- Repair D3030 COOLING GENERATING SYSTEMS Chiller1 D303001 CHILLED WATER SYSTEMS Chiller, Rotary Screw - 160 TN, Air Cooled Screw Liquid Chiller

2002 B D303001 CHILLED WATER SYSTEMS Chiller, Rotary Screw - 160 TN, Air Cooled Screw Liquid Chiller 1 (EA) RepairD3030 COOLING GENERATING SYSTEMS

-- Repair D3030 COOLING GENERATING SYSTEMS Chiller2 D303001 CHILLED WATER SYSTEMS Chiller, Rotary Screw - 160 TN, Air Cooled Screw Liquid Chiller

2002 C D303001 CHILLED WATER SYSTEMS Chiller, Rotary Screw - 270 TN, Air Cooled Screw Liquid Chiller 1 (EA) RepairD3030 COOLING GENERATING SYSTEMS

-- Repair D3030 COOLING GENERATING SYSTEMS Chiller3 D303001 CHILLED WATER SYSTEMS Chiller, Rotary Screw - 160 TN, Air Cooled Screw Liquid Chiller

2002 D304003 HOT WATER DISTRIBUTION SYSTEMS General 5,500 (MBH) RepairD3040 DISTRIBUTION SYSTEMS

-- Repair D3040 DISTRIBUTION SYSTEMS D304003 HOT WATER DISTRIBUTION SYSTEMS General

2002 D304006 CHILLED WATER DISTRIBUTION SYSTEMS General 100 (TON) RepairD3040 DISTRIBUTION SYSTEMS

-- Repair D3040 DISTRIBUTION SYSTEMS D304006 CHILLED WATER DISTRIBUTION SYSTEMS General

D40 FIRE PROTECTION2016

2002 D401001 FIRE ALARM DISTRIBUTION Other 278,700 (SF) RepairD4010 FIRE ALARM AND DETECTION SYSTEMS

-- Repair D4010 FIRE ALARM AND DETECTION SYSTEMS D401001 FIRE ALARM DISTRIBUTION General

B20 EXTERIOR ENCLOSURE2017

Aviano Hospital-School Annex

Year System

Completion Date Qty (UM) CostActivity

Section Description Component Status

-- Description

ScoreProject

Unassigned151 - Aviano Bldg MS/HS 151

Cost Book: Reference

Work Items by Building Report

Page 2 of 7April 29, 2020

2002 B201001 EXTERIOR CLOSURE E.I.F.S.

132,580 (SF) ReplaceB2010 EXTERIOR WALLS

-- Replace B2010 EXTERIOR WALLS 2002 B201001 EXTERIOR CLOSURE Stucco

C10 INTERIOR CONSTRUCTION2017

2002 C101001 FIXED PARTITIONS Wall - Plaster w/Stud Framing 323,423 (SF) PaintC1010 PARTITIONS

-- Paint C1010 PARTITIONS 2002 C101001 FIXED PARTITIONS Wall - Plaster w/Stud Framing

C20 STAIRS2017

2002 C201090 STAIR HANDRAILS, GUARDRAILS AND ACCESSORIES General 1,243 (LF) PaintC2010 STAIR CONSTRUCTION

-- Paint C2010 STAIR CONSTRUCTION C201090 STAIR HANDRAILS, GUARDRAILS AND ACCESSORIES General

C30 INTERIOR FINISHES2017

2002 C302005 CARPETING General 85,091 (SF) ReplaceC3020 FLOOR FINISHES

-- Replace C3020 FLOOR FINISHES 2002 C302005 CARPETING General

2002 C303003 PLASTER CEILING FINISHES General 66,789 (SF) PaintC3030 CEILING FINISHES

-- Paint C3030 CEILING FINISHES 2002 C303003 PLASTER CEILING FINISHES General

D30 HVAC2017

2002 M401 AHU6 D304008 AIR HANDLING UNITS Indoor Modular - 7000 CFM, 17.5 TN Central AHU 1 (EA) RepairD3040 DISTRIBUTION SYSTEMS

-- Repair D3040 DISTRIBUTION SYSTEMS AHU6 D304008 AIR HANDLING UNITS Indoor Modular - 7000 CFM, 17.5 TN Central AHU

2002 M401 AHU7 D304008 AIR HANDLING UNITS Indoor Modular - 7000 CFM, 17.5 TN Central AHU 1 (EA) RepairD3040 DISTRIBUTION SYSTEMS

-- Repair D3040 DISTRIBUTION SYSTEMS AHU7 D304008 AIR HANDLING UNITS Indoor Modular - 7000 CFM, 17.5 TN Central AHU

Aviano Hospital-School Annex

Year System

Completion Date Qty (UM) CostActivity

Section Description Component Status

-- Description

ScoreProject

Unassigned151 - Aviano Bldg MS/HS 151

Cost Book: Reference

Work Items by Building Report

Page 3 of 7April 29, 2020

2002 M403 AHU1 D304008 AIR HANDLING UNITS Indoor Modular - 7000 CFM, 17.5 TN Central AHU 1 (EA) RepairD3040 DISTRIBUTION SYSTEMS

-- Repair D3040 DISTRIBUTION SYSTEMS AHU1 D304008 AIR HANDLING UNITS Indoor Modular - 7000 CFM, 17.5 TN Central AHU

B20 EXTERIOR ENCLOSURE2018

2002 B201001 EXTERIOR CLOSURE E.I.F.S.

132,580 (SF) PaintB2010 EXTERIOR WALLS

-- Paint B2010 EXTERIOR WALLS 2002 B201001 EXTERIOR CLOSURE Stucco

C20 STAIRS2018

2002 C201090 STAIR HANDRAILS, GUARDRAILS AND ACCESSORIES General 2,003 (LF) PaintC2010 STAIR CONSTRUCTION

-- Paint C2010 STAIR CONSTRUCTION 2002 C201090 STAIR HANDRAILS, GUARDRAILS AND ACCESSORIES General

C30 INTERIOR FINISHES2018

2002 C302005 CARPETING General 90,000 (SF) ReplaceC3020 FLOOR FINISHES

-- Replace C3020 FLOOR FINISHES 2002 C302005 CARPETING General

D50 ELECTRICAL2018

2002 D503003 INTERCOMMUNICATIONS SYSTEMS 100 stations 1 (EA) ReplaceD5030 COMMUNICATIONS & SECURITY

-- Replace D5030 COMMUNICATIONS & SECURITY 2002 D503003 INTERCOMMUNICATIONS SYSTEMS 100 stations

C30 INTERIOR FINISHES2019

2002 C302005 CARPETING General 90,000 (SF) ReplaceC3020 FLOOR FINISHES

-- Replace C3020 FLOOR FINISHES 2002 C302005 CARPETING General

Aviano Hospital-School Annex

Year System

Completion Date Qty (UM) CostActivity

Section Description Component Status

-- Description

ScoreProject

Unassigned151 - Aviano Bldg MS/HS 151

Cost Book: Reference

Work Items by Building Report

Page 4 of 7April 29, 2020

D50 ELECTRICAL2019

2002 D503002 PUBLIC ADDRESS SYSTEMS 100 outlets 2 (EA) ReplaceD5030 COMMUNICATIONS & SECURITY

-- Replace D5030 COMMUNICATIONS & SECURITY 2002 D503002 PUBLIC ADDRESS SYSTEMS 100 outlets

2002 D503003 INTERCOMMUNICATIONS SYSTEMS 100 stations 1 (EA) ReplaceD5030 COMMUNICATIONS & SECURITY

-- Replace D5030 COMMUNICATIONS & SECURITY 2002 D503003 INTERCOMMUNICATIONS SYSTEMS 100 stations

C30 INTERIOR FINISHES2020

2002 C302005 CARPETING General 90,000 (SF) ReplaceC3020 FLOOR FINISHES

-- Replace C3020 FLOOR FINISHES 2002 C302005 CARPETING General

D30 HVAC2020

2002 D304003 HOT WATER DISTRIBUTION SYSTEMS General 6,896 (MBH) ReplaceD3040 DISTRIBUTION SYSTEMS

-- Replace D3040 DISTRIBUTION SYSTEMS 2002 D304003 HOT WATER DISTRIBUTION SYSTEMS General

D50 ELECTRICAL2020

2002 D503003 INTERCOMMUNICATIONS SYSTEMS 100 stations 1 (EA) ReplaceD5030 COMMUNICATIONS & SECURITY

-- Replace D5030 COMMUNICATIONS & SECURITY 2002 D503003 INTERCOMMUNICATIONS SYSTEMS 100 stations

2002 D509006 ENERGY MANAGEMENT CONTROL SYSTEM General 275,854 (SF) ReplaceD5090 OTHER ELECTRICAL SERVICES

-- Replace D5090 OTHER ELECTRICAL SERVICES 2002 D509006 ENERGY MANAGEMENT CONTROL SYSTEM General

Aviano Hospital-School Annex

Year System

Completion Date Qty (UM) CostActivity

Section Description Component Status

-- Description

ScoreProject

Unassigned151 - Aviano Bldg MS/HS 151

Cost Book: Reference

Work Items by Building Report

Page 5 of 7April 29, 2020

C10 INTERIOR CONSTRUCTION2017

2005 C101001 FIXED PARTITIONS Wall - Plaster w/Stud Framing 21,434 (SF) PaintC1010 PARTITIONS

-- Paint C1010 PARTITIONS 2005 C101001 FIXED PARTITIONS Wall - Plaster w/Stud Framing

C20 STAIRS2017

2005 C201090 STAIR HANDRAILS, GUARDRAILS AND ACCESSORIES General 50 (LF) PaintC2010 STAIR CONSTRUCTION

-- Paint C2010 STAIR CONSTRUCTION C201090 STAIR HANDRAILS, GUARDRAILS AND ACCESSORIES General

D30 HVAC2017

2005 D304008 AIR HANDLING UNITS Central Station - 2000 CFM 1 (EA) RepairD3040 DISTRIBUTION SYSTEMS

-- Repair D3040 DISTRIBUTION SYSTEMS AHU2 D304008 AIR HANDLING UNITS Indoor Modular - 3000 CFM, 7.5 TN Central AHU

2005 AHU1 E202 D304008 AIR HANDLING UNITS Indoor Modular - 12,000 CFM, 30 TN Central AHU 1 (EA) RepairD3040 DISTRIBUTION SYSTEMS

-- Repair D3040 DISTRIBUTION SYSTEMS AHU1 D304008 AIR HANDLING UNITS Indoor Modular - 12,000 CFM, 30 TN Central AHU

D50 ELECTRICAL2017

2005 D503003 INTERCOMMUNICATIONS SYSTEMS 12 stations 1 (EA) RepairD5030 COMMUNICATIONS & SECURITY

-- Repair D5030 COMMUNICATIONS & SECURITY D503003 INTERCOMMUNICATIONS SYSTEMS 12 stations

C20 STAIRS2018

2005 C201090 STAIR HANDRAILS, GUARDRAILS AND ACCESSORIES General 50 (LF) PaintC2010 STAIR CONSTRUCTION

-- Paint C2010 STAIR CONSTRUCTION 2005 C201090 STAIR HANDRAILS, GUARDRAILS AND ACCESSORIES General

Aviano Hospital-School Annex

Year System

Completion Date Qty (UM) CostActivity

Section Description Component Status

-- Description

ScoreProject

Aviano ES (HE5649)114 - Aviano ES Bldg 114

Cost Book: Reference

Work Items by Building Report

Page 6 of 7April 29, 2020

D40 FIRE PROTECTION2018

2005 D401001 FIRE ALARM DISTRIBUTION Other 20,049 (SF) RepairD4010 FIRE ALARM AND DETECTION SYSTEMS

-- Repair D4010 FIRE ALARM AND DETECTION SYSTEMS 2005 D401001 FIRE ALARM DISTRIBUTION Other

Aviano Hospital-School Annex

Year System

Completion Date Qty (UM) CostActivity

Section Description Component Status

-- Description

ScoreProject

Aviano ES (HE5649)114 - Aviano ES Bldg 114

Cost Book: Reference

Work Items by Building Report

Page 7 of 7April 29, 2020

Appendix F

Remaining Service Life (RSL) Detail Report

B20 EXTERIOR ENCLOSURE B2010 EXTERIOR WALLS 2002 B201001 EXTERIOR CLOSURE E.I.F.S. 18 26 4

B2010 EXTERIOR WALLS 2002 B201001 EXTERIOR CLOSURE Stone Veneer w/CMU Backup 18 39

B2010 EXTERIOR WALLS 2002 B201001 EXTERIOR CLOSURE Wall Louver 18 16

B2010 EXTERIOR WALLS 2002 B201005 EXTERIOR LOUVERS & SCREENS General 18 8

B2010 EXTERIOR WALLS 2002 B201006 BALCONY WALLS & HANDRAILS Ladder 18 6

B2010 EXTERIOR WALLS 2002 B201007 EXTERIOR SOFFITS General 18 8 Unknown

B2010 EXTERIOR WALLS 2002 B201011 SUN CONTROL DEVICES General 18 8

B2010 EXTERIOR WALLS 2002 A B201010 EXTERIOR JOINT SEALANT General 18 8

B2010 EXTERIOR WALLS 2002 B B201010 EXTERIOR JOINT SEALANT General 18 8

B2020 EXTERIOR WINDOWS 2002 B202001 WINDOWS General 18 20

B2020 EXTERIOR WINDOWS 2002 B202002 STOREFRONTS General 18 8

B2020 EXTERIOR WINDOWS 2002 B202003 CURTAIN WALLS General 18 39

B2030 EXTERIOR DOORS 2002 B203001 SOLID DOORS Steel 18 8

B2030 EXTERIOR DOORS 2002 B203002 GLAZED DOORS General 18 12

B2030 EXTERIOR DOORS 2002 B203090 OTHER EXTERIOR SPECIALTY DOORS Emergency Egress D

18 6

B2030 EXTERIOR DOORS 2002 B203090 OTHER EXTERIOR SPECIALTY DOORS Other 18 6

B30 ROOFING B3010 ROOF COVERINGS 2002 B301001 STEEP SLOPE ROOF SYSTEMS Clay Tile 18 37

B3010 ROOF COVERINGS 2002 B301002 LOW SLOPE ROOF SYSTEMS Modified Bitumen 18 4

B3010 ROOF COVERINGS 2002 B301002 LOW SLOPE ROOF SYSTEMS Single Ply Membrane 18 4

B3010 ROOF COVERINGS 2002 B301003 ROOF INSULATION & FILL General 18 2

B3010 ROOF COVERINGS 2002 B301004 FLASHINGS & TRIM Flashings - Base 18 10

B3010 ROOF COVERINGS 2002 B301004 FLASHINGS & TRIM Flashings - Cap 18 10

B3010 ROOF COVERINGS 2002 B301004 FLASHINGS & TRIM General 18 10

B3010 ROOF COVERINGS 2002 B301005 GUTTERS & DOWNSPOUTS Downspouts 18 8

B3010 ROOF COVERINGS 2002 B301005 GUTTERS & DOWNSPOUTS Gutters 18 8

B3010 ROOF COVERINGS 2002 B301006 ROOF OPENINGS AND SUPPORTS Gravity Ventilator - 6" Di t

18 8

B3010 ROOF COVERINGS 2002 B301006 ROOF OPENINGS AND SUPPORTS Hatches 18 31

B3010 ROOF COVERINGS 2002 B301006 ROOF OPENINGS AND SUPPORTS Skylights 18 31

B3010 ROOF COVERINGS 2002 A B301002 LOW SLOPE ROOF SYSTEMS Modified Bitumen 3 13

B3010 ROOF COVERINGS 2002 B B301002 LOW SLOPE ROOF SYSTEMS Modified Bitumen 0 20

C10 INTERIOR

CONSTRUCTION

Unassigned151 - Aviano Bldg MS/HS 151

Section Description Age (yrs) RSL (yrs) RPL (yrs)ComponentSystem

Aviano Hospital-School Annex

Remaining Service Life (RSL) Detail Report

C1010 PARTITIONS 2002 C101001 FIXED PARTITIONS Wall - Plaster w/Stud Framing 18 65 18

Page 1 of 11April 29, 2020

C1010 PARTITIONS 2002 C101005 INTERIOR WINDOWS Interior Windows 18 26

C1020 INTERIOR DOORS 2002 C102001 STANDARD INTERIOR DOORS Wood Door/Wood Frame 18 16

C1020 INTERIOR DOORS 2002 C102002 GLAZED INTERIOR DOORS General 18 16

C1030 SPECIALTIES 2002 C103001 COMPARTMENTS, CUBICLES & TOILET PARTITIONS Shower Compartment

18 8

C1030 SPECIALTIES 2002 C103001 COMPARTMENTS, CUBICLES & TOILET PARTITIONS Toilet P titi

18 8

C1030 SPECIALTIES 2002 C103001 COMPARTMENTS, CUBICLES & TOILET PARTITIONS Urinal Screen

18 8

C1030 SPECIALTIES 2002 C103002 TOILET & BATH ACCESSORIES General 18 6

C1030 SPECIALTIES 2002 C103003 MARKER BOARDS & TACK BOARDS General 18 8

C1030 SPECIALTIES 2002 C103005 LOCKERS General 18 9

C1030 SPECIALTIES 2002 C103008 COUNTERS Laminated Plastic 18 9

C1030 SPECIALTIES 2002 C103009 CABINETS Other 18 6

C20 STAIRS C2010 STAIR CONSTRUCTION 2002 C201001 INTERIOR AND EXTERIOR STAIRS Exterior Stairs - Concrete (12 Ri Fli ht)

18 52

C2010 STAIR CONSTRUCTION 2002 C201001 INTERIOR AND EXTERIOR STAIRS Exterior Stairs - Metal (12 Riser Flight)

18 27

C2010 STAIR CONSTRUCTION 2002 C201001 INTERIOR AND EXTERIOR STAIRS Interior Stairs 18 31

C2010 STAIR CONSTRUCTION 2002 C201001 INTERIOR AND EXTERIOR STAIRS Interior Steps 18 8

C2010 STAIR CONSTRUCTION 2002 C201001 INTERIOR AND EXTERIOR STAIRS Interior Steps - Concrete 18 8

C2010 STAIR CONSTRUCTION 2002 C201090 STAIR HANDRAILS, GUARDRAILS AND ACCESSORIES General

18 8 3

C30 INTERIOR FINISHES C3010 WALL FINISHES 2002 C301004 TILE & TERRAZZO WALL FINISHES Tile 18 31

C3020 FLOOR FINISHES 2002 C302001 TILE FLOOR FINISHES Ceramic Tile 18 31

C3020 FLOOR FINISHES 2002 C302003 WOOD FLOORING General 18 8

C3020 FLOOR FINISHES 2002 C302004 RESILIENT FLOOR FINISHES Composition Sheet 18 7

C3020 FLOOR FINISHES 2002 C302005 CARPETING General 11 0

C3030 CEILING FINISHES 2002 C303001 ACOUSTICAL CEILING TILES & PANELS General 18 29

C3030 CEILING FINISHES 2002 C303003 PLASTER CEILING FINISHES General 18 52 17

C3030 CEILING FINISHES 2002 C303005 SUSPENSION SYSTEMS General 18 8

D10 CONVEYING D1010 ELEVATORS AND LIFTS 2002 D101002 PASSENGER ELEVATORS Hydraulic Elevators - 2500 lb, 5 floors 18 13

D1010 ELEVATORS AND LIFTS 2002 D101004 WHEELCHAIR LIFT General 18 6

D20 PLUMBING D2010 PLUMBING FIXTURES 2002 D201001 WATERCLOSETS General 18 8

D2010 PLUMBING FIXTURES 2002 D201002 URINALS General 18 8

Unassigned151 - Aviano Bldg MS/HS 151

Section Description Age (yrs) RSL (yrs) RPL (yrs)ComponentSystem

Aviano Hospital-School Annex

Remaining Service Life (RSL) Detail Report

D2010 PLUMBING FIXTURES 2002 D201004 SINKS General 18 8

Page 2 of 11April 29, 2020

D2010 PLUMBING FIXTURES 2002 D201004 SINKS Kitchen Sink 18 14

D2010 PLUMBING FIXTURES 2002 D201005 SHOWERS/TUBS Shower 18 8

D2010 PLUMBING FIXTURES 2002 D201006 DRINKING FOUNTAINS AND COOLERS Water Cooler 18 8

D2010 PLUMBING FIXTURES 2002 D201090 OTHER PLUMBING FIXTURES Emergency Eye Wash 18 10

D2010 PLUMBING FIXTURES 2002 D201090 OTHER PLUMBING FIXTURES Emergency Shower 18 10

D2020 DOMESTIC WATER

DISTRIBUTION

2002 D202001 PIPES & FITTINGS General 18 32

D2020 DOMESTIC WATER

DISTRIBUTION

2002 D202003 DOMESTIC WATER EQUIPMENT Storage Tank - Glass lined, PE 325 ll 36" i t 81" L O A

18 16

D2020 DOMESTIC WATER

DISTRIBUTION

2002 D202003 DOMESTIC WATER EQUIPMENT Water Softener 18 4

D2020 DOMESTIC WATER

DISTRIBUTION

2002 A D202003 DOMESTIC WATER EQUIPMENT Storage Tank - Glass lined, PE 1330 ll 66" i t 107" L O

18 20

D2020 DOMESTIC WATER

DISTRIBUTION

2002 B D202003 DOMESTIC WATER EQUIPMENT Storage Tank - Glass lined, PE 1330 gallon 66" diameter 107" L O A

18 20

D2020 DOMESTIC WATER

DISTRIBUTION

2002 C D202003 DOMESTIC WATER EQUIPMENT Storage Tank - Glass lined, PE 1330 ll 66" i t 107" L O

18 20

D2020 DOMESTIC WATER

DISTRIBUTION

2002 D D202003 DOMESTIC WATER EQUIPMENT Storage Tank - Glass lined, PE 1330 gallon 66" diameter 107" L O A

18 20

D2020 DOMESTIC WATER

DISTRIBUTION

2002 ROOM B2 D202003 DOMESTIC WATER EQUIPMENT Booster Pump - 1

HP

18 10

D2030 SANITARY WASTE 2002 D203001 WASTE PIPE & FITTINGS General 18 32

D2030 SANITARY WASTE 2002 D203002 VENT PIPE & FITTINGS General 18 2

D2030 SANITARY WASTE 2002 D203003 FLOOR DRAINS General 18 8

D30 HVAC D3020 HEAT GENERATING SYSTEMS 2002 D302005 EQUIPMENT THERMAL INSULATION General 18 10

D3020 HEAT GENERATING SYSTEMS 2002 B3 D302004 AUXILIARY EQUIPMENT Boiler Feedwater Tank - Shot h i l f d fl t 10 l

18 8

D3020 HEAT GENERATING SYSTEMS 2002 B3 D302004 AUXILIARY EQUIPMENT Expansion Tank - 100 gal 18 12

D3020 HEAT GENERATING SYSTEMS 2002 B3 D302004 AUXILIARY EQUIPMENT Expansion Tank - 220 gal 18 12

D3020 HEAT GENERATING SYSTEMS 2002 B3 D302004 AUXILIARY EQUIPMENT Expansion Tank - 40 gal 18 16

D3020 HEAT GENERATING SYSTEMS 2002 B3 BO1 D302001 BOILERS Gas, Hot Water - 4500-5500 MBH 18 12

D3020 HEAT GENERATING SYSTEMS 2002 B3 BO2 D302001 BOILERS Gas, Hot Water - 4500-5500 MBH 18 12

D3020 HEAT GENERATING SYSTEMS 2002 B3 BO3 D302001 BOILERS Gas, Hot Water - 2500-3500 MBH 18 12

D3020 HEAT GENERATING SYSTEMS 2002 B3 BO4 D302001 BOILERS Gas, Hot Water - 2500-3500 MBH 18 16

D3030 COOLING GENERATING

SYSTEMS

2002 D303001 CHILLED WATER SYSTEMS Chiller, Reciprocating, Air Cooled -

20 TN

18 2

D3030 COOLING GENERATING

SYSTEMS

2002 A D303001 CHILLED WATER SYSTEMS Chiller, Rotary Screw - 160 TN, Ai Cooled Screw Liquid Chiller

18 8

D3030 COOLING GENERATING

SYSTEMS

2002 B D303001 CHILLED WATER SYSTEMS Chiller, Rotary Screw - 160 TN, Ai C l S Li i Chill

18 8

D3030 COOLING GENERATING

SYSTEMS

2002 C D303001 CHILLED WATER SYSTEMS Chiller, Rotary Screw - 270 TN, Air Cooled Screw Liquid Chiller

6 10

D3040 DISTRIBUTION SYSTEMS 2002 D304001 AIR DISTRIBUTION, HEATING & COOLING Ductwork 18 22

D3040 DISTRIBUTION SYSTEMS 2002 D304003 HOT WATER DISTRIBUTION SYSTEMS General 18 0

Unassigned151 - Aviano Bldg MS/HS 151

Section Description Age (yrs) RSL (yrs) RPL (yrs)ComponentSystem

Aviano Hospital-School Annex

Remaining Service Life (RSL) Detail Report

D3040 DISTRIBUTION SYSTEMS 2002 D304003 HOT WATER DISTRIBUTION SYSTEMS Heat Exchanger, Shell &

T 2 0 GPM

18 8

Page 3 of 11April 29, 2020

D3040 DISTRIBUTION SYSTEMS 2002 D304006 CHILLED WATER DISTRIBUTION SYSTEMS General 2 18

D3040 DISTRIBUTION SYSTEMS 2002 D304007 EXHAUST SYSTEMS Fan System, Roof Exhaust - 800 CFM 18 8

D3040 DISTRIBUTION SYSTEMS 2002 D304007 EXHAUST SYSTEMS Kitchen Exhaust/Make-Up Air - 2000 CFM 18 10

D3040 DISTRIBUTION SYSTEMS 2002 D304007 EXHAUST SYSTEMS Kitchen Exhaust/Make-Up Air - 3000 CFM 18 10

D3040 DISTRIBUTION SYSTEMS 2002 A D304007 EXHAUST SYSTEMS Fume Hood Exhaust System - 4', 2000

CFM

18 5

D3040 DISTRIBUTION SYSTEMS 2002 A D304007 EXHAUST SYSTEMS Kitchen Exhaust/Make-Up Air - 12,000

CFM

18 10

D3040 DISTRIBUTION SYSTEMS 2002 B D304007 EXHAUST SYSTEMS Fume Hood Exhaust System - 4', 2000

CFM

18 5

D3040 DISTRIBUTION SYSTEMS 2002 B D304007 EXHAUST SYSTEMS Kitchen Exhaust/Make-Up Air - 12,000

CFM

18 10

D3040 DISTRIBUTION SYSTEMS 2002 C D304007 EXHAUST SYSTEMS Fume Hood Exhaust System - 4', 2000

CFM

18 5

D3040 DISTRIBUTION SYSTEMS 2002 D D304007 EXHAUST SYSTEMS Fume Hood Exhaust System - 4', 2000

CFM

18 5

D3040 DISTRIBUTION SYSTEMS 2002 E D304007 EXHAUST SYSTEMS Fume Hood Exhaust System - 4', 2000

CFM

18 5

D3040 DISTRIBUTION SYSTEMS 2002 M401 AHU6 D304008 AIR HANDLING UNITS Indoor Modular - 7000 CFM, 17 5 TN Central AHU

18 8

D3040 DISTRIBUTION SYSTEMS 2002 M401 AHU7 D304008 AIR HANDLING UNITS Indoor Modular - 7000 CFM, 17 5 TN C t l HU

18 6

D3040 DISTRIBUTION SYSTEMS 2002 M401 EF18 D304008 AIR HANDLING UNITS Indoor Modular - 3000 CFM, 7 5 TN Central AHU

18 6

D3040 DISTRIBUTION SYSTEMS 2002 M401 EF19 D304008 AIR HANDLING UNITS Indoor Modular - 3000 CFM, 7 5 TN C t l HU

18 6

D3040 DISTRIBUTION SYSTEMS 2002 M401 EF5 D304008 AIR HANDLING UNITS Indoor Modular - 3000 CFM, 7 5 TN Central AHU

18 8

D3040 DISTRIBUTION SYSTEMS 2002 M401 EF6 D304008 AIR HANDLING UNITS Indoor Modular - 4000 CFM, 10 TN C t l HU

18 6

D3040 DISTRIBUTION SYSTEMS 2002 M401 EF7 D304008 AIR HANDLING UNITS Indoor Modular - 6000 CFM, 15 TN Central AHU

18 6

D3040 DISTRIBUTION SYSTEMS 2002 M402 AHU8 D304008 AIR HANDLING UNITS Indoor Modular - 4400 CFM, 11 TN C t l HU

18 6

D3040 DISTRIBUTION SYSTEMS 2002 M403 AHU1 D304008 AIR HANDLING UNITS Indoor Modular - 7000 CFM, 17 5 TN Central AHU

18 8

D3040 DISTRIBUTION SYSTEMS 2002 M403 AHU1A D304008 AIR HANDLING UNITS Indoor Modular - 4400 CFM 11 TN C t l HU

18 8

D3040 DISTRIBUTION SYSTEMS 2002 M403 AHU2 D304008 AIR HANDLING UNITS Indoor Modular - 6000 CFM, 15 TN Central AHU

18 8

D3040 DISTRIBUTION SYSTEMS 2002 M403 AHU3 D304008 AIR HANDLING UNITS Indoor Modular - 4400 CFM, 11 TN C t l HU

18 8

D3040 DISTRIBUTION SYSTEMS 2002 M403 AHU4 D304008 AIR HANDLING UNITS Indoor Modular - 4400 CFM, 11 TN Central AHU

18 8

D3040 DISTRIBUTION SYSTEMS 2002 M403 AHU5 D304008 AIR HANDLING UNITS Indoor Modular - 3000 CFM, 7 5 TN C t l HU

18 8

D3040 DISTRIBUTION SYSTEMS 2002 M403 EF1 D304008 AIR HANDLING UNITS Indoor Modular - 3200 CFM, 8 TN Central AHU

18 8

D3040 DISTRIBUTION SYSTEMS 2002 M403 EF10 D304008 AIR HANDLING UNITS Indoor Modular - 3000 CFM, 7 5 TN C t l HU

18 8

D3040 DISTRIBUTION SYSTEMS 2002 M403 EF2 D304008 AIR HANDLING UNITS Indoor Modular - 3000 CFM, 7 5 TN Central AHU

18 8

D3040 DISTRIBUTION SYSTEMS 2002 M403 EF3 D304008 AIR HANDLING UNITS Rooftop - 10000 CFM 18 8

D3040 DISTRIBUTION SYSTEMS 2002 ROOF AHU10 D304008 AIR HANDLING UNITS Rooftop - 2000 CFM 18 4

D3040 DISTRIBUTION SYSTEMS 2002 ROOF AHU11 D304008 AIR HANDLING UNITS Rooftop - 15000 CFM 18 4

D3040 DISTRIBUTION SYSTEMS 2002 ROOF AHU12 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM 18 4

Unassigned151 - Aviano Bldg MS/HS 151

Section Description Age (yrs) RSL (yrs) RPL (yrs)ComponentSystem

Aviano Hospital-School Annex

Remaining Service Life (RSL) Detail Report

Page 4 of 11April 29, 2020

D3040 DISTRIBUTION SYSTEMS 2002 ROOF AHU9 D304008 AIR HANDLING UNITS Rooftop - 10000 CFM 18 4

D3040 DISTRIBUTION SYSTEMS 2002 ROOF EF8 D304008 AIR HANDLING UNITS Rooftop - 2000 CFM 18 4

D3040 DISTRIBUTION SYSTEMS 2002 ROOF HVU1 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM 18 4

D3040 DISTRIBUTION SYSTEMS 2002 ROOF HVU2 D304008 AIR HANDLING UNITS Rooftop - 5000 CFM 18 4

D3040 DISTRIBUTION SYSTEMS 2002 ROOF HVU3 D304008 AIR HANDLING UNITS Rooftop - 10000 CFM 18 4

D3040 DISTRIBUTION SYSTEMS 2002 ROOF HVU4 D304008 AIR HANDLING UNITS Rooftop - 2000 CFM 18 4

D3040 DISTRIBUTION SYSTEMS 2002 ROOM B2 D304003 HOT WATER DISTRIBUTION SYSTEMS Circulating P E S ti 2 1/2" i 3 HP t 150 GPM

18 6

D3040 DISTRIBUTION SYSTEMS 2002 ROOM B2 D304003 HOT WATER DISTRIBUTION SYSTEMS Circulating Pump End Suction 6" size 25 HP to 1550 GPM

18 10

D3040 DISTRIBUTION SYSTEMS 2002 ROOM B2 D304006 CHILLED WATER DISTRIBUTION SYSTEMS Ci l ti P D l S ti 6" i 50 HP t 1200 GPM

18 8

D3040 DISTRIBUTION SYSTEMS 2002 ROOM B2 D304006 CHILLED WATER DISTRIBUTION SYSTEMS Circulating Pump End Suction 6" size 25 HP to 1550 GPM

18 8

D3040 DISTRIBUTION SYSTEMS 2002 ROOM B3 D304003 HOT WATER DISTRIBUTION SYSTEMS Circulating P E S ti 2 1/2" i 3 HP t 150 GPM

18 6

D3050 TERMINAL & PACKAGE UNITS 2002 D305001 UNIT VENTILATORS Air Curtain 18 8

D3050 TERMINAL & PACKAGE UNITS 2002 D305001 UNIT VENTILATORS Make-Up Air Unit - 10,000 CFM, 838 MBH, i l t t l

18 12

D3050 TERMINAL & PACKAGE UNITS 2002 D305002 UNIT HEATERS Hydronic - 300 MBH 18 12

D3050 TERMINAL & PACKAGE UNITS 2002 D305006 PACKAGE UNITS A/C Unit, Split Systems w/ Air Cooled

C 2 TN

4 6

D40 FIRE PROTECTION D4010 FIRE ALARM AND DETECTION

SYSTEMS

2002 D401001 FIRE ALARM DISTRIBUTION Other 18 2

D4020 FIRE SUPP WATER SUPPLY /

EQUIP

2002 ROOM B4 D402001 FIRE PROTECTION WATER PIPING AND

EQUIPMENT Backflow Preventer 8"

18 21

D4020 FIRE SUPP WATER SUPPLY /

EQUIP

2002 ROOM B4 D402002 FIRE PUMP 5" pump, 40 HP, 1000 GPM 18 10

D4030 STANDPIPE SYSTEMS 2002 D403001 STANDPIPE EQUIPMENT & PIPING Riser - 8" diam 18 10

D4040 SPRINKLERS 2002 D404001 SPRINKLERS AND RELEASING DEVICES Wet Pipe Systems 18 57

D4090 OTHER FIRE PROTECTION

SYSTEMS

2002 D409004 HOOD & DUCT FIRE PROTECTION General 18 13

D50 ELECTRICAL D5010 ELECTRICAL SERVICE &

DISTRIBUTION

2002 D501003 INTERIOR DISTRIBUTION TRANSFORMERS Buck-boost, 240 V primary 208/120 V secondary 45 kVA

18 16

D5010 ELECTRICAL SERVICE &

DISTRIBUTION

2002 D501003 INTERIOR DISTRIBUTION TRANSFORMERS dry-type, 240/480 V i 120/240 V 15 kV

18 26

D5010 ELECTRICAL SERVICE &

DISTRIBUTION

2002 D501003 INTERIOR DISTRIBUTION TRANSFORMERS dry-type, 240/480 V primary 120/240 V secondary 25 kVA

18 26

D5010 ELECTRICAL SERVICE &

DISTRIBUTION

2002 D501003 INTERIOR DISTRIBUTION TRANSFORMERS dry-type, 240/480 V i 120/240 V 50 V

18 26

D5010 ELECTRICAL SERVICE &

DISTRIBUTION

2002 D501004 PANELBOARDS Main lugs, 120/208 V, 100 amp, NQOD 18 16

D5010 ELECTRICAL SERVICE &

DISTRIBUTION

2002 D501004 PANELBOARDS Main lugs, 120/208 V, 225 amp, NQOD 18 16

D5010 ELECTRICAL SERVICE &

DISTRIBUTION

2002 D501004 PANELBOARDS Main lugs, 400 amp 18 10

D5010 ELECTRICAL SERVICE &

DISTRIBUTION

2002 D501004 PANELBOARDS Safety Switch, >100 Amp 18 16

D5010 ELECTRICAL SERVICE &

DISTRIBUTION

2002 D501004 PANELBOARDS Safety Switch, 30-100 Amp 18 16

Unassigned151 - Aviano Bldg MS/HS 151

Section Description Age (yrs) RSL (yrs) RPL (yrs)ComponentSystem

Aviano Hospital-School Annex

Remaining Service Life (RSL) Detail Report

D5010 ELECTRICAL SERVICE &

DISTRIBUTION

2002 D501006 MOTOR CONTROL CENTERS Motor Control Center - Size 2, 25 HP 18" i

18 21

Page 5 of 11April 29, 2020

D5010 ELECTRICAL SERVICE &

DISTRIBUTION

2002 ROOM B2 D501006 MOTOR CONTROL CENTERS Motor Control Center - Si 6 400 HP 72" hi h

18 21

D5010 ELECTRICAL SERVICE &

DISTRIBUTION

2002 ROOM B5 D501002 SERVICE ENTRANCE EQUIPMENT Electrical Service 3 Phase 120/208 V 2000 A

18 10

D5010 ELECTRICAL SERVICE &

DISTRIBUTION

2002 ROOM B5 D501003 INTERIOR DISTRIBUTION TRANSFORMERS dry-t 480 V i 120/208 V 150 V

18 26

D5020 LIGHTING & BRANCH WIRING 2002 D502001 BRANCH WIRING General 18 42

D5020 LIGHTING & BRANCH WIRING 2002 D502002 LIGHTING EQUIPMENT Exit Lighting 18 10

D5020 LIGHTING & BRANCH WIRING 2002 D502002 LIGHTING EQUIPMENT General 18 10

D5030 COMMUNICATIONS &

SECURITY

2002 D503002 PUBLIC ADDRESS SYSTEMS 100 outlets 4 10

D5030 COMMUNICATIONS &

SECURITY

2002 D503003 INTERCOMMUNICATIONS SYSTEMS 100 stations 18 0

D5030 COMMUNICATIONS &

SECURITY

2002 D503005 SECURITY SYSTEMS General 18 10

D5030 COMMUNICATIONS &

SECURITY

2002 D503007 CLOCK & PROGRAM SYSTEMS General 4 10

D5090 OTHER ELECTRICAL

SERVICES

2002 D509002 EMERGENCY LIGHTING & POWER General 18 10

D5090 OTHER ELECTRICAL

SERVICES

2002 D509002 EMERGENCY LIGHTING & POWER Uninterruptible Power Supply 10 kVA

18 13

D5090 OTHER ELECTRICAL

SERVICES

2002 D509003 GROUNDING SYSTEMS General 18 32

D5090 OTHER ELECTRICAL

SERVICES

2002 D509004 LIGHTNING PROTECTION Unknown 18 26

D5090 OTHER ELECTRICAL

SERVICES

2002 D509006 ENERGY MANAGEMENT CONTROL SYSTEM General 18 0

E10 EQUIPMENT E1090 OTHER EQUIPMENT *COLD PAN SINGLE BASIN A E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *COLD PAN SINGLE BASIN B E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *DEEP FRYER E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *DISH MACHINE E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *FOOD PROCESSOR A E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *FOOD PROCESSOR B E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *FREEZER REACH IN 2 DR E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *HOLDING CABINET A E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *HOLDING CABINET B E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *REFRIGERATOR REACH IN 1 DR A E109002 FOOD SERVICE EQUIPMENT General

18 13

E1090 OTHER EQUIPMENT *REFRIGERATOR REACH IN 1 DR B E109002 FOOD SERVICE EQUIPMENT G l

18 13

E1090 OTHER EQUIPMENT *REFRIGERATOR REACH IN 1 DR C E109002 FOOD SERVICE EQUIPMENT General

18 13

E1090 OTHER EQUIPMENT *REFRIGERATOR REACH IN 2 DR A E109002 FOOD SERVICE EQUIPMENT G l

18 13

E1090 OTHER EQUIPMENT *REFRIGERATOR REACH IN 2 DR B E109002 FOOD SERVICE EQUIPMENT General

18 13

E1090 OTHER EQUIPMENT *REFRIGERATOR REACH IN 2 DR C E109002 FOOD SERVICE EQUIPMENT G l

18 13

E1090 OTHER EQUIPMENT *SERVING LINE COOLER A E109002 FOOD SERVICE EQUIPMENT General 18 13

Unassigned151 - Aviano Bldg MS/HS 151

Section Description Age (yrs) RSL (yrs) RPL (yrs)ComponentSystem

Aviano Hospital-School Annex

Remaining Service Life (RSL) Detail Report

E1090 OTHER EQUIPMENT *SERVING LINE COOLER B E109002 FOOD SERVICE EQUIPMENT General 18 13

Page 6 of 11April 29, 2020

E1090 OTHER EQUIPMENT *SERVING LINE COOLER C E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *SERVING LINE COOLER D E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *SERVING LINE COOLER E E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *SERVING LINE COOLER F E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *SLICER E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *STEAM COUNTER ELECTRIC MULTI BASIN A E109002 FOOD SERVICE

EQUIPMENT General

18 13

E1090 OTHER EQUIPMENT *STEAM COUNTER ELECTRIC MULTI BASIN B E109002 FOOD SERVICE

EQUIPMENT G l

18 13

E1090 OTHER EQUIPMENT *STEAM COUNTER ELECTRIC MULTI BASIN C E109002 FOOD SERVICE

EQUIPMENT General

18 13

E1090 OTHER EQUIPMENT *STEAM COUNTER ELECTRIC MULTI BASIN D E109002 FOOD SERVICE

EQUIPMENT G l

18 13

E1090 OTHER EQUIPMENT *STEAMER 1 DOOR A E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *STEAMER 1 DOOR B E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *STEAMER 1 DOOR C E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *STEAMER 1 DOOR D E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *STEAMER 1 DOOR E E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *TILT KETTLE A E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *TILT KETTLE B E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *WALK IN COOLER A E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *WALK IN COOLER B E109002 FOOD SERVICE EQUIPMENT General 18 13

E1090 OTHER EQUIPMENT *WALK IN FREEZER E109002 FOOD SERVICE EQUIPMENT General 18 13

Unassigned151 - Aviano Bldg MS/HS 151

Section Description Age (yrs) RSL (yrs) RPL (yrs)ComponentSystem

Aviano Hospital-School Annex

Remaining Service Life (RSL) Detail Report

Page 7 of 11April 29, 2020

B20 EXTERIOR ENCLOSURE B2010 EXTERIOR WALLS 2005 B201001 EXTERIOR CLOSURE Stone Veneer w/CMU Backup 15 39

B2010 EXTERIOR WALLS 2005 B201001 EXTERIOR CLOSURE Stucco 15 21 18

B2010 EXTERIOR WALLS 2005 B201001 EXTERIOR CLOSURE Wall Louver 15 12

B2010 EXTERIOR WALLS 2005 B201007 EXTERIOR SOFFITS General 15 10 Unknown

B2010 EXTERIOR WALLS 2005 B201010 EXTERIOR JOINT SEALANT General 15 8

B2020 EXTERIOR WINDOWS 2005 B202001 WINDOWS Aluminum Windows 15 39

B2020 EXTERIOR WINDOWS 2005 B202002 STOREFRONTS General 15 10

B2030 EXTERIOR DOORS 2005 B203001 SOLID DOORS Steel 15 8

B2030 EXTERIOR DOORS 2005 B203090 OTHER EXTERIOR SPECIALTY DOORS Emergency Egress D

15 8

B30 ROOFING B3010 ROOF COVERINGS 2005 B301001 STEEP SLOPE ROOF SYSTEMS Clay Tile 15 37

B3010 ROOF COVERINGS 2005 B301003 ROOF INSULATION & FILL General 15 5

B3010 ROOF COVERINGS 2005 B301004 FLASHINGS & TRIM Flashings - Embedded Edge Metal 15 13

B3010 ROOF COVERINGS 2005 B301004 FLASHINGS & TRIM Flashings - Flashing Penetrations 15 13

B3010 ROOF COVERINGS 2005 B301005 GUTTERS & DOWNSPOUTS Downspouts 15 10

B3010 ROOF COVERINGS 2005 B301005 GUTTERS & DOWNSPOUTS Gutters 15 10

B3010 ROOF COVERINGS 2005 B301006 ROOF OPENINGS AND SUPPORTS Gravity Ventilator - 6" Di t

15 10

C10 INTERIOR

CONSTRUCTION

C1010 PARTITIONS 2005 C101001 FIXED PARTITIONS Wall - Plaster w/Stud Framing 15 65 Unknown

C1010 PARTITIONS 2005 C101005 INTERIOR WINDOWS Interior Windows 15 20

C1020 INTERIOR DOORS 2005 C102001 STANDARD INTERIOR DOORS Wood Door/Wood Frame 15 21

C1020 INTERIOR DOORS 2005 C102002 GLAZED INTERIOR DOORS General 15 16

C1030 SPECIALTIES 2005 C103002 TOILET & BATH ACCESSORIES General 15 6

C1030 SPECIALTIES 2005 C103003 MARKER BOARDS & TACK BOARDS General 15 8

C1030 SPECIALTIES 2005 C103008 COUNTERS Laminated Plastic 15 9

C1030 SPECIALTIES 2005 C103009 CABINETS Other 15 6

C20 STAIRS C2010 STAIR CONSTRUCTION 2005 C201001 INTERIOR AND EXTERIOR STAIRS Interior Stairs 15 52

C2010 STAIR CONSTRUCTION 2005 C201090 STAIR HANDRAILS, GUARDRAILS AND ACCESSORIES General

15 10 Unknown

C30 INTERIOR FINISHES C3010 WALL FINISHES 2005 C301004 TILE & TERRAZZO WALL FINISHES General 15 31

C3020 FLOOR FINISHES 2005 C302001 TILE FLOOR FINISHES Ceramic Tile 15 31

C3020 FLOOR FINISHES 2005 C302004 RESILIENT FLOOR FINISHES Composition Sheet 15 5

Aviano ES (HE5649)114 - Aviano ES Bldg 114

Section Description Age (yrs) RSL (yrs) RPL (yrs)ComponentSystem

Aviano Hospital-School Annex

Remaining Service Life (RSL) Detail Report

C3020 FLOOR FINISHES 2005 C302010 HARDENERS AND SEALERS Epoxy 15 8

Page 8 of 11April 29, 2020

C3030 CEILING FINISHES 2005 C303001 ACOUSTICAL CEILING TILES & PANELS General 15 29

C3030 CEILING FINISHES 2005 C303005 SUSPENSION SYSTEMS General 15 8

D20 PLUMBING D2010 PLUMBING FIXTURES 2005 D201001 WATERCLOSETS General 15 10

D2010 PLUMBING FIXTURES 2005 D201002 URINALS General 15 10

D2010 PLUMBING FIXTURES 2005 D201003 LAVATORIES General 15 10

D2010 PLUMBING FIXTURES 2005 D201004 SINKS Service Sink 15 10

D2010 PLUMBING FIXTURES 2005 D201006 DRINKING FOUNTAINS AND COOLERS Drinking Fountain 15 10

D2020 DOMESTIC WATER

DISTRIBUTION

2005 D202001 PIPES & FITTINGS General 15 35

D2020 DOMESTIC WATER

DISTRIBUTION

2005 D202003 DOMESTIC WATER EQUIPMENT Booster Pump - 5 HP 15 10

D2020 DOMESTIC WATER

DISTRIBUTION

2005 D202003 DOMESTIC WATER EQUIPMENT Water Heaters, Commercial, G 95 MBH i t 86 GPH

15 5

D2020 DOMESTIC WATER

DISTRIBUTION

2005 D202003 DOMESTIC WATER EQUIPMENT Water Treatment Equipment 15 10

D2020 DOMESTIC WATER

DISTRIBUTION

2005 A D202003 DOMESTIC WATER EQUIPMENT Storage Tank - Galvanized t l 300 ll 36" i t 76" L O

15 26

D2030 SANITARY WASTE 2005 D203001 WASTE PIPE & FITTINGS General 15 35

D2030 SANITARY WASTE 2005 D203002 VENT PIPE & FITTINGS General 15 5

D2030 SANITARY WASTE 2005 D203003 FLOOR DRAINS General 15 10

D30 HVAC D3020 HEAT GENERATING SYSTEMS 2005 D302004 AUXILIARY EQUIPMENT Boiler Feedwater Tank - Shot chemical feeder by pass in line mount 1 7 gal

15 10

D3020 HEAT GENERATING SYSTEMS 2005 D302004 AUXILIARY EQUIPMENT Expansion Tank - 15 gal 15 16

D3020 HEAT GENERATING SYSTEMS 2005 D302005 EQUIPMENT THERMAL INSULATION General 15 10

D3020 HEAT GENERATING SYSTEMS 2005 E110 B1 D302001 BOILERS Gas, Hot Water - 500-650 MBH 15 16

D3020 HEAT GENERATING SYSTEMS 2005 E110 B2…