This federal contract opportunity solicitation seeks proposals for construction services at the Dayton National Cemetery in Ohio. The Department of Veterans Affairs National Cemetery Administration is soliciting bids to perform repairs and construction projects including renovating the Public Information Center and Administration Building, repairing roads throughout the cemetery, and replacing the committal shelter building. Proposals are due by the date listed in the solicitation number 36C78623B0033. The contract will be awarded to the responsible bidder whose proposal follows the solicitation instructions and is most advantageous to the Government considering price and other factors. The selected contractor must perform the construction services and be available for inspections and completion by the project deadlines outlined in the final award.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MONTGOMERY COUNTY, OHIO
810CM3030
JULY 28, 2023 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
DAYTON NATIONAL CEMETERY
PIC/ADMIN BLDG, REPLACE COMMITTAL
SHELTER B, AND ROAD REPAIRSIntegrity Federal Services
(304) 725-8456
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 D
AY
TO
N
NA
TI
ON
AL
C
EM
ET
ER
Y\
EN
GI
N\
PL
AN
S\
GI
1.D
W G
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Apogee Consulting Group
(919) 858-7420
Foresite Group
(770) 368-1399
The LA Group
(518) 587-8100 GI001
COVER SHEET
DAYTON NATIONAL CEMETERY
PIC/ADMIN BLDG, REPLACE COMMITTAL
SHELTER B, AND ROAD REPAIRS
PROJECT NUMBER: 810CM3030
BID DOCUMENTS
MONTGOMERY COUNTY, OHIO
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
DRAWING INDEX
NO. DRAWING DRAWING TITLE
GENERAL
1. GI001 COVER SHEET
2. GI002 GENERAL NOTES, SYMBOLS, AND ABBREVIATIONS
3. VL001 SOIL BORING PLAN
4. VL100 OVERALL EXISTING CONDITIONS PLAN
5. VL101 EXISTING CONDITIONS PLAN
6. VL102 EXISTING CONDITIONS PLAN
7. VL103 EXISTING CONDITIONS PLAN
8. VL104 EXISTING CONDITIONS PLAN
9. VL105 EXISTING CONDITIONS PLAN
10. VL106 EXISTING CONDITIONS PLAN
11. VL107 EXISTING CONDITIONS PLAN
12. VL108 EXISTING CONDITIONS PLAN
13. VL109 EXISTING CONDITIONS PLAN
14. VL110 EXISTING CONDITIONS PLAN
15. GC100 CONSTRUCTION SEQUENCE PLAN
16. GC101 CONSTRUCTION SEQUENCE PLAN
CLIN 001
GENERAL
17. G-002 GENERAL INFORMATION
18. G-003 CONSTRUCTION MOBILIZATION PLAN
19. G-004 ARCHITECTURAL SITE AND LIFE SAFETY PLAN
20. G-005 CODE SUMMARY - NFPA 101
STRUCTURAL
21. S-001 GENERAL NOTES
22. S-101 FOUNDATION PLAN - ADMINISTRATION BUILDING
23. S-102 FOUNDATION AND FRAMING PLANS - EXIST. ADMINISTRATION BUILDING
RENOVATION
24. S-103 FOUNDATION AND FRAMING PLANS - HONOR GUARD BUILDING
25. S-104 FOUNDATION AND FRAMING PLANS - MAINTENANCE SHED
26. S-106 ROOF FRAMING PLAN - ADMINISTRATION BUILDING
27. S-301 FOUNDATION DETAILS
28. S-401 MASONRY DETAILS
29. S-501 STEEL DETAILS
30. S-502 LATERAL FRAME ELEVATIONS
31. S-503 TRUSS PROFILES
ARCHITECTURAL
32. A-001 ARCHITECTURAL SYMBOLS ABBREVIATIONS AND NOTES
33. AD101 FIRST FLOOR DEMOLITION PLAN - EXIST. ADMINISTRATION BUILDING
34. AD111 DEMOLITION REFLECTED CEILING PLAN - EXIST. ADMINISTRATION BLDG.
35. A-101 FIRST FLOOR PLAN - ADMINISTRATION BLDG. AND PUBLIC RESTROOMS
36. A-102 FIRST FLOOR PLAN - EXIST. ADMINISTRATION BLDG. RENOVATION
37. A-103 FIRST FLOOR & ROOF PLANS - HONOR GUARD BUILDING
38. A-104 FIRST FLOOR & REFLECTED CEILING PLANS - COVERED SHED
39. A-106 ROOF PLAN - ADMINISTRATION BLDG.
40. A-110 FIRST FLOOR REFLECTED CEILING PLAN - ADMINISTRATION BLDG.
41. A-111 FIRST FLOOR REFLECTED CEILING PLAN - EXIST. ADMINISTRATION BLDG.
42. A-112 FIRST FLOOR REFLECTED CEILING PLAN - HONOR GUARD BUILDING
43. A-201 EXTERIOR ELEVATIONS - ADMINISTRATION BLDG.
44. A-202 EXTERIOR ELEVATIONS- HONOR GUARD BLDG.
45. A-301 BUILDING SECTIONS - ADMINISTRATION BLDG.
46. A-302 BUILDING SECTIONS - HONOR GUARD BLDG.
47. A-310 WALL SECTIONS - NEW AND EXISTING ADMINISTRATION BLDGS.
48. A-311 WALL SECTIONS - HONOR GUARD BLDG.
49. A-312 WALL SECTIONS - EXISTING ADMINISTRATION BLDG.
50. A-501 PARTITION TYPES
51. A-502 EXTERIOR MASONRY DETAILS
52. A-503 EXTERIOR METAL PANEL DETAILS
53. A-506 EXTERIOR PENETRATION DETAILS
54. A-521 INTERIOR COLUMN DETAILS
55. A-601 DOOR SCHEDULE, ELEVATIONS AND DETAILS, WINDOW TYPES
56. A-602 LOUVER SCHEDULE
INTERIORS
57. I-001 GENERAL NOTES, ABBREVIATIONS AND ROOM FINISH SCHEDULE
58. I-101 FIRST FLOOR FINISH, SIGNAGE, AND WALL PROTECTION PLAN -
ADMINISTRATION BLDG.
59. I-102 FIRST FLOOR FINISH, SIGNAGE, AND WALL PROTECTION PLAN - EXIST.
ADMINISTRATION BLDG. RENOVATION
60. I-103 FIRST FLOOR FINISH, SIGNAGE AND WALL PROTECTION PLAN - HONOR
GUARD BLDG.
61. I-201 CASEWORK AND MILL WORK ELEVATIONS
62. I-202 CASEWORK DETAILS
63. I-411 FIRST FLOOR EQUIPMENT PLAN - ADMINISTRATION BLDG.
64. I-412 FIRST FLOOR EQUIPMENT PLAN - EXIST. ADMINISTRATION BLDG.
RENOVATION
65. I-413 FIRST FLOOR EQUIPMENT PLAN - HONOR GUARD BLDG.
66. I-421 ENLARGED EQUIPMENT PLANS
67. I-422 ENLARGED EQUIPMENT PLANS
68. I-431 ENLARGED TOILET PLANS AND ELEVATIONS
69. I-432 ENLARGED TOILET PLANS AND ELEVATIONS
70. I-433 ENLARGED TOILET PLANS AND ELEVATIONS
71. I-434 ENLARGED TOILET PLANS AND ELEVATIONS
72. I-501 INTERIOR ELEVATIONS AND DETAILS
73. I-601 EQUIPMENT SCHEDULE
74. I-901 INTERIOR RENDERINGS
PLUMBING
75. P-001 PLUMBING GENERAL INFORMATION
76. PD101 FIRST FLOOR PLUMBING DEMOLITION PLAN
77. PP101 ADMINISTRATION BLDG. DOMESTIC WATER PLAN
78. PP102 EXIST. ADMINISTRATION BLDG. DOMESTIC WATER PLAN
79. PP103 HONOR GUARD BLDG. DOMESTIC WATER PLAN
80. PP104 ADMINISTRATION BLDG. SEWER PLAN
81. PP105 EXIST. ADMINISTRATION BLDG. SEWER PLAN
82. PP106 HONOR GUARD BLDG. SEWER PLAN
83. P-501 PLUMBING DETAILS AND SCHEDULES
84. P-601 PLUMBING SCHEDULES
MECHANICAL
85. M-001 MECHANICAL GENERAL INFORMATION
86. MD101 FIRST FLOOR MECHANICAL DEMOLITION PLAN
87. MD102 ROOF MECHANICAL DEMOLITION PLAN
88. MH101 ADMINISTRATION BLDG. HVAC PLAN
89. MH102 EXIST. ADMINISTRATION BLDG. HVAC PLAN
90. MH103 HONOR GUARD BLDG. HVAC PLAN
91. M-501 MECHANICAL DETAILS
92. M-502 MECHANICAL CONTROLS
93. M-601 MECHANICAL SCHEDULES
ELECTRICAL
94. E-001 ELECTRICAL GENERAL NOTES, SYMBOL LEGENDS, AND ABBREVIATIONS
95. ES101 ELECTRICAL SITE PLAN
96. ED101 FIRST FLOOR ELECTRICAL DEMOLITION PLAN
97. EL101 FIRST FLOOR LIGHTING PLAN - ADMINISTRATION BLDG.
98. EL102 FIRST FLOOR LIGHTING PLAN - EXIST. ADMINISTRATION BLDG.
99. EL103 FIRST FLOOR LIGHTING PLAN - HONOR GUARD BUILDING
100. EP101 FIRST FLOOR POWER PLAN - ADMINISTRATION BLDG.
101. EP102 FIRST FLOOR POWER PLAN - EXIST. ADMINISTRATION BLDG.
102. EP103 FIRST FLOOR POWER PLAN - HONOR GUARD BUILDING
103. E-501 ELECTRICAL DETAILS
104. E-601 SINGLE LINE DIAGRAMS
105. E-602 PANEL SCHEDULES
106. E-603 ELECTRICAL EQUIPMENT SCHEDULES
FIRE ALARM
107. FA001 FIRE ALARM GENERAL NOTES SYMBOL LEGEND AND RISER
108. FA101 FIRST FLOOR FIRE ALARM PLAN - ADMINISTRATION BLDG.
109. FA102 FIRST FLOOR FIRE ALARM PLAN - EXIST. ADMINISTRATION BLDG.
110. FA103 FIRST FLOOR FIRE ALARM PLAN - HONOR GUARD BUILDING
TECHNOLOGY
111. T-001 TECHNOLOGY GENERAL NOTES SYMBOL LEGEND AND ABBREVIATIONS
112. T-101 FIRST FLOOR TECHNOLOGY PLAN - ADMINISTRATION BLDG.
113. T-102 FIRST FLOOR TECHNOLOGY PLAN - EXIST. ADMINISTRATION BLDG.
114. T-103 FIRST FLOOR TECHNOLOGY PLAN - HONOR GUARD BLDG.
115. T-401 TECHNOLOGY ENLARGEMENTS
116. T-501 TECHNOLOGY DETAILS
117. T-502 TECHNOLOGY DETAILS
CLIN 002 & CLIN 003
CIVIL
118. GC111 EROSION & SEDIMENT CONTROL PLAN PHASE I
119. GC112 EROSION & SEDIMENT CONTROL PLAN PHASE I
120. GC113 EROSION & SEDIMENT CONTROL PLAN PHASE I
121. GC114 EROSION & SEDIMENT CONTROL PLAN PHASE I
122. GC121 EROSION & SEDIMENT CONTROL PLAN PHASE II
123. GC122 EROSION & SEDIMENT CONTROL PLAN PHASE II
124. GC123 EROSION & SEDIMENT CONTROL PLAN PHASE II
125. GC124 EROSION & SEDIMENT CONTROL PLAN PHASE II
126. GC501 EROSION & SEDIMENT CONTROL NOTES AND DETAILS
127. CD101 SITE DEMOLITION PLAN (BASE BID)
128. CD102 SITE DEMOLITION PLAN (BASE BID)
129. CD103 SITE DEMOLITION PLAN (BASE BID)
130. CD104 SITE DEMOLITION PLAN (BASE BID)
131. CD111 SITE DEMOLITION PLAN (BID OPTION 1)
132. CD112 SITE DEMOLITION PLAN (BID OPTION 1)
133. CD113 SITE DEMOLITION PLAN (BID OPTION 1)
134. CD114 SITE DEMOLITION PLAN (BID OPTION 1)
135. CS101 SITE PLAN (BASE BID)
136. CS102 SITE PLAN (BASE BID)
137. CS103 SITE PLAN (BASE BID)
138. CS104 SITE PLAN (BASE BID)
139. CS111 SITE PLAN (BID OPTION 1)
140. CS112 SITE PLAN (BID OPTION 1)
141. CS113 SITE PLAN (BID OPTION 1)
142. CS114 SITE PLAN (BID OPTION 1)
143. CT201 ROAD PLAN & PROFILE
144. CS501 SITE DETAILS
145. CS502 SITE DETAILS
146. CS503 SITE DETAILS
147. CG101 GRADING PLAN
148. CG111 RETAINING WALL PLAN AND PROFILE
149. CG112 RETAINING WALL DETAILS
150. CG113 RETAINING WALL DETAILS
UTILITIES
151. CU101 SITE UTILITY PLAN
152. CU201 SANITARY SEWER PLAN AND PROFILE
153. CU501 SANITARY SEWER DETAILS
154. CU231 WATER MAIN PLAN AND PROFILES
155. CU531 WATER DETAILS
156. CU532 WATER DETAILS
157. CU261 STORM PROFILES
158. CU561 STORM SEWER DETAILS
159. CU562 STORM SEWER DETAILS
160. CU761 STORM SEWER COMPUTATIONS
STORM WATER MANAGEMENT
161. CJ101 PRE DEVELOPMENT DRAINAGE AREA MAP
162. CJ102 POST DEVELOPMENT DRAINAGE AREA MAP
163. CJ103 WATER QUALITY MAP
164. CJ501 STORM WATER MANAGEMENT NARRATIVE AND DETAILS
SITE IMPROVEMENTS
165. CI100 SITE FURNISHINGS PLAN
166. CI110 SITE SIGNAGE PLAN
167. CI501 SITE FURNISHINGS DETAILS
168. CI510 SITE SIGNAGE DETAILS 1
169. CI511 SITE SIGNAGE DETAILS 2
170. CI512 SITE SIGNAGE DETAILS 3
171. CI513 TEMPORARY SITE SIGNAGE DETAILS
172. CI600 SITE SIGNAGE AND SITE FURNISHINGS SCHEDULE
LANDSCAPING
173. LS100 OVERALL LANDSCAPE PLAN
174. LS101 PIC / ADMINISTRATION BUILDING LANDSCAPE PLAN ENLARGEMENT
175. LS102 STORMWATER MANAGEMENT AREA LANDSCAPE PLAN ENLARGEMENT
176. LS500 LANDSCAPE DETAILS AND SCHEDULE
STRUCTURAL
177. S-001 GENERAL NOTES
178. S-101 FOUNDATION PLAN - SHELTER BUILDING
179. S-201 ROOF FRAMING PLAN - SHELTER BUILDING
180. S-301 FOUNDATION DETAILS
181. S-401 MASONRY DETAILS
182. S-501 STEEL DETAILS
ARCHITECTURAL
183. A-101 FLOOR, REFLECTED CEILING, ROOF PLANS, & DOOR SCHEDULE -
SHELTER B
184. A-201 EXTERIOR ELEVATIONS
185. A-301 WALL SECTIONS - COMMITTAL SHELTER
ELECTRICAL
186. E-102 COMMITAL SHELTER POWER AND LIGHTING PLAN
Know what's below.
before you dig.Call
R
DAYTON NATIONAL CEMETERY
INTEGRITY FEDERAL SERVICES
148 SOUTH QUEEN STREET, SUITE 201
MARTINSBURG, WV 25401
304-725-8456
APOGEE CONSULTING GROUP
1151 KILDAIRE FARM ROAD
CARY, NC 27511
919-858-7420
FORESITE GROUP
3740 DAVINCI COURT, SUITE 100
PEACHTREE CORNERS, GEORGIA 30092
770-368-1399
THE LA GROUP
40 LONG ALLEY
SARATOGA SPRINGS, NY 12866
518-587-8100
NO. DRAWING DRAWING TITLE
MD RPP
U.S. Department of Veterans Affairs
NO. DRAWING DRAWING TITLE
AutoCAD SHX Text
PREPARED BY
AutoCAD SHX Text
CONSULTANTS
AutoCAD SHX Text
REGIONAL MAP (N.T.S.)
AutoCAD SHX Text
LOCAL MAP (N.T.S.)
AutoCAD SHX Text
PROJECT LOCATION
AutoCAD SHX Text
SITE
AutoCAD SHX Text
W THIRD ST
AutoCAD SHX Text
LISCUM DR
AutoCAD SHX Text
S GETTYSBURG AVE
AutoCAD SHX Text
AutoCAD SHX Text
LAKE ERIE
AutoCAD SHX Text
WEST VIRGINIA
AutoCAD SHX Text
INDIANA
AutoCAD SHX Text
COLUMBUS
AutoCAD SHX Text
MICHIGAN
AutoCAD SHX Text
KENTUCKY
AutoCAD SHX Text
CLEVELAND
AutoCAD SHX Text
PENNSYLVANIA
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MONTGOMERY COUNTY, OHIO
810CM3030
JULY 28, 2023 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
DAYTON NATIONAL CEMETERY
PIC/ADMIN BLDG, REPLACE COMMITTAL
SHELTER B, AND ROAD REPAIRSIntegrity Federal Services
(304) 725-8456
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 D
AY
TO
N
NA
TI
ON
AL
C
EM
ET
ER
Y\
EN
GI
N\
PL
AN
S\
GI
2.D
W G
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Apogee Consulting Group
(919) 858-7420
Foresite Group
(770) 368-1399
The LA Group
(518) 587-8100 GI002
GENERAL NOTES, SYMBOLS, AND
ABBREVIATIONS
PROPOSED
BOUNDARY/RIGHT-OF-WAY LINE
ADJACENT BOUNDARY LINE
EASEMENT LINE
ROAD CENTERLINE
HEADER CURB
CURB & GUTTER
EDGE OF PAVEMENT
CHAIN LINK FENCE
OVERHEAD UTILITY LINE
UNDERGROUND UTILITY LINE
WATER MAIN
BUILDINGS
CONCRETE SIDEWALK
SANITARY SEWER MAIN
STORM SEWER LINE
TREES/SHRUBS
LIMITS OF GRADING
INDEX CONTOUR LINE
INTERMEDIATE CONTOUR LINE
SPOT ELEVATIONS
MISCELLANEOUS SIGNS
SITE LIGHT WITH POLE
DRIP LINE OF TREES
BOARD FENCE
SOIL BOUNDARY
WIRE FENCE
EDGE OF GRAVEL
GUARDRAIL
EDGE OF CONCRETE
SANITARY SEWER CLEANOUT
SANITARY SEWER MANHOLE
STORM SEWER MANHOLE
STORM SEWER YARD INLET
STORM SEWER CATCH BASIN
STORM SEWER RIP-RAP
STORM SEWER END SECTION
FIRE HYDRANT
WATER VALVE
WATER METER
MAIL BOX
UTILITY POLE
FEATURE WALL
OVERHEAD COMMUNICATIONS LINE
UNDERGROUND COMMUNICATIONS LINE
GROUND LIGHT
UTILITY POLE GUY WIRE
SANITARY SEWER FORCE MAIN
LIMITS OF WORK
FAR FLOOR AREA RATIO
FC FACE OF CURB
FD FOUNTAIN DRAIN
FF FIRST FLOOR OR FINISHED FLOOR
FG FINISHED GRADE
FH FIRE HYDRANT
FIN FINISHED
FLR FLOOR
FN FENCE
FP FLOOD PLAIN
FOC FACE OF CURB
FOY FOYER
FP FLAG POLE OR FIRE PROTECTION
FPS FEET PER SECOND
FR FROM
FT FEET
G GAS
GAL GALLON
GDR GUARD RAIL
GEN GENERATOR
GFA GROSS FLOOR AREA
GIP GALVANIZED IRON PIPE
GL GROUND LEVEL
GOVT GOVERNMENT
GR GRADE
GR GUARD RAIL
GS GROUND SHOT
H HORIZONTAL
HC HANDICAP
HCP HANDICAPPED
HDPE HIGH DENSITY POLYETHYLENE
HDR HEADER
HDWL HEADWALL
HGL HYDRAULIC GRADE LINE
HH HAND HOLE
HLBC HOT LAID BITUMINOUS CONCRETE
HMA MOT-MIX ASPHALT
HP HIGH POINT OR HIGH PRESSURE
HR HAND RAIL
HT HEIGHT
HW HOT WATER
HWSR HOT WATER SUPPLY & RETURN
HWY HIGHWAY
HYD HYDRANT
HYDR HYDRAULIC
I RAINFALL INTENSITY
I.E. INVERT ELEVATION
ID INSIDE DIAMETER
IGC IN-GROUND CRYPT
IN INCH
INV INVERT
IP IRON PIPE
IPF IRON PIPE FOUND
IPS IRON PIPE SET
IRR IRRIGATION
IW IRRIGATION WATER
JB JUNCTION BOX
K ONE THOUSAND (KILO)
KWY KEYWAY
L LENGTH
LAT LATERAL
LF LINEAR FEET
LOC LOCATION
LONG LONGITUDE
LOS LINE OF SIGHT
LP LOW POINT OR LOW PRESSURE
LT LIGHT OR LEFT
LL LOWER LEVEL
MAINT MAINTENANCE
MAT MATERIAL
MAX MAXIMUM
MB MAIL BOX
MECH MECHANICAL
MED MEDIUM
MEMO MEMORANDUM
MEP MECHANICAL, ELECTRICAL, PLUMBING
MFG MANUFACTURING
MGT MANAGEMENT
MH MANHOLE
MI MILE
MIN MINIMUM
MISC MISCELLANEOUS
ML MATERIALS LIST
MN MAGNETIC NORTH
MOD MODEL OR MODIFY
MON MONUMENT
MS MEDIAN STRIP
MSL MEAN SEA LEVEL
MTG MEETING
MTL MATERIAL
MULT MULTIPLE
MUNIC MUNICIPAL
N NORTH
N/F NOW OR FORMERLY
NA NOT APPLICABLE
NAT NATURAL
NATL NATIONAL
NBC NATIONAL BUILDING CODE
NBL NORTH BOUND LANE
NCA NATIONAL CEMETERY ADMINISTRATION
NE NOT EXCEEDING
NFA NET FLOOR AREA
NIC NOT IN CONTRACT
NO NUMBER
NOM NOMINAL
NRCP NON-REINFORCED CONCRETE PIPE
NTP NOT TO PROCEED
NTS NOT TO SCALE
OC ON CENTER
OD OUTSIDE DIAMETER
OFD OVERFLOW DRAIN
OH OVERHANG
OHC OVERHEAD COMMUNICATIONS
OHE OVERHEAD ELECTRIC
OS OVER-SIZED
OZ OUNCE
P PERIMETER
PAR PARALLEL
PAT PATTERN
PB PULL BOX
PC POINT OF CURVATURE
PCA PORTLAND CEMENT ASSOCIATION
PCC POINT OF COMPOUND CURVE
PCEP POINT OF CURVE, EDGE OF PAVEMENT
PCT PERCENT
PCTC POINT OF CURVE, TOP OF CURB
PERF PERFORATED
PED PEDESTAL
PG PAGE
PGL POINT OF GRADE LINE
PH PROFILE HOLE
PI POINT OF INTERSECTION
PIC PUBLIC INFORMATION CENTER
A AREA OR ARC
AC ACRE
A/C AIR CONDITIONING
ADA AMERICANS WITH DISABILITIES ACT
ADMIN ADMINISTRATION
AGE ABOVE GROUND ELECTRIC
AGEC ABOVE GROUND ELECTRIC CONDUIT
ANSI AMERICAN NATIONAL STANDARDS INSTITUTE
APPROX APPROXIMATE
ARCH ARCHITECTURAL
ASPH ASPHALT
AST ABOVE-GROUND STORAGE TANK
AVE AVENUE
AWWA AMERICAN WATER WORKS ASSOCIATION
A/C AIR CONDITIONING
BC BOTTOM OF CURB
BF BASEMENT FLOOR
BFP BACKFLOW PREVENTER
BFV BUTTERFLY VALVE
BITUM BITUMINOUS
BL BASE LINE
BLDG BUILDING
BLVD BOULEVARD
BM BENCHMARK
BOE BOTTOM OF EXCAVATION
BOV BLOW OFF VALVE
BRG BEARING
BRL BUILDING RESTRICTION LINE
BV BALL VALVE
BW BOTTOM OF WALL
C COEFFICIENT OF RUNOFF
CALC CALCULATE
CB CATCH BASIN OR CHORD BEARING
CC CENTER TO CENTER
CCTV CLOSED CIRCUIT TELEVISION
CD CONSTRUCTION DOCUMENTS OR CONTRACT
DOCUMENTS
CDW CHILLED DRINKING WATER
CDWR CHILLED DRINKING WATER RETURN
CDWS CHILLED DRINKING WATER SUPPLY
CEM CEMENT OR CEMETERY
CF CONTRACTOR FURNISHED
CFS CUBIC FEET PER SECOND
CG CURB AND GUTTER
CHD CHORD
CIP CAST IRON PIPE
CJ CONTRACTION JOINT
CL CENTERLINE
CMP CORRUGATED METAL PIPE
CMU CONCRETE MASONRY UNIT
CND CONDUIT
CNR CORNER
CO CLEANOUT
COL COLUMN
COMM COMMUNICATIONS
CONC CONCRETE
COND CONDITION OR CONDENSER
CONF CONFERENCE
CONN CONNECTION
CON CONTAMINATED
CONSTR CONSTRUCTION
CONT CONTINUATION
CONTR CONTRACT OR CONTRACTOR
COR CONTRACTING OFFICER'S REPRESENTATIVE
COTG CLEANOUT TO GRADE
COV COVER OF CUT OFF VALVE
CPP CORRUGATED PLASTIC PIPE
CRN CROWN
CSB CONCRETE SPLASH BLOCK
CSI CONSTRUCTION SPECIFICATIONS INSTITUTE
CSS COMMITTAL SERVICE SHELTER
CSP CONCRETE SEWER PIPE
CT COURT
CTR CENTER OR CONTOUR
CTRL CONTROL
CTS COOLING TOWER SUPPLY
CTV CABLE TELEVISION
CV CONTROL VALVE
CW CLOCKWISE
CWP COLD WATER PIPING
D DEPTH
DAT DATUM
DB DEED BOOK OR DESIGN-BUILD
DBL DOUBLE
DEG DEGREE
DEMO DEMOLITION
DEPT DEPARTMENT
DESC DESCRIPTION
DET DETAIL
DI DROP INLET
DIA DIAMETER
DIFF DIFFERENCE
DIP DUCTILE IRON PIPE
DIST DISTANCE
DM DROP MANHOLE
DOC DOCUMENT
DOM DOMESTIC
DR DRIVE
DRE DECOMPOSED ROCK ELEVATION
DS DOWNSPOUT
DWG DRAWING
D/W DRIVEWAY
D DELTA
EA EACH
EBL EAST BOUND LANE
EC EDGE OF CONCRETE
EG EDGE OF GUTTER
EJ EXPANSION JOINT
ELEV ELEVATION
ELEC ELECTRICAL
ENTR ENTRANCE
EOI END OF INFORMATION
EP EDGE OF PAVEMENT
EPA ENVIRONMENTAL PROTECTION AGENCY
E&S EROSION & SEDIMENT
ES END SECTION
ESMT EASEMENT
ETO EARLY TURNOVER
EPT EXTERNAL PIPE THREAD
EQ EQUAL
EW END WALL
EXP EXPANSION
EX EXISTING
EXT EXTERIOR
PIV POST INDICATOR VALVE
PL PROPERTY LINE
POTW POTABLE WATER
PP POLYPROPYLENE (PLASTIC)
PPC PRE-PLACED CRYPT
PRC POINT OF REVERSE CURVE
PRELIM PRELIMINARY
PROP PROPOSED
PSI POUNDS PER SQUARE INCH
PSL PIPE SLEEVE
PT POINT OF TANGENCY
PV PRIVATE VAULT
PVC POLY VINYL CHLORIDE (PLASTIC PIPE)
PVI POINT OF VERTICAL INTERSECTION
PVMT PAVEMENT
PVT POINT OF VERTICAL TANGENCY
P&P PLAN AND PROFILE
Q FLOW, AMOUNT OF RUNOFF
QTR QUARTER
QTY QUANTITY
QUAD QUADRANT
QUAL QUALITY
R RISER, RADIUS
RAD RADIANS
RCP REINFORCED CONCRETE PIPE/REFLECTED
CEILING PLAN
RD ROAD, ROOF DRAIN
RDC REDUCER
RE RESIDENT ENGINEER
REP REPAIR
REQ REQUIRED
REV REVISION
RGP ROUGH GRADING PLAN
RPA RESOURCE PROTECTION AREA
RR RAILROAD
RTE ROUTE
RT RIGHT
RV RELIEF VALVE
RW RETAINING WALL
R/W RIGHT-OF-WAY
SAN SANITARY
SB SPLASH BLOCK
SBL SOUTH BOUND LANE
SCHED SCHEDULE
SD STORM DRAIN
SDMH STORM DRAIN MANHOLE
SEC SECTION
SEG SEGMENT
SEL SELECT
SEW SEWER
SF SQUARE FEET
SJ SCORED JOINT
SLV SLEEVE
SMH STEAM MANHOLE
SOV SHUT OFF VALVE
SP SITE PLAN
SPEC SPECIFICATION
SPKLR SPRINKLER
SQ SQUARE
SS SANITARY SEWER, STORM SEWER OR STEAM
SUPPLY
ST STREET
STA STATION
STD STANDARD
STE STEAM
STK STACK
STM STORM
SUPT SUPPORT
SURV SURVEY
SVC SERVICE
S/W SIDEWALK
SWG SEWAGE
Sx CROSS SLOPE
SYM SYMBOL
T TANGENT
T&M TIME AND MATERIALS
TB TEST BORE
TC TOP OF CURB
TCP TERRA COTTA PIPE, TRAFFIC CONTROL PLAN
TELE TELEPHONE
TH TEST HOLE
TNL TUNNEL
TOB TOP OF BANK
TOC TOP OF CURB
TOP TOP OF PAVEMENT
TOPO TOPOGRAPHY
TP TEST PIT, TELEPHONE POLE
TW TOP OF WALL
TYP TYPICAL
UD UNDERDRAIN
U/G UNDERGROUND
UGC UNDERGROUND COMMUNICATIONS
UGE UNDERGROUND ELECTRIC
UFC UNIFORM FIRE CODE
UL UPPER LEVEL
UON UNLESS OTHERWISE NOTED
UP UTILITY POLE
UTIL UTILITY
V VERTICAL
VA VETERANS ADMINISTRATION, VIRGINIA
VAR VARIES
VC VERTICAL CURVE
VEL VELOCITY
VERT VERTICAL
VF VERTICAL FOOT
VIC VICINITY
VID VIDEO
VIF VERIFY IN FIELD
VOL VOLUME
W WATER, WEST OR WIDE
W/ WITH
W/O WITHOUT
WBL WEST BOUND LANE
WI WROUGHT IRON
WL WATER LINE
WM WATER MAIN OR WATER METER
WO WORK ORDER
WSE WATER SURFACE ELEVATION
WT WATER TIGHT
WW WASTE WATER
X-ING CROSSING
YI YARD INLET
YR YEAR
Z SIDE SLOPES
UNDERGROUND GAS LINE
HEADSTONE FACE DIRECTION
BURIAL CRYPT PLOTS
DRIP LINE OF BRUSH
WETLANDS
GRAVESITE GRID MONUMENT
BURIAL SECTION MARKER
UTILITY BOX
FLAG SLEEVES/MISCELLANEOUS POSTS
MOUNTABLE CURB
CIVIL LEGEND ABBREVIATIONS
STORM DRAINAGE CLEANOUT
COLUMBARIUM NICHE SECTION
RETAINING WALL
DRAINAGE FLOW ARROW
GENERAL NOTES:
1. THE PROPOSED IMPROVEMENTS FOR 'DAYTON NATIONAL CEMETERY PIC/ADMNIN BLDG, REPLACE COMMITTAL SHELTER B, AND ROAD REPAIRS' INCLUDES, BUT IS NOT
LIMITED TO,
1.1. DEMOLITION OF A PORTION OF THE EXISTING ADMINISTRATION BUILDING.
1.2. RENOVATION OF THE REMAINING ADMINISTRATION-MAINTENANCE BUILDING.
1.3. CONSTRUCTION OF A NEW ADMINISTRATION BUILDING AND A SEPARATE HONOR GUARD BUILDING.
1.4. CONSTRUCTION OF UTILITIES INCLUDING WATER, SANITARY SEWER, AND STORM SEWER.
1.5. CONSTRUCTION OF STORMWATER MANAGEMENT FACILITIES.
1.6. FULL DEPTH REPLACEMENT AND MILL & OVERLAY OF ASPHALT ROADWAYS, REPLACEMENT OF CONCRETE CURB/GUTTERS, REPAIR/REPLACEMENT OF STORM DRAINAGE
SYSTEM COMPONENTS.
1.7. CONSTRUCTION OF CORTEGE LANE(S).
1.8. CONSTRUCTION OF ADDITIONAL PARKING AT ADMINISTRATION-MAINTENANCE BUILDING AND CONSTRUCTION OF PARKING AT THE NEW HONOR GUARD BUILDING.
1.9. DEMOLITION AND REPLACEMENT OF COMMITTAL SERVICE SHELTER B.
THE PROJECT IS LOCATED IN MONTGOMERY COUNTY, OHIO.
2. THE TOPOGRAPHIC SURVEY WAS PREPARED BY MONUMENT ENGINEERING GROUP ASSOCIATES, INC. IN MAY 2022. THE TOPOGRAPHIC CONTOUR INTERVAL IS ONE (1) FOOT.
THE HORIZONTAL DATUM IS REFERENCED TO US STATE PLANE COORDINATE SYSTEM, NAD83, OHIO SOUTH ZONE 3402, INTERNATIONAL FEET. THE VERTICAL DATUM IS TO BE
REFERENCED TO NAVD88.
3. THE SUBJECT PROPERTY IS LOCATED ON F.E.M.A. MAP 39113C0235E DATED JANUARY 6, 2005 THE SCOPE OF WORK LIES ENTIRELY IN ZONE (X) AREA DETERMINED TO BE
OUTSIDE OF THE 0.2% ANNUAL CHANCE FLOODPLAIN.
4. SEE THIS SHEET FOR LEGEND OF PROPOSED SYMBOLS USED ON ALL SHEETS AND SHEET VL100 EXISTING CONDITIONS PLAN FOR LEGEND OF EXISTING SYMBOLS.
5. BURIAL CEREMONIES MAY BE SCHEDULED THROUGHOUT THE COURSE OF THIS PROJECT. DURING ALL CEREMONIES, ALL WORK MUST STOP, ESPECIALLY WHEN HEAVY EQUIPMENT ACTIVITY OR NOISE PRODUCING WORK IS BEING DONE. LIGHT WORK ACTIVITY CAN CONTINUE IF IT DOES NOT CREATE NOISE OR DISTRACTIONS TO THE CEREMONY. COORDINATE DAILY ACTIVITIES WITH THE CEMETERY DIRECTOR OR HIS APPROVED REPRESENTATIVE TO ACCOMMODATE SCHEDULED BURIALS.
6. DUE TO THE SENSITIVE NATURE OF THE CEMETERY SITE, CONTRACTOR SHALL MAINTAIN EACH WORK AREA IN A CLEAN AND ORDERLY APPEARANCE. TRASH AND WASTE MATERIALS SHALL BE STORED IN APPROVED CONTAINERS AND ROUTINELY DISPOSED OF OFF-SITE. CLEANUP SHALL BE REQUIRED AT THE END OF EACH DAY AND/OR MORE
FREQUENTLY AS REQUIRED.
7. AFFECT OF WORK ON PUBLIC ACCESS SHALL BE MINIMIZED AND SHALL BE COORDINATED WITH THE CEMETERY DIRECTOR. ANY ALTERED PUBLIC TRAFFIC ROUTES SHALL BE WELL DEFINED WITH PROFESSIONALLY MADE SIGNAGE AND/OR OTHER APPROVED CONVENTIONAL METHODS. CONTRACTOR SHALL PROVIDE TWO SIGNS SIMILAR TO THE CEMETERY'S "PARDON OUR APPEARANCE" SIGNS. SIZE TO BE A MINIMUM OF 4'X5' HIGH MOUNTED ON TWO 4"X4" POSTS, PLACED IN A LOCATION AS DETERMINED BY THE CEMETERY DIRECTOR. TEXT SIZE SHALL BE MAXIMUM SIZE PROPORTIONAL TO WIDTH/HEIGHT OF SIGN. TEXT WILL BE PROVIDED BY CEMETERY DIRECTOR.
8. THERE SHALL BE AT ALL TIMES WHEN WORK IS BEING DONE, A COMPETENT PERSON WHO IS APPRISED OF THE CONDITION AND PROGRESS OF ALL AREAS OF WORK ON SITE.
THIS PERSON SHALL BE ABLE TO SPEAK FOR AND ACT IN THE BEHALF OF THE CONTRACTOR. THEY SHALL BE AWARE AND KNOWLEDGEABLE OF ALL THE SAFETY CONCERNS ON THE JOB SITE. THEY SHALL BE EMPOWERED TO IMMEDIATELY AND EFFECTIVELY MITIGATE THE ACTIONS OF ANY WORKMAN ON SITE.
CONSTRUCTION NOTES:
1. THE CONTRACTOR IS RESPONSIBLE FOR REVIEWING THE PLANS PRIOR TO CONSTRUCTION AND NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY
CIRCUMSTANCES FOUND WITHIN THESE PLANS IN NEED OF VERIFICATION SO THAT APPROPRIATE REVISIONS CAN BE MADE, IF WARRANTED.
2. THE CONTRACTOR IS RESPONSIBLE FOR ACQUIRING ALL APPLICABLE PERMITS.
3. DEVELOPMENT OF THE SITE INCLUDING CONSTRUCTION AND MATERIALS SHALL BE IN CONFORMANCE WITH THE U.S. DEPARTMENT OF VETERANS AFFAIRS REQUIREMENTS
AND LOCAL/STATE CONSTRUCTION STANDARDS AND SPECIFICATIONS, WHERE APPLICABLE.
4. EROSION AND SEDIMENT CONTROL DEVICES ARE TO BE IN PLACE PRIOR TO ANY CONSTRUCTION. REFER TO EROSION AND SEDIMENT CONTROL PLAN FOR PHASING AND
DETAILS.
5. ALL LAND ON OR OFF-SITE WHICH IS DISTURBED BY CONSTRUCTION AND WHICH IS NOT BUILT UPON OR SURFACED SHALL BE ADEQUATELY STABILIZED TO CONTROL EROSION
AND SEDIMENTATION.
6. THE CONTRACTOR SHALL BE RESPONSIBLE FOR NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY CHANGES OR CONDITIONS ATTACHED TO PERMITS
REQUIRED FOR CONSTRUCTION.
7. THE CONTRACTOR SHALL PROVIDE ADEQUATE MEANS OF CLEANING TRUCKS AND/OR EQUIPMENT OF MUD AND DEBRIS, PRIOR TO ENTERING PAVED AREAS. IT IS THE CONTRACTOR'S RESPONSIBILITY TO CLEAN STREETS OF MUD AND/OR LAYING DUST AND TO TAKE ALL APPROPRIATE MEASURES NECESSARY TO ENSURE THAT STREETS ARE
KEPT IN A CLEAN AND DUST FREE CONDITION AT ALL TIMES.
8. THE CONTRACTOR SHALL VISIT THE SITE AND SHALL VERIFY EXISTING CONDITIONS PRIOR TO STARTING CONSTRUCTION ACTIVITIES.
9. THE CONTRACTOR SHALL CLEAR THE SITE OF ALL TREES, BUILDINGS, FOUNDATIONS, ETC. WITHIN THE LIMITS OF CONSTRUCTION AND SHALL BE RESPONSIBLE FOR COORDINATING ANY DISCONNECTION AND/OR ABANDONMENT OF EXISTING UTILITIES AND STRUCTURES. IF NECESSARY, THE CONTRACTOR SHALL BE RESPONSIBLE FOR LOCATING AND ABANDONING ALL EXISTING WELLS AND/OR SEPTIC DRAIN FIELDS AND COORDINATING THEIR ABANDONMENT WITH THE HEALTH DEPARTMENT.
10. CONTRACTOR SHALL CONTACT OHIO 811 AT 1-800-362-2764 OR 811 A MINIMUM OF THREE (3) FULL BUSINESS DAYS PRIOR TO ANY EXCAVATION WITHIN AREAS SERVED BY UNDERGROUND UTILITIES. THE CONTRACTOR IS RESPONSIBLE FOR FIELD VERIFYING THE PRESENCE OF ANY UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION.
11. IFS DOES NOT CERTIFY TO THE LOCATION OF OR THE EXISTENCE OF ANY EXISTING UNDERGROUND UTILITIES. ANY UNDERGROUND UTILITIES SHOWN HEREON ARE BASED UPON AVAILABLE RECORDS AND DISCUSSION WITH THE OWNER. THIS DOES NOT CONSTITUTE A GUARANTEE OF THEIR ACTUAL LOCATIONS OR THAT THEY HAVE ALL BEEN SHOWN. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES PRIOR TO BEGINNING ANY CONSTRUCTION. THESE TEST HOLES WILL BE MADE TO VERIFY ALL CROSSINGS BETWEEN NEW AND EXISTING FACILITIES AND AT CRITICAL GRADE CHANGES. IF CONDITIONS ARE FOUND IN THE FIELD, WHICH ARE MATERIALLY DIFFERENT FROM THE PLANS, THE CONTRACTOR SHALL NOTIFY IFS SO THAT APPROPRIATE REVISIONS IF WARRANTED CAN BE MADE TO THE PLANS AT THE GOVERNMENT'S
EXPENSE.
12. IFS DOES NOT CERTIFY TO THE SUB-SURFACE CONDITIONS OF THE SITE OR THE LOCATION OF UNDERLYING ROCK. THE CONTRACTOR SHALL BE RESPONSIBLE FOR THE DIGGING OF TEST HOLES TO VERIFY SUB-SURFACE CONDITIONS PRIOR TO BEGINNING ANY CONSTRUCTION.
13. ALL TESTS, STUDIES, ETC., REQUIRED DURING CONSTRUCTION WILL BE CARRIED OUT BY A THIRD PARTY ENGINEERING FIRM AND PAID FOR BY THE CONTRACTOR.
14. ALL PROPOSED ELEVATIONS AS SHOWN HEREIN ARE FINISHED GRADE UNLESS OTHERWISE NOTED.
15. MAINTAIN A MINIMUM VERTICAL CLEARANCE OF ONE (1) FOOT SIX (6) INCHES BETWEEN CROSSING OF ALL UTILITY LINES UNLESS OTHERWISE NOTED.
16. EARTHWORK SHALL BE COMPACTED IN ACCORDANCE WITH SPECIFICATION 31 20 00.
17. THE CONTRACTOR AND/OR SURVEYOR SHALL BE RESPONSIBLE FOR NOTIFYING THE U.S. DEPARTMENT OF VETERANS AFFAIRS OF ANY CONDITIONS FOUND IN THE FIELD PRIOR TO STAKEOUT THAT VARY FROM THE APPROVED PLANS OR THAT MAKE CONSTRUCTABILITY IMPOSSIBLE SO THAT APPROPRIATE REVISIONS CAN BE MADE PRIOR TO STAKEOUT AND/OR CONSTRUCTION. ANY OBSERVATIONS REGARDING APPARENT INCONSISTENCIES IN THE PLANS SHALL BE BROUGHT TO THE U.S. DEPARTMENT OF
VETERANS AFFAIRS ATTENTION FOR VERIFICATION PRIOR TO STAKEOUT.
18. THE CONTRACTOR SHALL BE RESPONSIBLE FOR INITIATING, MAINTAINING AND SUPERVISING ALL SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE PERFORMANCE OF ITS WORK AND THE WORK OF ITS SUBCONTRACTORS. INTEGRITY FEDERAL SERVICES SHALL NOT HAVE CONTROL OVER, CHARGE OF, OR RESPONSIBILITY FOR THE CONSTRUCTION MEANS, METHODS, TECHNIQUES, SEQUENCES OR PROCEDURES OR FOR SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK.
MD RPP
IRRIGATION NOTES:
1. CONTRACTOR'S BID SHALL ASSUME REPAIR OF THE EXISTING IRRIGATION SYSTEM AND INSTALLATION OF A NEW FULLY FUNCTIONAL AUTOMATIC IRRIGATION SYSTEM
CONNECTED TO THE EXISTING IRRIGATION SYSTEM, WITHIN THE PROJECT WORK AREA. ALL NEW LANDSCAPE (TREES AND TURFGRASS) SHALL BE AUTOMATICALLY IRRIGATED TO SUPPORT HEALTHY, VIGOROUS PLANT GROWTH. CONTRACTOR SHALL SUBMIT FOR REVIEW AND APPROVAL THE IRRIGATION CONTRACTOR'S INSTALLERS EXPERIENCE FOR QUALITY ASSURANCE. IRRIGATION CONTRACTOR'S INSTALLERS SHALL HAVE A MINIMUM EXPERIENCE LEVEL OF INSTALLING AT LEAST FIVE (5) AUTOMATIC IRRIGATION SYSTEMS WITH IRRIGATION PIPES 6-INCH AND LARGER, WITHIN THE LAST TEN (10) YEARS. IRRIGATION CONTRACTOR AND SUPERINTENDENT MUST BE CURRENTLY IN GOOD STANDING WITH THE ASSOCIATION CERTIFIED IRRIGATION CONTRACTOR (CIC). IRRIGATION CONTRACTOR MUST BE LICENSED IN OHIO. IRRIGATION EQUIPMENT INSTALLED SHALL MATCH EXISTING IRRIGATION EQUIPMENT (NEW EQUIPMENT USED SHALL BE COMPATIBLE WITH THE EXISTING). IRRIGATION MAINS AND LINES SHALL NOT BE UNDER TREES OR IN CONFLICT WITH FOUNDATIONS. THERE SHALL BE NO IRRIGATION OVERSPRAY OUTSIDE OF LANDSCAPE AREAS. THE IRRIGATION SYSTEM ALSO NEEDS TO BE
ABLE TO BE COMPLETED DRAINED BEFORE WINTER.
2. EXISTING IRRIGATION SYSTEM IS SHOWN ON PLANS PER PROJECT "DAYTON NATIONAL CEMETERY - IRRIGATE ENTIRE CEMETERY" PROJECT 81CM3026 RECORD DRAWINGS
DATED JUNE 8, 2015 BY MTR LANDSCAPE ARCHITECTS AND HAS NOT BEEN FIELD LOCATED.
3. CONFIRM EXACT LIMITS OF IRRIGATED AREA AND ALL EXISTING AND FUTURE HARDSCAPE AND BURIAL AREAS PRIOR TO CONSTRUCTION.
4. COORDINATE UTILITY LOCATES ("CALL BEFORE YOU DIG") OF UNDERGROUND UTILITIES PRIOR TO CONSTRUCTION. CONTRACTOR RESPONSIBLE FOR LOCATING AND VERIFYING ALL UNDERGROUND UTILITIES AND CONDITIONS POTHOLING OR OTHER METHODS BEFORE EXCAVATING. LOCATIONS OF EXISTING WATER UTILITIES SHOWN ON DRAWINGS HAVE NOT BEEN FIELD VERIFIED. CONTRACTOR RESPONSIBLE FOR ALL UNDERGROUND UTILITIES LOCATION AND CONDITION AS PART OF THE BID PACKAGE.
5. DO NOT PROCEED WITH THE INSTALLATION OF THE IRRIGATION SYSTEM WHEN IT IS OBVIOUS IN THE FIELD THAT OBSTRUCTIONS OR GRADE DIFFERENCES EXIST THAT MIGHT NOT HAVE BEEN CONSIDERED IN THE ENGINEERING, OR IF DISCREPANCIES IN CONSTRUCTION DETAILS, LEGEND, NOTES, OR SPECIFICATIONS ARE DISCOVERED. BRING ALL
SUCH OBSTRUCTIONS OR DISCREPANCIES TO THE ATTENTION OF THE COR.
6. AVOID CONFLICTS BETWEEN THE IRRIGATION SYSTEM, PLANTING MATERIALS, AND ARCHITECTURAL FEATURES.
7. INSTALL IRRIGATION PIPE AND WIRING IN LANDSCAPED AREAS WHENEVER POSSIBLE.
8. SELECT NOZZLES FOR ROTARY SPRINKLERS WHICH PROVIDE COMPLETE AND ADEQUATE COVERAGE IF SITE CONDITIONS ARE NOT AS SHOWN. CAREFULLY ADJUST THE RADIUS OF THROW AND ARC OF EACH ROTARY SPRINKLER TO PROVIDE THE BEST PERFORMANCE AND MINIMIZE OVERSPRAY.
9. PROVIDE THE FOLLOWING COMPONENTS TO THE OWNER PRIOR TO THE COMPLETION OF THE PROJECT:
9.1. TWO OPERATING KEYS FOR EACH TYPE OF MANUALLY OPERATED VALVE.
9.2. TWO OF EACH SERVICING WRENCH OR TOOL NEEDED FOR COMPLETE ACCESS, ADJUSTMENT, AND REPAIR OF ALL ROTARY SPRINKLERS.
9.3. FIVE OF EACH TYPE OF SPRINKLER HEAD ASSEMBLY PROPOSED.
9.4. TWO QUICK COUPLING KEYS, EACH WITH ATTACHED SWIVEL HOSE ELL FOR OPERATION OF THE QUICK COUPLING VALVES PROPOSED.
SEGMENTAL RETAINING WALL NOTES:
1. THE SEGMENTAL RETAINING WALLS SHALL BE DESIGNED AND DETAILED BY THE MANUFACTURER'S LICENSED STRUCTURAL ENGINEER AND SHALL BE A MECHANICALLY
STABILIZED EARTH (MSE) RETAINING WALL SYSTEM HAVING HIGH DENSITY POLYETHYLENE GEOGRIDS POSITIVELY CONNECTED TO SEGMENTAL CONCRETE FACING UNITS IN
ACCORDANCE WITH THE CONTRACT DOCUMENTS AND THE FOLLOWING:
1.1. AMERICAN SOCIETY FOR TESTING AND MATERIALS (ASTM)-C1372-17 STANDARD SPECIFICATION FOR SEGMENTAL RETAINING WALL UNITS.
1.2. GEOSYNTHETIC RESEARCH INSTITUTE (GRI) STANDARD PRACTICE GG4 - DETERMINATION OF THE LONG-TERM DESIGN STRENGTH OF GEOGRIDS
1.3. NATIONAL CONCRETE MASONRY ASSOCIATION (NCMA) TEK 02-4C SPECIFICATION FOR SEGMENTAL RETAINING WALL UNITS.
2. SUBMIT FOR REVIEW THE FOLLOWING:
2.1. DESIGN CALCULATIONS AND PLANS FOR THE RETAINING WALL SYSTEM SEALED BY THE DESIGNER
2.2. ENGINEERING DRAWINGS, ELEVATIONS, AND LARGE SCALE DETAILS OF ELEVATIONS, TYPICAL SECTIONS, DETAILS AND CONNECTIONS.
2.3. MANUFACTURER'S MATERIALS SPECIFICATIONS, INSTALLATION INSTRUCTIONS, AND GENERAL RECOMMENDATIONS.
2.4. CONTRACTOR AND SITE SUPERVISOR SHALL HAVE PROVEN QUALIFIED EXPERIENCE TO COMPLETE THE INSTALLATION OF THE SEGMENTAL RETAINING WALL SYSTEM.
3. SEE SHEETS CG111-CG113 FOR FURTHER INFORMATION.
TEMPORARY FACILITIES NOTES:
1. TEMPORARY FACILITIES INCLUDES PROVIDING ELECTRIC , TELECOMMUNICATIONS, & SECURITY SERVICES FOR THE OPERATION OF ALL TEMPORARY TRAILERS. CONTRACTOR
SHALL COORDINATE WITH POWER COMPANY AND OTHER ENTITIES AFFECTED BY THE WORK. OVERHEAD ELECTRICAL/TELECOMMUNICATIONS SERVICE IS ACCEPTABLE WITH THE FOLLOWING EXCEPTIONS/CONDITIONS: OVERHEAD WIRES ALLOWED TO CROSS OVER CEMETERY ROADS, PARKING AREAS, OR BURIAL SECTIONS;TEMPORARY METERS
AND POLES SHALL BE LOCATED IN DISCRETE AREAS AS APPROVED BY THE COR.
2. CONTRACTOR SHALL PROVIDE TWO (2) CONEX BOXES FOR CEMETERY USE FOR TEMPORARY STORAGE DURING TRANSITION TO NEW BUILDINGS. COORDINATE WITH
CEMETERY FOR LOCATIONS.
3. NEW ADMIN/PIC BUILDING SHALL BE PROVIDED WITH TEMPORARY SANITARY SEWER SERVICE FOR TRANSITION PERIOD WHERE BUILDING IS OCCUPIED AND DEMOLITION OF OLD ADMIN BUILDING IS COMPLETED. PERMANENT SANITARY SEWER SERVICE CONNECTION CANNOT BE CONSTRUCTED UNTIL DEMOLITION IS COMPLETE. CONTRACTOR SHALL PROVIDE EJECTOR PUMP OR SIMILAR MEASURE TO FACILITATE TEMPORARY SANITARY SERVICE.
AutoCAD SHX Text
REVERSE CURB
AutoCAD SHX Text 8" W/M
AutoCAD SHX Text
TRANS
AutoCAD SHX Text
CURB
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
TC
AutoCAD SHX Text
CO
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
INV
AutoCAD SHX Text
8" SAN. SEW.
AutoCAD SHX Text
15" HDPE
AutoCAD SHX Text
CO
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text A1
AutoCAD SHX Text E co
ST
W W
ESx
Project Number
Drawing Number
Project Title
Location
Issue Date Checked Drawn
A
B
C
D
E
F
A
B
C
D
E
F
21 4 5 6 7 8 9
MONTGOMERY COUNTY, OHIO
810CM3030
JULY 28, 2023 Dwg. of
Office of Design and Construction
Service U.S. Department of Veterans Affairs
ARCHITECT/ENGINEER OF RECORD STAMPCONSULTANT
Revisions: Date:
Drawing Title
Approved: Project Director
Phase
Building Number
BID DOCUMENTS
VA FORM 08 - 6231
321 4 5 6 7 8 9
DAYTON NATIONAL CEMETERY
PIC/ADMIN BLDG, REPLACE COMMITTAL
SHELTER B, AND ROAD REPAIRSIntegrity Federal Services
(304) 725-8456
Fil e P ath : G
:\P
RO
JE
CT
\S
BU
\33
-1
1 D
AY
TO
N
NA
TI
ON
AL
C
EM
ET
ER
Y\
EN
GI
N\
PL
AN
S\
VL
0.D
W G
GORDON - The LA Group Joint Venture, LLC The LA Group 40 Long Alley Saratoga Springs, NY 12866
(518) 587-8100
INTEGRITY FEDERAL SERVICES
148 S. Queen Street, Suite 201 Martinsburg, WV 25401
(304) 725-8456
Apogee Consulting Group
(919) 858-7420
Foresite Group
(770) 368-1399
The LA Group
(518) 587-8100 VL001
SOIL BORING PLAN
GRAPHICAL SCALE: 1"=150'
150 75 0 150 300 450
03MD RPP
SOIL BORING
SOIL BORING PLAN LEGEND:
BORING LOGS
BORING NUMER NORTHING EASTING ELEVATION
C-01 641501.0 1473907.4 899 C-02 641016.1 1474055.5 911 C-03 640603.9 1473577.2 919 C-04 640532.9 1472996.7 930 C-05 641410.4 1473135.4 912 C-06 641211.9 1473953.3 902 C-07 641068.0 1473709.2 929 C-08 640461.0 1472631.7 943 C-09 640467.0 1472044.9 960 C-10 640698.6 1471639.9 958 C-11 640979.2 1471635.5 954 C-12 640733.7 1474281.1 931 C-13 641233.5 1474550.2 916 C-14 640987.4 1475400.3 902 C-15 640757.5 1474896.7 916 C-16 640389.4 1474323.7 927
BORING LOGS
BORING NUMBER NORTHING EASTING ELEVATION
R-01 641118.6 1474313.7 914 R-02 641167.5 1472383.1 930 R-03 640519.1 1473312.6 925 R-04 640668.3 1474778.2 919 R-05 641638.4 1475402.9 891 B-01 641294.5 1474298.0 915 B-02 641269.2 1474190.6 912 B-03 640651.6 1473483.9 924 B-04 641106.4 1474098.3 906
KEY MAP
(NOT TO SCALE)
2 3 4 5
6 7 8
AutoCAD SHX Text
ST
AutoCAD SHX Text
EX. MAINTENANCE BUILDING 2,435 SF (HT=20.0')
AutoCAD SHX Text
EX. BUILDING 8,939 SF (HT=20.0')
AutoCAD SHX Text
EX. BUILDING 2,356 SF (HT=20.0')
AutoCAD SHX Text
FUEL TANK
AutoCAD SHX Text
OIL TANK
AutoCAD SHX Text T
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
YD
AutoCAD SHX Text
YD
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
DS
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text
CO
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text I
AutoCAD SHX Text T
AutoCAD SHX Text
CABLE BOX
AutoCAD SHX Text
CABLE BOX
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
MH
AutoCAD SHX Text
VLT
AutoCAD SHX Text
MH
AutoCAD SHX Text
VLT
AutoCAD SHX Text
VLT
AutoCAD SHX Text
VLT
AutoCAD SHX Text
VLT
AutoCAD SHX Text
35121 FMON
AutoCAD SHX Text
35122 FMON
AutoCAD SHX Text
35150 FMON
AutoCAD SHX Text
103 FMON
AutoCAD SHX Text
101 FMON
AutoCAD SHX Text
35325 FMON
AutoCAD SHX Text
VLT
AutoCAD SHX Text
1 CP SIR
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text S
AutoCAD SHX Text
RIM=914.12
AutoCAD SHX Text (35911)
AutoCAD SHX Text S
AutoCAD SHX Text
(35912) RIM=914.27
AutoCAD SHX Text S
AutoCAD SHX Text
RIM=912.91
AutoCAD SHX Text (45592)
AutoCAD SHX Text
ST
AutoCAD SHX Text
RIM=903.35
AutoCAD SHX Text (35926)
AutoCAD SHX Text
RIM=905.18
AutoCAD SHX Text (35928)
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text 924.50
AutoCAD SHX Text
FFE
AutoCAD SHX Text 934.45
AutoCAD SHX Text
FFE
AutoCAD SHX Text 933.64
AutoCAD SHX Text
FFE
AutoCAD SHX Text 912.42
AutoCAD SHX Text
FFE
AutoCAD SHX Text 912.42
AutoCAD SHX Text
FFE
AutoCAD SHX Text 913.33
AutoCAD SHX Text
FFE
AutoCAD SHX Text 913.35
AutoCAD SHX Text
FFE
AutoCAD SHX Text 913.26
AutoCAD SHX Text
FFE
AutoCAD SHX Text 913.32
AutoCAD SHX Text
FFE
AutoCAD SHX Text 913.30
AutoCAD SHX Text
FFE
AutoCAD SHX Text 913.68
AutoCAD SHX Text
FFE
AutoCAD SHX Text 913.76
AutoCAD SHX Text
FFE
AutoCAD SHX Text 913.20
AutoCAD SHX Text
FFE
AutoCAD SHX Text 913.24
AutoCAD SHX Text
FFE
AutoCAD SHX Text 913.33
AutoCAD SHX Text
FFE
AutoCAD SHX Text 913.80
AutoCAD SHX Text
FFE
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EH
AutoCAD SHX Text
EX. CCS. B
AutoCAD SHX Text S
AutoCAD SHX Text
ST
AutoCAD SHX Text
ST
AutoCAD SHX Text
RIM=898.38
AutoCAD SHX Text (36024)
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
AutoCAD SHX Text
MCMAHON AVE
AutoCAD SHX Text
MCMAHON AVE
AutoCAD SHX Text
MONUMENT AVE
AutoCAD SHX Text
MCMAHON AVE
AutoCAD SHX Text
BROWN AVE
AutoCAD SHX Text
INDIANA AVE
AutoCAD SHX Text
COLORADO AVE
AutoCAD SHX Text
COLORADO AVE
AutoCAD SHX Text
KANSAS AVE
AutoCAD SHX Text
TEXAS AVE
AutoCAD SHX Text
DAKOTA AVE
AutoCAD SHX Text
WISCONSIN AVE
AutoCAD SHX Text
NEW MEXICO PL
AutoCAD SHX Text
PENNSYLVANIA AVE
AutoCAD SHX Text
NEW MEXICO PL
AutoCAD SHX Text
WISCONSIN AVE
AutoCAD SHX Text
WISCONSIN AVE
AutoCAD SHX Text
OHIO AVE
AutoCAD SHX Text
PENNSYLVANIA AVE
AutoCAD SHX Text
PENNSYLVANIA AVE
AutoCAD SHX Text
TEXAS AVE
AutoCAD SHX Text
W THIRD ST
AutoCAD SHX Text
INDIANA AVE
AutoCAD SHX Text
HAWAII PL
AutoCAD SHX Text C02
AutoCAD SHX Text C01
AutoCAD SHX Text C03
AutoCAD SHX Text C04
AutoCAD SHX Text C05
AutoCAD SHX Text C06
AutoCAD SHX Text C07
AutoCAD SHX Text C08
AutoCAD SHX Text C09
AutoCAD SHX Text C10
AutoCAD SHX Text C11
AutoCAD SHX Text C12
AutoCAD SHX Text C13
AutoCAD SHX Text C14
AutoCAD SHX Text C15
AutoCAD SHX Text R02
AutoCAD SHX Text R01
AutoCAD SHX Text R03
AutoCAD SHX Text R04
AutoCAD SHX Text R05
AutoCAD SHX Text B02
AutoCAD SHX Text B01
AutoCAD SHX Text B03
AutoCAD SHX Text C16
AutoCAD SHX Text B01
AutoCAD SHX Text B04
AutoCAD SHX Text
EX. BUILDING 2,435 SF (HT=20.0')
AutoCAD SHX Text
EX. BUILDING 8,939 SF (HT=20.0')
AutoCAD SHX Text
EX. BUILDING 2,356…