DIVISION_23_-_HVAC.pdf

PDF 8 MB Posted

Attached to
Michigan Avenue Warehouse Renovation
Solicitation number
ITB 25-098
Issued by
Lee County, Fruitville CDP, Florida

About this file

This document is a comprehensive Division 23 HVAC Technical Specification for the City of Ft. Myers Warehouse Conversion project, specifically focusing on mechanical systems and equipment specifications. The specification covers detailed requirements for HVAC demolition, ductwork, air handling units, refrigerant piping, fans, terminal units, coils, air conditioning units, grilles, registers, diffusers, and associated control systems. The technical specifications provide comprehensive guidance for contractors on materials, installation methods, performance standards, testing requirements, warranties, and quality assurance for all HVAC components related to converting two warehouse structures into municipal facilities for the Parks & Records Departments.

The specifications are designed to ensure high-quality, code-compliant HVAC installations that meet stringent performance and safety standards. Key requirements include compliance with Florida Building Code, NFPA standards, and UL listings, with specific emphasis on energy efficiency, sound levels, and environmental considerations. The document mandates the use of specific manufacturing standards, detailed installation protocols, and comprehensive testing procedures. Contractors must provide detailed shop drawings, performance data, and submit to rigorous quality assurance checks. The specifications also outline warranty requirements, with most components having a minimum one-year parts and labor warranty, and some components like compressors having extended warranties up to four years. The technical requirements reflect a commitment to modern, efficient mechanical systems that will support the functional needs of the City of Ft. Myers' warehouse conversion project.

View the file

Other files

File Type Posted
Michigan_Avenue_Warehouse_Renovation_(Addendum_#19_Revision).pdf PDF
Michigan_Avenue_Warehouse_Renovation_(Addendum_#10_Revision).pdf PDF
DIVISION_22_-_PLUMBING.pdf PDF
CFM_Parks_and_Rec_-_Landscape_Plans_-_South_Parcel.pdf PDF
DIVISIONS_27_&_28_-_SECURITY_&_COMMS.pdf PDF
CoFM_Warehouse_Conversion_Parks_and_Records_Dept_Arch_Spec_Binder.pdf PDF
CFM_Parks_and_Rec_-_Civil_Plans_-_North_Parcel.pdf PDF
2024-118_-_Combined_Plumbing_-_S&S.pdf PDF
2024-118_-_CoFM_Warehouse_-_Combined_Electrical.pdf PDF
2024-118_-_Combined_Mechanical_-_S&S.pdf PDF
20250619_-_Warehouse_Convert_to_Parks_&_Rec_Department_100%_CD_KMW.pdf PDF
CFM_Parks_and_Rec_-_Tech_Specifications.pdf PDF
2025.06.19-_Exist_Warehouse_to_Parks_Rec_-_Structural_Permit_Set_SS.pdf PDF
DIVISON_26_-_ELECTRICAL.pdf PDF
DIVISON_21_-_FIRE_PROTECTION.pdf PDF
CFM_Parks_and_Rec_-_Civil_Plans_-_South_Parcel.pdf PDF
2024-118_-_Combined_Fire_Protection_-_S&S.pdf PDF
CFM_Parks_and_Rec_-_Landscape_Plans_-_North_Parcel.pdf PDF
DIVISION_23_-_HVAC.pdf PDF
SRF_SupplementaryConditions_EM_Contract_(August_2022).pdf PDF
SRF_SupplementaryConditions_Construction_Contract_(August_2022).pdf PDF
FHWA-1273_(10_23)_.pdf PDF
Notice_of_Award.docx DOCX document
2_CFR_Part_200_app_II_(up_to_date_as_of_4-28-2025).pdf PDF
Show all 24

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

City of Ft. Myers - Parks & Records Departments.

Warehouse Conversion.

City of Ft. Myers - Warehouse Conversion

Bid / Permit - Construction Documents

000110 - 1

MECHANICAL

TABLE OF CONTENTS

DIVISION 23

DIVISION 23 – HVAC SYSTEMS

230500 Common Work Results or HVAC Systems

230010 HVAC Demolition

230510 Basic Materials and Methods for HVAC Systems

230513 Common Motor Requirements for HVAC Equipment

230518 Control Wiring

230529 Hangers and Supports for HVAC Piping and Equipment

230553 Identification for HVAC Piping and Equipment

230593 Testing, Adjusting and Balancing For HVAC

230700 HVAC Insulation

230923 Instrumentation and Control Devices for HVAC

230993 Sequence of Operations for HVAC Controls

232300 Refrigerant Piping

233100 HVAC Ducts and Casings

233101 Shop Fabricated Ductwork

233300 Air Duct Accessories

233400 HVAC Fans

233600 Air Terminal Units

233713 Diffusers, Registers and Grilles

234100 Particulate Air Filtration

236213 Packaged Air Cooled Condensing Units

237313 Packaged Air Handling Units

238143 Ductless Split System Air Conditioning Units

238216 Coils

238219 Fan Coil Units

City of Ft. Myers - Warehouse Conversion

000110 - 2

This Page Intentionally Left Blank

City of Ft. Myers - Warehouse Conversion

230010 - 1

SECTION 230010 - HVAC DEMOLITION

PART 1 - GENERAL

1.1 RELATED DOCUMENTS

A. Drawings and general provisions of the Contract, including General and Supplementary

Conditions and Division 01 Specification Sections, apply to this Section.

1.2 WORK INCLUDED

A. Heating, Ventilation and Air Conditioning: Remove all existing heating, ventilating and air conditioning equipment including as shown on the Contract Documents.

PART 2 - PRODUCTS (NOT APPLICABLE)

PART 3 - EXECUTION

3.1 GENERAL

A. The Contractor shall obtain the permission of the Owners Representative and coordinate with other trades prior to commencement of demolition of the existing installations.

B. The Contractor shall provide for safe conduct of the work, protection of property, and coordination with other work in progress. The spread of dust and flying particles shall be minimized.

C. Existing construction to remain shall be protected from damage. Work damaged by the

Contractor shall be repaired to match existing work.

D. When indicated, the contractor shall remove specific equipment in a careful manner so as to maintain the equipment in proper operating order. This equipment will be turned over to the Owner and transported to a storage area as directed by the Owner and further described herein.

E. Material demolished under this section shall become the property of the Contractor and shall be promptly removed and disposed of off the site.

F. Debris and rubbish shall not accumulate on the site, and shall be disposed of periodically by the Contractor.

G. All necessary precautions shall be taken by the Contractor to prevent spillage during removal activities. Pavement and areas adjacent to the demolition areas shall be kept clean and free from mud, dirt and debris at all times.

H. Existing utilities and mechanical systems including related equipment shall be disconnected by the Contractor to the extent shown on the contract drawings or specified and as required to perform the work in accordance with Division 23 of the specifications.

230010 - 2

I. The Contractor shall exercise care during the progress of the work under this section so as not to damage or displace the work of the other trades performed under other sections.

He shall coordinate work under this section with work under other sections, as necessary for the proper execution of the entire work.

J. When the contract documents indicate the removal of existing equipment to be temporarily stored and to be re-used, the contractor shall provide adequate protection for the stored equipment including the proper capping of several pipe connections, protection of power and control wiring and devices, and draining of coils to prevent freezing damage.

K. Equipment which contains refrigerants shall be pumped down prior to demolition. The refrigerant shall be properly contained and disposed of in accordance with the accepted local procedures.

L. Pre Demolition photographs shall be taken showing existing conditions of adjoining construction and site improvements, including finished surfaces that might be misconstrued as damage caused by selective demolition operations. Photograph items requested to be salvage by the Owner. Submit all photographic documentation before the start of demolition.

M. Pre-demolition Conference: Conduct conference at Project site with the Owner to inspect and discuss condition of construction to be selectively demolished, review areas where existing construction is to remain and requires protection, review list of items to be salvaged and delivered to the Owner.

END OF SECTION

230500 - 1

SECTION 230500 - COMMON WORK RESULTS FOR HVAC SYSTEMS

PART 1- GENERAL

1.2 ARTICLES INCLUDED

A. Definitions.

B. Permits, Fees and Notices.

C. Applicable Publications.

D. Code Compliance.

E. Scope of Work.

F. Record Drawings.

G. Intent of Drawings and Specifications.

H. Quality Assurance

I. Submittals.

J. Product Requirements, Equals and Substitutions.

K. Manufacturer’s Instructions.

L. Transportation and Handling.

M. Storage and Protection.

N. Cutting, Patching and Demolition.

O. Cleaning Up/Removal of Debris.

P. Starting of Mechanical Systems.

Q. Operating and Maintenance Manuals.

R. Training of Owners Operators.

S. Guarantee of Work.

230500 - 2

T. System Testing.

1.3 ARTICLES

A. Definitions:

1. The term "As indicated" means as shown on drawings by notes, graphics or schedules, or written into other portions of contract documents. Terms such as

"shown", "noted", "scheduled" and "specified" have same meaning as

"indicated", and are used to assist the reader in locating particular information.

2. The term "Provide", means furnish and install as part of the work covered in

Division 23.

3. The term "Furnish" means furnish only, for installation, as part of this contract, by other Divisions.

4. The term "Install only" means to install under the work of Division 23 equipment furnished by other Divisions, or by the Owner.

5. The term "Owner's Representative" when referenced herein shall be the Architect or the Engineer acting as his designated representative unless otherwise noted.

6. The term "design" as it pertains to the work of this division shall describe the basic intent, component sizing, component relationships and overall architecture of the plumbing system. The design is generally schematic in nature and will require specific detailing after the accepted products are determined.

7. The term "detail" as it pertains to the work of this division shall describe the work required by the contractor to assure a fully coordinated installation of the material and equipment supplied. When requested, the contractor shall produce detailed shop drawings or sketches indicating the actual placement of the equipment or material supplied; also including how the equipment or material interfaces with work of other sections or divisions within the contract documents.

8. The term "workman-like manner" as it pertains to the work of this division shall describe a neat well organized high quality installation system (duct, pipe, control wire or tube, conduit, etc.). Routing shall be well thought out providing adequate service clearance and maximum use of space. Equipment placement shall exhibit proper clearances for service. All lines (duct, pipe, control wire or tube, conduit, etc.) shall be run straight and true, parallel or perpendicular to building structure neatly supported.

9. For additional definitions refer to the Division 01 - General Requirements.

B. Permits, Fees and Notices: Comply with the Division 01 - General Requirements.

1. Submit copies of permits, licenses, certifications, inspection reports, releases, jurisdictional settlements, notices, receipts for fee payments, judgments, correspondence, records, and similar documents, established for compliance with standards and regulations bearing on performance of the Work.

C. Applicable Publications:

1. Publications listed in each Section form a part of that Section to the extent referenced.

2. When a standard is specified by reference, comply with requirements of that standard, except when requirements are modified by the Contract Documents, or

230500 - 3 applicable codes establish stricter standards.

3. The Publication or Standard is the publication in effect as of the bid date, except when a specific date is listed.

D. Code Compliance:

1. Florida Building Code 8th Edition (2023) Building

2. Florida Building Code 8th Edition (2023) Energy Conservation

3. Florida Building Code 8th Edition (2023) Mechanical

4. Florida Building Code 8th Edition (2023) Existing Building

5. Florida Building Code 8th Edition (2023) Accessibility

6. Florida Fire Prevention Code 8th Edition (2023)

7. NFPA 1, Fire Code, 2021 Edition

8. NFPA 70, National Electric Code (NEC), 2020 Edition

9. NFPA 101 Life Safety Code, 2021 Edition

E. Scope of Work: The work to be performed under this Division consists of the satisfactory completion of all HVAC as indicated in the Contract Documents.

F. Record Drawings: Comply with the Division 01 - General Requirements.

1. Drawings - Legibly mark drawings to record actual construction:

a. Depths of various elements of foundation in relation to finish first floor datum.

b. Horizontal and vertical locations of underground utilities and appurtenances, referenced to permanent surface improvements.

c. Location of internal utilities and appurtenances concealed in the construction, referenced to visible and accessible features of the structure.

d. Field changes of dimension and detail.

e. Changes made by Addenda, Supplemental Instruction, Construction

Change Directive, or Change Order.

f. Details not on original Contract Drawings.

2. Specifications - Legibly mark each section to record:

a. Manufacturer, trade name, catalog number, and supplier of each product and item of equipment actually installed.

b. Changes made by Supplemental Instruction, Construction Change

Directive, or Change Order.

c. Addenda - Legibly mark or post in Drawings and Specifications all items as listed in Addenda.

3. At Substantial Completion, deliver Record Documents to Engineer for review prior to sending to the Owner’s Representative.

G. Intent of Drawings and Specifications:

1. The intent of the drawings and specifications is to establish minimum acceptable

230500 - 4 quality standards for materials, equipment and workmanship, and to provide operable mechanical systems complete in every respect.

2. Existing conditions, dimensions, etcetera, depicted on the drawings are taken from the "as-built" drawings of the original construction supplemented by field observation. The contractor is cautioned to field verify all existing conditions, dimensions, etcetera, notifying the Owner's Representative of any discrepancies other than those minor in nature, for direction, prior to ordering or fabricating equipment or materials. Anything mentioned in the specifications and not shown on the drawings, or shown on the drawings and not mentioned in the specifications, shall be of like effect as if shown or mentioned in both. In case of difference between drawing and specifications, the more stringent shall govern, unless the discrepancy conflicts with applicable codes, wherein the code shall govern.

3. The drawings are diagrammatic, intending to show general arrangement, capacity and location of system components, and are not intended to be rigid in detail.

Final placement of equipment, other system components, and coordination of all related trades shall be the contractor's responsibility.

4. Due to the small scale of the drawings, and to unforeseen job conditions, all required offsets and fittings may not be shown but shall be provided at no additional change in contract cost.

5. In the event of a conflict, the Owner's Representative will render an interpretation in accordance with the Division 01 - General Requirements.

H. Quality Assurance:

1. All equipment furnished under this Division shall be listed and labeled by U.L., ETL or a nationally recognized testing laboratory (NRTL).

2. Material furnished under this Division shall be standard catalogued products of recognized manufacturers regularly engaged in the production of such material and shall be the latest design.

3. Materials shall be the best of their respective kinds. Materials shall be new except where the specifications permit reuse of certain existing materials.

4. Work provided for in these specifications shall be constructed and finished in every part in a workmanlike manner.

5. All items necessary for the completion of the work and the successful operation of a product shall be provided even though not fully specified or indicated on the drawings.

6. All work to be performed by qualified and experienced personnel specifically trained in their respective field.

7. All work of this division shall be carefully interfaced with the work of other divisions to assure a complete, functioning system or systems.

I. Submittals: Comply with the Division 01 - General Requirements.

J. Product Requirements, Equals and Substitutions: Comply with the Division 01 - General

Requirements.

K. Manufacturer's Instructions:

1. Installation of work shall comply with manufacturer's printed instructions.

230500 - 5

2. Should job conditions or specified requirements conflict with manufacturer's instructions, consult with Owner's Representative for clarification. Do not proceed with work without clear instructions.

L. Transportation and Handling: Comply with the Division 01 - General Requirements.

1. Provide for expeditious transportation and delivery of products to project site undamaged, on a schedule to avoid delay of the work, or work of other contractors.

2. Provide equipment and personnel at the site, unload and handle products in a manner to avoid damage to products.

M. Storage and Protection:

1. Store products in accord with manufacturer's instructions, with seals and labels intact and legible.

2. Store products to prevent damage by the elements. Space temperature shall be controlled as required to prevent condensation and metal corrosion or damage to electrical or electronic parts are the result of condensation.

3. Arrange storage in a manner to provide easy access for inspection. Make periodic inspections of stored products to assure that products are maintained under specified conditions, and free from damage or deterioration.

4. Provide protection as necessary to prevent damage after installation.

5. Products which suffer damage due to improper storage shall not be installed and if found in place, shall be removed and replaced at the contractors expense.

N. Cutting and Patching: Comply with the Division 01 - General Requirements.

1. Examine surfaces to be cut and patched and conditions under which cutting and patching are to be performed.

2. Compatibility: Before patching, verify compatibility with and suitability of substrates, including compatibility with in-place finishes or primers.

3. Proceed with installation only after unsafe or unsatisfactory conditions have been corrected.

O. Cleaning Up/Removal of Debris: Comply with the Division 01 - General Requirements.

1. Maintain a clean work area. Construction debris shall be immediately removed from all newly erected work.

P. Starting of Mechanical Systems:

1. Provide material and labor to perform start-up of each respective item of equipment and system prior to beginning of test, adjust and balance procedures.

2. Provide labor to assist the Owner's Representative in acceptance review.

3. Provide point by point system check-out. Submit results in tabulated form by system. Include this data as part of Operation and Maintenance Manuals.

4. Provide information and assistance and cooperate with test, adjust and balance services.

5. Comply strictly with manufacturer's recommended procedures in starting up

230500 - 6 mechanical systems.

6. Provide such periodic continuing adjustment services as necessary to ensure proper functioning of mechanical systems until acceptance and up to 1 full year after date of Owner acceptance.

Q. Operating and Maintenance Manuals: Comply with the Division 01 - General

Requirements.

R. Training of Owners Operators:

1. The owners shall be given comprehensive training in the understanding of the systems and the operation and maintenance of each major piece of equipment.

2. The contractor shall be responsible for scheduling the training which shall start with classroom sessions followed by hands on training on each piece of equipment. Hands on training shall include start-up, operation in all modes possible, shut-down and any emergency procedures.

3. The manufacturer's representative shall provide the instructions on each major piece of equipment. These sessions shall use the printed installation, operation and maintenance instruction material included in the O&M manuals and shall emphasize safe and proper operating requirements and preventative maintenance.

S. Guarantee of Work: Comply with Division 01 – General Requirements.

1. Where applicable, furnish manufacturer's written warranty for materials and equipment.

2. Insert warranties in appropriate locations in operating and maintenance manuals.

3. Materials and equipment having seasonal operation limitations shall be guaranteed for a minimum of one year from date of seasonally appropriate test, and acceptance in writing by the Owner, unless specific Division 23 specifications specify a longer period.

T. System Testing:

1. Provide all necessary labor, materials and equipment to successfully complete all system testing necessary for building occupancy and owner acceptance.

2. Provide all necessary labor, materials and equipment to assist contractors of other division to complete system testing necessary for building occupancy and owner acceptance, wherever an inter-relationship between Division 23 and the work of other divisions exists.

3. Tests shall be repeated as necessary until all occupancy and operation permits are granted and the owner accepts the project.

PART 2- PRODUCTS - Not Used

PART 3 - EXECUTION - Not Used

230510 - 1

SECTION 230510 - BASIC MATERIALS AND METHODS OF HVAC SYSTEMS

A. Access doors.

B. Waterproofing and flashing. (Refer to Division 07)

C. Fire and smoke stopping. (Refer to Division 07)

D. Electrical requirements. (Refer to Division 26)

E. Painting. (Refer to Division 09)

F. Plumbing requirements. (Refer to Division 22)

G. Concrete work. (Refer to Division 03)

H. Fabricated steel supports.

I. Excavation, trenching and backfilling. (Refer to Division 33)

J. Placing of equipment.

1.3 APPLICABLE PUBLICATIONS

A. The publications listed below form a part of this Section to the extent referenced.

1. American Institute of Steel Construction (AISC) Publications

2. American National Standards Institute (ANSI) Standards

3. American Society for Testing and Materials (ASTM) Publications

4. American Welding Society (AWS) Publications

5. Underwriters Laboratories, Inc. (UL) Standards

1.4 SUBMITTALS

A. General: Where submittals are required, comply with Division 01 requirements.

B. Shop Drawings: Submit drawings of fabricated steel supports where proposed supports are not in accordance with details on drawings, or where drawings do not detail supports.

Submittal for acceptance is required.

230510 - 2

C. Product Data: Submittal for other than fabricated steel supports is not required. Product data for the following shall be included in the operation and maintenance manuals. Submittal for acceptance is not required.

1. Access doors.

2. Waterproofing and flashing material.

3. Fire and smoke stopping material.

2.1 ACCEPTABLE MANUFACTURERS

A. Access Doors:

1. Acudor

2. Elmodor Manufacturing, Co.

3. Karp Metal Associates, Inc.

4. Larsen’s Manufacturing Co.

5. Milcor

B. Waterproofing and Flashing: (Refer to Division 07 for requirements).

1. Stoneman Engineering and Manufacturing Co.

2. S.B.C. Industries.

3. Other suppliers acceptable.

C. Fire and Smoke Stopping Material: (Refer to Division 07 for requirements).

2.2 FABRICATION

A. Access doors:

1. Access doors: UL labeled where installed in fire rated walls, partitions, and ceilings.

Door rating shall be not less than wall, partition, or ceiling rating.

2. Frames: 16 gauge steel, flush trim, with corners welded and ground smooth, masonry anchor strap for masonry walls, bolt holes for mounting in framed openings.

3. Non-fire rated doors: 13 gauge steel, concealed continuous piano hinge with dust flap, flush screwdriver operated lock with stainless steel cam and studs.

4. Fire rated doors: 20 gauge steel welded pan type, concealed continuous piano hinge with stainless steel pins, key-operated latch bolt, interior latch release, automatic door closer, automatic door latch when door closes. The door panel shall contain 2- inch thick insulation in sandwich type construction.

5. Finish of doors and frames: Prime coat of rust inhibitive baked enamel, except as specified otherwise.

6. Finish of doors and frames in wet areas, and in areas with surfaces subject to wet cleaning: No. 4 satin stainless steel.

7. Label access doors per NFPA 80-19.2.3.2. and NFPA 105-6.3.2.2.

B. Waterproofing and Flashing: All work is provided under Division 07.

230510 - 3

C. Fire and Smoke Stopping: All work is provided under Division 07.

D. Electrical Requirements: Product description not applicable to this Section.

E. Painting: Product specified in Division 09 - Finishes.

F. Concrete Work:

1. Concrete is provided under DIVISION 03 - Concrete.

2. This contractor to provide detailed dimension drawings, including anchor bolt locations where required for all bases and pads required for equipment furnished under this Division.

3. Concrete for equipment bases and pads shall be 3000 p.s.i. design mix prepared in accord with ASTM C94. Cement shall be in accord with ASTM C150. Aggregate shall be fine sand in accord with ASTM C33. Water shall be clean, fresh, drinkable.

G. Fabricated Steel Supports:

1. Steel angles, channels, and plate shall be in accordance with ASTM A36.

2. Steel members, including fasteners, exposed to weather shall be galvanized.

H. Excavation, Trenching, and Backfilling: Product description not applicable

I. Placing of Equipment: Product description not applicable.

PART 2 - EXECUTION

A. Installation of materials and equipment shall be in accord with the manufacturer's written instructions, except as specified.

3.2 INSTALLATION

A. Access Doors:

1. Furnish access doors for installation under Division 09 - Finishes.

2. Deliver access doors to the appropriate trade well in advance of the time they are needed so as to avoid unnecessary delay of the work.

3. Access doors shall be sized as indicated on drawings. If no size is given, provide access door of size suitable for servicing equipment or valve. Unless otherwise noted, the minimum size for a access door shall be 12" x 12".

4. Access doors shall be provided where indicated and if not indicated, where required.

5. Access doors shall be installed so as to allow full door swing.

6. Where full swing and access is not possible, removable doors shall be provided.

7. Access doors not required in lay-in-tile ceilings.

B. Waterproofing and Flashing: All penetrations of roof to be in accordance with requirements of Division 07.

230510 - 4

C. Fire and Smoke Stopping: Fire and smoke stopping shall be provided in Division 07.

D. Electrical Requirements: Refer to Division 26 for electrical requirements.

E. Painting:

1. All equipment shall be furnished with a factory-applied galvanized, prime paint, or finish paint finish. Touch-up damaged surfaces of equipment immediately.

2. Paint for galvanized surfaces shall be in accordance with ASTM A780 using zinc rich compound.

3. Paint wooden mounting backboards with two coats of gray enamel prior to making attachments to the board.

4. For quality control refer to DIVISION 09 - FINISHES.

5. Remove all dirt, rust, scale, grease, pipe dope, solder flux, and welding slag from all surfaces to be painted.

6. Paint immediately, under this Division, all damaged galvanized surfaces. Paint galvanized metal surfaces behind grilles with two coats of flat black paint.

7. Apply rust inhibitive primer to ferrous surfaces of shop fabricated steel supports.

8. Paint immediately under this division all field and shop welded joints in piping or equipment supports with 2 coats of grey metal primer.

9. All exposed piping shall have a PVC jacket, per ANSI Standard with the following colors:

a. Chilled water supply Dark blue

b. Chilled water return Light blue

c. Condensate piping Orange

d. Hot water supply Dark orange

e. Hot water return Light orange

F. Concrete Work:

1. Concrete pads and curbs for supports of equipment shall be a minimum of 4" high with chamfered edges and sized for approved equipment. Furnish drawings to

Division 03 Contractor.

2. Surfaces of concrete shall be troweled smooth. When forms are removed, fill voids with cement and rub smooth with rubbing stone.

3. Do not pour concrete when ambient temperature is less than 40oF, and falling.

G. Fabricated Steel Supports:

1. Because of the small scale of the drawings, details of equipment support are not always shown. It shall be the responsibility of the contractor to provide supports as required for safe and adequate support.

2. Fabricated steel supports and ladders may be shop or field-fabricated, and shall be in accord with details on drawings.

3. When details are not indicated, the contractor shall submit proposed support detail for review. The contractor shall bear all cost in producing this detail in the bid. This includes but is not limited to structural engineering support.

230510 - 5

4. Steel members shall be saw cut, with corners ground smooth, and shall be assembled with welded or bolted connections at Contractor's option. Connections shall be in accord with specified AISC Publications.

H. Excavation, Trenching, and Backfilling:

1. Definitions:

a. Satisfactory material includes all materials except those classified

"unsatisfactory", "unyielding" or "unstable".

b. Unsatisfactory material includes those materials containing roots, organic matter, trash, debris, frozen materials, stones larger than 3 inches in any dimension, and materials classified by ASTM D 2487 as OL, OH, and PT.

c. Unyielding material consists of rock and gravely soils with stones greater than 3 inches in any dimension, or as defined by the pipe or tank manufacturer, whichever is smaller.

d. Unstable material consists of material too wet to properly support the pipe or tank.

e. Select granular material consists of well-graded sand, gravel, crushed gravel, crushed stone, or crushed gravel, crushed stone, or crushed slag composed of hard, tough, and durable particles, and shall contain not more than 10 percent by weight of material passing a No. 200 mesh sieve, and no less than

95 percent by weight passing the 1 inch sieve. The maximum allowable aggregate size shall be 3 inches, or the maximum size recommended by the pipe or tank manufacturer, whichever is smaller.

2. Excavation, trenching, and backfilling for site utility piping systems is specified in

Division 31 – Earthwork.

I. Placing of Equipment:

1. Coordinate setting of equipment with the requirements of other trades so as to avoid conflicts and to insure compatibility. Equipment shall not block access for installation of other equipment.

2. All air handling units shall have code required and manufacturer required clearances around all equipment.

3. Set base mounted equipment on permanent and finished supports. Temporary support, if any, shall be removed prior to making final pipe, duct, or electrical connections to equipment.

4. Adjust suspended equipment to final elevation prior to making pipe, duct or electrical connections.

5. Exercise caution during equipment placing operations to insure that structure is not overloaded.

6. Do not move heavy equipment across floor or roof of insufficient load bearing capacity to support such equipment. Provide bracing or shoring as required, or use crane to place equipment directly on permanent and finished support.

7. Secure all roof mounted equipment to the structure adequately to resist overturning, uplift and sliding forces for basic wind speeds indicated for this location in Figure

1609B of the Florida Building Code 8th Edition (2023) – Building.

230510 - 6

8. Guards shall be provided where appliances, equipment, fans or other components that require service are located within 10 feet of a roof edge or open side of a walking surface and such edge or open side is located more than 30 inches above the floor, roof or grade below. The guard shall extend not less than 30 inches beyond each end of such appliance, equipment, fan or component and the top of the guard shall be located not less than 42 inches above the elevated surface adjacent to the guard. The guard shall be constructed so as to prevent the passage of a 21-inch-diameter sphere and shall comply with the loading requirements for guards specified in the Florida

Building Code 8th Edition (2023) – Building.

230513 - 1

SECTION 230513 - COMMON MOTOR REQUIREMENTS FOR HVAC EQUIPMENT

PART 1- GENERAL

A. Starters for all motors furnished under this Division, except where starters are provided in a motor control center by Electrical Specifications or where motors require adjustable frequency drives.

B. Motors for equipment furnished under this Section.

1.3 SUBMITTALS

A. Motor Starters:

1. Submission for acceptance is not required. Provide a schedule indicating duty, motor

HP, starter size and heater size.

2. Product data, along with installation operation and maintenance instructions, shall be included in the operation and maintenance manuals.

B. Motors:

1. Submission for acceptance is required. All three phase motors are based on NEMA

Premium efficiency motors as described below by the minimum allowable efficiency. As a result, all motor starting codes are based on Code letter F or greater as defined by NEC Article 430. In the event that a manufacturer provides a motor with a code letter less than F, the overcurrent protection of the motor shall be coordinated with the Electrical Contractor to comply with NEC Article 430.

2. Product data, along with installation operation and maintenance instructions, shall be

1.4 APPLICABLE PUBLICATIONS

A. NEMA Publication ICS.

B. NEMA Publications MG-1, MG-2, MG-13.

1.5 QUALITY ASSURANCE

A. All starters to be standard product of single manufacturer.

B. Motor efficiencies in accordance with IEE Standard 112 Method B as defined by NEMA

230513 - 2

MG1-1.23 a. and b.

PART 2 - PRODUCTS

A. Starters:

1. Allen Bradley

2. Cerus

3. Cutler Hammer

4. General Electric

5. Square D

B. Motors:

1. A.O. Smith/Century E-Plus

2. Baldor Electric Company, Premium Efficiency.

3. Emerson Electric Company, U.S. Electrical Motors Div., Premium Efficiency Type

‘DE’ & ‘RE’.

4. The Louis Allis Company, High Efficiency.

5. General Electric Company, Premium Efficiency Energy Saver

6. Reliance Electric Manufacturing Company, XE Premium Efficiency Motors.

2.2 FABRICATION – MOTOR STARTERS

A. Starters - Full Voltage, Single Speed, Magnetic:

1. Full voltage, non-reversing magnetic as scheduled.

2. 3 phase, 60 Hz, voltage as scheduled.

3. Electronic overload relay protection in all phases.

4. Manual reset in cover.

5. Under voltage release.

6. Hand-off-automatic selector switch.

7. Red and green panel lights that are multi-LED style. Full voltage lamps are not acceptable.

8. Size to suit motor being controlled.

9. Control transformer for 120 volt control, fused and grounded in accordance with

NEC.

10. Non-fused disconnect switch.

11. Starters located indoors to have NEMA 1 General Purpose Enclosure. Starters located outdoors or in unheated spaces to have NEMA 3R watertight and dust tight enclosure.

12. Solderless lugs.

13. Two N.O. auxiliary contacts.

14. Starter for all motors shall include three-phase power monitor as manufactured by

Time Mark Corporation Model 258 or equal, providing solid state protection by opening starter for loss of any phase, low voltage of any or all phases, and phase

230513 - 3 reversal. Monitor shall be field adjustable for drop-out voltage. Monitor shall be UL recognized.

B. Manual Starters:

1. Bi-metal type thermal overload protection in all phases of type to cause switch handle to assume mid position on overload.

2. Quick break operating mechanism and silver contacts.

3. Pressure type terminals.

4. Mechanism trip free so contacts cannot be reclosed until bimetallic strip cools.

5. Starters located indoors to have NEMA 1 General Purpose Enclosure. Starters located outdoors or in unheated spaces to have NEMA 3R watertight and dust tight enclosure.

6. Manual starters for three phase motors shall utilize a full voltage single speed, magnetic starter as specified in paragraph 2.2-A. A toggle switch shall be provided to facilitate the manual control specified of the magnetic starter.

2.3 FABRICATION - MOTORS

A. 3/4 HP and Larger Horsepower Motors:

1. NEMA Premium efficiency type having the following minimum efficiencies:

Minimum Nominal Full-Load Motor Efficiency (%)

Open Motors Totally Enclosed

Number of Poles 2-Pole 4-Pole 6-Pole 2-Pole 4-Pole 6-Pole

Speed

(RPM)

RPM

RPM

RPM

RPM

RPM

RPM

HP

0.75 --- 85.5 --- --- 85.5 ---

1 77.0 85.5 82.5 77.0 85.5 82.5

1.5 84.0 86.5 86.5 84.0 86.5 87.5

2 85.5 86.5 87.5 85.5 86.5 88.5

3 85.5 89.5 88.5 86.5 89.5 89.5

5 86.5 89.5 89.5 88.5 89.5 89.5

7.5 88.5 91.0 90.2 89.5 91.7 91.0

10 89.5 91.7 91.7 90.2 91.7 91.0

15 90.2 93.0 91.7 91.0 92.4 91.7

20 91.0 93.0 92.4 91.0 93.0 91.7

25 91.7 93.6 93.0 91.7 93.6 93.0

30 91.7 94.1 93.6 91.7 93.6 93.0

40 92.4 94.1 94.1 92.4 94.1 94.1

50 93.0 94.5 94.1 93.0 94.5 94.1

60 93.6 95.0 94.5 93.6 95.0 94.5

75 93.6 95.0 94.5 93.6 95.4 94.5

230513 - 4

100 93.6 95.4 95.0 94.1 95.4 95.0

125 94.1 95.4 95.0 95.0 95.4 95.0

150 94.1 95.8 95.4 95.0 95.8 95.8

200 95.0 95.8 95.4 95.4 96.2 95.8

2. Drip proof, except motors located outdoors to be TEFC or as otherwise specified.

3. Continuous duty, 40C ambient.

4. Regreasable ball bearing design.

5. Speed/Torque curves shall be NEMA Design B so that overload protection provided by standard motor starters will be adequate to prevent over-heating during stall or slightly prolonged motor acceleration.

6. Class B insulation, except motors for variable speed drive application to be specially built for Adjustable Frequency Drive (AFD) duty and include Class F insulation and be suitable for operation down to 10% on fan and pump applications.

7. Assembly to meet application.

8. 1.15 service factor.

9. Suitable for starter type as scheduled on drawings.

10. Slide bases as required.

11. 60 Hz. terminal box large enough to accommodate the required conduit and wiring.

12. 200, 208, 230 or 460 volt, 3 phase as scheduled.

13. Provide shaft grounding rings on all motors driven by a VFD. Typically to an

AEGIS – SGR model.

B. Fractional Horsepower Motors:

1. All motors 1/12 HP to ¾ HP shall be electronically commutated motors (ECM).

2. 115 volt, 1 phase, 60 Hz.

3. Thermally protected.

4. Other features of motors supplied as an integral part of a factory assembly shall be acceptable as the manufacturer’s standard based on acceptance of the assembly as a whole.

PART 3 – EXECUTION

A. Furnish starters for all motors furnished under Division 23 except where starters are provided in motor control center by Division 26.

B. Receive, unload and deliver starters to electrical contractor on job-site for storage, uncrating and installation by Division 26.

C. Furnish all necessary wiring diagrams to Division 26 for installation and power wiring.

D. Starter Schedule:

1. All motors up to and including 40 HP at 460 V or 20 HP at 200V shall be provided with full voltage starters.

2. Single phase motors requiring automatic start-stop to be provided with manual starter

230513 - 5 and controlled by pilot relay.

3. Pump and fan motors listed as adjustable or variable speed to be controlled by adjustable frequency drive units specified in Section 230517.

4. All three phase motors shall be provided with phase loss protection.

E. Starters to be mounted where indicated on the drawings or within sight of the motor controlled.

F. Starters may be mounted directly to masonry, CMU or concrete walls using appropriate fastening methods. When the wall is an exterior wall or any wall where condensation may occur, provide appropriate stand-off, i.e., Unistrut channel).

G. Starters may be mounted directly to equipment such as factory or field built AHU. In this case, through bolts and backing plates along with an appropriate stand-off shall be used. Seal all holes. Self-tapping screws with exposed ends will not be acceptable.

H. When starters are required to be located in areas where walls are not available, provide a

Unistrut type frame securely mounted to floor adequately braced to form a rigid mounting surface.

I. Starters shall be generally mounted with the center of the unit at 60" above the finished floor.

Service clearance shall be provided in accordance with the National Electric Code and under no circumstances less than the following:

Voltage to Ground Minimum Clearance Distance

110V or 120V 3'-0"

208V, 220V, 240V or 277V 3'-6"

460V or 480V 4'-0"

Greater than 480V 5'-0"

J. Starters shall be accessible.

K. Provide housekeeping pad for all floor mounted starters.

3.2 MOTORS – INSTALLATION

A. Motors:

1. Install in accordance with requirements of the duty.

2. Lugs to be provided under this Division.

3. All motors shall have overload protection as required by NEC. Any motor without integral protection shall have a starter that provides overload protection furnished by

Division 23.

END OFSECTION

230513 - 6

230518 - 1

SECTION 230518 - CONTROL WIRING

B. Refer to Division 26 for electrical wiring requirements.

C. Refer to Specification Section 230923 – Instrumentation and Control Devices for HVAC

A. Building Automation System Wiring – Specification Section 230923.

B. Split Direct Expansion (DX) System Interlock Wiring.

1.3 DEFINITIONS

A. Control Wiring: All wiring, high or low voltage other than power wiring, required for the proper operation of the mechanical systems.

B. Power Wiring: All line voltage wiring to the mechanical equipment. Line voltage which also serves as a control circuit, such as a line voltage thermostat, or involves interlocking with a damper, shall be considered control wiring.

1.4 QUALITY ASSURANCE

A. All work will be in accordance with the requirements of the National Electrical Code.

1.5 SUBMITTALS

A. Submittals are not required.

2.1 MATERIALS

A. All material used in the completion of the wiring under this section will comply with the requirements of Division 26 Electrical and Section 230923 – Instrumentation and Control

Devices for HVAC.

3.1 INSTALLATION

A. Cooperate completely with the contractor for Division 26.

230518 - 2

B. Provide all conduit, wire and accessories necessary to complete the control wiring as specified under WORK INCLUDED.

C. Because of variations in requirements from manufacturer to manufacturer, all details may not be included in the Contract Documents. This sub-contractor must obtain approved coordinated wiring diagrams before proceeding with the control wiring.

D. All control wiring shall be properly installed in an approved raceway system or when allowed, run exposed in concealed spaces. All control wiring run in exposed areas shall be in an approved raceway unless otherwise noted.

E. Control wire run exposed shall be neatly bundled and routed parallel and/or perpendicular to building structure or equipment casing. Routing of wire shall be so that it does not interfere, chafe or obstruct service or maintenance of the equipment served.

F. Exposed control wire shall be properly secured and/or supported within equipment encloses. Cable shall be secured on no greater than 18" centers.

G. All openings made for the passing of control wire shall be properly bushed to prevent chafing. The size of the hole shall be suitable for the quantity of wires or tubing passing through while allowing for ease of pulling and future expansion. Oversized holes beyond these requirements are not allowed.

H. Holes made within air handling equipment which may allow the transfer or bypassing of air shall be properly sealed after wire is pulled. Expanding foam sealant and proper backing material will be acceptable. Seal shall be suitable for maximum unit operating pressures.

I. Attachments of control devices, raceway and cable supports shall be made with proper attachments. Self-drilling screws which result in exposed end will not be acceptable.

Bolts and nuts shall be used with bolt head exposed to view. All fasteners located where exposed to weather or moisture shall be stainless steel or cadmium plated.

J. Any opening, holes or cuts in equipment enclosures or building structure not used shall be neatly sealed. On equipment, the seal or patch shall be of similar material sealed and painted to match.

K. The control contractor shall clean all unused or scrap material from the equipment enclosure.

L. All control wire shall be identified by proper cable identification methods. Verify how cables shall be labeled with the Owner's Representative prior to the start of work. All termination shall be labeled and labels clearly visible.

M. All control devices, cabinets, equipment and raceways shall be labeled. Verify how the hardware shall be labeled with the Owner's Representative prior to the start of work.

N. Splices in control wire are not allowed unless the length of run is too great to allow for a continuous run. When splices become necessary, they shall be solder connected with

230518 - 3 heat shrink tubing. When raceway is used, all splices shall be in junction boxes.

O. Control devices (i.e., flow switches), connected to cold equipment where the possibility of condensation may occur shall be vapor-proof type. The connecting conduit shall be properly sealed with spray type foam after the wires are pulled through. If this is not possible, a weatherproof junction box shall be close mounted to the device to allow for proper moisture sealing. Conduit connections shall be sealed with a silicon type caulk/sealant.

P. All control devices or wiring located exposed to weather or moisture shall be in an approved raceway system. This system shall be properly supported and sealed to prohibit moisture convection or transfer. Provide flexible conduit similar to seal tight for connection to all equipment. EMT and set screw fittings are not acceptable. All exterior raceway shall be IMC (Intermediate Metallic Conduit) or better with threaded fittings.

Q. Where a disconnect switch is mounted between an adjustable frequency drive and the motor, the disconnect switch must have a late make, early break auxiliary contact. This contact shall be wired into the AFD control circuit so that the control circuit is disconnected before the power circuit it broken.

R. BAS Contractor shall fully coordinate with all other trades to ensure sufficient service access to HVAC control panels and devices is provided.

230518 - 4

230529 - 1

SECTION 230529 - HANGERS AND SUPPORTS FOR HVAC PIPING AND EQUIPMENT

A. Inserts, Shells and Upper Attachments.

B. Pipe Hangers, Rods, Supports and Accessories.

C. Pipe Sleeves.

D. Duct Hangers and Supports.

E. Duct Sleeves.

F. Fabricated Steel Support.

1.3 QUALITY ASSURANCE

A. Design of pipe supporting elements shall be in accordance with ANSI B31.1.

B. Fabrication and installation of pipe hangers and supports shall be in accordance with the following Manufacturers Standardization Society (MSS) Standards.

1. SP-58 Pipe Hangers and Supports: Materials, Design and Manufacture.

2. SP-69 Pipe Hangers and Supports: Selection and Application.

3. SP-89 Pipe Hangers and Supports: Fabrication and Installation Practices.

C. Steel angles, channels and plate shall be in accordance with ASTM A36, red primed or hot dipped galvanized for interior applications, and hot galvanized for exterior applications.

D. Bolts, including nuts and washers, used for fabricating steel members shall be in accordance with ASTM A325 and shall be stainless steel or plated for corrosion protection. Plain steel components are unacceptable.

E. Welding of steel members shall be in accordance with AWS D1.1.

F. Duct hangers and supports shall be in accordance with SMACNA HVAC Duct

Construction Standards – Metal and Flexible as applicable.

230529 - 2

G. Steel supports for ducts, pipe anchors, pipe guides, and piping supported from below shall be fabricated in accordance with AISC Specification for the Design, Fabrication and Erection of Structural Steel for buildings. If required, the contractor shall include the cost of the services of a structural engineer to design or review the system.

H. For all PP-R & PP-RCT Piping Inserts, Shells, Attachments, Hangers, Clamps, Rods, Supports and Accessories refer to the Aquatherm “Installation Principles” manual and the “Walraven BIS” manual. These shall be the requirements for all PP-R & PP-RCT piping. They are attached for your reference and bidding purposes.

1.4 APPLICABLE PUBLICATIONS

A. Applicable sections of the publications listed below form a part of this Section. The latest publications are referenced to in the text by the basic designation only.

1. American Institute of Steel Construction (AISC)

2. American National Standards Institute (ANSI)

3. American Society for Testing and Materials (ASTM)

4. American Welding Society (AWS)

5. The Manufacturer's Standardization Society of the Valve and Fittings Industry

(MSS)

6. Sheet Metal and Air Conditioning Contractor's National Association, Inc.

(SMACNA)

1.5 SUBMITTALS

A. Submit schedule indicating type of hanger to be used by system and pipe size. Include rod size for each hanger size.

B. Product data, along with installation operation and maintenance instructions, shall be

A. Inserts, Shells and Upper Attachments:

1. Anvil International, Inc.

2. Carpenter Paterson, Inc.

3. Cooper B-Line, Inc.

4. Elcen Metal Products

5. Hilti

6. Michigan Hanger Company

7. PHD Manufacturing, Inc.

8. Unistrut

230529 - 3

B. Pipe Hangers, Rods, Supports and Accessories:

1. Anvil International, Inc.

2. Carpenter Paterson, Inc.

3. Cooper B-Line, Inc.

4. Elcen Metal Products

5. Gripple

6. Hilti

7. Michigan Hanger Company

8. PHD Manufacturing, Inc.

9. Unistrut

C. Pipe Sleeves:

1. Metraflex – Metraseal

2. Thunderline Corporation - Link Seal

3. Owner Approved Substitution.

D. Duct Hangers and Supports: Fabricated per Specifications

E. Duct Sleeves: Fabricated per Specifications

F. Fabricated Steel Support: As Detailed on Drawings.

1. Inserts; MSS Type 18; malleable iron body and nut, galvanized finish, opening in top of insert for reinforcing rod, lateral adjustable. Rated for 1,140 lbs.

2. Shells: Steel shell and expander plug, snap off end fastener. Based on Phillips

Concrete Fasteners Red Head or approved substitution.

3. Upper Attachments:

a. Top beam clamps; MSS Type 19: Malleable iron galvanized finish clamp, hardened steel cup point set screw and locknut. Rating is contingent on rod and bolt size. Based on Anvil Fig. 94 or approved substitution.

b. Bottom Beam Clamp; MSS Type 23: Malleable iron galvanized finish clamp, hardened steel cup point set screw and locknut, and retaining clip. Rating is contingent on rod and bolt size. Based on Anvil Fig. 86

Clamp and Fig. 89 Retaining Clip (or Fig. 87) or approved substitution.

c. Welded Beam Attachment; MSS Type 22: Carbon steel suitable for eye rod or rod and locknut, rating is contingent on rod and bolt size. Based on Anvil Fig. 66 or approved substitution.

d. Center Beam Clamp; MSS Type 21: Malleable iron jaw and square head bolt and nut with galvanized finish. Rating is contingent on rod and bolt size. Based on Anvil Fig. 134 or approved substitution.

230529 - 4

e. Center Beam clamp; MSS Type 29: Forged steel, weldless eye nut, tie rod to secure clamp to beam all with galvanized finish, rating is contingent on rod and bolt size. Based on Anvil Fig. 292 or 292L or approved substitution.

B. Pipe Hangers, Rods, Supports and Accessories:

1. Pipe Hangers:

a. Clevis Hanger; MSS Type 1: Carbon steel, galvanized for interior and exterior use, sized to accommodate required insulation. Rating is contingent on rod and bolt size. Based on Anvil Fig. 260 or 300 or approved substitution.

b. Pipe Rings; MSS Type 10: Carbon steel, galvanized for black steel and insulated pipe copper or copper plated or rubber coated for copper pipe.

Threaded swivel, sized to accommodate required insulation. Rating is contingent on rod and bolt size. Based on Anvil Fig. 69 or Fig. 97C for copper pipe or approved substitution.

c. Adjustable Roller Hanger; MSS Type 43: Cast iron roll, carbon steel yoke rod roll and hex nut with galvanized finish. Sized to accommodate insulation. Rating is contingent on rod and bolt size. Based on Anvil

Fig. 181 or approved substitution.

2. Rods:

a. Size 3/8" and up: All thread steel rod electro galvanized. Sizing for pipe or equipment support as follows:

Copper Tube, Plastic Steel, Cast Iron or

Fiberglass Reinforced Glass Max Equip.

Pipe Size Pipe Size Rod Size Load

¼” to 2” ¼” to 2” 3/8” 730 lbs.

2-1/2” to 5” 2-1/2” to 3” ½” 1350 lbs.

6” 4” to 5” 5/8” 2160 lbs

8” to 12” 6” ¾” 3230 lbs.

14” 8” to 12” 7/8” 4480 lbs.

16” 14” to 16” 1” 5900 lbs.

18” to 20” 18” to 20” 1-1/4” 9500 lbs.

22” to 42” 22” to 42” 1-1/2” 13,800 lbs.

b. Rods may be reduced one size for double rod hangers with 3/8” minimum diameter, or when other paragraphs require a minimum of 2 hangers per section provided the minimum diameter of 3/8” in maintained. Based on Anvil Fig. 146 or approved substitution.

230529 - 5

3. Supports:

a. Pipe Saddle; MSS Type 38: Cast iron saddle, black steel lock nut nipple, cast iron reducer all with galvanized finish. Suitable for standard field cut and threaded galvanized steel pipe. Cast iron floor flange.

Based on Anvil Fig. 264 Saddle, Fig. 63 Floor Flange or approved substitution.

b. Pipe Saddle Cold Piping: MSS Type 40. Single bonded unit consisting of a galvanized metal shield and a molded section of rigid polyurethane foam insulation. Rigid urethane foam shall have a density of 4 pounds per cubic foot, a thermal conductivity of 0.13 Btu.in/sq.ft./hr.oF at 75oF mean temperature. Insulation thickness to be equal to thickness specified for pipe being supported.

c. Adjustable Pipe Roll…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .