S02_Attachment - 2023-09-14-DNC Amendment Memo 002.pdf
PDF 71 KB Posted
- Solicitation number
- 36C78623B0033
About this file
This memorandum outlines revisions to plans and specifications for the DAYTON NATIONAL CEMETERY: PIC/Admin Bldg, Repair Roads, & Replace Committal Shelter B solicitation issued by the Department of Veterans Affairs National Cemetery Administration. Specifications were added for asphalt shingles and finishes, and revised for door hardware and other finishes. Drawings were revised to update roof plans, remove a splash pad, change flooring designations, add transition lines, and identify storm infrastructure. The keynote schedule was also updated on several drawings to reflect changes to room finishes.
View the file
Other files
Show all 25
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Civil Engineering I Landscape Architecture I Planning 148 South Queen Street, Suite 201, Martinsburg, WV 25401 � 304-725-8456
Service-Disabled Veteran-Owned Small Business
Added Specifications:
1. 07 31 13 Asphalt Shingles
Revised Specifications:
2. 08 71 00 Door Hardware
a. updated
3. 09 06 00 Schedule of Finishes
a. PTB-1 added
Revised drawings:
1. A-110R
a. RCP updated
2. A-111R
a. RCP updated
3. A-112R
a. RCP updated
4. A-201R
a. Splash pad removed
5. I-001R
a. Lobby 100 flooring changed to WOC-1
b. Parts/Tools base changed to RB-1
c. 126 Vestibule flooring changed to WOC-1
d. Staff Toilet 108 and 110
6. I-101R
To Jessie Magee Date September 14, 2023 Department of Veterans Affairs Project Name Dayton National Cemetery National Cemetery Administration PIC-Admin_Roads_Shelter
From Chad Wallen, PLA Subject RFI’s / Plan & Specification
Revision
Memorandum - Amendment 002
Dayton National Cemetery Memorandum - Amendment 002
9-14-2023
Planning I Civil Engineering I Landscape Architecture 148 South Queen Street, Martinsburg, WV 25401 � 304-725-8456 Service Disabled Veteran Owned Small Business
a. Transition line added between Reception 101 and Lobby 100
7. I-431R
a. Keynotes edited to reflect room finish schedule
8. I-432R
a. Keynotes edited to reflect room finish schedule
b. Transition line added between Toilet/Shower 124 and Men’s Locker 125
9. CU101R
a. Storm Cleanouts identified with Key Notes
b. Water service lines labeled
10. CU562R
a. Storm Cleanout Detail added
11. A-101R
a. Door Hardware schedule updated
File details come from the government source that posted it. Updated .