Attachment F Above Ceiling Permit 11-10-17.pdf

PDF 82 KB Posted

Attached to
Z2DA--Design Build Replace Air Handling Units 9, 15, 17, 24, 28, 29, 34, and 39
Solicitation number
36C24821R0082
Issued by

About this file

This document contains an above ceiling permit and details of a federal contract opportunity for design-build services. The above ceiling permit is issued by the Department of Veterans Affairs Medical Center West Palm Beach and applies to outside contractors working on projects that could impact fire and smoke walls. It requires final inspection of areas above ceilings and confirmation that no unauthorized penetrations exist.

The related federal contract opportunity is being issued by the Department of Veterans Affairs Network Contracting Office 8. It involves the design and replacement of eight air handling units at the West Palm Beach VA Medical Center that have reached the end of their useful life. Design-build services are required for demolition and construction of new air handling systems and controls. The estimated value is between $2-5 million. The solicitation will be issued on May 12, 2021 with a response due date of June 14, 2021. The requirement is set aside for Service-Disabled Veteran-Owned Small Businesses.

View the file

Other files

File Type Posted
Attachment J Specialized Experience Information Sheet.docx DOCX document
36C24821R0082 0005.docx DOCX document
Questions and Answers.pdf PDF
36C24821R0082 0004.docx DOCX document
H3 Drawing.pdf PDF
36C24821R0082 0003.docx DOCX document
36C24821R0082 0002.docx DOCX document
36C24821R0082 Sign In Sheet_Redacted.pdf PDF
36C24821R0082 0001.docx DOCX document
1-H9R.pdf PDF
Attachment E VHA Directive 7712 FIRE PROTECTION CODE REVIEWS.pdf PDF
1-H106R.pdf PDF
1-H107.pdf PDF
1-H4R.pdf PDF
Attachment J Experience Information Sheet.pdf PDF
1-H32.pdf PDF
Design and Construction Procedures - Drawings.pdf PDF
Attachment L Architect Engineering Submission Instructions.pdf PDF
1-H48R.pdf PDF
Design and Construction Procedures - Piping Ducts and Electrical Conduits.pdf PDF
Attachment 1 AHU Unit(s) and Return Fan Expansion Detail Specifications.pdf PDF
1-H104.pdf PDF
Technical Information Library Specifications.pdf PDF
Attachment C CITP Statement of Work.pdf PDF
Attachment D Pre-Award Contractor Safety and Environmental Record Form.pdf PDF
Design Review Check List Electrical.pdf PDF
36C24821R0082_1.pdf PDF
1-108R.pdf PDF
1-H110R.pdf PDF
1-57.pdf PDF
1-H106.pdf PDF
3-H3.pdf PDF
Attachment G Limitations on Subcontracting Offerors Certification.pdf PDF
Attachment H Project Price Breakdown.xlsx XLSX spreadsheet
1-106.pdf PDF
Attachment K PAST PERFORMANCE QUESTIONNAIRE.pdf PDF
1-H34.pdf PDF
1-H107R.pdf PDF
AHU Test and Balance Reports.pdf PDF
36C24821R0082_1.docx DOCX document
1-H105.pdf PDF
Attachment P Mask Specification.pdf PDF
Attachment A Wage Grade Determination FL20210220 04092021.pdf PDF
1-105.pdf PDF
AE Check List HVAC.pdf PDF
Design and Construction Procedures - Codes Standards and Executive Orders.pdf PDF
Design Review Checklist HVAC.pdf PDF
HVAC Design Manual.pdf PDF
Attachment B West Palm Beach VAMC Campus Map.pdf PDF
1-H108.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Date of last revision 11/10/17

Department of Veterans Affairs Medical Center West Palm Beach

Construction Safety Program

ABOVE CEILING PERMIT

This purpose of this permit is to ensure the integrity of fire and smoke walls within the scope of work.

Outside contractors are to report any existing penetrations to the Medical Center COR or Project

Supervisor for correction. Project CORs/Supervisors are to conduct a final inspection above the ceiling, complete and return this permit to the Safety office for review by the Construction Safety Committee.

Issued by: ___________________________________ Date: _____________________________

Issued to: _______________________________________________________________________ (FMS/ITOPS/Other Service Project Supervisor responsible for inspection of above ceiling)

This portion is to be completed by the COR/Project Supervisor. This permit applies only to the area and for the date(s) specified:

Permit issued for: Building:________Floor:_________Room(s):________________________

*****If issued for the Community Living Center: Has Contractor/Project Supervisor confirmed chemicals to be used above the ceiling are safe for CPVC/PVC sprinkler components? Y N

Dates permit is valid: _______________________________________

Project # and Name:______________________________________________________________

Description of Project:

FINAL INSPECTION

The final above ceiling inspection for this project is complete and no penetrations exit. All existing penetrations have been n correctly and completed sealed as required by wall construction.

Building:_____Floor:_____ Room(s):________________________ Inspection Date:_________

Inspected By:__________________________________________________________________ (PRINT AND SIGN NAME - COR/FMS/OIT Project Supervisor)

Received by Occupational Safety and Health: _______________________________________

(NAME AND DATE)

Date submitted to the Construction Safety Committee: ________________________________

File details come from the government source that posted it. Updated .