DFS1FD 00 08 00B SUPPLEMENTARY GENERAL CONDITIONS PART 2 072226DR - pdf.pdf

PDF 91 KB Posted

Attached to
removal and installation of fuel storage tank, dispenser and related accessories
Solicitation number
BD-27-2246-DFD3-DFD3-131596
Issued by
Bristol County, Massachusetts

About this file

This is a Supplementary General Conditions document (Part 2) for Dartmouth Fire District #3 in Massachusetts, establishing contractual terms and conditions for the fuel storage tank project. The document outlines the scope of work involving selective removal of an existing underground fuel storage tank and accessories, coupled with installation of a new above-ground fuel storage tank, fuel dispenser, and related piping and accessories. The project is estimated at $186,000.00, with sealed bids required in accordance with the attached contract documents. Specific response dates, due dates, site visit requirements, and bidder's conference details would be detailed in the primary contract documents referenced by these supplementary conditions.

The supplementary general conditions establish the legal framework and standard contract clauses governing the bidding process, contractor performance, and project execution. This document addresses administrative requirements, insurance provisions, payment terms, and other standard contractual obligations typical for public works projects in Massachusetts. As a supplementary conditions document, it modifies or supplements the primary general conditions already established, ensuring clarity and compliance with applicable state and local regulations for the fuel storage tank removal and installation project undertaken by Dartmouth Fire District #3.

View the file

Other files

File Type Posted
DFS1FD 00 00 20 INVITATION TO BID 072226DR - pdf~1.pdf PDF
DFS1FD 00 09 00A LABOR STANDARDS 072226SR - pdf.pdf PDF
DFS1FD 00 00 01 TABLE OF CONTENTS 072226DR - pdf.pdf PDF
DFS1FD 01 60 00 PRODUCT REQUIREMENTS 072226DR - pdf.pdf PDF
DFS1FD 00 03 25B AIA A201 GENERAL CONDITIONS 072226DR.pdf PDF
DFS1FD 00 03 25C AIA A310 BID BOND 072226DR.pdf PDF
DFS1FD 00 03 25D AIA A312 PERFORMANCE BOND 072226DR.pdf PDF
DFS1FD 03 30 00 CAST-IN-PLACE CONCRETE 072226DR - pdf.pdf PDF
DFS1FD 09 91 13 PAINTING 072226DR - pdf.pdf PDF
DFS1FD 00 03 00 FORM FOR GENERAL BID 072226DR - pdf.pdf PDF
DFS1FD 01 33 00 SUBMITTAL PROCEDURES 072226DR - pdf.pdf PDF
DFS1FD 02 60 00 UST EXCAVATION AND REMOVAL 072226DR - pdf.pdf PDF
DFS1FD 01 10 00 SUPPLEMENTARY REQUIREMENTS 072226DR - pdf.pdf PDF
DFS1FD 01 50 00 TEMPORARY FACILITIES AND CONTROLS 072226DR - pdf.pdf PDF
DFS1FD 01 00 00 GENERAL REQUIREMENTS 072226DR - pdf.pdf PDF
DFS1FD 31 22 70 SEDIMENTATION AND EROSION CONTROL 072226DR - pdf.pdf PDF
DFS1FD 01 78 39 PROJECT RECORD DOCUMENTS 0072226DR - pdf.pdf PDF
DFS1FD 00 08 00A SUPPLEMENTARY GENERAL CONDITIONS PART 1 072226DR - pdf.pdf PDF
DFS1FD 32 55 40 FUEL STORAGE TANK AND EQUIPMENT 072226DR - pdf.pdf PDF
DFS1FD 01 77 00 CONTRACT CLOSEOUT PROCEDURES 072226DR - pdf.pdf PDF
DFS1FD 01 26 00 CONTRACT MODIFICATION PROCEDURES 072226DR - pdf.pdf PDF
DFS1FD 31 20 00 EARTHWORK 072226DR - pdf.pdf PDF
DFS1FD 00 00 03 LIST OF DRAWINGS 072226DR - pdf.pdf PDF
DFS1FD 00 01 00 INSTRUCTIONS TO BIDDERS 072226DR - pdf.pdf PDF
DFS1FD 00 03 25A AIA A101 OWNER CONTRACTOR AGREEMENT 072226DR.pdf PDF
Show all 25

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DARTMOUTH FIRE STATION NO. 1

NEW FUEL DEPOT

DARTMOUTH, MASSACHUSETTS 22 JULY 2026

RT ARCHITECTS, INC.

SUPPLEMENTARY CONDITIONS

00 08 00B - PART 2

Pg. 1 of 4

SECTION 00 80 00B

SUPPLEMENTARY CONDITIONS - PART 2

PART 1 - GENERAL

A. Articles set forth under the SUPPLEMENTARY CONDITIONS - PART 2 are amendments to the GENERAL AND SUPPLEMENTARY CONDITIONS - PART 1, in the form of additions, deletions, or substitutions, as required to suit the particular project under this Contract. Any provisions of the basic Articles not so amended shall remain in effect.

ARTICLE 1 - GENERAL PROVISIONS

PARAGRAPH 1.1.4: Add the following:

1. The term “Project” means “Fire Station No. 1, New Fuel Depot, Dartmouth, Massachusetts” for which the construction work is contemplated in whole under this Contract.

PARAGRAPH 1.1.5: Add the following:

1. The term “Drawings” refer to those listed in the List of Drawings for the Project entitled “Fire Station No. 1, New Fuel Depot, Dartmouth, Massachusetts” which form part of the Contract.

PARAGRAPH 1.1.6: Add the following:

1. The terms “Specification” and “Specifications” mean the Specifications for the project entitled “Fire Station No. 1, New Fuel Depot, Dartmouth, Massachusetts”. The Specification includes the GENERAL CONDITIONS - PART 1 AND PART 2, List of Drawings, Divisions 00 through 33 inclusive of the detailed Specifications, and the forms of the following: 50% Labor and Materials or Payment Bond, and Contract.

ARTICLE 2 - OWNER

PARAGRAPH 2.1: Add the following:

2.1.3 The terms “Owner” and “Awarding Authority” mean the “Dartmouth Fire District No. 3, or its authorized representative.

Pg. 2 of 4

ARTICLE 3.6 - TAXES

PARAGRAPH 2.1: Add the following:

3.6.2 Payment of Massachusetts Sales Tax:

1. Materials to be incorporated into this project are not subject to the Massachusetts Sales Tax.

2. The Owner’s certificate of exemption from the Department of Corporation and Taxation shall be supplied by the Owner.

ARTICLE 11 - INSURANCE AND BONDS

FOLLOWING PARAGRAPH 11.4.10: Add the following which will be substitutions for corresponding articles in the GENERAL CONDITIONS.

11.4.11 CONTRACTOR’S INSURANCE AMOUNTS:

1. Before commencing performance of this Contract, the Contractor shall provide by insurance for payment of compensation and the furnishing of other benefits under MA.

G.L., Ch. 152 (the Workmen’s Compensation Law so-called) to all persons to be employed under this Contract and shall continue such insurance in full force and effect during the term of this Contract. Failure to provide and continue in force such insurance and aforesaid benefits shall be deemed a material breach of this Contract and shall operate as an immediate termination thereof at the election of the Owner. Said insurance shall be written with such company as may be acceptable to the Owner and the policy shall be submitted to the Owner for examination. Satisfactory certificates of said insurance shall be filed with the Owner, in duplicate, prior to the commencement of operations by the Contractor. The Contractor will be charged with the responsibility for proper and adequate workmen’s compensation coverage for all his subcontract operations under this bid, and in the event the Contractor’s policy does not cover each and every Sub-Contractor, certificates of insurance issued on policies by companies that may be acceptable to the Owner, covering each and every Sub-Contractor, shall be filed with the Owner prior to the commencement of such subcontract operations.

11.4.12 COMPREHENSIVE INSURANCE:

1. The Contractor shall carry Comprehensive General Liability Insurance (including Premise-Operations; Independent Contractors Protective; Products and Completed Operations; Broad Form Property Damage); including the Hampden Charter School of Science, Chicopee, Massachusetts, as an additional insured with respect to the work to be performed under the contract.

Pg. 3 of 4

a. The limits are not to be less than:

(1) Bodily Injury: $1,000,000 per occurrence.

(2) Property Damage: $1,000,000 per occurrence.

(3) Property Damage Liability Insurance shall be written on a Broad Form and shall include Explosion, Collapse, and Underground Hazards.

(4) Contractual Liability:

Bodily Injury: $1,000,000 per occurrence.

Property Damage: $1,000,000 per occurrence; $2,000,000 aggregate.

(5) Personal Injury with Employment Exclusion deleted: $2,000,000 aggregate.

b. Products and Completed Operations Insurance shall be maintained for a minimum period of six (6) years after final payment and the Contractor shall continue to provide evidence of such coverage to Owner on an annual basis during the aforementioned period.

2. The Contractor shall also carry Comprehensive Automobile Liability Insurance (owned, non-owned, hired).

a. The limits are to be not less than:

(1) Bodily Injury: $1,000,000 each person. $1,000,000 each accident.

(2) Property Damage: $1,000,000 each occurrence.

3. Other Insurance:

a. The Contractor will be charged with the responsibility for similar public liability and property damage insurance, as required under Subparagraph 1. of this Section for all of the subcontract operations and, in the event that the Contractor’s policy does not cover each and every Sub-Contractor, certificates of insurance issued on policies by companies that may be acceptable to the Owner covering each and every Sub-Contractor, shall be filed with the Owner prior to the commencement of such subcontract operations.

Pg. 4 of 4

b. The Contractor shall effect and maintain insurance against physical loss or damage by theft, vandalism and malicious mischief, fire, lightning, wind storm, cyclone, tornado, hail, explosion, riot, riot attending strike, aircraft, vehicle, and smoke damage upon all work not in place and all materials stored at the building site, whether or not covered by partial payments made by the Owner. The Owner will maintain insurance on all work in place. Work shall be considered to be in place if it is physically either built in, attached, anchored, secured, piped, wired, connected, or otherwise permanently affixed. This insurance shall be in an amount equal to the full insurable value thereof at all times and shall be for the benefit of the Owner, the Contractor, and each Sub-Contractor as their interest may respectively appear. This insurance shall be placed with such company or companies and, where practicable, re-insured with such other company or companies as may be acceptable to the Owner.

4. General:

a. In the event that the form of any policy or certificates of insurance required under this Contract or the amount thereof, if not especially specified herein, or the companies writing the same are not satisfactory to the Owner, the Contractor shall secure other policies or certificates in form and amount and with companies satisfactory to the Owner; the Contractor shall not cause any policies to be cancelled or permit them to lapse, and all insurance policies shall include a clause to the effect that the policy shall not be cancelled or changed.

END OF SECTION