DFS1FD 01 50 00 TEMPORARY FACILITIES AND CONTROLS 072226DR - pdf.pdf

PDF 147 KB Posted

Attached to
removal and installation of fuel storage tank, dispenser and related accessories
Solicitation number
BD-27-2246-DFD3-DFD3-131596
Issued by
Bristol County, Massachusetts

About this file

This is a Temporary Facilities and Controls specification document for the Dartmouth Fire Station No. 1 New Fuel Depot project in Dartmouth, Massachusetts, prepared by RT Architects, Inc. as of July 22, 2026. The document outlines comprehensive requirements for temporary construction facilities and controls that the contractor must provide, including weather protection, temporary utilities (electricity, cooling, ventilation, sanitary facilities), vehicle access and traffic control, scaffolding and hoisting equipment, temporary barricades and enclosures, security provisions, dust and noise control measures, and rubbish removal. The contractor is responsible for maintaining all temporary systems until substantial completion and must comply with Federal, State, and local regulations. Weather protection with heating to maintain minimum 40 degrees Fahrenheit is required from November through March, and the contractor must coordinate with all trades and obtain necessary permits and inspections for temporary work.

The specification requires the contractor to establish an Owner's field office with designated furniture, equipment, and consumables; maintain temporary security provisions including fire extinguishers and fire watches during high-risk operations; control dust through regular watering and street sweeping within 500 feet of the work site; and limit noise levels to 70 decibels at the project boundary. Construction work hours are restricted to 7:00 AM to 5:00 PM Monday through Friday and 9:00 AM to 4:00 PM on Saturday, with no work permitted on Sundays or holidays except in emergencies. All workers must be properly identified, maintain professional conduct, and comply with strict behavioral standards regarding smoking, alcohol, illegal substances, and other prohibited activities. The contractor must also provide current CORI background checks for all personnel prior to work commencement, with the Owner retaining the right to reject individuals deemed to present risk.

View the file

Other files

File Type Posted
DFS1FD 00 00 20 INVITATION TO BID 072226DR - pdf~1.pdf PDF
DFS1FD 00 09 00A LABOR STANDARDS 072226SR - pdf.pdf PDF
DFS1FD 00 00 01 TABLE OF CONTENTS 072226DR - pdf.pdf PDF
DFS1FD 01 60 00 PRODUCT REQUIREMENTS 072226DR - pdf.pdf PDF
DFS1FD 00 03 25B AIA A201 GENERAL CONDITIONS 072226DR.pdf PDF
DFS1FD 00 03 25C AIA A310 BID BOND 072226DR.pdf PDF
DFS1FD 00 03 25D AIA A312 PERFORMANCE BOND 072226DR.pdf PDF
DFS1FD 03 30 00 CAST-IN-PLACE CONCRETE 072226DR - pdf.pdf PDF
DFS1FD 09 91 13 PAINTING 072226DR - pdf.pdf PDF
DFS1FD 00 03 00 FORM FOR GENERAL BID 072226DR - pdf.pdf PDF
DFS1FD 01 33 00 SUBMITTAL PROCEDURES 072226DR - pdf.pdf PDF
DFS1FD 02 60 00 UST EXCAVATION AND REMOVAL 072226DR - pdf.pdf PDF
DFS1FD 01 10 00 SUPPLEMENTARY REQUIREMENTS 072226DR - pdf.pdf PDF
DFS1FD 01 00 00 GENERAL REQUIREMENTS 072226DR - pdf.pdf PDF
DFS1FD 31 22 70 SEDIMENTATION AND EROSION CONTROL 072226DR - pdf.pdf PDF
DFS1FD 01 78 39 PROJECT RECORD DOCUMENTS 0072226DR - pdf.pdf PDF
DFS1FD 00 08 00A SUPPLEMENTARY GENERAL CONDITIONS PART 1 072226DR - pdf.pdf PDF
DFS1FD 32 55 40 FUEL STORAGE TANK AND EQUIPMENT 072226DR - pdf.pdf PDF
DFS1FD 01 77 00 CONTRACT CLOSEOUT PROCEDURES 072226DR - pdf.pdf PDF
DFS1FD 01 26 00 CONTRACT MODIFICATION PROCEDURES 072226DR - pdf.pdf PDF
DFS1FD 00 08 00B SUPPLEMENTARY GENERAL CONDITIONS PART 2 072226DR - pdf.pdf PDF
DFS1FD 31 20 00 EARTHWORK 072226DR - pdf.pdf PDF
DFS1FD 00 00 03 LIST OF DRAWINGS 072226DR - pdf.pdf PDF
DFS1FD 00 01 00 INSTRUCTIONS TO BIDDERS 072226DR - pdf.pdf PDF
DFS1FD 00 03 25A AIA A101 OWNER CONTRACTOR AGREEMENT 072226DR.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DARTMOUTH FIRE STATION NO. 1

NEW FUEL DEPOT

DARTMOUTH, MASSACHUSETTS 22 JULY 2026

RT ARCHITECTS, INC.

TEMPORARY FACILITIES AND CONTROLS

01 50 00 - 1

SECTION 01 50 00

PART 1 - GENERAL

1.01 RELATED DOCUMENTS

A. All of the Contract Documents, including Drawings, General Conditions, Supplementary Conditions, and all Sections of Division 01 - General Requirements, apply to the Work of this Section.

1.02 DESCRIPTION OF WORK

A. Provide, maintain, remove, and pay all costs related thereto, all temporary facilities included under the Work of this Section, or as otherwise required for progress and completion of the Work in accordance with requirements of the Contract Documents.

B. Coordinating and scheduling among all trades and subcontractors, the furnishing and use of all temporary facilities for the Work in accordance with all Federal, State, and local governing rules and regulations.

1.03 RELATED WORK SPECIFIED ELSEWHERE

A. Carefully examine all of the Contract Documents for requirements which effect the Work of this Section.

B. Other Specification Sections which directly relate to the Work of this Section include, but are not limited to, the following:

1. Section 01 00 00 General Requirements

2. Section 01 26 00 Contract Modification Procedures

3. Section 01 33 00 Submittal Procedures

4. Section 01 77 00 Contract Closeout Procedures

5. Section 01 78 39 Project Record Documents

6. Section 26 00 00 Electrical

7. Section 31 20 00 Earthwork

8. Section 31 22 70 Sedimentation and Erosion Control

9. Section 32 12 16 Paving and Surfacing

10. Section 32 55 40 Above Ground Storage Tank and Equipment

C. Nothing in this Section is intended to limit types and amounts of temporary Work required, and no omission from this

Section will be recognized as an indication by the Architect that such temporary activity is not required for successful completion of the Work or compliance with requirements of the Contract Documents.

1.04 REQUIREMENTS OF REGULATORY AGENCIES

A. Provide and maintain all temporary facilities in compliance with governing rules, regulations, codes, ordinances and laws of agencies and utility companies having jurisdiction over Work involved in the project.

B. Be responsible for all temporary Work provided, and obtain any necessary permits and inspections for such Work.

C. Do not interfere with normal use of streets in vicinity of project site accept as indicated on drawings and/or as absolutely necessary to execute required Work, and then only after proper arrangement has been made with applicable authorities, including traffic control.

01 50 00 - 2

1.05 JOB CONDITIONS

A. Notify the Owner, Architect, and other affected parties no less than 10 days in advance of shutting down, starting up, interrupting utilities or service of facilities which may affect the neighboring homes or businesses. Allow sufficient time for protective measures to be taken.

B. On site storage of equipment and materials will be limited to the existing area as indicated on the Drawings.

1.06 NOT USED

1.07 WEATHER PROTECTION

A. The Contractor shall provide temporary enclosures and heat to permit Work to be carried on during the months of November through March in compliance with M.G.L. c 149 sec. 44G9(d), and include temporary enclosures and heat for exterior masonry wall back-up and masonry veneer construction of the building envelope. These specifications are not to be construed as requiring enclosures or heat for operations that are not economically feasible in the opinion of the Owner.

B. "Weather Protection" shall mean the temporary protection of the Work adversely affected by moisture, wind, and cold by covering, enclosing, and/or heating. This protection shall provide adequate Work areas during the months of November through March as determined by the Owner and consistent with the construction schedule to permit the continuous progress of all Work necessary to maintain an orderly and efficient sequence of construction operations.

The General Contractor shall furnish and install "Weather Protection" material and be responsible for all costs, including heating required to maintain a minimum of 40 degrees Fahrenheit at the Work surface and include temporary enclosures and heat for exterior masonry wall back-up and masonry veneer construction of the building envelope. This provision does not supersede any specified requirements for methods of construction, curing of materials, or the applicable conditions set forth in the Contract Articles with added regard to performance obligations of the Contractor.

C. Installation of weather protection and heating devices shall comply with all safety regulations including provisions for adequate ventilation and fire protection devices.

D. Unit heaters, if used, shall be of the smokeless type and be installed and operated in such a way that they will not damage finished Work or endanger the health and welfare of the occupants. Salamanders shall not be used.

E. The Contractor shall be responsible for weather protection during construction, until Substantial Completion, and shall be liable for any damage to any Work caused by failure to supply weather protection and proper ventilation.

F. The Contractor shall remove and replace all Work damaged by frost, as directed by the Architect, at no additional cost to the Owner

G. It is to be specifically understood that the Contractor shall do no Work under any conditions deemed unsuitable by the Contractor to the perfect execution of the Work. This provision shall not constitute any waiver, release, or lessening of the Contractor's obligation to bring the Work to Substantial Completion within the period of time set forth in the Contract Documents.

1.08 TEMPORARY SERVICES

A. Temporary Electricity and Lighting:

1. The Electrical Subcontractor shall install, maintain and remove entirely, light and power system for entire project, including temporary offices and security lighting. Initial hook-up, meter, and/or connection for temporary electric service and final service connections shall be part of the Work of Section 26 00 01 – Electrical.

01 50 00 - 3

2. The Electrical Subcontractor shall provide sufficient temporary lighting to ensure proper Workmanship everywhere; by combined use of daylight, general lighting and portable plug-in task lighting. Provide general lighting with local switching which will enable energy conservation during periods of varying activity (Work-in-progress, traffic only, security checks, lock-up, etc.). Pay for all permits, charges and fees related to temporary electric service.

a. All Temporary Light and Power is the Work of the Electrical Subcontractor unless specifically noted to be performed elsewhere in the specifications.

3. The Electrical Subcontractor shall provide and maintain temporary wiring as required for power and lighting.

4. The General Contractor shall pay for the cost of energy consumed by all trades. Temporary wiring of a special nature, for lights and power required to complete the Work in accordance with requirements of the Contract Documents, other than that specifically called for in Section 26 00 01, shall be paid for by the Electrical Contractor.

B. Temporary Cooling and Ventilation:

1. The General Contractor shall provide temporary cooling and ventilation as required to maintain adequate environmental conditions and schedule to facilitate progress of the Work, to provide heat of not less than 40 degrees F, and not more than 85 degrees F which shall be continuously maintained in the enclosed area until the project is accepted.

2. Provide adequate forced ventilation of enclosed areas for curing of installed materials, to disperse humidity, and to prevent hazardous accumulation of dust, fumes, vapors or gasses.

3. The new HVAC equipment installed under the Work of this Contract shall not be used for temporary heat, unless authorized in advance, in writing, by the Architect.

D. Provide temporary sanitary facilities, including temporary toilets, wash facilities, and drinking water facilities. Comply with regulations and health codes for type, number, location, operation and maintenance of fixtures and facilities. The toilets and wash facilities shall be installed in a location approved by the Owner. Include toilet tissue, paper towels, paper cups and similar disposable materials for each facility. Provide covered waste containers for used material.

1. Provide self contained chemical type toilet units, including periodic maintenance. Shield toilets as required to ensure privacy, and do not lift while occupied.

2. Provide facilities supplied with potable water for personnel involved in handling materials that require wash-up.

Dispose of drainage properly.

E. Removal:

1. Completely remove temporary materials and equipment when their use is no longer required.

2. Clean and repair damage caused by temporary installations or used for temporary facilities.

3. Restore permanent facilities used for temporary services to their original condition.

1.09 VEHICLE AND CONTRACTOR ACCESS AND TRAFFIC CONTROL

A. The Contractor shall be responsible for all traffic control, including municipal police services, at streets adjacent to the Project site, as required to provide safe access and egress for Owner and construction related vehicles. Provide and maintain a suitable means of access to the Contract Work areas as necessary for vehicles and equipment of all trades requiring such access.

B. The Contractor shall be responsible for all measures necessary to maintain Department and public access and safety at all times to existing Town of Dartmouth property in coordination with Dartmouth Fire District No. 3 personnel and the Architect. Clear and unobstructed vehicular and personnel access to three (3) existing overhead doors will be provided and maintained throughout the duration of the Work of this Contract, as indicated on the Drawings.

01 50 00 - 4

1.10 TEMPORARY PARKING

A. Parking for vehicles belonging to the Contractor, Subcontractors, or other personnel providing services included under the Work of this Contract shall be limited to within the Limit of Work line of this Project. Vehicle parking for all personnel providing services included under the Work of this Contract shall not be allowed in the are4a of the existing leach field as indicated on the Drawings or elsewhere in the Town of North Dartmouth.

1.11 SCAFFOLDING, LADDERS AND HOISTING FACILITIES

A. The Contractor shall provide and maintain all temporary stairs, ramps, runways, chutes, ladders, staging, and hoists as required for proper execution of the Work in accordance with applicable requirements of Federal, State and Local Codes, except as otherwise indicated below. Provide means to safely enable access to all parts of Work by Architect, Owner or other such person authorized to inspect Work. Construction, installation, and maintenance of such equipment shall be Work in accordance with applicable requirements of Federal, State and Local Codes.

B. If temporary hoisting equipment is to be anchored to, or supported by, building structure and/or related building construction, submit layout of equipment, loads involved, anchorage proposed and other pertinent data for review by the Structural Engineering Consultant prior to installation.

C. Provide and maintain suitable means of travel between floor levels of building and to all roof levels for use by all Contractors and Workmen until permanent stair systems are installed and as required for proper execution of Work.

1.12 TEMPORARY BARRICADES AND ENCLOSURES

A. Provide temporary enclosure where indicated and where reasonably required to ensure adequate Workmanship and protection from weather and unsatisfactory ambient conditions for the Work, including enclosure where temporary heat is used. Provide fire-retardant treated lumber and plywood. Provide tarpaulins with UL label and flame spread of 15 or less; provide translucent type (nylon reinforced polyethylene) where daylighting of enclosed workspace would be beneficial for Workmanship, and reduce use of temporary lighting. Enclosures visible to building exterior shall be painted with the color designated by the Owner.

1. Provide protection at all times, against rain, snow, wind, storms, and at the end of each day's Work cover all new

Work subject to damage. Work damaged by failure to provide such protection shall be removed and replaced at no additional cost to the Owner.

2. Provide barricades as required for traffic control at streets adjacent to the Project site, as required to provide safe access and egress for Owner and construction related vehicles.

3. Provide protection as required to prevent existing site and/or building flooding.

1.13 SECURITY AND PROTECTION PROVISIONS

A. Temporary security and protection provisions required shall include, but not be limited to, guard rails, fire protection, barricades, warning signs/lights, enclosed fence, sidewalk bridges, building enclosure/lockup, theft protection, environmental protection, and similar provisions intended to minimize property loses, personal injuries and claims for damages at project site.

1. Provide types, sizes, numbers and locations of fire extinguishers, as would be reasonably effective in extinguishing fires during early stages, by personnel at project site (minimum 2 per floor of each building).

Provide type A extinguishers at locations of low-potential for either electrical or grease-oil-flammable liquids fires;

provide Type ABC dry chemical extinguishers at other locations; comply with recommendations of NFPA No. 10 “Standard for Portable Fire Extinguishers” and NFPA 241 “Standard for Safeguarding Construction, Alterations and Demolition Operations. Post warning and quick-instructions at each extinguisher location, and instruct all personnel at project site, at time of their first arrival, on proper use of extinguishers and other available facilities at project site. Post local fire department call number on each telephone instrument at project site.

a. Complete each new permanent fire protection system and facility at earliest reasonable date, and make ready for emergency use, and instruct personnel at site on availability and proper use.

01 50 00 - 5

b. Perform torch cutting and welding operations only when approved by the Contractor. Provide chemical extinguishers at all locations where such Work is in progress.

c. Maintain a fire watch of the interior and exterior of the facility for at least one hour after the Project’s daily quitting time when the following activities have been done: torching, welding or other activities capable of starting combustion.

1.13 OWNERS FIELD OFFICE

A. Location of Owner’s Field Office shall be determined in coordination with the Owner and Architect.

B. Provide the following furniture, equipment, and accessories for Owner Field Office. All equipment furnished shall be property of the Contractor and removed in its entirety upon completion of the Work. Provide the following:

1. One roll around, upholstered office chairs.

2. One waste baskets.

3. Bottled Drinking water

4. One (1) First-aid kit.

5. One (1) Tri-Class (ABC), dry chemical fire extinguisher, 10-pound.

6. One (1) ten (10)-inch outdoor-type thermometer, mounted at a convenient location, not in direct sunlight.

7. One (1) multifunction, color printer scanner, capable of printing 11X17, capable of wifi printing such as Epson

WF7620 or equal

8. Consumables, 8 1/2X 11 and 11x 17 20lb printing paper, Ink, Color markers, File folders, Six 3”-ring binders, six

1.5” 3 ring binders, Three hole paper punch, Push pins, Paper clips

9. One (1) 1.7 cu ft refrigerator.

10. Twelve (12) Safety Helmet and Safety Vest for use by visitors

1.14 DUST AND NOISE CONTROL

A. Provide and maintain throughout the conduct of the Work of this Project, the following measures necessary to control and reduce emission of airborne dust, and prevent contamination of exterior surfaces at the existing Harwich High School and adjacent public and private properties, or otherwise creating a nuisance to the Owner or adjacent properties.

1. Periodic dosing with water or other approved dust control materials of site access roads during periods of extended heat or dry weather, as determined by the Architect

a. Sufficiently wet construction materials with a fine spray or sprinkling of water during removal, cutting or other handling to reduce the emission of airborne dust. On Workdays this is to be done a minimum of four (4) times per day. On Sundays and Saturdays, it is to be one (1) time per day, 24 hours maximum after last Workday watering and 24 hours between each weekend watering.

2. Covering with heavy duty tarps, or other approved protection, of all on-site stockpiles of loam and fill

3. Installation of crushed rock dust traps at all transition points from dirt to asphalt

4. Street sweeping of all public ways located within a distance of 500 feet from the Limit of Work line, as required to maintain all areas clean and free of dirt, mud, and debris at all times.

5. The Contractor shall include the cost to comply with the above requirements in a separate line item included in the

Schedule of Values provided in accordance with the Contract Documents.

01 50 00 - 6

B. The Contractor shall use every effort and every means possible to minimize noise caused by his operations, which the Architect, the Owner’s Representative, Owner, or governing authorities may consider objectionable. The noise levels on the construction site will be controlled so that at no time will the noise level measured at the Limit of Work line shall exceed 70dB. The General Contractor shall provide Working machinery and equipment equipped with suitable mufflers and sound-deadening panels in accordance with the latest edition of the OSHA regulations. Compressors shall be equipped with silencers or mufflers on intake and exhaust lines. Wherever practical electricity shall be used for power to reduce noise. Dumping bins, hoppers and trucks used for disposal shall be lined with wood or other sound deadening material if required. Where required agencies have jurisdiction, certain noise-producing Work may have to be performed during specified periods only, further; the Contractor and Subcontractors are required to comply with all applicable regulations.

1. Prior to the start of construction, the Contractor shall submit to the Owner, the Owner’s Representative and the Architect, a Noise Control Program for review where Work with high level of noise is anticipated to Work out plans to mitigate the noise impact, especially for Work anticipated to be done during normal school hours.

1.15 RUBBISH REMOVAL

A. All waste and debris caused by the Work of the Contract shall be stock piled and removed daily under the Work by General Contractor. Final removal from all parts of the building, site, and other Contract areas, and legal off-site disposal of all waste and debris shall be provided by the Contractor, in accordance with requirements of the Contract Documents.

D. Burning or on site disposal of waste and debris caused by the Work of this Contract shall not be allowed.

E. Areas for accumulation of construction waste and debris caused by the Work of this Contract shall be visually screened from public view.

1.16 PROJECT SIGNAGE

A. Provide other signs as required to provide directional information to construction personnel, visitors and school personnel. Construct signs in an attractive manner utilizing rigid materials and crisp graphic lettering and pictorials acceptable to Architect. Install signs at appropriate locations.

01 50 00 - 7

1.17 SAFETY AND COOPERATION

A. This project is subject to compliance with Public Law 91-596, "Occupied Safety and Health Act of 1970" (OSHA) and all amendments thereto, with respect to all rules and regulations pertinent to construction.

1. The Work of this Contract shall be performed between the hours of 7:00 AM and 5:00 PM, Monday through Friday, and 9:00 AM and 4:00 PM on Saturday. Performance of the Work of this Contract shall not be allowed on Sunday or Holidays. Exceptions to the specified hours of Work will be allowed in the event of an emergency, in coordination with the Owner.

B. The Contractor shall coordinate all Work and extend full cooperation to Fire District personnel and the Work of other trades.

C. The following rules and regulations will be required of Contractor, Subcontractor, or other personnel providing services included under the Work of this Contract. No deviation or exception will be permitted without the express written approval of the Owner. The Contractor shall take responsibility for ensuring all construction personnel adhere to and cooperate with the Owner in enforcing these responsibilities.

1. All Workers must be properly, permanently and visually identified. The identification systems will be set up by the Owner and administered by the Contractor. Maintain an updated list of authorized Workers with Owner and notify the Owner of any change.

2. All Workers shall maintain their actions in a professional and workmanlike manner while at the Project site. Failure to comply with the following restrictions shall be grounds for permanent removal from the list of authorized workers, as described above. Worker restrictions include, but are not limited to, the following:

a. No abusive language

b. No littering

c. No lewd behavior

d. No conduct otherwise deemed unacceptable by the Owner or Architect

e. No smoking on School District property, in accordance with State of Massachusetts law

f. Consumption of alcoholic beverages on the job, or coming to Work in an intoxicated condition

g. Possessing or consuming illegal drugs or any other illegal substance while working on the Project

h. Using or removing Owner's or Subcontractors' possessions from the property without prior written authorization

i. Violating any state, federal or city statues, rules, regulations, and the like while working on the Project

j. Possessing firearms or explosives while Working on the Project

k. Using Project facilities for jobs other than specific assignments directly related to the Work of this Project

l. Physically abusing or harming an individual who Works at or visits the Project

m. Duplication of any keys used in the existing or new building without prior written authorization by the Owner

n. Providing building access at any time to anyone not directly working for the Contractor

o. Abusing, defacing, or destroying existing or new property of the Owner

p. Preventing access to any and all areas of the Project by the Owner, Architect and the Owner's Consultants.

D. The Contractor shall provide to the Owner, prior to commencing the Work of this Contract, evidence of current CORI background checks for all General Contractor and Subcontractor personnel. Background checks shall be performed in accordance with 105 CMR 950.00 and Hampden Charter School of Science requirements.

The Owner reserves the right to reject such personnel that the required CORI indicate may present reasonable assumption of risk to the staff and students. The Contractor shall immediately replace such personnel at no additional cost to the Owner.

PART 2 - PRODUCTS NOT USED

PART 3 - EXECUTION NOT USED

END OF SECTION