This document contains a federal contract opportunity notice and a design review checklist for electrical systems. The contract opportunity is for design-build services to replace eight air handling units at the West Palm Beach Veterans Affairs Medical Center. Work includes designing, demolishing, and constructing new air handling systems, mixing boxes, filters, heating and cooling valves, actuators, dampers, and pneumatic controls. The magnitude of construction is estimated between $2 million to $5 million. The solicitation will be issued on May 12, 2021 via Beta.SAM.gov, with responses due June 14, 2021. The opportunity is set aside for service-disabled veteran-owned small businesses. The design review checklist provides items for reviewers to ensure electrical schematics, design development documents, and construction documents comply with applicable VA standards for electrical systems at new medical facilities.

View the file

Other files

File Type Posted
Attachment J Specialized Experience Information Sheet.docx DOCX document
36C24821R0082 0005.docx DOCX document
Questions and Answers.pdf PDF
36C24821R0082 0004.docx DOCX document
H3 Drawing.pdf PDF
36C24821R0082 0003.docx DOCX document
36C24821R0082 0002.docx DOCX document
36C24821R0082 Sign In Sheet_Redacted.pdf PDF
36C24821R0082 0001.docx DOCX document
1-H9R.pdf PDF
Attachment E VHA Directive 7712 FIRE PROTECTION CODE REVIEWS.pdf PDF
1-H106R.pdf PDF
1-H107.pdf PDF
1-H4R.pdf PDF
Attachment J Experience Information Sheet.pdf PDF
1-H32.pdf PDF
Design and Construction Procedures - Drawings.pdf PDF
Attachment L Architect Engineering Submission Instructions.pdf PDF
1-H48R.pdf PDF
Design and Construction Procedures - Piping Ducts and Electrical Conduits.pdf PDF
Attachment 1 AHU Unit(s) and Return Fan Expansion Detail Specifications.pdf PDF
1-H104.pdf PDF
Technical Information Library Specifications.pdf PDF
Attachment C CITP Statement of Work.pdf PDF
Attachment D Pre-Award Contractor Safety and Environmental Record Form.pdf PDF
36C24821R0082_1.pdf PDF
1-108R.pdf PDF
1-H110R.pdf PDF
1-57.pdf PDF
1-H106.pdf PDF
3-H3.pdf PDF
Attachment G Limitations on Subcontracting Offerors Certification.pdf PDF
Attachment H Project Price Breakdown.xlsx XLSX spreadsheet
1-106.pdf PDF
Attachment K PAST PERFORMANCE QUESTIONNAIRE.pdf PDF
1-H34.pdf PDF
1-H107R.pdf PDF
AHU Test and Balance Reports.pdf PDF
36C24821R0082_1.docx DOCX document
1-H105.pdf PDF
Attachment P Mask Specification.pdf PDF
Attachment A Wage Grade Determination FL20210220 04092021.pdf PDF
1-105.pdf PDF
AE Check List HVAC.pdf PDF
Design and Construction Procedures - Codes Standards and Executive Orders.pdf PDF
Design Review Checklist HVAC.pdf PDF
Attachment F Above Ceiling Permit 11-10-17.pdf PDF
HVAC Design Manual.pdf PDF
Attachment B West Palm Beach VAMC Campus Map.pdf PDF
1-H108.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

June 1, 2020

ELECTRICAL

Reviewers should - Use Checklists when reviewing any type of VA construction project for the following disciplines:

Architectural, Electrical, Heating, Ventilating, and Air Conditioning

(HVAC),

Incineration/Solid Waste, Plumbing, Fire Protection, and Sanitary, Site and Landscape, Steam Distribution, Steam Generation, and Structural.

Reviewers should - Ensure that A/E Submission Instructions

(PG-18-15) for Schematic, Design Development, and Construction Documents are followed for various types of VA construction projects.

Reviewers should - Ensure that every VA construction project is in compliance with all life safety issues.

Reviewers should - Be aware that these checklists are not all-inclusive but only provide minimum review items.

DESIGN REVIEW CHECKLIST

TITLE________________________________PROJECT NO. ______________

LOCATION___________________________________DATE ______________

REVIEWED BY ___________________________________________________

ORGANIZATION _________________________________________________

The reviewer should be thoroughly familiar with the following VA standards before conducting a design review. These are available on the CFM Internet Web site: https://www.cfm.va.gov/til

ITEM DESCRIPTION

1. DESIGN MANUALS (PG-18-10)

2. MASTER CONSTRUCTION SPECIFICATIONS (PG-18-1)

3. STANDARD DETAILS (PG-18-4)

4. DESIGN AND CONSTRUCTION PROCEDURES (PG-18-3)

5. DESIGN GUIDES (PG-18-12)

6. DESIGN ALERTS

7. A/E SUBMISSION INSTRUCTIONS, PROGRAM GUIDE (PG-18-15)

8. VA & CAD STANDARDS

GENERAL INFORMATION FOR REVIEWERS

NO. ELECTRICAL – SCHEMATICS ITEM

COMMENTS/

YES/NO/NA

1 General Provisions for New Buildings - In addition to items given below check all requirements for buildings, switchgear rooms, transformer rooms, elevator machine rooms, electrical closets, telecommunications rooms, etc. per Design and Construction Procedures Topic 8 and the Electrical Design Manual.

a. Dual means of egress from transformer vaults, switchgear rooms, switchboard (over 1200 amps) rooms and generator rooms or buildings.

b. Stack Electrical Closets and Telecommunications Rooms vertically. Telecommunication Rooms shall not be located adjacent to Electrical closets which have transformers.

c. Show quantity of electrical closets on a floor: Maximum distance of the farthest branch circuit to the nearest closet shall not exceed 75 ft.

d. All closets shall be free of columns inside.

e. Electrical rooms shall be located above grade and above the Base

Flood Elevation – Refer to Physical Security Design Manual.

Electrical rooms shall not be located beneath toilets, showers, laboratories, kitchens, sinks, open courtyards, planters, roof drain leaders, cooling towers, or other areas where water service is provided. Pipes containing liquids or gases shall not pass through these rooms.

f. Provide doors that open under simple pressure leading from the switchgear rooms, electrical rooms, transformer vaults, generator rooms and elevator machine rooms. The doors shall swing in the direction of exit travel.

SCHEMATICS

NO. ELECTRICAL – SCHEMATICS ITEM

COMMENTS/

YES/NO/NA

g. Emergency Feeder-circuit Wiring shall meet the fire rating requirements per NEC 700.

2 Electrical metering for buildings as required in the VA Electrical Design Manual.

3 Coordinate drawings with other technical disciplines 4 Compliance with VA National CAD Standard Application Guide and applicable National CAD Standard modules

NO. ELECTRICAL – DESIGN DEVELOPMENT ITEM

YES/NO/NA

1 All electrical rooms, transformer vaults and closets shall not be located directly below showers, laboratories, kitchens, dishwashing areas or other areas where water service is provided. Pipe containing liquids or gases shall not pass through these rooms. See Physical Security Design Manual.

2 Compliance to Design and Construction Procedures/ NEC/…

a. Requirements for Essential Electrical system distribution follow

NEC 517-30/517-40 and Electrical Design Manual.

b. Requirements for Primary and Secondary transformation and distribution equipment are per Electrical Design Manual.

c. Receptacles, mounting heights as required in different areas (see Electrical Design Manual)

d. Raceways required in Fluoroscopic, Radiographic and Deep Therapy rooms (see Electrical Design Manual).

e. Raceway systems as required in Electrical Design Manual.

(1) All wiring shall be installed in raceways.

(2) Underground raceways shall be encased in concrete.

3 Alarms: Nonflammable medical gas and medical- surgical vacuum systems. See Electrical Design Manual and NFPA 99.

a. Master alarm panels required at the telephone switchboard and engineering control center or boiler plant.

b. Area alarms provided at nurses’ stations where medical gas systems are installed.

4 Miscellaneous Alarms (see Electrical Design Manual), such as Blood Bank refrigeration, Medical Gas System Alarm and others.

5 Electrical sub-metering equipment as required by the Electrical Design Manual, and sustainability requirements.

6 Lightning Protection System: See Electrical Design Manual.

DESIGN DEVELOPMENT

NO. ELECTRICAL – DESIGN DEVELOPMENT ITEM

COMMENTS/

YES/NO/NA

7 Fire Alarm Systems: See Fire Protection Design Manual 8 Coordinate drawings with other technical disciplines 9 Compliance with VA National CAD Standard Application Guide and applicable National CAD Standard modules.

NO. ELECTRICAL – CONSTRUCTION DOCUMENTS ITEM

YES/NO/NA

1 Requirements for Essential and Standby Electrical System distribution

- follow Electrical Design Manual.

2 Requirements for primary and secondary transformation and distribution equipment (see Electrical Design Manual).

3 Receptacles, mounting heights as required in different areas (see Electrical Design Manual).

4 Raceways required in Fluoroscopic, Radiographic and Deep Therapy rooms (see Electrical Design Manual).

5 Raceway systems (see Electrical Design Manual):

a. Install all wiring in raceways.

b. Encase underground raceways in concrete.

6 Alarms: Nonflammable medical gas and medical- surgical vacuum systems (see Electrical Design Manual) and NFPA 99:

a. Master alarm panels required at the Telephone Console Room and Engineering Control Center.

b. Area alarms provided at nurses’ stations where medical gas systems are installed.

7 Miscellaneous Alarm Systems (see Electrical Design Manual): Blood Bank refrigeration, Medical Gas System Alarm and others.

8 Lightning Protection System: (see Electrical Design Manual).

9 Fire Alarm Systems: See Fire Protection Design Manual 10 Coordinate drawings with other technical disciplines 11 Compliance with VA National CAD Standard Application Guide and applicable National CAD Standard modules

CONSTRUCTION DOCUMENTS