Attachment J Specialized Experience Information Sheet.docx

DOCX document 23 KB Posted

Attached to
Z2DA--Design Build Replace Air Handling Units 9, 15, 17, 24, 28, 29, 34, and 39
Solicitation number
36C24821R0082
Issued by

About this file

This document contains a specialized experience information sheet and details of a related federal contract opportunity for design-build services. The opportunity involves replacing eight air handling units at the West Palm Beach Veterans Affairs Medical Center, with a construction value between $2 million and $5 million. Interested parties must submit the experience sheet demonstrating relevant past performance on four projects as a prime contractor or subcontractor. The design-build contract will be awarded on a firm-fixed-price basis, and is set aside for Service-Disabled Veteran-Owned Small Businesses. The solicitation will be issued on May 12, 2021, with responses due June 14, 2021. The work will be overseen by the Department of Veterans Affairs Network Contracting Office 8 located in Tampa, Florida.

View the file

Other files

File Type Posted
36C24821R0082 0005.docx DOCX document
Questions and Answers.pdf PDF
36C24821R0082 0004.docx DOCX document
H3 Drawing.pdf PDF
36C24821R0082 0003.docx DOCX document
36C24821R0082 0002.docx DOCX document
36C24821R0082 Sign In Sheet_Redacted.pdf PDF
36C24821R0082 0001.docx DOCX document
1-H9R.pdf PDF
Attachment E VHA Directive 7712 FIRE PROTECTION CODE REVIEWS.pdf PDF
1-H106R.pdf PDF
1-H107.pdf PDF
1-H4R.pdf PDF
Attachment J Experience Information Sheet.pdf PDF
1-H32.pdf PDF
Design and Construction Procedures - Drawings.pdf PDF
Attachment L Architect Engineering Submission Instructions.pdf PDF
1-H48R.pdf PDF
Design and Construction Procedures - Piping Ducts and Electrical Conduits.pdf PDF
Attachment 1 AHU Unit(s) and Return Fan Expansion Detail Specifications.pdf PDF
1-H104.pdf PDF
Technical Information Library Specifications.pdf PDF
Attachment C CITP Statement of Work.pdf PDF
Attachment D Pre-Award Contractor Safety and Environmental Record Form.pdf PDF
Design Review Check List Electrical.pdf PDF
36C24821R0082_1.pdf PDF
1-108R.pdf PDF
1-H110R.pdf PDF
1-57.pdf PDF
1-H106.pdf PDF
3-H3.pdf PDF
Attachment G Limitations on Subcontracting Offerors Certification.pdf PDF
Attachment H Project Price Breakdown.xlsx XLSX spreadsheet
1-106.pdf PDF
Attachment K PAST PERFORMANCE QUESTIONNAIRE.pdf PDF
1-H34.pdf PDF
1-H107R.pdf PDF
AHU Test and Balance Reports.pdf PDF
36C24821R0082_1.docx DOCX document
1-H105.pdf PDF
Attachment P Mask Specification.pdf PDF
Attachment A Wage Grade Determination FL20210220 04092021.pdf PDF
1-105.pdf PDF
AE Check List HVAC.pdf PDF
Design and Construction Procedures - Codes Standards and Executive Orders.pdf PDF
Design Review Checklist HVAC.pdf PDF
Attachment F Above Ceiling Permit 11-10-17.pdf PDF
HVAC Design Manual.pdf PDF
Attachment B West Palm Beach VAMC Campus Map.pdf PDF
1-H108.pdf PDF
Show 40 more

Latest 50 of 54 listed here. See the rest on GovTribe.

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SPECIALIZED EXPERIENCE INFORMATION SHEET

SPECIALIZED EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 1 Must have a total of four (4) projects, more than 4 will not be evaluated; less than 4 may result in a lower rating.

a. Contractor Information of awarded contract (Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)

b. Contract and/or Task Order Number and Award Date (mm/dd/yyyy)

c. Project Title/Name and Location

d. Work Performed as: Prime Contractor, Subcontractor

e. Percent (%) of project work performed by your company

f. If you work as subcontractor, who was the prime?

(Firm Name, Address, DUNS Number and Cage Code, Phone number, POC Name, POC email, Company email)

g. Government Agency/Company which awarded contract to offeror, and Contact Information, such Contracting Officer/Procurement Official/Point of Contract (Name, Title, Email, Phone Number).

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 2

h. Description of project’s scope of work and the offeror’s specific roles and responsibilities in the project: Describe work performed in sufficient detail to permit evaluation of project relevancy to this procurement. Detail how work performed is relevant to the effort required by the solicitation? Use continuation sheet for additional information, if necessary.

EXPERIENCE INFORMATION SHEET

PROJECT NO. [ ] Page 3

i. Describe any difficulties and/or obstacles encountered during performance; steps taken toward resolution.

j. Describe unforeseen conditions and how each were resolved.

k. Performance Period, including contract start date (mm/dd/yyyy), and original completion date, if not completed, projected date (mm/dd/yyyy) contract start date:

Original completion date, if not completed, projected completion date (mm/dd/yyyy)

l. Actual Completion Date (mm/dd/yyyy), and if not completed, why?

Actual Completion Date:

If not completed, Why?

m. Project is complete? YES [ ] No [ ]. If “No” explain percentage of completion, if not completed for any reason, rating may be lower.

n. The Offerors shall indicate if any of the contracts listed were terminated and the type and reasons for the termination.

o. Original Contract Price (Award Amount), Final Contract Price (to include all modifications, if applicable), Explain Differences.

Original Contract Price: Final Contract Price:

Explain Differences:

Section h. Continuation Page 36C24821R0082